CN104806291A - Method for verifying near outburst coal bed tunneling working face joint region - Google Patents

Method for verifying near outburst coal bed tunneling working face joint region Download PDF

Info

Publication number
CN104806291A
CN104806291A CN201510178457.6A CN201510178457A CN104806291A CN 104806291 A CN104806291 A CN 104806291A CN 201510178457 A CN201510178457 A CN 201510178457A CN 104806291 A CN104806291 A CN 104806291A
Authority
CN
China
Prior art keywords
coal bed
value
projecting coal
drilling
projecting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510178457.6A
Other languages
Chinese (zh)
Inventor
郝贵
文光才
张光德
王建
邹银辉
张志刚
周勇
张占国
程建圣
黄光利
冀超辉
龚选平
孙炳兴
程波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenhua Group Corp Ltd
CCTEG Chongqing Research Institute Co Ltd
Original Assignee
Shenhua Group Corp Ltd
CCTEG Chongqing Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenhua Group Corp Ltd, CCTEG Chongqing Research Institute Co Ltd filed Critical Shenhua Group Corp Ltd
Priority to CN201510178457.6A priority Critical patent/CN104806291A/en
Publication of CN104806291A publication Critical patent/CN104806291A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Testing Or Calibration Of Command Recording Devices (AREA)

Abstract

The invention discloses a method for verifying a near outburst coal bed tunneling working face joint region. The method comprises the following steps that a, a verified region of a tunneling working face is an outburst coal bed group, and the outburst coal bed group of the tunneling working face comprises a lower coating outburst coal bed and an upper coating outburst coal bed; b, the lower coating outburst coal bed or the upper coating outburst coal bed is drilled; c, a drilling cutting index method is adopted in a drilling construction process to measure drilling cutting amount S value and gas desorption index K1 value; d, the measured S value and K1 value are compared with clinical values, and if the measured S value and the K1 value are both smaller than the clinical values, the tunneling working face does not have an outburst risk. According to the method provided by the invention, a tunneling working face head verifies and drills a striking region nearby the coal bed, whether the outburst risk exists or not is judged by taking the K1 value in the drilling cutting index method as the clinical value, and a basis for verifying the similar near outburst coal bed tunneling working face joint region is provided.

Description

A kind of method of closely projecting coal bed drift face associating area validation
Technical field
The present invention relates to field of coal mine safety, particularly a kind of method of closely projecting coal bed drift face associating area validation.
Background technology
In order to strengthen outburst prevention work further, national Coal Mine Safety Supervision Bureau promulgated " control coal and gas prominent regulation " in 2009.In new regulation, the content of outstanding control part in former " control coal and gas prominent detailed rules and regulations " is reconfigured, defines regional complex outburst prevention measures and local comprehensive outburst control measure.Wherein last link of regional complex outburst prevention measures is area validation.Work plane outburst hazard prediction steps and the method for area validation work during stone door punching coal and local comprehensive outburst control measure are identical, but when driving face and coal-face operation, both slightly distinguish.Area validation carries out for some specific regions, and this specific region refers to through regional prediction without outburst hazard or taking region outburst prevention measures and the region delimited without outburst hazard through validity check.But carrying out according to " control coal and gas prominent regulation ", closely in projecting coal bed area validation process, occurring the awkward situation that no standard can be complied with.Such as, two-layer coal all has outburst hazard, and interlamellar spacing is very near, before one deck coal carries out mining work activities wherein, except needs take regional complex outburst prevention measures to this coal seam, also needs to take same measure to adjacent layer.At present, with regard to domestic projecting mine, the projecting coal bed associating area validation that how to carry out spacing being less than to 5m still belongs to blank.
Therefore, need to propose a kind of method for the closely projecting coal bed drift face associating area validation in projecting mine closely projecting coal bed drift face quaternity protrusion-dispelling system.
Summary of the invention
In view of this, a kind of closely projecting coal bed drift face is the object of the present invention is to provide to combine the method for area validation, meet head on to set area validation boring to projecting coal bed by driving face, K1 value is adopted in method of drilling index to determine whether to have outburst hazard for threshold, for the area validation of similar closely projecting coal bed group's digging laneway provides foundation, fill up the blank which kind of method " control coal and gas prominent specifies " is taked about closely projecting coal bed group's tunnelling area validation link to adjacent layer and how to be implemented, avoid carrying out closely in projecting coal bed area validation process according to " control coal and gas prominent regulation ", there is the awkward situation that no standard can be complied with.
The method of a kind of closely projecting coal bed drift face associating area validation of the present invention, comprises the following steps:
A. the validation region of driving face is projecting coal bed group, the projecting coal bed group of driving face comprise underlie projecting coal bed and on cover projecting coal bed;
B. to underlie projecting coal bed or on cover and projecting coal bedly carry out drilling construction;
C. in drilling construction process, adopt method of drilling index, measure coal powder quantity of bore S value and desorption of mash gas index K 1value;
D. by the S value that records and K 1value and threshold contrast, if S value and K 1value is all less than threshold, then driving face is regarded as without outburst danger.
Further, when projecting coal bed group's digging laneway, when surrounding have spacing be less than underliing of 2m or on cover projecting coal bed time, to underlie or on cover and projecting coal bedly carry out drilling construction, measure S value and K 1value.
Further, underlie described in projecting coal bed and on cover projecting coal bed all adopt concordant boring and layer-through drilling construct.
Further, described in underlie projecting coal bed and on when covering projecting coal bed employing concordant drilling construction, whole S values that 1m measures this 1m section are often crept in boring, hole often to creep into 2m and measure a drilling cuttings K 1value.
Further, described in underlie the construction of projecting coal bed employing layer-through drilling time, boring is often crept into 2m and is measured a drilling cuttings K 1value.
Further, when covering the construction of projecting coal bed employing layer-through drilling on described, whole S values that 1m measures this 1m section are often crept in boring, and boring is often crept into 2m and measured a drilling cuttings K 1value.
Further, be 6kg/m, K according to the threshold of " control coal and gas prominent specify " S value 1the threshold of value is
Beneficial effect of the present invention: the method for a kind of closely projecting coal bed drift face associating area validation of the present invention, meet head on to set area validation boring to projecting coal bed by driving face, K1 value is adopted in method of drilling index to determine whether to have outburst hazard for threshold, for the area validation of similar closely projecting coal bed group's digging laneway provides foundation, fill up the blank which kind of method " control coal and gas prominent specifies " is taked about closely projecting coal bed group's tunnelling area validation link to adjacent layer and how to be implemented, avoid carrying out closely in projecting coal bed area validation process according to " control coal and gas prominent regulation ", there is the awkward situation that no standard can be complied with.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the invention will be further described:
Fig. 1 is the projecting coal bed time domain checking firing pattern that underlies of the present invention;
Fig. 2 is that sectional drawing is arranged in projecting coal bed time domain checking boring of underliing of the present invention;
Fig. 3 be of the present invention on cover projecting coal bed time domain checking firing pattern;
Fig. 4 be of the present invention on cover projecting coal bed time domain checking boring arrange sectional drawing.
Detailed description of the invention
As shown in the figure: the method for a kind of closely projecting coal bed drift face associating area validation of the present embodiment, comprises the following steps:
A. the validation region of driving face is projecting coal bed group, the projecting coal bed group of driving face comprise underlie projecting coal bed and on cover projecting coal bed;
B. to underlie projecting coal bed or on cover and projecting coal bedly carry out drilling construction;
C. in drilling construction process, adopt method of drilling index, measure coal powder quantity of bore S value and desorption of mash gas index K 1value;
D. by the S value that records and K 1value and threshold contrast, if S value and K 1value is all less than threshold, then driving face is regarded as without outburst danger, gets rid of other abnormal conditions in mensuration process, is considered as without other abnormal conditions.
In the present embodiment, when projecting coal bed group's digging laneway, when surrounding have spacing be less than underliing of 2m or on cover projecting coal bed time, to underlie or on cover and projecting coal bedly carry out drilling construction, measure S value and K 1value.
In the present embodiment, described in underlie projecting coal bed and on cover projecting coal bed all adopt concordant boring and layer-through drilling construction, improve mensuration accuracy.
In the present embodiment, described in underlie projecting coal bed and on when covering projecting coal bed employing concordant drilling construction, whole S values that 1m measures this 1m section are often crept in boring, hole often to creep into 2m and measure a drilling cuttings K 1value.When underlie projecting coal bed employing concordant drilling construction time, meeting head on to construct to work plane front coal body from this coal bed drift face, three diameters are 42mm, hole depth is the boring of 10 ~ 10.5m, one of them boring is positioned in the middle part of this coal seam digging laneway section, and be parallel to tunneling direction, the whole hole point of two other boring is positioned at the outer 2m of drift section both sides outline line, boring is numbered 1# ~ 3#, and whole S values that 1m measures this 1m section are often crept in boring, and boring is often crept into 2m and measured a drilling cuttings K 1value; When on cover projecting coal bed employing concordant drilling construction time, meeting head on to construct to work plane front coal body from this coal bed drift face, three diameters are 42mm, hole depth is the boring of 10 ~ 10.5m, one of them boring is positioned in the middle part of this coal seam digging laneway section, and be parallel to tunneling direction, the whole hole point of two other boring is positioned at the outer 2m of drift section both sides outline line, boring is numbered 7# ~ 9#, and whole S values that 1m measures this 1m section are often crept in boring, and boring is often crept into 2m and measured a drilling cuttings K 1value.
In the present embodiment, described in underlie the construction of projecting coal bed employing layer-through drilling time, boring is often crept into 2m and is measured a drilling cuttings K 1value.During the projecting coal bed employing layer-through drilling that underlies construction, meeting head on from this coal bed drift face, construction three diameters are downwards 42mm, hole depth is the boring of 11.2 ~ 12.5m, one of them boring is positioned in the middle part of digging laneway section, and be parallel to tunneling direction, the whole hole point of two other boring is arranged in underlie coal seam corresponding to the outer 2m of this heading section both sides outline line, and boring is numbered 4# ~ 6#, because boring is all lower perform hole, S value cannot be measured, but can K be measured 1value, passes through K 1value determines whether underlie coal seam has outburst hazard.
In the present embodiment, when covering the construction of projecting coal bed employing layer-through drilling on described, whole S values that 1m measures this 1m section are often crept in boring, and boring is often crept into 2m and measured a drilling cuttings K 1value.On cover projecting coal bed employing layer-through drilling construction time, meeting head on upwards to construct from this coal bed drift face, six diameters are 42mm, hole depth is the boring of 5 ~ 12.5m, often organizing boring is two, wherein one group of boring is positioned in the middle part of this coal seam digging laneway section, bore direction is tunneling direction, the whole hole points of other two groups of borings be arranged in the outer 2m of this heading section both sides outline line corresponding on cover coal seam, boring is numbered 1# ~ 6#, whole S values that 1m measures this 1m section are often crept in boring, often creep into 2m and measure a drilling cuttings K 1value.
In the present embodiment, the threshold according to " control coal and gas prominent specifies " S value is 6kg/m, K 1the threshold of value is
What finally illustrate is, above embodiment is only in order to illustrate technical scheme of the present invention and unrestricted, although with reference to preferred embodiment to invention has been detailed description, those of ordinary skill in the art is to be understood that, can modify to technical scheme of the present invention or equivalent replacement, and not departing from aim and the scope of technical solution of the present invention, it all should be encompassed in the middle of right of the present invention.

Claims (7)

1. closely projecting coal bed drift face combines a method for area validation, and it is characterized in that, the method comprises the following steps:
A. the validation region of driving face is projecting coal bed group, the projecting coal bed group of driving face comprise underlie projecting coal bed and on cover projecting coal bed;
B. to underlie projecting coal bed or on cover and projecting coal bedly carry out drilling construction;
C. in drilling construction process, adopt method of drilling index, measure coal powder quantity of bore S value and desorption of mash gas index K 1value;
D. by the S value that records and K 1value and threshold contrast, if S value and K 1value is all less than threshold, then driving face is regarded as without outburst danger.
2. the method for a kind of closely projecting coal bed drift face associating area validation according to claim 1, it is characterized in that: when projecting coal bed group's digging laneway, when surrounding have spacing be less than underliing of 2m or on cover projecting coal bed time, to underlie or on cover and projecting coal bedly carry out drilling construction, measure S value and K 1value.
3. the method for a kind of closely projecting coal bed drift face associating area validation according to claim 1 and 2, is characterized in that: described in underlie projecting coal bed and on cover projecting coal bed concordant boring and the layer-through drilling of all adopting and construct.
4. the method for a kind of closely projecting coal bed drift face associating area validation according to claim 3, it is characterized in that: described in underlie projecting coal bed and on when covering projecting coal bed employing concordant drilling construction, whole S values that 1m measures this 1m section are often crept in boring, and boring is often crept into 2m and measured a drilling cuttings K 1value.
5. the method for a kind of closely projecting coal bed drift face associating area validation according to claim 3, is characterized in that: described in underlie the construction of projecting coal bed employing layer-through drilling time, boring is often crept into 2m and is measured a drilling cuttings K 1value.
6. the method for a kind of closely projecting coal bed drift face associating area validation according to claim 3, it is characterized in that: when covering the construction of projecting coal bed employing layer-through drilling on described, whole S values that 1m measures this 1m section are often crept in boring, and boring is often crept into 2m and measured a drilling cuttings K 1value.
7. the method for a kind of closely projecting coal bed drift face associating area validation according to claim 1, is characterized in that: the threshold according to " control coal and gas prominent specifies " S value is 6kg/m, K 1the threshold of value is
CN201510178457.6A 2015-03-18 2015-04-15 Method for verifying near outburst coal bed tunneling working face joint region Pending CN104806291A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510178457.6A CN104806291A (en) 2015-03-18 2015-04-15 Method for verifying near outburst coal bed tunneling working face joint region

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CN2015101187382 2015-03-18
CN201510118738 2015-03-18
CN201510178457.6A CN104806291A (en) 2015-03-18 2015-04-15 Method for verifying near outburst coal bed tunneling working face joint region

Publications (1)

Publication Number Publication Date
CN104806291A true CN104806291A (en) 2015-07-29

Family

ID=53691443

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510178457.6A Pending CN104806291A (en) 2015-03-18 2015-04-15 Method for verifying near outburst coal bed tunneling working face joint region

Country Status (1)

Country Link
CN (1) CN104806291A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105332695A (en) * 2015-08-17 2016-02-17 綦江县科信煤矿安全技术服务有限公司 Prediction method of coal working face
CN107143375A (en) * 2017-07-13 2017-09-08 辽宁工程技术大学 A kind of comprehensive outburst control method in great burying gently inclined seam region
CN107237619A (en) * 2016-03-24 2017-10-10 张鹏翔 A kind of outburst prediction index coal powder quantity of bore fast accurate intelligent measurement method
CN110458369A (en) * 2019-08-16 2019-11-15 西安科技大学 A kind of coal and gas prominent coal seam getting working face risk integrated estimation system
CN111396118A (en) * 2020-03-19 2020-07-10 贵州盘江精煤股份有限公司 Coal seam group rapid rock cross-cut coal uncovering outburst eliminating method
CN112324487A (en) * 2020-10-20 2021-02-05 中煤科工集团重庆研究院有限公司 Double-index evaluation method for outburst prevention effect of coal roadway strip
CN113216968A (en) * 2021-06-02 2021-08-06 江苏徐矿能源股份有限公司张双楼煤矿 Pressure relief and scour prevention method for coal seam merging area
CN113446063A (en) * 2021-08-13 2021-09-28 中煤科工集团重庆研究院有限公司 Method for verifying fusion index region of close-range adjacent outburst coal seam

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1105664A1 (en) * 1983-05-16 1984-07-30 Институт Горного Дела Ан Казсср Method of degassing a coal seam in pillar-less mining in columns
CN101598033A (en) * 2009-07-03 2009-12-09 重庆俞科矿山设备有限公司 The method that a kind of on-the-spot forecasting coal and gas are outstanding
CN102705010A (en) * 2012-05-31 2012-10-03 中煤科工集团重庆研究院 Working surface outburst risk evaluation index system analysis method
CN102926810A (en) * 2012-11-16 2013-02-13 天地(常州)自动化股份有限公司 Forecasting method of coal and gas outburst
CN103306677A (en) * 2013-05-26 2013-09-18 贵州省矿山安全科学研究院 Rapid rock cross-cut coal uncovering process and outburst prevention method
CN103775127A (en) * 2013-12-31 2014-05-07 中国矿业大学 Method for comprehensively treating gas in low-air-permeability high-gas-content coal seam group

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1105664A1 (en) * 1983-05-16 1984-07-30 Институт Горного Дела Ан Казсср Method of degassing a coal seam in pillar-less mining in columns
CN101598033A (en) * 2009-07-03 2009-12-09 重庆俞科矿山设备有限公司 The method that a kind of on-the-spot forecasting coal and gas are outstanding
CN102705010A (en) * 2012-05-31 2012-10-03 中煤科工集团重庆研究院 Working surface outburst risk evaluation index system analysis method
CN102926810A (en) * 2012-11-16 2013-02-13 天地(常州)自动化股份有限公司 Forecasting method of coal and gas outburst
CN103306677A (en) * 2013-05-26 2013-09-18 贵州省矿山安全科学研究院 Rapid rock cross-cut coal uncovering process and outburst prevention method
CN103775127A (en) * 2013-12-31 2014-05-07 中国矿业大学 Method for comprehensively treating gas in low-air-permeability high-gas-content coal seam group

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
国家安全生产监督管理总局: "《防治煤与瓦斯突出规定》", 14 May 2009 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105332695A (en) * 2015-08-17 2016-02-17 綦江县科信煤矿安全技术服务有限公司 Prediction method of coal working face
CN107237619A (en) * 2016-03-24 2017-10-10 张鹏翔 A kind of outburst prediction index coal powder quantity of bore fast accurate intelligent measurement method
CN107143375A (en) * 2017-07-13 2017-09-08 辽宁工程技术大学 A kind of comprehensive outburst control method in great burying gently inclined seam region
CN107143375B (en) * 2017-07-13 2019-03-26 辽宁工程技术大学 A kind of comprehensive outburst control method in great burying gently inclined seam region
CN110458369A (en) * 2019-08-16 2019-11-15 西安科技大学 A kind of coal and gas prominent coal seam getting working face risk integrated estimation system
CN111396118A (en) * 2020-03-19 2020-07-10 贵州盘江精煤股份有限公司 Coal seam group rapid rock cross-cut coal uncovering outburst eliminating method
CN112324487A (en) * 2020-10-20 2021-02-05 中煤科工集团重庆研究院有限公司 Double-index evaluation method for outburst prevention effect of coal roadway strip
CN113216968A (en) * 2021-06-02 2021-08-06 江苏徐矿能源股份有限公司张双楼煤矿 Pressure relief and scour prevention method for coal seam merging area
CN113446063A (en) * 2021-08-13 2021-09-28 中煤科工集团重庆研究院有限公司 Method for verifying fusion index region of close-range adjacent outburst coal seam

Similar Documents

Publication Publication Date Title
CN104806291A (en) Method for verifying near outburst coal bed tunneling working face joint region
CN102619552B (en) Directional hydraulic pressing penetration, permeability increase and outburst elimination method of guide groove
CN102705010B (en) Working surface outburst risk evaluation index system analysis method
CN104110270B (en) A kind of dynamic note alkali is administered the method for coal seam hydrogen sulfide
CN105909254B (en) Projecting coal bed bottom plate, which is faced upward, wears the advanced area cover coal roadway tunneling method of layer directional hole
CN106761902B (en) A kind of stereo synthesis pressure relief gas pumping mining method suitable for soft rock protective coat extracted
CN103939099A (en) Method for controlling strong shock risk coal seam group rock burst
CN103362540A (en) High gas coal seam pressure relief gas extraction method
WO2016041389A1 (en) Method for evaluating filling quality at working face of solid-filling coal mining
CN103184887A (en) Method for underground tunnel drilling construction and geological information inversing
CN102337922A (en) Method for inspecting burst-preventing effect of areas
CN104763466B (en) Method for detecting active diffusion radius of covered rock separation grouting filling slurry
CN103016047A (en) Method of draining gas in gob through long drill hole in roof trend on fully mechanized caving face
CN102808644A (en) Coal and gas co-mining method based on mining fissure elliptic paraboloid zone
CN104963721A (en) Downhole stereo rapid water drainage method through the combination of horizontal drilling holes and vertical drilling holes
CN109915197A (en) A kind of method that rock gangway km directional long borehole substitution middle part bottom pumping rock gangway is taken out at bottom
CN105822307A (en) Downward subsection open stope mining method
CN111396118A (en) Coal seam group rapid rock cross-cut coal uncovering outburst eliminating method
CN105422097A (en) Coal seam group mining method
CN116084947A (en) Method for alternately shielding coal roadway and rapidly tunneling along bedding double-prevention long drilling holes
CN103643996B (en) Driving face gas outbursts Prediction method based on graphic-arts technique
CN112855123B (en) Method for determining depth of pressure relief drilling hole
CN109736876A (en) It adopts kinetoplast and gushes out gas top plate major diameter directional long borehole pumping method
CN204327172U (en) Formula boring goaf extraction structure before and after high-rise position
CN113586133A (en) Method for extracting pressure-relief gas from adjacent layer mined by upper protection layer of close-distance thin coal seam group

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Wen Guangcai

Inventor after: Ji Chaohui

Inventor after: Fan Xiaogang

Inventor after: Gong Xuanping

Inventor after: Sun Bingxing

Inventor after: Cheng Bo

Inventor after: Zhang Guangde

Inventor after: Wang Jian

Inventor after: Zou Yinhui

Inventor after: Zhang Zhigang

Inventor after: Zhou Yong

Inventor after: Zhang Zhanguo

Inventor after: Cheng Jiansheng

Inventor after: Huang Guangli

Inventor before: Hao Gui

Inventor before: Huang Guangli

Inventor before: Ji Chaohui

Inventor before: Gong Xuanping

Inventor before: Sun Bingxing

Inventor before: Cheng Bo

Inventor before: Wen Guangcai

Inventor before: Zhang Guangde

Inventor before: Wang Jian

Inventor before: Zou Yinhui

Inventor before: Zhang Zhigang

Inventor before: Zhou Yong

Inventor before: Zhang Zhanguo

Inventor before: Cheng Jiansheng

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: HAO GUI WEN GUANGCAI ZHANG GUANGDE WANG JIAN ZOU YINHUI ZHANG ZHIGANG ZHOU YONG ZHANG ZHANGUO CHENG JIANSHENG HUANG GUANGLI JI CHAOHUI GONG XUANPING SUN BINGXING CHENG BO TO: WEN GUANGCAI ZHANG GUANGDE WANG JIAN ZOU YINHUI ZHANG ZHIGANG ZHOU YONG ZHANG ZHANGUO CHENG JIANSHENG HUANG GUANGLI JI CHAOHUI FAN XIAOGANG GONG XUANPING SUN BINGXING CHENG BO

RJ01 Rejection of invention patent application after publication

Application publication date: 20150729

RJ01 Rejection of invention patent application after publication