CN104790979A - Combinable trolley and construction method thereof - Google Patents

Combinable trolley and construction method thereof Download PDF

Info

Publication number
CN104790979A
CN104790979A CN201510129754.1A CN201510129754A CN104790979A CN 104790979 A CN104790979 A CN 104790979A CN 201510129754 A CN201510129754 A CN 201510129754A CN 104790979 A CN104790979 A CN 104790979A
Authority
CN
China
Prior art keywords
chassis
main frame
side form
combination
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510129754.1A
Other languages
Chinese (zh)
Other versions
CN104790979B (en
Inventor
林世友
樊福发
陈国昌
王方荣
甘道波
史清华
蒋彬
李焱
谢林星
余光君
陈冠文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Water Power Urban Rail Transit Construction Co Ltd
Guangdong No 2 Hydropower Engineering Co Ltd
Original Assignee
Guangdong Water Power Urban Rail Transit Construction Co Ltd
Guangdong No 2 Hydropower Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Water Power Urban Rail Transit Construction Co Ltd, Guangdong No 2 Hydropower Engineering Co Ltd filed Critical Guangdong Water Power Urban Rail Transit Construction Co Ltd
Priority to CN201510129754.1A priority Critical patent/CN104790979B/en
Publication of CN104790979A publication Critical patent/CN104790979A/en
Application granted granted Critical
Publication of CN104790979B publication Critical patent/CN104790979B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/02Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for rooms as a whole by which walls and floors are cast simultaneously, whole storeys, or whole buildings
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D13/00Large underground chambers; Methods or apparatus for making them

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a combinable trolley. The combinable trolley comprises at least two combination trolley bodies (1). Every two adjacent combination trolley bodies (1) are connected through a fixing support (2). Each combination trolley body (1) comprises a trolley main frame (11), a trolley top mold (12), a side mold (13), a haunch formwork (14) and a trolley base (15). Each fixing support (2) comprises a support main frame (21) and a support top mold (22). The construction method of the combinable trolley includes the following steps: positioning an upper construction face, positioning the haunch formworks, positioning the side molds, carrying out construction, releasing the side molds, releasing the haunch formworks, releasing the top molds, advancing the trolley and beginning a next work cycle. By means of the combinable trolley and the construction method, the aim that side walls and floors are constructed at the same time is achieved, and the requirements for constructing different cross section types and different widths in a station are further met. By means of the trolley, the combination way is versatile, free combining can be achieved, and independent work can also be achieved.

Description

A kind of chassis capable of being combined and construction method thereof
Technical field
The present invention relates to a kind of subway platform construction chassis, particularly one may be combined with chassis and construction method thereof.
Background technology
The construction of domestic main structure of subway station concrete, existing formwork jumbo is split type chassis, and namely side form and floor adopt two kinds of dissimilar chassis section constructions, and long construction period, cost is relatively high.The combination of chassis is more single and limit to.
Summary of the invention
The technical problem to be solved in the present invention provide a kind of construction requirement, combination meeting different section type and width in station changeable, can the independent assortment chassis capable of being combined that also can work independently, the construction method of this chassis capable of being combined is provided simultaneously.
The invention discloses a kind of chassis capable of being combined, comprise between at least two combination vehicles, described combination vehicle and being connected by fixed support, it is characterized in that:
Described combination vehicle comprises chassis main frame, chassis backform, side form, armpit Angle formwork and chassis base, described chassis base comprises base plate, be fixed on base plate under bogie wheels, jack for jack-up base plate, described chassis main frame is fixed on described base plate, described side form is dismountable is arranged on chassis main frame both sides, described chassis backform is fixed on the upside of chassis main frame, between described chassis backform and side form, armpit Angle formwork is installed, described armpit Angle formwork and chassis backform hinged;
Described fixed support comprises support main frame, support backform, and described support backform and combination vehicle splice;
Described combination vehicle is connected side side form with fixed support is dismantled, and described support bracket fastened support main frame is fixedly connected with the chassis main frame of combination vehicle.
As a modification of the present invention, described chassis main frame is fixedly connected with by telescopic side form oil cylinder with between side form, and described oily side form cylinder body is fixed on chassis main frame, and side form oil cylinder push rod is fixedly connected with side form.
As a modification of the present invention, described armpit Angle formwork intersects by two pieces and angle is the top board at obtuse angle and side plate forms, and described side plate is connected with chassis main frame by armpit angle oil cylinder.
As a modification of the present invention, described support backform and chassis backform splice and at same plane.
As a modification of the present invention, described support backform and the armpit Angle formwork after strutting splice.
As a modification of the present invention, described combination vehicle quantity is two, and side by side and the side form of corresponding side is unloaded, the side of described side form unloading is fixedly connected with by the chassis main frame of support main frame by two combination vehicles described two combination vehicles.
As a modification of the present invention, described combination vehicle quantity is three, described three combination vehicles side by side, wherein the side form of the corresponding side of both sides combination vehicle is unloaded, the side form of intermediate combination car both sides all unloads, and described three combination vehicles are side by side fixedly connected with by the chassis main frame of support main frame by three combination vehicles.
As a modification of the present invention, described combination vehicle quantity is four, described four combination vehicles side by side, wherein the side form of the corresponding side of both sides combination vehicle is unloaded, the side form of middle two combination vehicle both sides all unloads, and described three combination vehicles are side by side fixedly connected with by the chassis main frame of support main frame by three combination vehicles.
The present invention discloses a kind of construction method of chassis capable of being combined, comprise the following steps:
Upper working face location: adjustment is fixed on the jack for jack-up base plate under base plate, makes backform reach design height, fixes and locked jack;
Armpit Angle formwork is located: make armpit Angle formwork reach preposition, installs screw mandrel and supports;
Side form is located: make the side form of composed bogie both sides and armpit Angle formwork paste close, installs side form screw mandrel and supports;
Construction: add release agent in working face, fluid concrete, waits for concrete setting;
The side form demoulding: remove side form screw mandrel and support, complete the side form demoulding;
The armpit Angle formwork demoulding: remove armpit Angle formwork screw mandrel and support, complete the demoulding of armpit Angle formwork;
The backform demoulding: remove supporting leg screw mandrel and support, regain jack 153, complete the backform demoulding;
Chassis advances, and enters subsequent work circulation.
As a modification of the present invention, described side form is fixedly connected with chassis main frame with armpit angle oil cylinder respectively by side form oil cylinder with armpit Angle formwork.
Generally speaking the present invention has following beneficial effect:
1, present invention achieves the object that side wall and floor are constructed simultaneously, also achieve the construction requirement of different section type and width in station.Chassis combination is changeable, can independent assortment, also can work independently;
2, tear steel pipe support open after arranging between chassis, solve the formwork requirement that plate face, station structure is changeable, the simultaneously less form removal span of floor, shortens the construction period of unit construction section;
3, can the early demoulding, improve construction effect, chassis and steel pipe support combination construction, floor span can be met and be greater than 8m and carry out the demoulding when concrete strength reaches design load 75%;
4, wide adaptability, utilizes the Telescopic of chassis, can meet the construction requirement of subway station different section width, form of fracture.Also can be used for the construction of subway open cut interval structure;
5, by different combinations, can meet two across, three across, four across the construction needs of section, be greater than the scope of 8m in floor span, after arranging between chassis, tear steel pipe support open, trolley unit construction period can be shortened, improve efficiency of construction.Chassis armpit angle place template adopts scalable design, and can meet the construction requirement of different partition wall thickness, different post, deck-siding, have very large flexibility, applicability is wide.
Accompanying drawing explanation
Fig. 1 bis-pore structure working drawing;
Fig. 2 tri-pore structure working drawing;
Fig. 3 tetra-pore structure working drawing;
Fig. 4 combination vehicle sectional view;
Wherein: 1-combination vehicle, 11-chassis main frame, 12-chassis backform, 13-side form, 14-armpit Angle formwork, 141-top board, 142-side plate, 143-armpit angle oil cylinder, 15-chassis base, 151-base plate, 152-bogie wheels, 153-jack, 16-side form oil cylinder;
2-fixed support, 21-support main frame, 22-support backform.
Detailed description of the invention
Below in conjunction with accompanying drawing, the invention will be further described.
As shown in Figure 1, Figure 2, Figure 3 and Figure 4, the invention discloses a kind of chassis capable of being combined, this chassis capable of being combined comprises combination vehicle 1 and the fixed support 2 for being connected combination vehicle.Combination vehicle 1 comprises chassis main frame 11, chassis backform 12, side form 13, armpit Angle formwork 14 and chassis base 15, described chassis base 15 comprises base plate 151, be fixed on base plate 151 under bogie wheels 152, jack 153 for jack-up base plate 151, chassis main frame 11 is fixed on described base plate 151; Described side form 13 is dismountable is arranged on chassis main frame 11 both sides, be fixedly connected with by telescopic side form oil cylinder 16 between chassis main frame 11 with side form 13, oil side form cylinder 16 body is fixed on chassis main frame 11, and side form oil cylinder 16 push rod is fixedly connected with side form 13; Described chassis backform 12 is fixed on the upside of chassis main frame 11, between described chassis backform 12 and side form 13, armpit Angle formwork 14 is installed, armpit Angle formwork 14 intersects by two pieces and angle is the top board 141 at obtuse angle and side plate 142 forms, described armpit Angle formwork 14 hinged with top board 141 chassis backform 12, side plate 142 is connected with chassis main frame 11 by armpit angle oil cylinder 143; Fixed support 2 comprises support main frame 21, support backform 22, and described support backform 22 splices with combination vehicle 1; Described combination vehicle 1 is connected side side form 13 with fixed support 2 is dismantled, and the support main frame 21 of described fixed support 2 is fixedly connected with the chassis main frame 11 of combination vehicle 1.
Embodiment 1: two pore structure is constructed
As shown in Figure 1, two hollow structure constructions comprise the construction of first hole and the construction of second hole.
First hole comprises 1, four placements that combination vehicle is parallel of four combination vehicles, and the side plate 13 of the corresponding side of combination vehicle 1 of both sides and armpit Angle formwork 14 are removed, and side plate 13 and the armpit Angle formwork 14 of middle two combination vehicle 1 both sides are all removed.The chassis main frame 11 of four combination vehicles 1 is fixedly connected with by the support main frame 21 of fixed support 2, makes four combination vehicles 1 form a complete work plane and can move simultaneously.The backform 12 of both sides combination vehicle 1, the backform 12 of intermediate combination car 1 are in same plane with the support backform 22 of the fixed support 2 being connected both sides combination vehicle 1 and intermediate combination car 1 and split forms work plane mutually.Backform 12 and the support backform 22 of the fixed support 2 being fixedly connected with two intermediate combination cars 1 of two intermediate combination cars 1 form a depression working face for back timber of constructing.
Second hole is the construction of two circular cavities, four combination vehicles 1 are divided into two groups to be placed on respectively in two circular cavities, the side plate of the side that every two combination vehicles 1 are corresponding removes and the chassis main frame 11 of combination vehicle 1 is fixedly connected with by the support main frame 21 of fixed support 2, and the backform 12 of combination vehicle 1 and the support backform 22 of fixed support 2 are in same plane and split forms work plane mutually.
Embodiment 2: three pore structure is constructed
As shown in Figure 2, three pore structure constructions comprise the construction of first hole and the construction of second hole.
First hole comprises 1, four placements that combination vehicle is parallel of four combination vehicles, and the side plate 13 of the corresponding side of combination vehicle 1 of both sides and armpit Angle formwork 14 are removed, and side plate 13 and the armpit Angle formwork 14 of middle two combination vehicle 1 both sides are all removed.The chassis main frame 11 of four combination vehicles 1 is fixedly connected with by the support main frame 21 of fixed support 2, makes four combination vehicles 1 form a complete work plane and can move simultaneously.The backform 12 of four combination vehicles 1 is in same plane with the support backform 22 of the fixed support 2 being connected four combination vehicles 1 and split forms work plane mutually.
Second hole is the construction of three holes, and four combination vehicles 1 are divided into three groups, is divided into two combination vehicles merged 1 and two independent combination vehicles 1; The side plate of two corresponding sides of combination vehicle 1 merged removes and the chassis main frame 11 of combination vehicle 1 is fixedly connected with by the support main frame 21 of fixed support 2, and the backform 12 of combination vehicle 1 and the support backform 22 of fixed support 2 are in same plane and split composition work plane mutually.
Embodiment 3: four pore structure is constructed
As shown in Figure 3, four pore structure constructions comprise the construction of first hole and the construction of second hole.
First hole comprises 1, four placements that combination vehicle is parallel of four combination vehicles, and the side plate 13 of the corresponding side of combination vehicle 1 of both sides and armpit Angle formwork 14 are removed, and side plate 13 and the armpit Angle formwork 14 of middle two combination vehicle 1 both sides are all removed.The chassis main frame 11 of four combination vehicles 1 is fixedly connected with by the support main frame 21 of fixed support 2, makes four combination vehicles 1 form a complete work plane and can move simultaneously.The backform 12 of both sides combination vehicle 1, the backform 12 of intermediate combination car 1 are in same plane with the support backform 22 of the fixed support 2 being connected both sides combination vehicle 1 and intermediate combination car 1 and split forms work plane mutually.Backform 12 and the support backform 22 of the fixed support 2 being fixedly connected with two intermediate combination cars 1 of two intermediate combination cars 1 form a depression working face for back timber of constructing.
Second hole is the construction of four holes, and four combination vehicles 1 are distributed in four holes constructs separately.
The construction process that above-mentioned two pore structure constructions, three pore structure constructions and four pore structures are constructed is as follows:
Upper working face location: adjustment is fixed on the jack 153 for jack-up base plate 151 under base plate 151, makes backform 12 reach design height, fixes and locked jack 153;
Armpit Angle formwork is located: by regulating the stroke of armpit angle oil cylinder 143, make armpit Angle formwork 14 reach preposition, installs screw mandrel and supports;
Side form is located: by the stroke of adjusting side mould oil cylinder 16, makes the side form 13 of composed bogie both sides paste close with armpit Angle formwork 14, installs side form screw mandrel and support;
Construction: add release agent in working face, fluid concrete, waits for concrete setting;
The side form demoulding: remove side form screw mandrel and support, the stroke of adjusting side mould oil cylinder 16, completes the side form demoulding;
The armpit Angle formwork demoulding: remove armpit Angle formwork screw mandrel and support, regulate the stroke of armpit angle oil cylinder 143, complete the demoulding of armpit Angle formwork;
The backform demoulding: remove supporting leg screw mandrel and support, regain jack 153, complete the backform demoulding.
Chassis advances, and enters subsequent work circulation.
The foregoing is only better embodiment of the present invention, the present invention is not limited to above-mentioned embodiment, the structural modification that local is small may be there is in implementation process, if do not depart from the spirit and scope of the present invention to various change of the present invention or modification, and belonging within claim of the present invention and equivalent technologies scope, then the present invention is also intended to comprise these change and modification.

Claims (10)

1. a chassis capable of being combined, is comprised between at least two combination vehicles (1), described combination vehicle (1) and being connected by fixed support (2), it is characterized in that:
Described combination vehicle (1) comprises chassis main frame (11), chassis backform (12), side form (13), armpit Angle formwork (14) and chassis base (15), described chassis base (15) comprises base plate (151), be fixed on the bogie wheels (152) under base plate (151), for the jack (153) of jack-up base plate (151), described chassis main frame (11) is fixed on described base plate (151), described side form (13) is dismountable is arranged on chassis main frame (11) both sides, described chassis backform (12) is fixed on chassis main frame (11) upside, between described chassis backform (12) and side form (13), armpit Angle formwork (14) is installed, described armpit Angle formwork (14) is hinged with chassis backform (12),
Described fixed support (2) comprises support main frame (21), support backform (22), and described support backform (22) and combination vehicle (1) splice;
Described combination vehicle (1) is connected side side form (13) with fixed support (2) is dismantled, and the support main frame (21) of described fixed support (2) is fixedly connected with the chassis main frame (11) of combination vehicle (1).
2. chassis capable of being combined according to claim 1, it is characterized in that: described chassis main frame (11) is fixedly connected with by telescopic side form oil cylinder (16) with between side form (13), described oily side form cylinder (16) body is fixed on chassis main frame (11), and side form oil cylinder (16) push rod is fixedly connected with side form (13).
3. chassis capable of being combined according to claim 1, it is characterized in that: described armpit Angle formwork (14) is intersected by two pieces and angle is the top board (141) at obtuse angle and side plate (142) forms, and described side plate (142) is connected with chassis main frame (11) by armpit angle oil cylinder (143).
4. chassis capable of being combined according to claim 1, is characterized in that: described support backform (22) and chassis backform (12) splice and at same plane.
5. chassis capable of being combined according to claim 1, is characterized in that: described support backform (22) and the armpit Angle formwork (14) after strutting splice.
6. according to the chassis capable of being combined described in claim 1 to 5, it is characterized in that: described combination vehicle (1) quantity is two, side by side and the side form of corresponding side (13) is unloaded, the side that described side form (13) unloads is fixedly connected with by the chassis main frame (11) of support main frame (21) by two combination vehicles (1) described two combination vehicles (1).
7. according to the chassis capable of being combined described in claim 1 to 5, it is characterized in that: described combination vehicle (1) quantity is three, described three combination vehicles (1) side by side, wherein the side form (13) of the corresponding side of both sides combination vehicle is unloaded, the side form (13) of intermediate combination car both sides all unloads, and described three combination vehicles (1) are side by side fixedly connected with by the chassis main frame (11) of support main frame (21) by three combination vehicles (1).
8. according to the chassis capable of being combined described in claim 1 to 5, it is characterized in that: described combination vehicle (1) quantity is four, described four combination vehicles (1) side by side, wherein the side form (13) of the corresponding side of both sides combination vehicle is unloaded, the side form (13) of middle two combination vehicle (1) both sides all unloads, and described three combination vehicles (1) are side by side fixedly connected with by the chassis main frame (11) of support main frame (21) by three combination vehicles (1).
9. utilize a construction method for chassis capable of being combined as claimed in claim 1, comprise the following steps:
Upper working face location: adjustment is fixed on the jack for jack-up base plate (151) (153) under base plate (151), makes backform reach design height, fixes and locked jack (153);
Armpit Angle formwork is located: make armpit Angle formwork (14) reach preposition, installs screw mandrel and supports;
Side form is located: make the side form of composed bogie both sides (13) and armpit Angle formwork (14) paste close, installs side form screw mandrel and supports;
Construction: add release agent in working face, fluid concrete, waits for concrete setting;
The side form demoulding: remove side form screw mandrel and support, complete the side form demoulding;
The armpit Angle formwork demoulding: remove armpit Angle formwork screw mandrel and support, complete the demoulding of armpit Angle formwork;
The backform demoulding: remove supporting leg screw mandrel and support, regain jack (153), complete the backform demoulding;
Chassis advances, and enters subsequent work circulation.
10. the construction method of chassis capable of being combined according to claim 9, is characterized in that: described side form (13) is fixedly connected with chassis main frame with armpit angle oil cylinder (143) respectively by side form oil cylinder (16) with armpit Angle formwork (14).
CN201510129754.1A 2015-03-24 2015-03-24 A kind of combined chassis and its construction method Active CN104790979B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510129754.1A CN104790979B (en) 2015-03-24 2015-03-24 A kind of combined chassis and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510129754.1A CN104790979B (en) 2015-03-24 2015-03-24 A kind of combined chassis and its construction method

Publications (2)

Publication Number Publication Date
CN104790979A true CN104790979A (en) 2015-07-22
CN104790979B CN104790979B (en) 2017-05-31

Family

ID=53556113

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510129754.1A Active CN104790979B (en) 2015-03-24 2015-03-24 A kind of combined chassis and its construction method

Country Status (1)

Country Link
CN (1) CN104790979B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106120855A (en) * 2016-08-23 2016-11-16 青岛城建集团有限公司 A kind of subway open-cut station arch is without rod structure and construction thereof
CN108951704A (en) * 2018-08-24 2018-12-07 中铁十七局集团第三工程有限公司 Piping lane new type formwork trolley and its construction technology
CN109487814A (en) * 2018-10-29 2019-03-19 杭州市市政工程集团有限公司 Cast-in-place piping lane integrated moveable formwork jumbo construction method
CN109532897A (en) * 2018-11-14 2019-03-29 安徽浦进轨道装备有限公司 A kind of combined orbit flatcar
CN109538245A (en) * 2018-12-04 2019-03-29 中铁十二局集团有限公司 A kind of no column stalk vault subway station formwork jumbo and its construction method
CN112982480A (en) * 2021-02-03 2021-06-18 中建三局集团有限公司 Quick-dismantling method for subway station structural construction by utilizing stress of middle plate

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102296971A (en) * 2011-08-08 2011-12-28 湖南五新重型装备有限公司 Lining method for tunnel emergency turnout strips and tunnel-lining trolley
CN203097904U (en) * 2013-01-25 2013-07-31 中铁十四局集团有限公司 Separating type trolley system used for underground excavation of long-span cross section
KR20130106199A (en) * 2012-03-19 2013-09-27 선산철강공업(주) Steel form for tunnel construction under linning board and tunnel construction method using it
CN203238589U (en) * 2013-03-24 2013-10-16 王慧英 Formwork trolley applied to inverted siphon project
CN103470272A (en) * 2013-10-11 2013-12-25 北京住总集团有限责任公司 Trolley for concrete construction on multiple sections by employing mining method and construction method thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102296971A (en) * 2011-08-08 2011-12-28 湖南五新重型装备有限公司 Lining method for tunnel emergency turnout strips and tunnel-lining trolley
KR20130106199A (en) * 2012-03-19 2013-09-27 선산철강공업(주) Steel form for tunnel construction under linning board and tunnel construction method using it
CN203097904U (en) * 2013-01-25 2013-07-31 中铁十四局集团有限公司 Separating type trolley system used for underground excavation of long-span cross section
CN203238589U (en) * 2013-03-24 2013-10-16 王慧英 Formwork trolley applied to inverted siphon project
CN103470272A (en) * 2013-10-11 2013-12-25 北京住总集团有限责任公司 Trolley for concrete construction on multiple sections by employing mining method and construction method thereof

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106120855A (en) * 2016-08-23 2016-11-16 青岛城建集团有限公司 A kind of subway open-cut station arch is without rod structure and construction thereof
CN108951704A (en) * 2018-08-24 2018-12-07 中铁十七局集团第三工程有限公司 Piping lane new type formwork trolley and its construction technology
CN109487814A (en) * 2018-10-29 2019-03-19 杭州市市政工程集团有限公司 Cast-in-place piping lane integrated moveable formwork jumbo construction method
CN109532897A (en) * 2018-11-14 2019-03-29 安徽浦进轨道装备有限公司 A kind of combined orbit flatcar
CN109532897B (en) * 2018-11-14 2020-10-16 安徽浦进轨道装备有限公司 Combined rail flat car
CN109538245A (en) * 2018-12-04 2019-03-29 中铁十二局集团有限公司 A kind of no column stalk vault subway station formwork jumbo and its construction method
CN109538245B (en) * 2018-12-04 2020-05-15 中铁十二局集团有限公司 Construction method of template trolley for non-column straight-wall vault subway station
CN112982480A (en) * 2021-02-03 2021-06-18 中建三局集团有限公司 Quick-dismantling method for subway station structural construction by utilizing stress of middle plate

Also Published As

Publication number Publication date
CN104790979B (en) 2017-05-31

Similar Documents

Publication Publication Date Title
CN104790979A (en) Combinable trolley and construction method thereof
CN102239302B (en) The method of concrete blinding is peeled off from concrete surface
CN103195450B (en) Hydraulic pressure tunnel invert operation trolley and inverted arch construction method
CN104908149A (en) Template system of magnetic-levitation linear track beam and application method
CN107227690B (en) Supporting leg structure in uplink movable mould frame
CN204414305U (en) A kind of prefab-form system for many casees corrugated steel web case beam that broadens
CN105538484A (en) U-beam mold used for preventing damage of tensioning and releasing tensile stress and U-beam manufacturing method
CN104358577B (en) A kind of tunnel lining trolley
CN109267490A (en) A kind of long nose-girder type mobile formwork and its construction method
CN203542831U (en) Precast concrete production system and demolding mechanism thereof
CN211341736U (en) Be applied to chain building structure of building engineering's building
CN104453951B (en) Combined type subway station lining template trolley for baffle
CN103046740B (en) Large-span moving-door type combined formwork system
CN102198693A (en) Sectional box beam hydraulic internal mold
CN101476288B (en) Cast-in-place moving die carrier of T type bridge flange board
CN104179352A (en) Dismountable template system
CN105442454A (en) Segmented self-traveling type cast-in-place beam hydraulic inner mould and mould erecting and demoulding method thereof
CN109356618A (en) A kind of simple integral movable type square type tunnel frame and its construction method
CN202380732U (en) Self-load bearing template support device utilizing steel reinforced concrete beam
KR200479355Y1 (en) The formwork of PSC box girder that is installed struts
CN203741723U (en) Automatic traveling type movable formwork used for bridge construction
CN203145273U (en) Dismountable steel-concrete composite floor
CN105625708B (en) A kind of aluminum wood composite shuttering system for building
CN215368705U (en) Floor post-cast strip pouring mold structure
CN201343704Y (en) Cast-in-place moving die carrier of T type bridge flange board

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant