CN104805857B - One detachably recycles bottomless steel jacket box and construction method thereof - Google Patents

One detachably recycles bottomless steel jacket box and construction method thereof Download PDF

Info

Publication number
CN104805857B
CN104805857B CN201510225841.7A CN201510225841A CN104805857B CN 104805857 B CN104805857 B CN 104805857B CN 201510225841 A CN201510225841 A CN 201510225841A CN 104805857 B CN104805857 B CN 104805857B
Authority
CN
China
Prior art keywords
steel
steel jacket
box
jacket box
casing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510225841.7A
Other languages
Chinese (zh)
Other versions
CN104805857A (en
Inventor
刘万国
杨铁雄
田伟权
潘寿东
楼敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd
Original Assignee
Third Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd filed Critical Third Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd
Priority to CN201510225841.7A priority Critical patent/CN104805857B/en
Publication of CN104805857A publication Critical patent/CN104805857A/en
Application granted granted Critical
Publication of CN104805857B publication Critical patent/CN104805857B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Earth Drilling (AREA)

Abstract

The present invention relates to field of bridge construction, be specifically related to one and detachably recycle bottomless steel jacket box and construction method thereof.It is the bottomless Guan Bi cofferdam that several independent case body being arranged on around underwater support table are formed by connecting from bottom to top, and each described independent case body is enclosed by several box unit faces and forms;Between described independent case body and independent case body, it is connected by ring flange and bolt between described box unit face and box unit face;Described ring flange is positioned at inside casing;It is provided with casing in described independent case body reinforce directly support and reinforce the straight casing reinforcing diagonal brace supportting angle in an acute angle with described casing;Described casing is reinforced the two ends of diagonal brace and is intersected with the adjacent boxes elemental area of same independent case body.Using the bottomless steel jacket box structure of the present invention, it may not be necessary to large-scale crane, less demanding to place, casing can recycle, and saves construction cost.

Description

One detachably recycles bottomless steel jacket box and construction method thereof
Technical field
The present invention relates to field of bridge construction, be specifically related to one and detachably recycle bottomless steel jacket box and construction party thereof Method.
Background technology
Along with China's economic development, highway, railway are constructed on a large scale, for adapting to the needs of transportation, a lot of highways, ferrum The circuit of road and bridge beam designs across great river, sea, thus underwater support table, bridge pier can be found everywhere.At home, the construction of underwater support table Method is a lot, including single (double) wall steel cofferdam, steel boxed cofferdam, builds island open cut, open caisson, pneumatic caisson etc., various construction methods Differ from one another.Because bottomless steel jacket box is wide because being suitable for stratum ratio, so, it is a kind of conventional that bottomless steel jacket box becomes underwater support table Construction method.The construction method used at present is a lot, but the most similar, during underwater support table construction, owing to steel jacket box is heavier, and steel It is generally required to large-scale crane coordinates during hollow steel box immersion, it is desirable to provide crane place, the requirement to place is high, after construction terminates, and set Case is not removed, and causes waste of material, increases engineering cost.
CN102409690A (2012-4-11) discloses a kind of multiple stage continuous jack and synchronizes to transfer bottomless double-wall steel casing The construction technology in cofferdam, but the method yet suffers from the problems referred to above.
Summary of the invention
An object of the present invention is to solve prior art to cause construction cost to increase because steel jacket box can not recycle The problems such as difficulty, it is provided that a kind of detachable, recycle, construction safety is reliable, reduce a kind of detachable circulation of engineering cost Utilize bottomless steel jacket box.
The two of the purpose of the present invention be to provide a kind of detachable, recycle, construction safety is reliable, reduce engineering cost A kind of construction method detachably recycling bottomless steel jacket box.
First technical purpose of the present invention has the technical scheme that
One detachably recycles bottomless steel jacket box, its be several independent case body of being arranged on around underwater support table from Lower and on the bottomless Guan Bi cofferdam that is formed by connecting, each described independent case body is enclosed by several box unit faces and forms;Described Between independent case body with independent case body, it is connected by ring flange and bolt between described box unit face and box unit face;Institute State ring flange to be positioned at inside casing;
It is provided with casing in described independent case body reinforce straight support and reinforce the straight set supportting angle in an acute angle with described casing Diagonal brace reinforced by case;Described casing is reinforced the two ends of diagonal brace and is intersected with the adjacent boxes elemental area of same independent case body.
Using the bottomless steel jacket box structure of the present invention, it may not be necessary to large-scale crane, less demanding to place, casing can To recycle, save construction cost.
As preferably, the height of every layer of described independent case body is 1.5-2.5m, and every layer assembled by 4 faces;Described solely Vertical box inside welding is provided with suspension ring.
Use this structure, it is simple to hang assembly and disassembly, save construction cost.
As preferably, bottom orlop casing, bolt do not gone up by above 1m position adpting flange.
Use this structure, can be easy to hang assembly and disassembly while ensureing safety.
As preferably, described casing is reinforced straight support and is disposed in levels independent case body.
Use this structure, it is ensured that the bottomless steel jacket box of the present invention has enough supports and safety.
As preferably, described casing is reinforced straight support and is positioned in same level with described casing reinforcing diagonal brace.
Use this structure, support and the safety of the bottomless steel jacket box of the present invention can be strengthened further.
As preferably, the angle of straight support and described casing reinforcing diagonal brace reinforced by described casing is 45 °.
As preferably, it is arranged in the independent case body in bottomless steel jacket box intermediate layer to be provided with and is positioned in same level and group Close and form the described casing reinforcing straight support consistent with independent case body structure.
Use this structure, support and the safety of the bottomless steel jacket box of the present invention can be strengthened further, and saving is executed Work material and cost.
The steel wire rope being arranged on bottomless steel jacket box top is had it is highly preferred that connect on described angle steel.
Using this structure, it is simple to follow-up hang assembly and disassembly, construction cost is low.
