CN104766183A - Power grid real time fault event flow management system and adopted management method thereof - Google Patents
Power grid real time fault event flow management system and adopted management method thereof Download PDFInfo
- Publication number
- CN104766183A CN104766183A CN201510218107.8A CN201510218107A CN104766183A CN 104766183 A CN104766183 A CN 104766183A CN 201510218107 A CN201510218107 A CN 201510218107A CN 104766183 A CN104766183 A CN 104766183A
- Authority
- CN
- China
- Prior art keywords
- electric network
- network fault
- event
- management system
- fault event
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention relates to a power grid real time fault event flow management system. The power grid real time fault event flow management system comprises a power grid fault information acquisition module which is connected with a power grid energy management system and used for acquiring power grid fault information, a power grid fault event intelligence analysis module which is connected with the power grid fault information acquisition module and performs analytical reasoning on a power grid fault to obtain a power grid fault event, a power grid fault event flow processing module which is connected with the power grid fault event intelligence analysis module and defines a fault processing flow for determination according to the power grid fault event and a power grid fault event statistics evaluation module which is connected with the power grid fault event flow processing module and performs statistics and report generation on the power grid fault event and the fault processing flow; the power grid real time fault event flow management system is connected with a power grid production management system. The power grid real time fault event flow management system and an adopted management method thereof can achieve the flow and standardized management of the fault event, improve the fault processing efficiency, and avoid the error phenomenon of the fault information.
Description
Technical field
The invention belongs to electric power system dispatching production management field, particularly relate to a kind of orderly management system and method electrical network being implemented to event of failure.
Background technology
Along with the expansion of electrical network scale, inevitably there is power grid accident in electrical network in operational process.Traditionally, electric network fault information is in EMS(energy management system) in receive, process and represent, and the typing in production management system of electric network fault event, gather and process.EMS system and production management system separate, the intellectual analysis of the integrated and event of failure of unrealized failure message, cause relying on merely manual analysis electric network fault information and typing electric network fault event to there is the situations such as record by mistake, wrong record and many records, be unfavorable for the intellectual analysis and the orderly management that realize electric network fault event.
Summary of the invention
The object of this invention is to provide a kind of EMS system based on electrical network and production management system and realize electrical network real time fail event procedure management system and the management method of the intellectual analysis of the integrated of electric network fault information and event of failure.
For achieving the above object, the technical solution used in the present invention is:
A kind of electrical network real time fail event procedure management system, comprises
Electric network fault data obtaining module, described electric network fault data obtaining module is connected with energy management system, and obtains electric network fault information by described energy management system;
Electric network fault event intelligent analysis module, described electric network fault event intelligent analysis module is connected with described electric network fault data obtaining module, and according to obtained electric network fault information, analysis ratiocination is carried out to electric network fault, thus draw electric network fault event;
Electric network fault event flow process processing module, electric network fault event flow process processing module is connected with described electric network fault event intelligent analysis module, its according to described electric network fault event definition troubleshooting process for confirmation;
Electric network fault event statistics evaluation module, described electric network fault event statistics evaluation module is connected with described electric network fault event flow process processing module, and carries out statistics and generating report forms to described electric network fault event and described troubleshooting process.
Described electrical network real time fail event procedure management system is connected with Production Managementsystem For Electricpower Network.
The management method that above-mentioned electrical network real time fail event procedure management system adopts, comprises
(1) electrical network real time fail acquisition of information: the acquisition electric network fault information described in described energy management system obtains;
(2) electric network fault information intelligent is analyzed: carry out intellectual analysis to described electric network fault information, to draw electric network fault event;
(3) electric network fault event business processing: the troubleshooting process described in obtaining according to described electric network fault event is also supplied to relevant departments and confirms;
(4) electric network fault event query statistic: by the electric network fault event after confirmation and troubleshooting process generating report forms.
In described step (1), the messaging bus interface of the energy management system described in utilization, the electric network fault information described in real-time reception.
In described step (2), the analytical approach of expert reasoning, artificial intelligence or Petri network is adopted to analyze described electric network fault information.
In described step (4), according to fault-time, fault type, faulty equipment, fault plant stand or fault zone described electric network fault event and troubleshooting process added up and form described in generating.
Because technique scheme is used, the present invention compared with prior art has following advantages: system and method for the present invention can obtain electric network fault information in real time and carry out intelligent analysis to it, to obtain electric network fault event, thus realize procedure, the standardized management of event of failure, improve fault handling efficiency, avoid the phenomenon of makeing mistakes of failure message.
Accompanying drawing explanation
Accompanying drawing 1 is the high-level schematic functional block diagram of electrical network real time fail event procedure management system of the present invention.
Accompanying drawing 2 is the procedure process schematic diagram of the management method that electrical network real time fail event procedure management system of the present invention adopts.
Embodiment
Below in conjunction with embodiment, the invention will be further described.
Embodiment one: as shown in Figure 1, one is connected to the electrical network real time fail event procedure management system between EMS system (energy management system) and Production Managementsystem For Electricpower Network, comprises electric network fault data obtaining module, electric network fault event intelligent analysis module, electric network fault event flow process processing module and electric network fault event statistics evaluation module.
Electric network fault data obtaining module is connected with energy management system, and it is for by obtaining electric network fault information in energy management system.Electric network fault event intelligent analysis module is connected with electric network fault data obtaining module, and it for carrying out analysis ratiocination according to obtained electric network fault information to electric network fault, thus draws electric network fault event.Electric network fault event flow process processing module is connected with electric network fault event intelligent analysis module, its for according to electric network fault event definition troubleshooting process for confirmation.Electric network fault event statistics evaluation module is connected with electric network fault event flow process processing module, and it is for carrying out statistics and generating report forms to electric network fault event and troubleshooting process.
The management method that above-mentioned electrical network real time fail event procedure management system adopts as shown in Figure 2, comprises the following steps:
(1) electrical network real time fail acquisition of information
Electric network fault information is obtained by energy management system.This step utilizes the messaging bus interface of energy management system to complete by electric network fault data obtaining module, thus real-time reception electric network fault information, it follows IEC61970 standard, Write fault message file, adopt FTP or Webservice mode, initiatively by electric network fault information pushing to native system server.Electric network fault information comprises circuit breaker trip information, protection act information, electrical network remote measure and communication information, PMU information etc.
(2) electric network fault information intelligent is analyzed
Intellectual analysis is carried out to electric network fault information, to draw electric network fault event.This step is completed by electric network fault event intelligent analysis module, adopts the analytical approachs such as expert reasoning, artificial intelligence or Petri network to analyze electric network fault information, thus draw the list of electric network fault event in electric network fault event intelligent analysis module.
(3) electric network fault event business processing
Obtain troubleshooting process according to electric network fault event and be supplied to relevant departments and confirm.This step is completed by electric network fault event flow process processing module, and it is based on electric network fault event, and electric company carries out event of failure confirmation, and can carry out increasing newly, delete, the operation such as amendment.After confirmation, the relevant departments such as scheduling, robotization, customer service process event of failure, file, and safety supervision personnel regularly carry out statistics examination.
(4) electric network fault event query statistic
By the electric network fault event after confirmation and troubleshooting process generating report forms.This step is completed by electric network fault event statistics evaluation module, and it carries out statistics and generating report forms according to fault-time, fault type, faulty equipment, fault plant stand or fault zone to electric network fault event and troubleshooting process.
Such scheme is from EMS system Real-time Obtaining electric network fault information, and intellectual analysis electric network fault, forms electric network fault list of thing automatically, and the management regulation flow processs such as clear failure is disposed, statistics examination, realize the procedure of event of failure, standardized management.Adopt the failure message that can realize EMS and production management system in this way integrated, solve problem of detached island of information, realize electric network fault from occurring, analyze, process, gather, add up, the whole-process management of examination etc., greatly improve the intelligent level of electric network fault analyzing and processing, specification processing procedure, improve fault handling efficiency, stop the phenomenons such as the mistake record of event of failure, wrong record and many records.
Above-described embodiment, only for technical conceive of the present invention and feature are described, its object is to person skilled in the art can be understood content of the present invention and implement according to this, can not limit the scope of the invention with this.All equivalences done according to Spirit Essence of the present invention change or modify, and all should be encompassed within protection scope of the present invention.
Claims (6)
1. an electrical network real time fail event procedure management system, is characterized in that: it comprises
Electric network fault data obtaining module, described electric network fault data obtaining module is connected with energy management system, and obtains electric network fault information by described energy management system;
Electric network fault event intelligent analysis module, described electric network fault event intelligent analysis module is connected with described electric network fault data obtaining module, and according to obtained electric network fault information, analysis ratiocination is carried out to electric network fault, thus draw electric network fault event;
Electric network fault event flow process processing module, electric network fault event flow process processing module is connected with described electric network fault event intelligent analysis module, its according to described electric network fault event definition troubleshooting process for confirmation;
Electric network fault event statistics evaluation module, described electric network fault event statistics evaluation module is connected with described electric network fault event flow process processing module, and carries out statistics and generating report forms to described electric network fault event and described troubleshooting process.
2. electrical network real time fail event procedure management system according to claim 1, is characterized in that: it is connected with Production Managementsystem For Electricpower Network.
3. a management method for electrical network real time fail event procedure management system employing as claimed in claim 1 or 2, is characterized in that: it comprises
(1) electrical network real time fail acquisition of information: the acquisition electric network fault information described in described energy management system obtains;
(2) electric network fault information intelligent is analyzed: carry out intellectual analysis to described electric network fault information, to draw electric network fault event;
(3) electric network fault event business processing: the troubleshooting process described in obtaining according to described electric network fault event is also supplied to relevant departments and confirms;
(4) electric network fault event query statistic: by the electric network fault event after confirmation and troubleshooting process generating report forms.
4. the management method of electrical network real time fail event procedure management system employing according to claim 3, it is characterized in that: in described step (1), the messaging bus interface of the energy management system described in utilization, the electric network fault information described in real-time reception.
5. the management method of electrical network real time fail event procedure management system employing according to claim 3, it is characterized in that: in described step (2), adopt the analytical approach of expert reasoning, artificial intelligence or Petri network to analyze described electric network fault information.
6. the management method of electrical network real time fail event procedure management system employing according to claim 3, it is characterized in that: in described step (4), according to fault-time, fault type, faulty equipment, fault plant stand or fault zone described electric network fault event and troubleshooting process added up and form described in generating.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510218107.8A CN104766183A (en) | 2015-05-04 | 2015-05-04 | Power grid real time fault event flow management system and adopted management method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510218107.8A CN104766183A (en) | 2015-05-04 | 2015-05-04 | Power grid real time fault event flow management system and adopted management method thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104766183A true CN104766183A (en) | 2015-07-08 |
Family
ID=53647997
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510218107.8A Pending CN104766183A (en) | 2015-05-04 | 2015-05-04 | Power grid real time fault event flow management system and adopted management method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104766183A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105807743A (en) * | 2016-03-15 | 2016-07-27 | 国网江苏省电力公司电力科学研究院 | Transformer substation equipment fault and defect analysis remote supporting system |
CN106202903A (en) * | 2016-07-04 | 2016-12-07 | 广州瑞康本圣生物科技有限公司 | Internet of Things wisdom hospital event Flow driving engine method |
CN111079430A (en) * | 2019-10-21 | 2020-04-28 | 国家电网公司华中分部 | Power failure event extraction method combining deep learning and concept map |
CN111652500A (en) * | 2020-05-29 | 2020-09-11 | 广东电网有限责任公司 | Automatic duty-on auxiliary system and equipment based on scheduling and report generation method thereof |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102708472A (en) * | 2012-06-20 | 2012-10-03 | 江西省电力公司超高压分公司 | Intelligent processing method for warning information of combined power grid |
CN103501047A (en) * | 2013-10-09 | 2014-01-08 | 云南电力调度控制中心 | Intelligent fault wave recording main station information management system |
CN104360237A (en) * | 2014-11-21 | 2015-02-18 | 国家电网公司 | Intelligent on-line distinguishing method for main equipment failures of regional power grid |
-
2015
- 2015-05-04 CN CN201510218107.8A patent/CN104766183A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102708472A (en) * | 2012-06-20 | 2012-10-03 | 江西省电力公司超高压分公司 | Intelligent processing method for warning information of combined power grid |
CN103501047A (en) * | 2013-10-09 | 2014-01-08 | 云南电力调度控制中心 | Intelligent fault wave recording main station information management system |
CN104360237A (en) * | 2014-11-21 | 2015-02-18 | 国家电网公司 | Intelligent on-line distinguishing method for main equipment failures of regional power grid |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105807743A (en) * | 2016-03-15 | 2016-07-27 | 国网江苏省电力公司电力科学研究院 | Transformer substation equipment fault and defect analysis remote supporting system |
CN106202903A (en) * | 2016-07-04 | 2016-12-07 | 广州瑞康本圣生物科技有限公司 | Internet of Things wisdom hospital event Flow driving engine method |
CN111079430A (en) * | 2019-10-21 | 2020-04-28 | 国家电网公司华中分部 | Power failure event extraction method combining deep learning and concept map |
CN111079430B (en) * | 2019-10-21 | 2023-09-15 | 国家电网公司华中分部 | Power failure event extraction method combining deep learning and concept map |
CN111652500A (en) * | 2020-05-29 | 2020-09-11 | 广东电网有限责任公司 | Automatic duty-on auxiliary system and equipment based on scheduling and report generation method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103499753B (en) | Intelligent system for rapidly identifying transient fault of high-voltage direct-current power transmission system | |
CN103427417B (en) | Based on the distribution network failure processing method of Multi-source Information Fusion | |
CN101854078B (en) | Monitoring system and method of operation condition of digitalized substation secondary device | |
CN103618297B (en) | Efficient high reliability fault handling method towards Complicated Distribution Network | |
CN105093033A (en) | Power grid multi-source information-based fault integrated analysis system and analysis method | |
CN103683511A (en) | Method and system for processing fault of integrated monitoring platform based on power distribution network | |
CN202167018U (en) | Power supply reliability data statistical treatment device suitable for power system | |
CN103326467A (en) | Protection action report implementation method based on information protection main station device recorded information | |
CN104766183A (en) | Power grid real time fault event flow management system and adopted management method thereof | |
CN110233877A (en) | A kind of intelligent photovoltaic power generation fault comprehensive early warning system | |
CN105117532A (en) | Modeling method for intelligent substation secondary equipment interval information model | |
CN103926917A (en) | Intelligent transformer substation master control device testing system and method | |
CN103839117B (en) | A kind of distribution network reliability and its investment sensitivity analysis determine method | |
CN103066700B (en) | Power grid fault information processing method and system | |
CN103366051A (en) | Method and system for modeling of primary equipment and secondary equipment | |
CN103440531A (en) | Wind power plant short-term wind power prediction system in view of operating state of wind power plant draught fan | |
CN103632307A (en) | Method for checking consistency between SCD and virtual loop table of intelligent substation | |
CN103023152A (en) | N-1 Cut-off scanning on-line computing system capable of considering autotomy cooperation | |
CN104992307A (en) | Power distribution network risk collaborative management and control system | |
CN104598713A (en) | Method for synthesizing theoretical line loss calculation demand data of power grid | |
CN104363121A (en) | GOOSE communication simulation and fault diagnosis method for station level of intelligent substation | |
CN103545805A (en) | Modeling-based railway power supply arm monitoring method | |
CN106159940A (en) | PMU optimum points distributing method based on network load specificity analysis | |
CN201910620U (en) | Wind power forecasting system | |
CN204179747U (en) | A kind of power grid accident automatic analysis process system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
EXSB | Decision made by sipo to initiate substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150708 |
|
RJ01 | Rejection of invention patent application after publication |