CN104775412A - Stratum reinforcement PSC construction method - Google Patents

Stratum reinforcement PSC construction method Download PDF

Info

Publication number
CN104775412A
CN104775412A CN201510132913.3A CN201510132913A CN104775412A CN 104775412 A CN104775412 A CN 104775412A CN 201510132913 A CN201510132913 A CN 201510132913A CN 104775412 A CN104775412 A CN 104775412A
Authority
CN
China
Prior art keywords
stratum
construction
psc
grouting
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510132913.3A
Other languages
Chinese (zh)
Other versions
CN104775412B (en
Inventor
刘建
郑杨锐
刘军
谢远云
梁远波
魏建滨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Xinlong tunnel equipment Limited by Share Ltd
Original Assignee
Guangzhou Jian Heng Mechanical And Electric Equipment Installation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Jian Heng Mechanical And Electric Equipment Installation Co Ltd filed Critical Guangzhou Jian Heng Mechanical And Electric Equipment Installation Co Ltd
Priority to CN201510132913.3A priority Critical patent/CN104775412B/en
Publication of CN104775412A publication Critical patent/CN104775412A/en
Application granted granted Critical
Publication of CN104775412B publication Critical patent/CN104775412B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D1/00Investigation of foundation soil in situ
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/12Consolidating by placing solidifying or pore-filling substances in the soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/003Injection of material
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Soil Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Analytical Chemistry (AREA)
  • Chemical & Material Sciences (AREA)
  • Agronomy & Crop Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The invention discloses a stratum reinforcement PSC construction method which comprises the following construction steps: lofting hole sites; performing first hole construction; determining slurry proportion; performing stratum drainage construction; performing stratum reinforcement grouting; repeating the previous steps, thereby finishing all the stratum reinforcement PSC construction steps. The stratum reinforcement PSC construction method has the beneficial effects that equipment used in the stratum reinforcement method is relatively small in size and flexible in movement among hole sites; the slurry consolidation time can be regulated according to practical situations; the slurry penetrability is favorable; the slurry can be consolidated under the condition of circulating water, is difficult to dissolve and good in water stop effect; the reinforcement method is applicable to various strata, wide in application range, good in environment-friendly functional effect, less in environment pollution, good in safe operation function and high in construction speed; by virtue of adopting the technology for construction, the construction process includes advancing-type construction and backing-type construction, additional hole guiding is not needed, the additional hole guiding time is saved, and hole collapse is avoided; the preparation of construction is simple, around-the-clock construction can be performed and the engineering cost is low.

Description

Stratum consolidation PSC construction method
Technical field
The present invention relates to stratum consolidation construction field, particularly relate to a kind of stratum consolidation PSC construction method.
Background technology
Domestic tunneling shield construction termination and building stratum consolidation method are mainly with the main reinforcement means such as modified form, displaced type, extrusion pressing type.Prior art is by rotary churning pile, sleeve valve barrel grouting to reach stratum consolidation object, and for rich water sandy pear variety, existing reinforcement means there is no a kind of safe, economic, efficient, ripe reservoir treating construction method.
Domestic prior art relevant to invention at present has one.For application people is China Railway Erju Co., Ltd and China Railway Erju 1st Engineering Co., Ltd., number of patent application is the patent of invention " construction method of soft clay area ground stabilization " of 201110064110.0, the invention discloses a kind of soft clay area foundation stabilization construction method, adopt following steps: construction equipment prepares; Construction plant prepares; The steps such as surveying and locating.Current this construction method only perforate grouting behind shaft or drift lining on the ground, does not improve soil layer, and the bulk strength after construction does not obtain the improvement of essence, and this construction method cannot meet now more and more higher construction requirement.
Summary of the invention
The technical problem to be solved in the present invention is to provide that a kind of construction effect is good, applied widely, environmental pollution is few, construction safety and stratum consolidation PSC construction method with low cost.
In order to solve technical problem proposed by the invention, the invention discloses a kind of stratum consolidation PSC construction method, this stratum consolidation PSC construction method comprises following construction sequence:
A, the setting-out of position, hole: construction before according to designing requirement total powerstation to the position setting-out of each hole, through repetition measurement test line qualified after, position on ground;
B, the first hole construction: use rig to carry out the first hole bore operation, drilling process wants microrunning, grasping stratum in operation process affects situation to rig, and determine the drilling parameter under this formation condition, stratum geological condition is determined in test simultaneously;
C, determine wet end furnish: reinforce wet end furnish according to reinforcing area stratum geological condition determination draining chemical sizwe proportioning and the filling perforation of grouting grouting;
D, layer drainage construction: reuse underground drill rig and carry out bore operation, while bit drills to reinforcing area, using grouting pump to determine, the chemical sizwe of proportioning injects in reinforcing area, until arrive design hole depth;
E, stratum consolidation slip casting: use grouting pump filling perforation to be reinforced in the reinforcing area completing stratum draining that slurry implantation step d obtains;
F, repetition steps d, e can complete whole stratum consolidation PSC construction sequence.
Stratum consolidation PSC construction method disclosed by the invention is different from original form of construction work, and first formation is carried out analysis and made construction more targeted, and behind analysis stratum, configures corresponding slurry workmanship according to stratum geological condition be guaranteed further; Carry out a stratum draining in the process of boring under underground drill rig drill bit and can get rid of stratum moisture content, improve the impermeability of the soil body; Reinforce slurry according to the filling perforation obtained after the geological condition of analysis stratum can change former physical properties of soil and improve the compressive strength of the soil body, finally make weak soil layer (especially chiltern, gravelly clay and layer of sand) become the reinforcing body that impermeability is high, compressive strength is high and stability is high.
As a modification of the present invention: described draining chemical sizwe comprises water glass and phosphoric acid.Water glass and phosphoric acid are conventional industrial materials, can effectively reduce cost of production.
As a modification of the present invention: described grouting filling perforation is reinforced slurry and comprised water glass and cement paste.Water glass and cement paste are conventional constructional materialss, can effectively reduce cost of production.
As a modification of the present invention: the bore operation in described ground layer drainage construction step is carried out to opposite side by the side of working face, completes stratum draining successively.Carried out holing to opposite side by the side of working face, stratum draining can ensure the water in stratum once to get rid of to opposite side from side, this form of construction work can obtain the substantially unified stratum of parameter, can improve construction quality.
As a modification of the present invention: described consolidation grouting process is carried out after ground layer drainage construction all completes, described consolidation grouting process is carried out to central area by working face periphery.Stratum consolidation slip casting is reinforce slurry due to filling perforation to have swelling in the process of solidifying by peripheral the carrying out to central area of working face, carried out can ensureing can not reinforce the expansion in slurry process of setting due to filling perforation in the process of construction to central area by periphery and destroy the stratum of having constructed around working face, affecting the outer stratum of construction area and stablize.
As a modification of the present invention: described consolidation grouting process upwards promotes by bottom hole, hoisting velocity need according to flow rate of grouting and grouting amount and the adjustment of slip casting penetration radius.The control of hoisting velocity can ensure slip casting effect, avoids slurries make slurries deficiency in hole form cavity very little or stablize because slurries too much destroy stratum here.
As a modification of the present invention: complete when after chemical sizwe is injected the step of hole by the consolidation grouting of described step e in completing steps d, drill bit of drilling machine promotes.Inject filling perforation reinforcing slurry in the process that underground drill rig drilling rod promotes after completing chemical sizwe injection hole and effectively can shorten the engineering time, stratum draining and stratum consolidation slip casting can complete when underground drill rig one-stop operation.
As a modification of the present invention: described underground drill rig bore operation is carried out to central area by working face periphery, and need to detect stratum geological condition in the process of bore operation, the proportioning of slurry is reinforced in base area layer parameter adjustment chemical sizwe and filling perforation.Detect stratum geological condition during bore operation and adjust according to stratum geological condition the proportioning that chemical sizwe and filling perforation reinforce slurry at any time and effectively can ensure construction quality, construction effect is better.
As a modification of the present invention: described stratum consolidation slip casting process underground drill rig drilling rod hoisting velocity need according to flow rate of grouting and grouting amount and the adjustment of slip casting penetration radius.
As a modification of the present invention: described grouting pump is Double-liquid mud-injection pump.Double-liquid mud-injection pump can complete the slip casting of two kinds of slurries.
Generally speaking the present invention has following beneficial effect:
1, general utility functions
Local layer reinforcement means uses equipment size less, and position, equipment moving hole is flexible; The slurry consolidation time can adjust according to actual conditions; Slurry infiltration is good; Slurries can when circulating water consolidation, slurries are not soluble, and stagnant water effect is good; Reinforcement means is applicable to all kinds of stratum, applied widely;
2, environment-friendly function
The slurries that this stratum consolidation method adopts are to underground water nontoxic pollution-free, and slurries do not run off, and substantially do not produce mud, and without the need to mud outward transport, environment pollution is little;
3, safety work function
Implement is simple, and plant equipment is moved conveniently at work plane, flexible operation, and construction safety is controlled; Consolidation effect is desirable, meets the construction requirements such as stratum consolidation, building strengthening, the reinforcing of tool changing point, the reinforcing of shield-tunneling construction termination;
4, speed of application is fast
Adopt this technology to construct, construction technology divides protrusive and retrusive construction, without the need to drawing hole in addition, saving and drawing the hole time in addition, avoiding collapse hole to occur.Preparation of construction is simple, can carry out operation in 24 hours;
5, engineering cost
This engineering construction equipment is simple, and equipment turnover field expense is less; Equipment operating simple and flexible, constructor is less; Construction material waste rate is lower, saves waste of material cost.
Detailed description of the invention
Need to carry out safety technics to constructor before stratum consolidation construction to tell somebody what one's real intentions are, on-the-spot outfit technician guiding construction, is equipped with professional captain and operates ruggedized equipment.Need in work progress to be equipped with site operation person, guarantee that the technology competitions such as the slip casting degree of depth, grouting amount, grout coordinate ratio and slurry consolidation time meet construction technical requirement.Constructor need focus on the relevant knowledges such as safety management, quality control, environmental protection in addition.
Preparation of construction comprises following several step:
1. enclosing construction
Formally march into the arena before construction, first carry out enclosing construction, and carry out roadblock and security warning.Inside enclosing, put sandbag simultaneously, prevent other road surfaces of mud contamination of being scattered;
2. pipeline detection
Advanced row pipes investigation, if this region is without pipeline, constructs; If there is pipeline, then excavate trial trench, definitely the orientation of underground pipelines, and carry out safeguard measure;
3. construction site layout
Before construction, place is arranged, determine the best putting position of plant equipment and material;
4. position, hole setting-out
Before construction according to designing requirement total powerstation to the position setting-out of each hole, through repetition measurement test line qualified after, position on ground with steel nail, ensure that stake holes center shift variance is less than 50mm.
According to designing requirement after preparation before completing construction, by rig mating holes position, vertical angle creeps into, and require that the biased difference in hole is ± 3cm, incident angle deviation is not more than 1 °.Behind mating holes position, rig must not be shifted, also must not arbitrarily landing.
Underground drill rig carries out the first hole construction behind location, wants microrunning during the first hole construction, and grasping stratum affects situation to rig, and to determine the drilling parameter under this formation condition, stratum geological condition is determined in test simultaneously.Close observation spilling water water outlet situation, when there is a large amount of spilling water water outlet, should stop immediately to bore, construct after analyzing reason again.Often creep into one section, check one section, rectify a deviation in time, position at the bottom of hole should be less than 30cm.
The proportioning of slurry is reinforced according to the stratum geological condition determination draining chemical sizwe obtained and grouting filling perforation, prepare water glass solution I, water glass solution II, phosphoric acid solution, the cement paste of constitutional chemistry slurry according to proportioning after determining proportioning, water glass solution I, water glass solution II, phosphoric acid solution are contained in solution tank for subsequent use, and cement paste scene at any time mixing uses.
After determining wet end furnish, during note chemical grout, be connected with the solution tank of water glass solution I by a wherein pulp-absorbing pipe of Double-liquid mud-injection pump, another root pulp-absorbing pipe is connected with the solution tank of phosphoric acid solution; When slurry is reinforced in note filling perforation, the cement grout mixing bucket that a pulp-absorbing pipe and the filling perforation of Double-liquid mud-injection pump are reinforced is connected, and another root pulp-absorbing pipe is connected with the solution tank of water glass solution II; All have two grouting pipes when noting different slurry, two grouting pipes are connected with the biliquid drilling rod of underground drill rig by two fluid grouting water tap.
The estimation equation of grouting amount of the present invention is undertaken by following formula:
Q=Anα
In formula: Q----grouting amount (m 3);
A----range of grouting volume (m 3);
N----porosity;
α----slurries filling rate.
Here is the embodiment of ground layer drainage construction and stratum consolidation slip casting, and by two kinds of different embodiments, the invention will be further described.
embodiment 1
Stratum drainage construction is carried out after determining proportioning, reuse underground drill rig and carry out bore operation, the hole diameter of boring formation under drill bit is not less than 40mm, uses the chemical sizwe transfer pump of Double-liquid mud-injection pump to determine that the chemical sizwe of proportioning injects in hole under drill bit while boring; And the bore operation in ground layer drainage construction step has carried out stratum draining by the side of working face successively to opposite side.
Stratum consolidation slip casting is carried out after completing stratum draining, need when stratum consolidation slip casting again underground drill rig to be moved to the hole place completing stratum draining, drill bit is pierced in hole again, uses when drill bit arrives bottom hole the filling perforation of Double-liquid mud-injection pump reinforcing slurry transfer pump filling perforation to be reinforced slurry injection and completed in the hole of stratum draining; Stratum consolidation slip casting process is carried out to central area by working face periphery.Stratum consolidation slip casting process slip casting termination upwards promotes by bottom hole, in slip casting process, drilling rod is carried on marginal not slurry limit, strict control lifting amplitude, often step is 0.3 ~ 0.4m, at the uniform velocity pumpback, notes grouting parameter change, hoisting velocity according to flow rate of grouting and grouting amount and the adjustment of slip casting penetration radius, need proceed shadoof after grouting amount or grouting pressure reach design load.
The process need of slip casting strictly controls grouting pressure, pays close attention to grouting amount simultaneously, when rising instantaneously when pressure or overflow starch from hole wall, section sand layer, should stop slip casting immediately, take the adjustment measure such as grouting parameter or displacement slip casting again after ascertaining the reason.
Embodiment 1 completes entirely layer drainage construction process laggard perform hole hole consolidation grouting, and effectively can get rid of the moisture contained by stratum in whole process, reinforcing body compressive strength is higher, impervious effective.
embodiment 2
Stratum drainage construction is carried out after determining proportioning, reuse underground drill rig and carry out bore operation, the hole diameter of boring formation under drill bit is not less than 40mm, uses the chemical sizwe transfer pump of Double-liquid mud-injection pump to determine that the chemical sizwe of proportioning injects in hole under drill bit while boring; The filling perforation reinforcing slurry starting Double-liquid mud-injection pump when drill bit upwards promotes starts slip casting, strict control lifting amplitude, often step is 0.3 ~ 0.4m, at the uniform velocity pumpback, note grouting parameter change, hoisting velocity according to flow rate of grouting and grouting amount and the adjustment of slip casting penetration radius, need proceed shadoof after grouting amount or grouting pressure reach design load.
The process need of slip casting strictly controls grouting pressure, pays close attention to grouting amount simultaneously, when rising instantaneously when pressure or overflow starch from hole wall, section sand layer, should stop slip casting immediately, take the adjustment measure such as grouting parameter or displacement slip casting again after ascertaining the reason.
In whole process, underground drill rig bore operation is carried out to central area by working face periphery, and needs to detect stratum geological condition in the process of bore operation, and the proportioning of slurry is reinforced in base area layer parameter adjustment chemical sizwe and filling perforation.
Carry out hole consolidation grouting when embodiment 2 promotes drilling rod after carrying out ground layer drainage construction process and completing, whole process can once complete, and effectively improves efficiency of construction.
Embodiments of the invention 1 and embodiment 2 all first carry out soil body draining with water glass solution I and phosphoric acid solution, improve the impermeability of the soil body, soil solidifying is carried out again with water glass solution II and cement paste, change former physical properties of soil and improve the compressive strength of the soil body and impervious effect, finally make weak soil layer (especially chiltern, gravelly clay and layer of sand) become impervious high, compressive strength is high and stability the is high soil body, thus meet design requirement and reach soil stabilization.
The foregoing is only better embodiment of the present invention, the present invention is not limited to above-mentioned embodiment, local minor modifications may be there is in implementation process, if do not depart from the spirit and scope of the present invention to various change of the present invention or modification, and belonging within claim of the present invention and equivalent technologies scope, then the present invention is also intended to comprise these change and modification.

Claims (10)

1. stratum consolidation PSC construction method, is characterized in that: this stratum consolidation PSC construction method comprises following construction sequence:
A, the setting-out of position, hole: construction before according to designing requirement total powerstation to the position setting-out of each hole, through repetition measurement test line qualified after, position on ground;
B, the first hole construction: use underground drill rig to carry out the first hole bore operation, drilling process wants microrunning, and grasping stratum affects situation to rig, determines the drilling parameter under this formation condition, and stratum geological condition is determined in test simultaneously;
C, determine wet end furnish: reinforce wet end furnish according to reinforcing area stratum geological condition determination draining chemical sizwe proportioning and grouting filling perforation;
D, layer drainage construction: reuse underground drill rig and carry out bore operation, drill bit arrive use grouting pump to determine while reinforcing area the chemical sizwe of proportioning injects in reinforcing area, until arrive design hole depth;
E, stratum consolidation slip casting: use grouting pump filling perforation to be reinforced in the reinforcing area completing stratum draining that slurry implantation step d obtains;
F, repetition steps d, e can complete whole stratum consolidation PSC construction sequence.
2. stratum consolidation PSC construction method according to claim 1, is characterized in that: described draining chemical sizwe comprises water glass and phosphoric acid.
3. stratum consolidation PSC construction method according to claim 1, is characterized in that: described grouting filling perforation is reinforced slurry and comprised water glass and cement paste.
4. according to the stratum consolidation PSC construction method described in claim 1 ~ 3, it is characterized in that: the bore operation in described ground layer drainage construction step is carried out to opposite side by the side of working face, completes stratum draining successively.
5. stratum consolidation PSC construction method according to claim 4, is characterized in that: described stratum consolidation slip casting process is carried out after ground layer drainage construction all completes, and described stratum consolidation slip casting process is carried out to central area by working face periphery.
6. stratum consolidation PSC construction method according to claim 5, is characterized in that: described stratum consolidation slip casting process slip casting termination upwards promotes by bottom hole, and hoisting velocity need according to flow rate of grouting and grouting amount and the adjustment of slip casting penetration radius.
7. stratum consolidation PSC construction method according to claim 1, is characterized in that: complete when after chemical sizwe is injected the step of hole by the stratum consolidation slip casting of described step e in completing steps d, drill bit of drilling machine promotes.
8. stratum consolidation PSC construction method according to claim 7, it is characterized in that: described underground drill rig bore operation is carried out to central area by working face periphery, and need to detect stratum geological condition in the process of bore operation, the proportioning of slurry is reinforced according to stratum geological condition adjustment chemical sizwe and grouting filling perforation.
9. stratum consolidation PSC construction method according to claim 7, is characterized in that: described stratum consolidation slip casting process underground drill rig drill bit hoisting velocity need according to flow rate of grouting and grouting amount and the adjustment of slip casting penetration radius.
10. stratum consolidation PSC construction method according to claim 1, is characterized in that: described grouting pump is Double-liquid mud-injection pump.
CN201510132913.3A 2015-03-25 2015-03-25 Stratum reinforcement PSC construction method Active CN104775412B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510132913.3A CN104775412B (en) 2015-03-25 2015-03-25 Stratum reinforcement PSC construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510132913.3A CN104775412B (en) 2015-03-25 2015-03-25 Stratum reinforcement PSC construction method

Publications (2)

Publication Number Publication Date
CN104775412A true CN104775412A (en) 2015-07-15
CN104775412B CN104775412B (en) 2017-04-19

Family

ID=53617153

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510132913.3A Active CN104775412B (en) 2015-03-25 2015-03-25 Stratum reinforcement PSC construction method

Country Status (1)

Country Link
CN (1) CN104775412B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105971637A (en) * 2015-03-12 2016-09-28 中铁隆工程集团有限公司 Application of WSS construction method in shield end reinforcement of water-rich sand layer
CN108798693A (en) * 2018-06-11 2018-11-13 中交公局海威工程建设有限公司 For band sand layer pipe jacking construction method
CN108951438A (en) * 2017-05-17 2018-12-07 沈阳市政集团有限公司 To cable protection construction method in earthing in box culvert advancing

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110777774A (en) * 2019-11-04 2020-02-11 南通五建控股集团有限公司 Double-component grouting method for reinforcement design of soft foundation and side slope

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002167746A (en) * 2000-11-29 2002-06-11 Kfc Ltd Ground reinforcing construction method and hole wall holding casing pipe used therefor
CN102108873A (en) * 2009-12-29 2011-06-29 郑州优特基础工程维修有限公司 High-polymer grouting method for rapidly disposing percolating water in tunnel
JP2012184650A (en) * 2012-05-30 2012-09-27 Ohbayashi Corp Foundation reinforcement structure and construction method of foundation reinforcement structure
CN103046534A (en) * 2012-12-28 2013-04-17 宁波高新区围海工程技术开发有限公司 Method for improving bearing capacity of foundation
CN103132536A (en) * 2013-03-18 2013-06-05 中国水利水电第七工程局成都水电建设工程有限公司 Drainage technology of geologic chemistry before grouting

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002167746A (en) * 2000-11-29 2002-06-11 Kfc Ltd Ground reinforcing construction method and hole wall holding casing pipe used therefor
CN102108873A (en) * 2009-12-29 2011-06-29 郑州优特基础工程维修有限公司 High-polymer grouting method for rapidly disposing percolating water in tunnel
JP2012184650A (en) * 2012-05-30 2012-09-27 Ohbayashi Corp Foundation reinforcement structure and construction method of foundation reinforcement structure
CN103046534A (en) * 2012-12-28 2013-04-17 宁波高新区围海工程技术开发有限公司 Method for improving bearing capacity of foundation
CN103132536A (en) * 2013-03-18 2013-06-05 中国水利水电第七工程局成都水电建设工程有限公司 Drainage technology of geologic chemistry before grouting

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105971637A (en) * 2015-03-12 2016-09-28 中铁隆工程集团有限公司 Application of WSS construction method in shield end reinforcement of water-rich sand layer
CN108951438A (en) * 2017-05-17 2018-12-07 沈阳市政集团有限公司 To cable protection construction method in earthing in box culvert advancing
CN108798693A (en) * 2018-06-11 2018-11-13 中交公局海威工程建设有限公司 For band sand layer pipe jacking construction method

Also Published As

Publication number Publication date
CN104775412B (en) 2017-04-19

Similar Documents

Publication Publication Date Title
CN102943466B (en) Construction method for miniature steel pipe concrete pile to penetrate through roadbed layer for reinforcing soft foundation construction
CN100591866C (en) Drifting sand layer and gravel stratum water-moving double-liquid high pressure slip-casting water-blocking construction method
CN205172598U (en) Pipe curtain spouts a supporting construction soon
CN105155541B (en) A kind of dual slurry closure construction method of catch pit
CN106759297A (en) A kind of construction method of support pile and three pipe high-pressure rotary jet grouting pile deep basal pits
CN104631470A (en) Deep foundation pit combination retaining and protecting construction method for geology with high water level and large particle size sand gravel
CN103835729A (en) Ground pre-grouting strengthening technology for deep long-distance roadway surrounding rock
CN102061697A (en) Method for treating uneven settlement of building
CN107489158A (en) A kind of spiral-digging pore stirs the construction method of water spray soil occlusion curtain pile
CN104775412A (en) Stratum reinforcement PSC construction method
CN107653889A (en) A kind of shaped steel pressure is poured water the construction method of soil curtain support pile
CN100503984C (en) Foundation reinforcing method
CN107747312A (en) A kind of method of sand and gravel stratum well cementing construction
CN106284295A (en) Multichannel high-pressure vibro-grouting jet groutinl construction method
CN105064335A (en) Ultrahigh pressure rotary jet grouting method suitable for sandy cobble stratum shield end well reinforcement
CN105731978B (en) A kind of grouting serous fluid and grouting method for fine sand layer jacking culvert solidifying of the working face
CN105484266B (en) The grouting equipment and its construction method of a kind of multifunctional information
CN104695458A (en) Construction method of deep stirring and jet grouting compound pile waterproof curtain
CN102979091B (en) Method for constructing cement jet grouting pile with fine aggregate concrete core
CN102953374A (en) High pressure rotary jet grouting pile construction method for power transmission line iron tower pile foundation construction
CN106677166A (en) Flow construction method for forming cast-in-place bored pile for gravel-decomposed rock stratum in double-machine combined mode
CN101629422B (en) Construction method for supporting foundation ditch of reinforced cement earth wall
CN105971638A (en) Application of WSS construction method in shield tool changing reinforcement of water-rich sand layer
CN103343534A (en) Closed precipitation method for foundation pit construction
CN108755671A (en) A kind of rich water gravel layer three axes agitating pile construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20170911

Address after: 511300, No. 112, No. 23, No. 1-3, Lai twelve Road, 96 Yongning Road, Guangdong, Guangzhou, Zengcheng (Zengcheng economic and Technological Development Zone, core area)

Patentee after: Guangdong Guang Chang Construction Machinery & Equipment Co., Ltd.

Address before: 511300, Guangdong, Zengcheng Yongning Street, Lai 96, No. twelve, No. 23, building 110, No. 1-3, the floor

Patentee before: Guangzhou Jian Heng mechanical and electric equipment installation Co., Ltd

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180930

Address after: 529700 F3 068, Gongjian Road, Gonghe Town, Heshan, Guangdong.

Patentee after: Guangdong Xinlong tunnel equipment Limited by Share Ltd

Address before: 511300 1-3 floors of No.112, No.23, No.12 Lixin Road, 96 Yongning Street, Zengcheng City, Guangzhou, Guangdong Province (core area of Zengcheng Economic and Technological Development Zone)

Patentee before: Guangdong Guang Chang Construction Machinery & Equipment Co., Ltd.