Second technical purpose of the present invention has the technical scheme that
A kind of construction method detachably recycling bottomless steel jacket box, it comprises the following steps successively:
(1) mast-up makes and lays: before mast-up is installed, and first drilled pile platform top half is removed, leaves steel pipe Stake;Drilled pile pile crown laitance is cut to concrete surface, the suspension bracket post of mast-up is placed on the pile crown abolished, then will lifting The steel-pipe pile of frame and drilled pile platform, by being welded and fixed, supports with suspension bracket post simultaneously and is welded with drilled pile casing by suspension bracket post Fixing, welding hanging ring on hanging beam, each suspension ring are installed at least one calabash;
The most bottomless steel jacket box make: according to cap design of pile size make steel jacket box, it is ensured that have to cushion cap limit inside casing to Few 1m distance, reserves bearing platform construction work space;
(3) interim bracket is installed on steel-pipe pile;
(4) casing leading truck is installed: leading truck is fixed by welding on the steel-pipe pile on four angles of drilled pile platform;
(5) assembled orlop casing on interim bracket: with crane, orlop casing is placed on interim bracket, is facing Time bracket on assembled orlop casing;
(6) interim bracket is removed and orlop hollow steel box immersion: after good for orlop casing assembly, will with the calabash on hanging beam It is sling, and removes all interim brackets, by assembled good orlop hollow steel box immersion and make orlop casing end face higher than the water surface, with Facilitate the connection of last layer casing and this layer of casing;
(7) the assembly of second layer casing and sinking: a box unit face crane of second layer casing is placed under On layer casing, separately hung with the calabash being similarly installed on hanging beam and prevent from rocking, by second layer casing and orlop casing After connecting, with described calabash, is somewhat sling in the described box unit face of described second layer casing, it is ensured that orlop casing exists Calabash no longer stress on described box unit face, then dismantles the calabash not stressed on orlop casing, with same side The calabash in other box unit face is dismantled by method;The most assembled good hollow steel box immersion, noting during sinking will be by independent case body Box unit face synchronize sink;
(8) repeat step (7), assembled third layer casing on second layer casing, assembled 4th layer of set on third layer casing Case ... until hollow steel box immersion is to design attitude;
(9) remove mast-up, extract the steel-pipe pile of drilled pile platform;
If (10) step (8) casing can not sink down into design attitude by deadweight, then, after completing step (9), utilize mast-up Shaped steel, shaped steel is laid on casing top, shaped steel lays reinforced plastic water container, then toward water filling in reinforced plastic water container until steel jacket box sinks To design attitude;
The most progressively the water in casing is got rid of, along with the decline of water level progressively adds inner support in casing in casing, reach After requiring, in removing casing, mud is to designed elevation, adds wood support, then apply blinding concrete bottom casing;
(12) casing is removed: treats that cushion cap, pier construction are complete and just can be removed by casing, each with casing with angle steel before removing Longitudinal piece in face welds several points, connects as interim, angle steel longitudinal pitch about 1m, and on each angle steel, on bolt, steel wire rope is also By steel wire rope number, all steel wire ropes are temporarily fixed at casing top, place stand-by, in addition to casing top layer top, by casing its He disassembles by the connecting bolt at each angle of each layer, after checking that confirmation does not has connecting bolt, in casing, water filling reduces casing All inner supports are the most all removed along with water level is gradually increasing, are treated not have inside and outside casing hydraulic pressure by outer differential water pressures Difference, starts to remove casing: whole casing is removed in four times, removes an elemental area every time, must be intended to during dismounting the face removed with The interim angle cleat crane in the face being connected with this dismounting face by bolt steel wire rope on angle steel before from bottom to up by Individual slinging until angle steel completely disengages from casing, after angle steel departs from casing, steel wire rope on bolt on the suspension ring of this elemental area, crane leads to Cross steel wire rope and hang this elemental area, remove other connecting bolts of this elemental area and adjacent cells face, release this elemental area and phase The connection of adjacent elemental area, makes this elemental area become independent face, is connected without any with other elemental areas, hung by this elemental area with crane From on the bank, by same way, other elemental areas of casing are removed one by one.
Orlop casing of the present invention i.e. ground floor casing;Leading truck of the present invention can play guiding, positioning action, by leading Can be by hollow steel box immersion to precalculated position to the effect of frame.Leading truck is welded on steel-pipe pile, it is ensured that casing sink time each The axis in face does not deviates by precalculated position.After casing assembly well, whether sink to design attitude, all carry out step 9, do not have Sink to design attitude and just carry out step 10;If having sunk to design attitude, then skip step 10, carry out step 11.At set Bottom portion adds wood support, its objective is to increase the safety of casing, applies blinding concrete, and wood is supported and buries by blinding concrete Living, wood supports and does not further takes out.
As preferably, described step (10), toward water filling in reinforced plastic water container, if after filling water or can not sink, then uses vibration hammer Vibration reinforced plastic water container, until steel jacket box sinks down into design attitude.
As preferably, mast-up is made up of 8 suspension ring on 4 suspension bracket posts, 4 hanging beams, hanging beams and support member;Described often Root hanging beam installs two 2 suspension ring.
For guaranteeing that hanging beam can be sling safely whole casing, when making mast-up, calculating to be passed through determines the shaped steel chi of hanging beam Very little.Each suspension ring are installed a calabash.Suspension ring are welded on hanging beam.The position of suspension ring: ensure the calabash being arranged on suspension ring Reed is sling after casing, and the axis of casing is at design attitude.
So, need not large-scale crane coordinate when casing is dismantled.Between layers, between face and face by ring flange even Connecing, ring flange is positioned at inside casing, and bolt do not gone up by orlop casing (ground floor casing) bottom about 1m adpting flange.In casing The vertical axis of the suspension ring on side welding hanging ring, its vertical axis and hanging beam is on the same line.
As preferably, the interim bracket of described step (5) is arranged on the steel-pipe pile of drilled pile platform outermost, interim bracket Use I-steel, be fixed by welding on the steel-pipe pile of outermost;Use at the connecting sewing of casing when described step (8) is assembled Collision mat made by 8-10mm rubber slab, and local at decussation seam uses atomized ash to carry out strengthening closure with cotton-wool.
Interim bracket is slightly above the water surface, convenient assembled orlop casing (ground floor casing) on bracket.Interim bracket is given One platform for lining of casing, is possible to prevent casing double swerve to be not easy to assembly.
As preferably, when welding casing with angle steel, weld seam is not passed through longitudinal piece of casing.
Accompanying drawing explanation
Fig. 1 is drilled pile Platform pipe stake and the mast-up floor map of the embodiment of the present invention;
Fig. 2 is the mast-up elevational schematic view of the embodiment of the present invention;
Fig. 3 is the orlop casing assembly well rear schematic diagram of the embodiment of the present invention;
Fig. 4 is that front view reinforced by embodiment of the present invention casing;
Fig. 5 is that top view reinforced by embodiment of the present invention casing;
Fig. 6 is embodiment of the present invention box unit face and Bolted angle connection schematic diagram;
Fig. 7 is that the present invention detachably recycles bottomless steel jacket box overall schematic;
Fig. 8 is that the present invention detachably recycles bottomless steel jacket box schematic top plan view;
Fig. 9 is that the present invention detachably recycles bottomless steel jacket box and riverbed, river surface and the front elevational schematic of cushion cap combination;
Figure 10 be before Fig. 6 amplifier section of the present invention i.e. removes casing angle steel with casing longitudinal direction piece connection diagram;
Figure 11 is that the present invention adds water tank schematic diagram on casing top;
Wherein, 1-casing;Straight support reinforced by 2-casing;Diagonal brace reinforced by 3-casing;4-round log;5-cushion cap;6-bed course;7-holes Stake;8-riverbed;9-river surface;10-steel-pipe pile;11-casing;12-suspension bracket post;13-suspension bracket post supports;14-hanging beam;15-holds in the palm temporarily Frame;16-leading truck;17-calabash;18-drilled pile platform;19-shaped steel;20-reinforced plastic water container;21-angle steel;22-suspension ring;23-bracket; 24-weld seam;25-longitudinal direction piece.
Detailed description of the invention
Below in conjunction with accompanying drawing, the present invention is described in further detail.
As shown in Fig. 1-Figure 10, detachably recycling bottomless steel jacket box 1, it is be arranged on around underwater support table some The bottomless Guan Bi cofferdam that individual independent case body is formed by connecting from bottom to top, each independent case body enclosed by several box unit faces and Become;Between independent case body with independent case body, it is connected by ring flange and bolt between box unit face and box unit face;Flange Dish is positioned at inside casing;It is provided with casing in independent case body reinforce straight support 2 and reinforce the straight set supportting 2 angles in an acute angle with casing Diagonal brace 3 reinforced by case;Casing is reinforced the two ends of diagonal brace 3 and is intersected with the adjacent boxes elemental area of same independent case body.Such as every layer solely The height of vertical casing is 1.5-2.5m, and every layer assembled by 4 faces;Inside independent case body, welding is provided with suspension ring 22.
Considering from safety and construction cost, bottom orlop casing, bolt do not gone up by above 1m position adpting flange.Set Case is reinforced straight support 2 and is disposed in levels independent case body.Casing is reinforced straight support 2 and is positioned at same water with casing reinforcing diagonal brace 3 In plane.The angle of straight support 2 and casing reinforcing diagonal brace 3 reinforced by casing is 45 °.It is arranged on the independence in bottomless steel jacket box 1 intermediate layer It is provided with on casing to be positioned in same level and combine and forms the casing reinforcing straight support 2 consistent with independent case body structure.
For the ease of dismounting, the spot welding of junction, box unit face connects angle steel 21;Connect on angle steel 21 and be arranged on nothing The steel wire rope at end steel jacket box 1 top.As shown in Figure 10, when welding casing with angle steel 21, weld seam 24 is not passed through casing Longitudinal piece 25.In this example, underwater support table a size of 7m*7m*2.5m(long * width * is high), korneforos mud is relatively deep, and place, riverbank has Limit, large-scale crane lifting operation is difficult to carry out, and can only use small crane coordinative construction, uses 25t truck crane in this example.This Example underwater support table pier shaft uses the detachable construction method recycling bottomless steel jacket box to sequentially include the following steps:
(1) mast-up makes and lays: before mast-up is installed, and first drilled pile platform top half is removed, leaves steel pipe Stake 10.Drilled pile 7 pile crown laitance as shown in Figure 1 and Figure 2, is cut to concrete surface, the suspension bracket post 12 of mast-up is put by mast-up On the pile crown abolished, then by the steel-pipe pile 10 of mast-up and drilled pile platform 18 by being welded and fixed, use suspension bracket simultaneously Post supports 13 and is welded and fixed with drilled pile casing 11 by suspension bracket post 12, and welding hanging ring on hanging beam installs 1 calabash on each suspension ring 17.Mast-up is made up of 2 suspension ring of 8 every, suspension ring hanging beams on 4 suspension bracket posts 12,4 hanging beams 14, hanging beams and support member. For guaranteeing that hanging beam 14 can be sling safely whole casing, when making mast-up, calculating to be passed through determines the steel section size of hanging beam 14. Each suspension ring are installed a calabash.Suspension ring are welded on hanging beam.The position of suspension ring: ensure the calabash 17 being arranged on suspension ring Slinging after casing, the axis of casing is at design attitude.
(2) bottomless steel jacket box makes: make steel jacket box 1 according to cap design of pile size, it is ensured that inside casing to cushion cap limit about There is 1m distance, reserve bearing platform construction work space.
If bottomless steel jacket box is divided into dried layer, the height of every layer is about 2m, and every layer assembled by 4 faces.So, at set Need not large-scale crane during case dismounting coordinate.Between layers, being connected by ring flange between face and face, ring flange is positioned at casing Inner side, bottom orlop casing i.e. ground floor casing, bolt do not gone up by about 1m adpting flange.Welding hanging ring inside casing, its vertical pivot The vertical axis of the suspension ring on line and hanging beam is on the same line.In this example, bottomless steel jacket box is formed by 4 layers, every layer from top to bottom Highly being respectively as follows: 1m+2m+2m+2m, casing every layer is made up of 4 faces, and four angles are set as fillet, and piece comes one on angle Point, digression about about 40cm;Layer passes through Flange joint with layer, face with face.
(3) interim bracket 15 is installed on steel-pipe pile 10.Interim bracket 15 is arranged on the steel of drilled pile platform 18 outermost On pile tube 10, interim bracket uses I-steel, is fixed by welding on the steel-pipe pile of outermost.Interim bracket is slightly above water Face, convenient assembled orlop casing i.e. ground floor casing on bracket.
(4) casing leading truck is installed: leading truck 16 is fixed by welding in the steel-pipe pile on four angles of drilled pile platform On 10.Leading truck 16 can play guiding, positioning action, can be by hollow steel box immersion to pre-determined bit by the effect of leading truck 16 Put.Leading truck is welded on steel-pipe pile 10, it is ensured that casing axis in each face when sinking does not deviates by precalculated position.
(5) assembled orlop casing i.e. ground floor casing on interim bracket 15: orlop casing is placed in crane On interim bracket 15, assembled orlop casing i.e. ground floor casing on interim bracket 15.Casing one spelling given by interim bracket 15 Assembling platform, is possible to prevent casing double swerve to be not easy to assembly.
(6) interim bracket is removed and orlop casing i.e. ground floor hollow steel box immersion: by the casing of the bottom i.e. ground floor set After case assembly is good, sling with 8 calabashs 17 on hanging beam, removed the most interim bracket 15, by orlop set good for assembly Case i.e. ground floor hollow steel box immersion is slightly above the water surface to casing end face, to facilitate the connection of last layer casing and this layer of casing.
(7) assembly of second layer casing and sinking: a face crane of second layer casing is placed in orlop casing I.e. on ground floor casing, another being hung with 2 calabashs (being similarly installed on hanging beam) prevents from rocking, by second layer casing and After i.e. ground floor casing connects, somewhat sling, it is ensured that orlop casing that is in this face of casing by lower floor's casing with these 2 calabashs One layer of casing, two calabash 17 no longer stress on this face, then by do not stress on orlop casing i.e. ground floor casing that Two calabashs are dismantled, and are dismantled by the calabash in other 3 faces by same method.8-10mm is used at the connecting sewing of casing time assembled Collision mat made by rubber slab, and local at decussation seam uses atomized ash to carry out strengthening closure with cotton-wool, by casing good for assembly Sink, note during sinking wanting 4 faces to synchronize.
(8) step (7) is repeated, assembled third layer casing on second layer casing, assembly the 4th layer on third layer casing Casing ... until hollow steel box immersion is to design attitude.
(9) remove mast-up, extract the steel-pipe pile 10 of drilled pile platform.
(10) if can not sink down into design attitude by deadweight in step (8) casing, then, after completing step (9), utilization is hung The shaped steel 19 shelved, is laid on casing top by shaped steel 19, lays reinforced plastic water container 20 on shaped steel, then toward water filling in reinforced plastic water container, if Still can not sink after filling water, then vibrate reinforced plastic water container with vibration hammer, until steel jacket box sinks down into design attitude.Sink to design Behind position, reinforced plastic water container 20 and shaped steel 19 are removed.
(11) progressively the water in casing is got rid of, along with in casing, the decline of water level progressively adds inner support in casing and enters Row is reinforced, and after reaching requirement, in removing casing, mud is to designed elevation, adds wood and support such as round log 4, then bottom casing Applying concrete cushion 6, next step abolishes pile crown, construction bearing platform and pier shaft.
(12) casing is removed: treats that cushion cap, pier construction are complete and just can be removed by casing, with angle steel and casing 4 before removing Longitudinal piece in individual face welds, and weld seam disconnects at casing connecting sewing, sees Fig. 5, connects, on each angle steel as interim On bolt 1 steel wire rope and by steel wire rope number, all steel wire ropes are temporarily fixed at casing top, place stand-by, except casing top layer Outside top, the connecting bolt in other 4 faces of each layer of casing with face is disassembled, if orlop casing i.e. ground floor casing has even Connecting bolt inside mud, then should be removed part mud and then also be disassembled by the bolt in mud, checks and confirms not connect After connecting bolt, in casing, water filling reduces differential water pressures inside and outside casing, along with water level is gradually increasing the most progressively by all interior Support and all remove, treat not have inside and outside casing differential water pressures, start to remove casing: whole casing is removed in four times, remove one every time Individual elemental area, the interim angle cleat 21 in the face that the face that must be intended to remove during dismounting is connected with this dismounting face passes through with crane Bolt steel wire rope on angle steel 21 is sling the most one by one until angle steel 21 completely disengages from casing before, and angle steel 21 departs from casing After, steel wire rope on bolt on the suspension ring of this elemental area, crane hangs this elemental area by steel wire rope, removes this elemental area with adjacent Other connecting bolts of elemental area, release the connection of this elemental area and adjacent cells face, make this elemental area become independent face, with it This elemental area, without any connection, is hung on the bank, by same way by other elemental areas of casing by his elemental area with crane Remove one by one.
Using the present invention, result shows, it may not be necessary to large-scale crane, less demanding to place, and casing can circulate Use, save construction cost.
This specific embodiment is only explanation of the invention, and it is not limitation of the present invention, people in the art The present embodiment can be made after reading this specification by member as required does not has the amendment of creative contribution, but as long as at this All protected by Patent Law in the right of invention.

Claims (7)

1. the construction method detachably recycling bottomless steel jacket box (1), it is characterised in that:
Described detachably recycle bottomless steel jacket box (1) if for the dried layer independent case body that is arranged on around underwater support table from lower and On the bottomless Guan Bi cofferdam that is formed by connecting, every layer of described independent case body is enclosed by several box unit faces and forms;Described independence Between casing with independent case body, it is connected by ring flange and bolt between described box unit face and box unit face;Described method Blue dish is positioned at inside steel jacket box;
It is provided with casing in described independent case body reinforce straight support (2) and reinforce straight support (2) angle in an acute angle with described casing Diagonal brace (3) reinforced by casing;Described casing is reinforced the two ends of diagonal brace (3) and is intersected with the adjacent boxes elemental area of same independent case body;
The height of every layer of described independent case body is 1.5-2.5m, and every layer assembled by 4 box unit faces;Described independent case body Inner side welding is provided with suspension ring;
Construction method comprises the following steps successively:
(1) mast-up makes and lays: before mast-up is installed, and first drilled pile platform (18) top half is removed, leaves steel pipe Stake (10);Drilled pile (7) pile crown laitance is cut to concrete surface, the suspension bracket post (12) of mast-up is placed in the pile crown abolished On, then by the steel-pipe pile (10) of mast-up and drilled pile platform (18) by being welded and fixed, support (13) with suspension bracket post simultaneously Suspension bracket post (12) is welded and fixed with drilled pile casing (11), welding hanging ring on hanging beam, each suspension ring are installed at least one calabash Reed (17);
(2) bottomless steel jacket box makes: make steel jacket box (1) according to cap design of pile size, it is ensured that have to cushion cap limit inside steel jacket box At least 1m distance, reserves bearing platform construction work space;
(3) at steel-pipe pile (10) the interim bracket of upper installation (15);
(4) steel jacket box leading truck is installed: leading truck (16) is fixed by welding in the steel-pipe pile on four angles of drilled pile platform (10) on;
(5) at the upper assembled orlop steel jacket box of interim bracket (15): with crane, orlop steel jacket box is placed in interim bracket (15) on, at the upper assembled orlop steel jacket box of interim bracket (15);
(6) interim bracket is removed and orlop steel jacket box sinks: after good for orlop steel jacket box assembly, with the calabash on hanging beam (17) sling, removed the most interim bracket (15), assembled good orlop steel jacket box is sunk and makes orlop steel jacket box End face is higher than the water surface, to facilitate the connection of last layer steel jacket box and this layer of steel jacket box;
(7) assembly of second layer steel jacket box and sinking: a box unit face crane of second layer steel jacket box is placed in On lower floor's steel jacket box, separately hung with the calabash being similarly installed on hanging beam and prevent from rocking, by second layer steel jacket box with under After layer steel jacket box connects, with described calabash, is somewhat sling in the described box unit face of described second layer steel jacket box, it is ensured that Lower floor's steel jacket box calabash no longer stress on described box unit face, then tears open the calabash not stressed on orlop steel jacket box Fall, by same method, the calabash in other box unit face is dismantled;Then steel jacket box good for assembly is sunk, note during sinking 4 box unit faces are wanted to synchronize;
(8) step (7) is repeated, assembled third layer steel jacket box on second layer steel jacket box, assembly the 4th on third layer steel jacket box Layer steel jacket box ... until steel jacket box sinks to design attitude;
(9) remove mast-up, extract the steel-pipe pile (10) of drilled pile platform;
(10) if step (8) steel jacket box can not sink down into design attitude by deadweight, then, after completing step (9), mast-up is utilized Shaped steel (19), shaped steel is laid on steel jacket box (1) top, shaped steel (19) lays reinforced plastic water container (20), then toward in reinforced plastic water container Water filling is until steel steel jacket box sinks down into design attitude;
(11) progressively the water in steel jacket box is got rid of, along with in steel jacket box, the decline of water level progressively adds in steel jacket box Support, after reaching requirement, in removing steel jacket box, mud is to designed elevation, adds wood support, then apply bed course bottom steel jacket box Concrete;
(12) steel jacket box is removed: treats that cushion cap, pier construction are complete and is removed by steel jacket box, removes front angle steel (21) every with steel jacket box Longitudinal piece in individual box unit face welds several points, connects as interim, on the upper bolt of each angle steel (21) steel wire rope and by Steel wire rope is numbered, and all steel wire ropes is temporarily fixed at steel jacket box top, places stand-by, in addition to steel jacket box top layer top, by steel bushing Case other each layers each box unit face disassembles with the connecting bolt in box unit face, checks that confirmation does not has connecting bolt After, in steel jacket box, water filling reduces differential water pressures inside and outside steel jacket box, the most progressively props up in all along with water level is gradually increasing Support is all removed, and treats not have inside and outside steel jacket box differential water pressures, starts to remove steel jacket box: whole steel jacket box is removed in four times, tears open every time Except a box unit face, the casing that the box unit face that must be intended to remove during dismounting is connected with this dismounting box unit face The interim angle cleat (21) of elemental area crane is sling the most one by one by bolt steel wire rope on angle steel (21) before Until angle steel (21) completely disengages from steel jacket box, after angle steel (21) departs from steel jacket box, steel on bolt on the suspension ring in this box unit face Cord, crane hangs this box unit face by steel wire rope, removes other companies in this box unit face and adjacent boxes elemental area Connecting bolt, releases the connection in this box unit face and adjacent boxes elemental area, makes this box unit face become independent case body unit Face, is connected without any with other box unit faces, hangs this box unit face on the bank with crane, by same way by steel Other box unit faces of casing are removed one by one.
One the most according to claim 1 detachably recycles the construction method of bottomless steel jacket box (1), and its feature exists In: described step (10), toward reinforced plastic water container (20) inner water filling, if still can not sink after filling water, then vibrates reinforced plastic water container with vibration hammer (20), until steel jacket box (1) sinks down into design attitude.
One the most according to claim 2 detachably recycles the construction method of bottomless steel jacket box (1), and its feature exists In: the described interim bracket of described step (3) (15) is arranged on the steel-pipe pile (10) of drilled pile platform (18) outermost, holds in the palm temporarily Frame uses I-steel, is fixed by welding on the steel-pipe pile of outermost;When described step (7) is assembled at the connecting sewing of steel jacket box Using 8-10mm rubber slab to make collision mat, local at decussation seam uses atomized ash to carry out strengthening closure with cotton-wool.
One the most according to claim 2 detachably recycles the construction method of bottomless steel jacket box (1), and its feature exists In: described casing is reinforced straight support (2) and is disposed in levels independent case body.
One the most according to claim 3 detachably recycles the construction method of bottomless steel jacket box (1), and its feature exists In: described casing is reinforced straight support (2) and is positioned in same level with described casing reinforcing diagonal brace (3).
One the most according to claim 4 detachably recycles the construction method of bottomless steel jacket box (1), and its feature exists In: the angle of straight support (2) and described casing reinforcing diagonal brace (3) reinforced by described casing is 45 °.
One the most according to claim 5 detachably recycles the construction method of bottomless steel jacket box (1), and its feature exists In: be arranged in the independent case body in bottomless steel jacket box (1) intermediate layer be provided be positioned in same level and combine formation with solely The straight support (2) of described casing reinforcing that vertical body structure is consistent.
CN201510225841.7A 2015-05-06 2015-05-06 One detachably recycles bottomless steel jacket box and construction method thereof Active CN104805857B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510225841.7A CN104805857B (en) 2015-05-06 2015-05-06 One detachably recycles bottomless steel jacket box and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510225841.7A CN104805857B (en) 2015-05-06 2015-05-06 One detachably recycles bottomless steel jacket box and construction method thereof

Publications (2)

Publication Number Publication Date
CN104805857A CN104805857A (en) 2015-07-29
CN104805857B true CN104805857B (en) 2016-09-28

Family

ID=53691026

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510225841.7A Active CN104805857B (en) 2015-05-06 2015-05-06 One detachably recycles bottomless steel jacket box and construction method thereof

Country Status (1)

Country Link
CN (1) CN104805857B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105332382B (en) * 2015-10-29 2017-06-30 成都华川公路建设集团有限公司 Adjacent river foundation ditch builds island cofferdam clay water stop construction method
CN105350551A (en) * 2015-11-27 2016-02-24 国网北京市电力公司 Flood-preventing cofferdam
CN107237266B (en) * 2017-06-27 2023-02-28 中铁第四勘察设计院集团有限公司 Open cut rock anchor combined foundation and reverse operation construction method thereof
CN108867672A (en) * 2018-08-24 2018-11-23 中国建筑第四工程局有限公司 A kind of Double-Wall Steel Boxed Cofferdam joining method
CN111533034A (en) * 2020-05-18 2020-08-14 段中华 Lifting device of large-scale hoisting equipment and method for disassembling large-scale hoisting equipment
CN113863355B (en) * 2021-10-18 2023-02-24 中电建十一局工程有限公司 Waterproof construction method for large-volume bearing platform in water

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4461914B2 (en) * 2004-06-09 2010-05-12 株式会社大林組 Temporary deadline structure and temporary deadline method
KR20120111582A (en) * 2011-04-01 2012-10-10 서수정 Prefabricated cofferdam
CN102409690A (en) * 2011-09-21 2012-04-11 长沙理工大学 Construction method for synchronously lowering bottomless double-walled steel case cofferdam through multiple continuous jacks
CN102936899B (en) * 2012-09-11 2015-03-18 武汉二航路桥特种工程有限责任公司 Method for installing steel cofferdam by the aid of pier supporting frame
CN203080537U (en) * 2013-02-05 2013-07-24 中铁一局集团有限公司 High-strength bolt connecting steel cofferdam
CN203188223U (en) * 2013-03-15 2013-09-11 浙江省交通工程建设集团有限公司 Bottomless double-wall steel sleeve box for achieving dry operation 100% recycle
CN104328792B (en) * 2013-07-23 2016-06-01 中交二航局第三工程有限公司 Bottomless double-wall steel casing splicing structure
CN204608812U (en) * 2015-05-06 2015-09-02 中铁十六局集团第三工程有限公司 One detachably recycles bottomless steel jacket box

Also Published As

Publication number Publication date
CN104805857A (en) 2015-07-29

Similar Documents

Publication Publication Date Title
CN104805857B (en) One detachably recycles bottomless steel jacket box and construction method thereof
CN105926448B (en) A kind of construction method of the Cable stayed Bridge Main Tower in the double rope faces of the only tower of curve
CN103924566B (en) A kind of Single Pile self-elevating drilling platform
US4607983A (en) Method of constructing an offshore tower structure
CN204940312U (en) A kind of integral lifting lowering system of steel cofferdam
CN103866693B (en) A kind of mounting method of steel concrete bowstring arch bridge arch rib
CN106120839A (en) A kind of construction technology of off-lying sea blower foundation embedded rock pile
CN204608812U (en) One detachably recycles bottomless steel jacket box
CN106869032B (en) Bridge bearing platform beam tying construction method
CN108867672A (en) A kind of Double-Wall Steel Boxed Cofferdam joining method
CN104563119A (en) Rotating type floating pile driving guide frame
CN102653938A (en) Offshore dismantling construction method of descending form traveler
CN107246016A (en) A kind of suspension type inner support system and foundation ditch construction method suitable for base pit engineering
CN107269085A (en) A kind of construction method of large-diameter concrete silo top conical shell structure
CN106759340A (en) Steel-pipe pile pile-pulling construction method and device in low spatial water
CN102817342A (en) Construction technology of in-situ assembly under pile foundation construction platform of double-wall steel cofferdam
CN200992710Y (en) Steel hanging box for bridge deep-water construction weir
CN202658590U (en) Integral assembled drilling platform
CN204435388U (en) Deep foundation ditch stage construction support changing structure for use
CN107142954A (en) The steel lifted trunk Lift-on/Lift-off System and its hanging method of a kind of integral hoisting
CN113882507A (en) Horizontal truss system containing giant arch and construction method thereof
CN201990995U (en) Jacket support structure for expanding offshore platform
CN111042164B (en) Composite special-shaped cofferdam and construction method
CN109024660A (en) Pile foundation method for dismounting and offshore foundation method for dismounting
CN104961058B (en) A kind of double Z shaped support steel beam and crane supporting member and preparation method containing it

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant