CN1048065C CN 93103251 CN93103251A CN1048065C CN 1048065 C CN1048065 C CN 1048065C CN 93103251 CN93103251 CN 93103251 CN 93103251 A CN93103251 A CN 93103251A CN 1048065 C CN1048065 C CN 1048065C
Authority
CN
China
Prior art keywords
coordinate
cylindrical shell
door frame
barrel
lift
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 93103251
Other languages
Chinese (zh)
Other versions
CN1078286A (en
Inventor
周信法
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Energy Engineering Group Shanxi No3 Electric Power Construction Co Ltd
Original Assignee
China Energy Engineering Group Shanxi No3 Electric Power Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Energy Engineering Group Shanxi No3 Electric Power Construction Co Ltd filed Critical China Energy Engineering Group Shanxi No3 Electric Power Construction Co Ltd
Priority to CN 93103251 priority Critical patent/CN1048065C/en
Publication of CN1078286A publication Critical patent/CN1078286A/en
Application granted granted Critical
Publication of CN1048065C publication Critical patent/CN1048065C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The present invention relates to a construction method for constructing a concrete cylinder body without a headframe or a scaffold. The present invention is characterized in that a lift-type door frame is attached to the cylinder wall of the cylinder body and is provided with a lifting device which is matched with the cylinder body to increase height; the door frame can be lifted along the cylinder wall and has the function of a vertical headframe; an operating platform and a template system are suspended on the cylinder wall to follow the pouring operation and the solidifying operation of the concrete of each circle of the cylinder body to rotate from bottom to top to be lifted to perform the function of the scaffold; the coordinate centering method is adopted to control the construction center of the cylinder body not to offset, etc. The present invention is suitable for the construction of the concrete cylinder body of any height, and the headframe and the scaffold are saved. Thereby, steel materials are saved, and the economic benefit is obvious.

Description

The building method of concrete barrel
The invention belongs to building field, relate to the concrete barrel building method, be applicable to the building of the concrete barrel of any height, the building as chimney, high pressure stringing tower, TV transmission tower etc. does not need to run derrick and scaffold.
Prior art concrete barrel construction method generally is to run derrick, erecting under the scaffold condition, adopting the sliding formwork method, carry modulus method, job practicess such as turnover panel method.
A kind of building concrete chimney stack method SU1441038 is disclosed as the Soviet Union, establishing central authorities in its stack shell runs derrick, and pursue joint and set up, it is long to take man-hour, though running derrick, perpendicular central authorities lack than the steel quantity consumption that runs derrick outward, but also need considerable steel material, and steel using amount increases and increases along with the concrete barrel design height.Adopt the interior working platform of mechanical lifting mechanism, play perpendicular interior scaffold effect, but cylinder body outer wall does not have working platform, the constructor props up template, when tying up reinforcing bar, operates extremely inconvenience, uneasy again congruent weak point outside cylindrical shell.
And for example France discloses a kind of reinforcement concrete chimney construction method 2587393, and it adopts and carries modulus method, and its vertical transport adopts hydraulic test to promote, and costs an arm and a leg.
At present still disputable to the construction quality of slip-form construction method, be prone to scalelike mark as the concrete barrel inwall, outer wall causes transverse crack easily or S distortion etc. occurs, influences the concrete barrel quality.
Comprehensively above-mentioned, there is main weak point in prior art:
1. generally adopt and run derrick, erect scaffold, need to consume great deal of steel, one-time investment is big;
2. the employing hydraulic test that has promotes, and costs an arm and a leg;
3. the construction quality of slip-form construction method remains in some problems etc.
Purpose of the present invention, for overcoming present technical deficiency part, a kind of job practices of building concrete cylindrical shell is provided, i.e. employing is adhered to the lift-type door frame and is replaced running derrick, and adopts the suspension type operating platform to replace perpendicular scaffold, employing turnover panel job practices etc., thereby saved the great deal of steel that runs derrick and consumed, saved the expensive investments of hydraulic lifting device, and construction safety has been arranged, advantage such as quality is good.
Technical scheme of the present invention: employing is adhered to the lift-type door frame and is replaced running derrick; Adopt place's two circle suspension type operating platforms replacement scaffolds (comprising suspension type tripod and typing frame plate) in the cylindrical shell; The job practices of concrete barrels such as the turnover panel construction method of employing unit combination template system and employing centering platform coordinate centralising device.Adhere to the lift-type door frame attached on the barrel of building the concrete barrel that solidifies, door frame uses lifting appliance can cooperate cylindrical shell to build height, promotes by joint; Template system along with the concrete pouring of the every circle of cylindrical shell, solidify, from bottom to top have enough to meet the need turnover panel method construction; Adopt coordinate centering method to control and build cylindrical shell center non-migration.Work progress is: pouring → lifting → pouring again → promote again, until being built into the barrel designs height.
The major advantage of the building method of concrete barrel of the present invention:
1, building method of the present invention is applicable to the building of the concrete barrel of any height, as buildings such as chimney, high pressure stringing tower, TV transmission tower, do not need to run derrick, do not need scaffold, as adhere to the lift-type door frame, use lifting appliance, can cooperate cylindrical shell to build height, can promote by joint, replaced running derrick, played the effect that runs derrick.
2, one-time investment is few, saves steel, and economic benefit is remarkable especially.Make one and adhere to the lift-type door frame, only need about 3 tons of steel, add template etc. again and need 4.2 ten thousand yuan altogether, more than run derrick or sliding formwork instrument and pole-climbing steel quantity consumption few.Just need 5.3 ten thousand yuan and erect 150 meters high derricks, adding steel sliding formwork, hydraulic test etc. again needs 26.3 ten thousand yuan altogether, 4.3 times of saving funds, and chimney of electric plant uses building method of the present invention up to 270 meters at present, and saving steel and fund are more remarkable.
3, job practices tube list of the present invention, easily grasp, the artificial easily control of construction quality.Adopt coordinate centering method as the cylindrical shell center, control and guarantee cylindrical shell building center non-migration.Template system and for example, adopt the unit template, artificial available adjustment template is adjusted the width and the gradient, mesh tightly not spillage between template, the seam crossing concrete surface is smooth etc. between upper and lower two-layer template, manually according to after the concrete setting by the joint reverse mould, can not look like slip-form construction method, take place easily that S reverses, scalelike mark etc. influences construction quality.
4, construction safety is reliable, and mechanical accident is few, and safety factor is big.As adopting inside and outside two-layer lapful safety net, the inside and outside wall of cylindrical shell is provided with two operating platforms, railing, handrail etc.Also adopt double joint wire rope, hoisting rope, its safety factor is multiple safety precautions such as 14 times.
5, facility of the present invention is as adhering to the lifting door frame, compact conformation, and it is little to take the construction plant, is specially adapted to the narrow and small structure engineering construction in place.
6, construction techniques of the present invention is more simple to operate than construction methods such as sliding formworks, and general skilled worker just can grasp, and the saving of labor, saves time, so this method unit in charge of construction is willing to adopt, broad prospect for its application is arranged.
Be the accompanying drawing of technical solution of the present invention below:
Fig. 1, the present invention adhere to lift-type door frame general assembly schematic diagram;
Fig. 2, the present invention adhere to lift-type door frame olecranon column assembly drawing;
Fig. 3, the present invention adhere to lift-type door frame truss elevation;
Fig. 4, the present invention adhere to lift-type door frame A-A sectional view;
Fig. 5, the present invention adhere to lift-type door frame lower pillar stand and adhere to the barrel scheme of installation;
Fig. 6, the present invention adhere to lift-type door frame lifting appliance and promote schematic diagram;
Fig. 7, the present invention adhere to lift-type door frame suspension type operating platform schematic diagram;
Fig. 8, the present invention adhere to lift gate shut die plate system connection diagram are installed;
Fig. 9, the present invention adhere to lift gate rack coordinate centralising device and form schematic diagram;
Each component names list of the building method of table one, concrete barrel of the present invention and the facility that uses:
Elevating hopper 2 cages 3 hoisting ropes 4
Pulley 5 remarkable suspension bridge 7 concrete catch gutters 8
Tripod 9 A type hanging baskets 10 typing scaffold floors 11
Railing 12 safety nets 13 templates 14
Concrete barrel 15 left columns 16 right columns 17
Truss 18 upper pillar stands 19 lower pillar stands 20
Flange 21 U type shroud rings 22 studs 23
Olecranon crossbeam 24 centering platforms 25 hounds 26
Junction plate 27 slotted holes 28 bolts 29
Steel shoulder pole 30 jacks 31 bottom bars 32
Central security vertical shaft 33 flexible dragline 34 column braces 35
Column horizon bar 36 gusset plates 37 elongated slot steel 38
Short channel-section steel 39 positive stop blocks 40 wind up 41
Lower edge 42 diagonal web members 43 horizon bars 44
Vertical rod 45 hollow cushion block 46 junction plates 47
Electric operation platform 48 reinforcing bars 49 enclose purlin 50
Bearing diagonal 51 vertical support 52 handrails 53
Vertical rod 54 tripod braces 55 tripod horizon bars 56
Riding, coordinate system 58 lines weigh down 59 on the iron 57
Coordinate 61 viscous liquids 62 under the cotton rope 60 sides barrel formula
Channel-section steel Y-axis 63 angle steel X-axis 64 lines weigh down and hang 65
Strip hole 66 positioning bolts 67 scales 68
The feature of introducing construction techniques of the present invention below in conjunction with accompanying drawing is as follows:
A kind of building method of concrete barrel adopts and adheres to lift-type door frame, operating platform and template system, and the three builds height with cylindrical shell and constantly promotes, and meanwhile toward placing of concrete between inner and outer template, sheds template then, it is characterized in that:
1, adheres to lift-type door frame such as Fig. 1, on its left and right column (16), (17) inside and outside wall attached to the barrel (15) of cylindrical shell, respectively use lifting appliance (as Fig. 6) on left and right column (16), (17), cooperate cylindrical shell to build height, door frame can promote by joint along barrel (15), so be called and adhere to the lift-type door frame, play the effect of running derrick;
2, all use operating platform inside and outside the barrel of cylindrical shell, operating platform such as Fig. 2.On the barrel (15) of installation attached to concrete barrel, along with the concrete pouring of the every circle of cylindrical shell, solidify, from bottom to top turnover promotes the scaffold effect that plays;
3, template (14) is made up of some groups of unit template levels, and two-layer up and down template connects with U type shroud ring (22);
4, adopt coordinate centering method to control the center non-migration of building cylindrical shell.
Below in conjunction with drawings and Examples, describe the feature and the application of building method of the present invention and employed key facility in detail.
1. adhere to the lift-type door frame shown in Fig. 1,2,3,4,5,6.
1). constitute: mainly by left and right column (16), (17), formations such as truss (18) lifting appliance, left and right column (16), (17) are radially relative, respectively attached on cylindrical shell (15) inside and outside wall, truss (18) two ends are connected with olecranon crossbeam (24) on left and right column (16), (17) top, truss (18) can be gone up the along continuous straight runs slippage at olecranon crossbeam (24), two groups of lifting appliances are located at respectively in left and right column (16), (17), the fulcrum of lifting appliance is on barrel, along with the high synchronous operation of building of cylindrical shell, make door frame pursue joint and evenly promote.
2). central security vertical shaft (33), centering platform (25), elevating hopper (2), cage (3) are adopted in the door frame center.Cage (3) is driven by hoisting machine, does vertical-lift by pulley (5), hoisting rope (4), flexible dragline (34) in cylindrical shell separately, uses for concrete, reinforcing bar vertical transport and upper and lower the transporting of constructor.And adopt inside and outside lapful safety net (13) as shown in Figure 1.
Elevating hopper (2) promotes, and is power with automatically controlled fast winch, and upper and lower side is provided with lead limit switch control hoisting depth, prevents roof fall.After elevating hopper (2) promoted, concrete flow in the dolly of operating platform by chute (8).
The constructor is promoted by cage (3) up and down, and cage (3) is provided with fixture block and safety device.Hoisting rope (4) adopts the double joint wire rope, and safety factor is 14 times, and range limiter is all arranged up and down.When promoting cage (3), hoist engine is selected middling speed for use.Cage (3) and hopper (2) the stable two flexible draglines (34) that are subjected to are up and down controlled.On the upper pillar stand (19) of left and right column (16), (17), be provided with remarkable suspension bridge (7), the setting height(from bottom) of remarkable suspension bridge (7) is consistent with cage (3).
3). the left and right column (16), (17) that adhere to the lift-type door frame divide upper pillar stand (19) and lower pillar stand (20) two parts as shown in Figure 2, and upper and lower column (19), (20) are with flange (21) connection.Seamless steel pipe is adopted in left and right column (16), (17), and steel pipe generally is not less than 108 * 4.5 millimeters of Φ, and height can not be less than 12 meters, and wherein lower pillar stand (20) highly is 6 meters.
Upper pillar stand (19) is made up of four root posts and some braces (35), horizon bar (36), gusset plate (37), each brace (35), horizon bar (36) are welded on the outer tube wall of column at a certain distance by gusset plate (37), four root posts are unified, it highly is the lifting safe altitude of elevating hopper (2) or cage (3), is generally about 6 meters.Upper pillar stand (19) is provided with electric operation platform (48), and railing (12) and handrail (53) are arranged on the electric operation platform (48).
Four root posts of lower pillar stand (20) are fixedly attached to U type shroud ring (22) and stud (23) on the inside and outside wall of cylindrical shell (15) (as shown in Figure 5).
Olo L is greater than the maximum ga(u)ge and inside and outside construction formwork (14) the thickness sum of cylindrical shell (15) between four root posts.When cylindrical shell (15) when wall thickness diminishes, can between lower pillar stand (20) and template (14), fill up graving piece, to adapt to the variation of wall thickness.
The length that lower pillar stand (20) is clamped cylindrical shell (15) is the height of 4 layers of template (14), promptly about 6 meters, wherein 4.5 meters are fastened on the cylindrical shell of placing of concrete (15), and 1.5 meters is the empty mould (as shown in Figure 1) that firm mounted template (14) is prepared placing of concrete.If a joint template height considers that then lower pillar stand (20) is separately fixed on the concrete barrel (15) in existing 72,48 and 24 hour age phase by on average constructing every day.
4). olecranon crossbeam (24) is unified into crossbeam by two elongated slot steel (38), some short channel-section steels (39) and positive stop block (40) as shown in Figure 2.Crossbeam (24) is contained on upper pillar stand (19) top of left and right column (16), (17).Hound (26) upper end is welded on the junction plate (27) of crossbeam (24), and the other end is provided with slotted hole (28), and hound (26) is connected on the outer tube wall of upper pillar stand (19) with bolt (29).Hound (26) plays a supportive role to olecranon crossbeam (24).
5), respectively use lifting appliance (as shown in Figure 6) in left and right column (16), (17).Lifting appliance comprises a steel shoulder pole (30), two jacks (31), be placed on to steel shoulder pole (30) horizontal symmetrical cylindrical shell (15) and go up the plane, two jacks (31) are hung in the two ends of steel shoulder pole (30), the lower end of jack (31) is held respectively on the bottom bar (32) of lower pillar stand (20), and the fulcrum of lifting appliance is on barrel.
The door frame lifting is in proper order: elevating hopper (2) and cage (3) are drop on the bottom cross bar (32) of melt pit → loosen flexible dragline (34) → two jacks (31) lower end is hung in lower pillar stand (20) → lemon pine stud (23) unclamps U type shroud ring (22) → pulling jack (31), left side with door frame, right column (16), (17) lower pillar stand (20) is promoted to simultaneously equably needs height, soon door frame rises to and requires highly → tighten stud (23), U type shroud ring (22) in the middle of fixing, and bottom U type shroud ring (22) moved to top and fix tightly → tighten flexible dragline (34) (by elastic force dynamometer control tension force, every dragline tension force is about 1.5 tons).
6), truss (18) is shown in Fig. 3,4, form by wind up (41), lower edge (42), diagonal web member (43), horizon bar (44), vertical rod (45), gusset plate (37), junction plate (47) etc., wind up (41) of truss (18) are to be welded on the junction plate (47) by two angle steel, lower edge (42) by two angle steel with horizon bar (44) uniformly lattice be linked to be rectangle integral body, diagonal web member (43) be welded in wind up (41) and the junction plate (47) of lower edge (42) on.Diagonal web member (43), horizon bar (44), gusset plate (37) connect into cross section whole truss triangular in shape, vertical rod (45) be welded on wind up (41) and the gusset plate (37) of lower edge (42) two ends on.The two ends of the lower edge (42) of truss (18) are parallel to be put on the olecranon crossbeam (24) of left and right column (16), (17), diminishes and the needs of barrel slope change according to barrel diameter, and truss (18) can be in the horizontal direction slippage of olecranon crossbeam (24).
2, the suspension type operating platform is shown in Fig. 1,7:
1), forms: comprise a cover A type hanging basket (10), two cover typing scaffold floors (11), three cover tripods (9), railing (12), handrail (53) etc., be suspended on respectively on the inside and outside wall of cylindrical shell (15), constitute the inside and outside two ring manipulation platforms of cylindrical shell (15).In addition, setting up remarkable suspension bridge (7) between the upper pillar stand (19) of central security vertical shaft (33) and right column (17), between the upper pillar stand (19) of central security vertical shaft (33) and left column (16), also setting up concrete catch gutter (8) etc. and replace scaffold.The suspension type operating platform adheres on the cylindrical shell (15) that is installed in certain intensity, relies on the shearing resistance of concrete intensity of cylindrical shell (15) and stud (23), live load and quiet lotus when bearing construction.
2), A type hanging basket (10) is welded into round steel, the upper end hangs on the tripod horizon bar (56), shop, lower end normal wood scaffold floor is form removal, stifled bolt hole usefulness, its circumferential distance is the wide twice of unit template.
3), safety net (13) is shown in Fig. 1,7.Adopt inside and outside lapful safety net, on the A type hanging basket (10) of cylindrical shell (15) outer wall and railing (12), be equipped with peripheral safety net, outside the hole of elevating hopper (2) and cage (3) operation is removed in the inside of cylindrical shell (15), completely hang inner ring safety net (13).The lapful safety net promotes with inner and outer template (14), personal safety when guaranteeing construction operation.
4), typing scaffold floor (11) is shown in Fig. 7,8.Form inside and outside two ring manipulation platforms with the male and female insertion.Typing scaffold floor (11) is placed on the horizon bar (56) of tripod (9), and the lumps of wood of typing scaffold floor (11) stretches out horizon bar more than (56) 20 centimetres.Vertical support (52) withstands on tripod horizon bar (56) below, guarantees the stable of upper strata operating platform.
5), tripod (9) is made up of vertical rod (54), brace (55), horizon bar (56), horizon bar (56) is provided with some holes, brace (55) upper end is fixed in the hole of horizon bar (56), can make horizon bar (56) maintenance level, vertical rod (54) is by the fixing inner and outer template (14) and enclose purlin (50) of split bolt (23), with the empty mould non-migration that guarantees to install, horizon bar (56) supporting and shaping scaffold floor.
6), suspension type operating platform sequence of construction is: tear internal mold open, internal mold is installed → tie up reinforcing bar → tear external mold, plug-hole swabbing open, external mold be installed → tear inside and outside tripod open, inside and outside tripod be installed → dismounting typing scaffold floor, typing frame plate → peace accommodation rail and safety net → placing of concrete → lifting A type hanging basket are installed.
3, template system, as shown in Figure 8.Enclosing purlin (50), hollow cushion block (46), stud (23) etc. by steel form (14), steel forms.Steel form (14) is to be made of some groups of unit templates, and every group of unit template adopts five standard forms (1500 * 200 centimetres) and an adjusting template to form, and adjusts the template width and the gradient with regulating template.Template one end is established circular hole, and the other end is established slotted hole, so that can both be connected firmly with U type shroud ring (22) in any position between the upper and lower two-layer template, makes upper and lower two-layer template joint concrete surface smooth.
It is to make with channel-section steel that steel encloses purlin (50), establishes three roads in every module unit template (14) outside and encloses purlin (50), and template (14) is indeformable during with the assurance placing of concrete.
Inner and outer template (14) two butt joint places use the iron (57) of riding to control the radial spacing of reinforcing bar (49), and with stud (23) tripod (9) and template (14) are fused with hollow concrete cushion block (46) application cylinder wall thickness.Bolt (23) is extracted repeated use when form removal, bolt hole stops up with cement mortar.
4, coordinate centralising device, as shown in Figure 9.
1), form and annexation: mainly comprise the last coordinate system (58) that can the four directions moves, line weighs down (59), cotton rope (60), coordinate (61) under side's bucket formula, positioning bolt compositions such as (67), last coordinate system (58) is fixed on the centering platform (25), the X of coordinate (61) under side's bucket formula, the Y-axis line is parallel to each other, on, following coordinate (58), (61) be fixed in the building on cylindrical shell (15) ground in the heart, line weighs down (59) are suspended on coordinate system (58) with cotton rope (60) Y-axis (63) central point (65), in the viscosity liquid (62) under line bob (59) side of droping to bucket formula in the coordinate (61), on, following coordinate (58), (61) mark corresponding scale (68) respectively, the X-axis (64) of last coordinate system (58), be equipped with strip hole (66) on the Y-axis (63), be equipped with strip hole (66) on the Y-axis (63), Y-axis (63) can go up at centering platform (25) along strip hole (66) and do cubic moving, to determine the building center of cylindrical shell (15) on centering platform (25).
2), go up coordinate system (58) with two angle steel be X-axis (64) secured in parallel on centering platform (25), be Y-axis (63) with a channel-section steel, vertically lie on two angle steel X-axis (64), channel-section steel Y-axis (63) can move in Y direction along strip hole (66).And can move in X-axis (64) direction along the strip hole (66) of angle steel X-axis (64).
3), fill viscosity liquid (62) in the coordinate (61) under side's bucket formula, this liquid weighs down (59) to line adhesion, can make line weigh down (59) stops swinging as early as possible to static, four peripheries of side's bucket, relatively constitute X, the Y-axis of coordinate down in twos, four peripheral subscripts are marked with X, Y-axis (64), (63) the corresponding coordinate scale (68) with last coordinate (58).
5. coordinate centering method: the building concrete cylindrical shell is being built in the high work progress by joint, must control cylindrical shell (15) building center non-migration.The present invention adopts coordinate centering method, uses centering platform (25) and coordinate centralising device.Centering platform (25) fixedly is suspended on the center of truss (18) by steelframe, and the level height of the flat upper surface of centering platform (25) is consistent with the last plane of template system.
Two angle steel X-axis (64) of the last coordinate (58) of coordinate centralising device are fixed on the centering platform (25), coordinate centering method is weighed down (59) when static by the line of coordinate centralising device, the cotton rope (60) at the peripheral horizontal plane of bucket place, the side of measuring is at the off-centered scale of X, Y-axis (68) of coordinate (61), by the operating personnel on the ground handling personnel Advise By Wire centering platform (25), to go up the Y-axis (63) of coordinate system (58) and make corresponding mobile, and locate with bolt (67) in X, Y direction.After moving correction, the hitch point (65) of cotton rope (60) in Y-axis (63) promptly is the building center of cylindrical shell on centering platform (25).
Control the center non-migration of building cylindrical shell (15) with coordinate centering method, than laser alignment method small investment, the operation tube is single, a centering, and advantage such as operating personnel are few, be method in simple, most economical, the most practical survey of a kind of control building cylindrical shell (15) center non-migration.

Claims (10)

1. the building method of a concrete barrel adopts lift-type door frame, operating platform and template system, and the three builds height with cylindrical shell and constantly promotes, and meanwhile toward placing of concrete between inner and outer template, sheds template then, it is characterized in that:
(1), on the inside and outside barrel of lift-type door frame attached to cylindrical shell, use lifting appliance, cooperate cylindrical shell to build height, door frame can promote by joint along barrel, play the effect of running derrick;
(2), all use operating platform inside and outside the barrel of cylindrical shell, operating platform is installed on the barrel attached to concrete barrel, along with the concrete pouring of the every circle of cylindrical shell, solidifies, and turnover from the bottom to top promotes, and plays the scaffold effect;
(3), adopt coordinate centering method to control the center non-migration of building cylindrical shell.
2. the building method of concrete barrel according to claim 1, it is characterized in that: employed lift-type door frame mainly is made of left and right column, truss etc., left and right column is radially relative, respectively on the inside and outside barrel attached to cylindrical shell, the truss two ends connect the slippage of truss energy along continuous straight runs with olecranon crossbeam on the left and right column top.
3. according to the building method of claim 1 or 2 described concrete barrels, it is characterized in that: central security vertical shaft and centering platform are adopted in the employed center of adhering to the lift-type door frame, elevating hopper, cage, cage is driven by hoist engine, separately by pulley, hoisting rope, flexible dragline vertical-lift and transportation in cylindrical shell, and adopt inside and outside safety net.
4. according to the building method of the described concrete barrel of claim 1, it is characterized in that: the centering platform that coordinate centering method is used fixedly is suspended on by steelframe on the truss of lift-type door frame, and the level height of centering flat upper surface is consistent with the last plane of template system.
5. according to the building method of claim 1 or 2 described concrete barrels, it is characterized in that: the employed left and right column that adheres to the lift-type door frame divides upper pillar stand and lower pillar stand two parts, upper and lower column connects with flange, four root posts of lower pillar stand are with U type shroud ring and stud is fixed and attached on the barrel inside and outside the cylindrical shell, the interior olo L of four root posts is greater than the maximum ga(u)ge and the inside and outside construction formwork thickness sum of cylindrical shell wall thickness.
6. according to the building method of claim 1 or 2 described concrete barrels, it is characterized in that: the employed left and right column that adheres to the lift-type door frame adopts seamless steel pipe, steel pipe generally is not less than 108 * 4.5 millimeters of Φ, the height of left and right column can not be less than 12 meters, and wherein the lower pillar stand height is 6 meters.
7. according to the building method of the described concrete barrel of claim 1, it is characterized in that: the employed left and right column that adheres to the lift-type door frame respectively uses lifting appliance, this device comprises a steel shoulder pole, two jacks, steel shoulder pole horizontal symmetrical is placed on the barrel, two jacks are hung in the two ends of steel shoulder pole, and the below of jack is held the bottom bar of lower pillar stand respectively, left and right two lifting appliance synchronous operations, whole door frame is evenly promoted by joint, replaced running derrick.
8. according to the building method of claim 1 or 2 described concrete barrels, it is characterized in that: the truss that adheres to the lift-type door frame that is made by wind up, lower edge, diagonal web member, horizon bar, vertical rod, gusset plate, junction plate form cross section whole truss triangular in shape.
9. according to the building method of the described concrete barrel of claim 1, it is characterized in that: the coordinate centralising device that coordinate centering method is used, mainly comprise the last coordinate system that can the four directions moves, coordinate under side's bucket formula, line weighs down, cotton rope and positioning bolt are formed, last coordinate system is fixed on the centering platform, coordinate is fixed in the building on cylindrical shell ground in the heart under the side bucket formula, line weighs down with the Y-axis central point of rope hanging at last coordinate system, in the viscosity liquid under the line bob side of the droping to bucket formula in the coordinate, on, the X of following coordinate, the Y-axis line is parallel to each other, and mark corresponding scale, the X of last coordinate system respectively, all adopt strip hole on the Y-axis, Y-axis can be done the four directions along strip hole and move on the centering platform.
10. according to the building method of claim 1 or 9 described concrete barrels, it is characterized in that: coordinate centering method is that first line with the coordinate centralising device weighs down in the mucus that drop to down in coordinate side's bucket, treat that line weighs down when static, the cotton rope at the peripheral horizontal plane of bucket place, the side of measuring is at the X of following coordinate, the scale on the Y-axis, and the Y-axis that will go up coordinate system above the notice is made corresponding mobile in X, Y direction, and with bolt location, moving the position of correcting back rope hanging point promptly is the building center of cylindrical shell on the centering platform.
CN 93103251 1993-03-20 1993-03-20 Method and equipment for construction of concrete cylinder Expired - Fee Related CN1048065C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 93103251 CN1048065C (en) 1993-03-20 1993-03-20 Method and equipment for construction of concrete cylinder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 93103251 CN1048065C (en) 1993-03-20 1993-03-20 Method and equipment for construction of concrete cylinder

Publications (2)

Publication Number Publication Date
CN1078286A CN1078286A (en) 1993-11-10
CN1048065C true CN1048065C (en) 2000-01-05

Family

ID=4984541

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 93103251 Expired - Fee Related CN1048065C (en) 1993-03-20 1993-03-20 Method and equipment for construction of concrete cylinder

Country Status (1)

Country Link
CN (1) CN1048065C (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101832023A (en) * 2010-03-25 2010-09-15 中冶实久建设有限公司 Method for preventing instability of supporting rod of chimney slip form
CN103171948A (en) * 2013-03-26 2013-06-26 中国水利水电第七工程局有限公司 Vertical shaft hoisted cage differential synchronizer
CN103556862B (en) * 2013-10-29 2016-01-20 中国电力工程顾问集团华东电力设计院有限公司 Multitube suspension type chimney internal cylinder system of support structures
CN103867022B (en) * 2014-03-12 2016-01-20 中国十七冶集团有限公司 One is carried and is touched formula concrete chimney construction method
CN106284997B (en) * 2015-05-28 2019-06-14 中国二十冶集团有限公司 The big punching block construction method for lifting whole of reinforced concrete chimney
CN107060474A (en) * 2017-03-14 2017-08-18 中国十七冶集团有限公司 A kind of sleeve-type chimney people goods shunting vertical transferring apparatus and construction method
CN107130807A (en) * 2017-04-13 2017-09-05 中建钢构有限公司 Simple belt conveyer-belt formula mounting platform
CN107630550B (en) * 2017-08-31 2020-08-18 中国一冶集团有限公司 Assembled scaffold with vertical transportation function
CN109882204A (en) * 2019-03-22 2019-06-14 中铁隧道集团二处有限公司 A kind of sliding mode system operating platform and its installation method for tunnel shaft lining cutting
CN112982960B (en) * 2021-05-14 2021-09-17 河南省第二建设集团有限公司 Interactive lifting formwork device and construction method

Also Published As

Publication number Publication date
CN1078286A (en) 1993-11-10

Similar Documents

Publication Publication Date Title
CN108019076B (en) Construction method of large-diameter reinforced concrete silo and device for conical shell construction
CN101619630B (en) Mounting method of steel chimney and implementary jacking device
CN101435276B (en) Cabin top steel beam hydraulic hoisting and positioning apparatus of cylinder cabin structure building and construction method thereof
CN1048065C (en) Method and equipment for construction of concrete cylinder
CN110685433A (en) Chimney construction device and construction method applying hydraulic lifting and rollover technology
CN203654702U (en) Operating platform for construction of reinforced concrete chimney
CN114575589B (en) Construction method for electric hoist lifting formwork of steel reinforced concrete structural column
CN211286601U (en) Chimney construction device applying hydraulic lifting and rollover technology
CN206110635U (en) Automatic convertible integrally lift up elevator shaft operating platform of landing leg
CN109252656B (en) High-rise building climbing template and assembling, pouring and lifting method
CN107829370A (en) High pier is from climbing liquid press to turn over molds construction technology
CN202064281U (en) Slip form frame
CN206680994U (en) Assembled steel reinforced cage descending frame
CN110409803B (en) Hoisting method for disassembling central drum ring of hydraulic mold lifting device
CN107815971A (en) High pier is from climbing liquid press to turn over molds system
CN112412152B (en) Construction method of underslung derrick-free variable-section rectangular chimney support system
CN1048066C (en) Method and apparatus for integrally self-lifting scaffold
CN214573768U (en) Self-climbing sliding formwork pouring system for second-stage concrete pouring of gate slot
CN210194445U (en) Vertical transportation self-lifting system for slip form construction
CN211974269U (en) From climbing formula elevartor shaft steel platform
CN2150185Y (en) Attached lifting front-frame for constructing concrete cylinder
CN215519871U (en) Combined elevator shaft operating frame
CN218323870U (en) Die carrier system of section of pouring does not have pull rod
CN219100670U (en) Low-level jacking climbing construction platform
CN217151322U (en) Detachable and portable guy rope fixing device

Legal Events

Date Code Title Description
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C06 Publication
PB01 Publication
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee