CN104765910B - A kind of route selection of Duo Hui branches, ranking interaction, scene modeling system and method - Google Patents
A kind of route selection of Duo Hui branches, ranking interaction, scene modeling system and method Download PDFInfo
- Publication number
- CN104765910B CN104765910B CN201510124891.6A CN201510124891A CN104765910B CN 104765910 B CN104765910 B CN 104765910B CN 201510124891 A CN201510124891 A CN 201510124891A CN 104765910 B CN104765910 B CN 104765910B
- Authority
- CN
- China
- Prior art keywords
- loop
- path
- ranking
- segmentation
- hui
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
Abstract
The invention discloses a kind of route selection of Duo Hui branches, ranking interaction, scene modeling system and method, pass sequentially through that Duo Hui branches route selection module determines the rack logical relation of transmission system and generates loop flat section index, cutting segmented paths sectional drawing simultaneously re-writes the flat profile data storehouse of segmentation;Tower locating module is arranged using the flat section index in loop, the flat profile data storehouse of multiplexing segmentation, the shaft tower ranking of loop path is carried out;And three-dimensional scenic modeling module utilizes hanging wire template, auto arrangement goes out most extension ground wire hanging wire mode, carries out the three-dimensional scenic modeling of transmission system.The route selection to the complicated circuit types such as single double back conversion, line disconnection, mixed pressure lines branch, ranking interaction, the whole process working process of scene modeling can be achieved, meet complicated transmission of electricity rack engineering design demand, so as to improve the integrated level and practicality of the three-dimensional collaborative design system of power transmission engineering, keep the self-consistentency of result of design, information sharing degree is high, and operating efficiency is substantially improved.
Description
Technical field
The route selection, ranking interaction, scene modeling system of Duo Hui branches can be realized based on GIS and CAD the present invention relates to a kind of
And method, belong to power transmission engineering design field.
Background technology
Development with computer technology and the intensification of power transmission engineering integrated software exploitation, the design meanses of power transmission engineering by
Three-dimensional collaboration minute design is gradually changed into by tradition, the efficiency and quality of power transmission engineering design is drastically increased.
However, power transmission engineering three-dimensional collaborative design is started late compared to other fields, current integrated software is only capable of reluctantly
Handle route selection, the shaft tower ranking of point-to-point simple path;Therefore the conversion of working process list double back, circuit it can not also open well
The common and complicated circuit types such as disconnected, mixed pressure lines branch, it is difficult to meet conventional power transmission engineering design requirement.
Specifically there is some following deficiency in existing power transmission engineering design system:
1st, wire selection system only supports the path route selection of point-to-point one direction trend, and table is carried out with the segmented paths set without logic
Reach, it is impossible to the rack relation of correct description power transmission electric network system.
2nd, on the basis of the segmented paths set without logic, each segmented paths can only in isolation be ranked, not only
Control voltage, the comformity relation of front and rear overlap joint tower are separated, and can only repeatedly have been sentenced by the pattern of manpower during ranking
Disconnected, modification, operation process is original and easy error, and operating efficiency has to be hoisted.
3rd, because segmented paths and ranking shaft tower lack relevance, three-dimensional scenic can only be by manually carrying out redundancy when modeling
The filtering of shaft tower, the extension string hanging wire of many times shaft towers of overlap joint and mixed pressure, this generic operation too rely on the pattern of manpower, directly result in
Working strength is big, directly affects the operating efficiency and correctness of design.
Therefore, need badly exploitation it is a kind of existing many times branched lines can be carried out route selection, ranking interaction, the system of scene modeling
And method, to solve the above problems.
The content of the invention
It is a primary object of the present invention to overcoming deficiency of the prior art, there is provided a kind of route selection of Duo Hui branches, ranking
Interaction, scene modeling system and method, can be achieved to the complicated circuit class such as single double back conversion, line disconnection, mixed pressure lines branch
The route selection of type, ranking interaction, the whole process working process of scene modeling, can meet complicated transmission of electricity rack engineering design demand, from
And the integrated level and practicality of the three-dimensional collaborative design system of power transmission engineering are improved, and self-consistentency is kept, it is reliable, efficient,
Information sharing degree is high, and applied widely, operating efficiency is significantly improved.
In order to achieve the above object, the technical solution adopted in the present invention is:
A kind of route selection of Duo Hui branches, ranking interaction, scene modeling system, including the Duo Hui branches route selection mould being sequentially connected
Block, row's tower locating module and three-dimensional scenic modeling module, row's tower locating module and three-dimensional scenic modeling module with segmentation
Flat profile data storehouse carries out data sharing.
Wherein, the Duo Hui branches route selection module is used to carry out combination of paths segmentation, generation path segments, chooses primary link
Sequentially path segments and corner pile are named after footpath and each side chain main chain, by choosing the loop road being made up of path segments
Footpath group, defined loop attribute index to determine the rack logical relation of transmission system and generate the flat section in loop, and cutting point
Section path sectional drawing simultaneously re-writes the flat profile data storehouse of segmentation.
Meanwhile, row's tower locating module is used to reconstruct loop path plane cross section, carries out the shaft tower ranking of loop path,
And set up ground wire database in circuit pole tower annex and shelves.
Moreover, the three-dimensional scenic modeling module is used to extract the flat section of segmentation and segmentation shaft tower Ranking Information, reconstruct is walked
House in the range of corridor, bridge, the model of trees and transmission facility, carry out the three-dimensional scenic modeling of transmission system.
The present invention also provides a kind of route selection of Duo Hui branches, ranking interaction, scene modeling method, comprises the following steps:
Step S01, data prepare;
Geo-spatial data, altitude data, the storages of power network topic space data are carried out, shaft tower, insulator chain is carried out
The type selection of three-dimensional modeling and engineering;
Step S02, combination of paths segmentation, generation path segments;
Actual track according to transmission system Duo Hui branches moves towards to draw line route, according to line route, branch's corner
The connection of stake carries out combination of paths segmentation, and generation is connected as the path segments of node with branch's corner pile;Described transmission of electricity
System Duo Hui branches include single double back conversion, line disconnection and mixed pressure lines branch;
Step S03, defines main chain path, each branch road main chain;
On the basis of the path segments of each segmentation, according to the principle that corner pile quantity is higher limit, closed path is not circulated
Main chain path, each branch road main chain are defined successively;
The name of step S04, path segments and corner pile;
Order according to main chain path, each branch road main chain is named to the path segments and corner pile of each segmentation;
Step S05, generates loop path group navigation scheme;
By defining the terminal of each time line route, generated according to the connection of branch's corner pile several by path
The loop path group navigation scheme of fragment composition;
Step S06, chooses loop path group;
By selecting loop path group navigation scheme, preferably go out loop path group;
Step S07, determines transmission system rack logical relation, generates the flat profile data storehouse in loop, and cutting segmented paths are broken
Face figure, re-write the flat profile data storehouse of segmentation;
On the basis of the loop path group that step S06 has chosen, loop attribute definition, described loop attribute bag are carried out
Include voltage class, alternating current-direct current type and feeder number;Further according to the rack logical relation of path segments in loop path group, divided
The association of branch corner pile, and generate the flat section index in loop;All path segments after step S04 is named are directed to simultaneously, turned
Angle stake cutting goes out segmented paths sectional drawing, re-writes the flat profile data storehouse of segmentation;
Step S08, reconstructs loop path plane cross section;
According to the flat section index in loop, and utilization is segmented flat profile data storehouse virtual reconstruction loop path plane cross section;
Step S09, if ranking judges;
Judge with the presence or absence of the flat section of segmentation that shaft tower is ranked has been completed in the section combination of loop path plane cross section, such as
It is as next in being directly entered in the absence of if in the presence of next step is entered after then calling the flat section shaft tower database of segmentation ranked
Step;
Step S10, sets up ground wire database in circuit pole tower annex and shelves;
Shaft tower ranking is carried out by using loop path plane cross section, ground wire data in circuit pole tower annex and shelves are set up
Storehouse, and ranking results are write into the corresponding flat section shaft tower database of segmentation of each flat section of segmentation;Described shaft tower ranking can be adopted
It is respectively row's tower and Automatic Optimal ranking by hand with two kinds of working methods;
Step S11, arranges out several ground wire hanging wire mode;
By carrying out hanging wire template definition on three-dimensional shaft tower, described hanging wire template includes ground wire voltage class, handed over
Direct current type, phase sequence installation site and loop hanging wire packet template;Using the flat profile data storehouse in loop, it is segmented flat profile data
Ground wire database in storehouse, the flat section shaft tower database of segmentation, circuit pole tower annex and shelves, according to loop trend, avoids leading ground
Line intersects, the principle auto arrangement of multiloop negative phase sequence goes out several ground wire hanging wire mode;
Step S12, batch optimization, replacing ground wire hanging wire mode;
It is preferred that go out loop, phase sequence hanging wire mode, will according to transformer station interval, loop transposition, wire commutation and special overlap joint
Ask the optimization of progress batch, ground wire hanging wire mode changed, while updating circuit pole tower annex and shelves according to ground wire hanging wire mode
Interior ground wire database;
Step S13, completes three-dimensional scenic modeling.
Compared with prior art, the invention has the advantages that:
1st, the present invention provide Duo Hui branches route selection, ranking interaction, scene modeling system and method, single double back can be become
Change, the circuit types that line disconnection, mixed pressure lines branch etc. are common and complicated carries out route selection, ranking interaction, scene modeling it is complete
Flow monoblock type working process, can meet complicated transmission of electricity rack engineering design demand, be set so as to improve power transmission engineering three-dimensional collaboration
The integrated level and practicality of meter systems.
2nd, the present invention overcome current wire selection system only support it is point-to-point it is simple move towards route selection, can not accurate description it is complicated
The defect of transmission of electricity rack, proposes that the corner pile based on main chain path is named automatically, is rationally determined by choosing loop path group
Transmission system rack logical relation, the obstacle that route selection function can be avoided to extend.
3rd, this invention removes the isolated ranking of segmented paths in legacy system, control voltage and front and rear overlap joint can not be realized
The problem of tower uniformity, utilize ground wire data in the flat profile data storehouse of the segmentation of each loop path, circuit pole tower annex and shelves
Storehouse, concurrent multiplexing is segmented flat profile data storehouse, each loop path plane cross section of virtual reconstruction so that the flat section of segmentation is correct, close
Reason splicing, realizes and shares the tower of flat section, exhales high completely the same, so as to reduce interior industry working strength, improve operating efficiency.
4th, the present invention is segmented flat section and segmentation shaft tower Ranking Information by extracting, and by defining three-dimensional shaft tower loop
Hanging wire is grouped template, fast automatic can realize the three-dimensional modeling of house in corridor range, bridge, trees and transmission facility etc., subtract
The workload of few three dimensional field modeling, further lifts operating efficiency.
The above is only the general introduction of technical solution of the present invention, in order to be better understood upon the technological means of the present invention, under
With reference to accompanying drawing, the invention will be further described in face.
Brief description of the drawings
Fig. 1 is the route selection of Duo Hui branches of the present invention, ranking interaction, the schematic flow sheet of scene modeling method;
The schematic diagram that Fig. 2 names for definition main chain path, path segments and the corner pile of the present invention;
Fig. 3 is each loop path plane cross section of the virtual reconstruction of the present invention;
Fig. 4 is grouped template schematic diagram for the three-dimensional shaft tower loop hanging wire of the present invention.
Embodiment
With reference to Figure of description, the present invention is further illustrated.
A kind of route selection of Duo Hui branches as shown in Figure 1, ranking interaction, scene modeling system, including be sequentially connected it is many
Return branch's route selection module 1, row's tower locating module 2 and three-dimensional scenic modeling module 3, row's tower locating module 2 and three-dimensional scenic
Modeling module 3 carries out data sharing with being segmented flat profile data storehouse.
Wherein, the Duo Hui branches route selection module 1 is used to carry out combination of paths segmentation, generation path segments, chooses main chain
Sequentially path segments and corner pile are named after path and each side chain main chain, by choosing the loop being made up of path segments
Group of paths, defined loop attribute index to determine the rack logical relation of transmission system and generate the flat section in loop, and cutting
Segmented paths sectional drawing simultaneously re-writes the flat profile data storehouse of segmentation.
Meanwhile, row's tower locating module 2 is used to reconstruct loop path plane cross section, carries out the shaft tower row of loop path
Position, and set up ground wire database in circuit pole tower annex and shelves.
Moreover, the three-dimensional scenic modeling module 3 is used to extract the flat section of segmentation and segmentation shaft tower Ranking Information, reconstruct is walked
House in the range of corridor, bridge, the model of trees and transmission facility, carry out the three-dimensional scenic modeling of transmission system.
A kind of route selection of Duo Hui branches as shown in Figure 1, ranking interaction, scene modeling method, comprise the following steps:
Step S01, data prepare;Geo-spatial data, altitude data, the storage of power network topic space data are carried out, is entered
The type selection of row shaft tower, the three-dimensional modeling of insulator chain and engineering.
Step S02, combination of paths segmentation, generation path segments;
Step S021, moves towards to draw line route according to the actual track of transmission system Duo Hui branches;Described transmission of electricity system
Tong Duohui branches include single double back conversion, line disconnection and mixed pressure lines branch;
Step S022, combination of paths segmentation is carried out according to the connection of line route, branch's corner pile, is generated with branch
Corner pile is connected as the path segments of node.
Step S03, defines main chain path, each branch road main chain;On the basis of the path segments of each segmentation, according to corner pile number
Measure the principle not circulated for higher limit, closed path and define main chain path, each branch road main chain successively.
The name of step S04, path segments and corner pile;According to main chain path, each branch road main chain order to each segmentation
Path segments and corner pile be named.
Step S05, generates loop path group navigation scheme;
Step S051, by the terminal for defining each time line route;Step S052, according to the connection feelings of branch's corner pile
Condition generates the several loop path group navigation scheme being made up of path segments.
Step S06, chooses loop path group;
Step S061, selects loop path group navigation scheme;Step S062, preferably goes out loop path group.
Step S07, determines transmission system rack logical relation, the flat section index in generation loop, cutting segmented paths section
Scheme, re-write the flat profile data storehouse of segmentation;
Step S071, on the basis of the loop path group that step S06 has chosen, carries out loop attribute definition, described
Loop attribute includes voltage class, alternating current-direct current type and feeder number;
Step S072, according to the rack logical relation of path segments in loop path group, carries out the association of branch's corner pile,
And generate the flat section index in loop;
Step S073, all path segments, corner pile cutting after being named for step S04 go out segmented paths section
Figure, re-writes the flat profile data storehouse of segmentation.
Step S08, reconstructs loop path plane cross section;According to the flat section index in loop, and utilization is segmented flat profile data
Storehouse virtual reconstruction loop path plane cross section.
Step S09, if ranking judges;
Step S091, judges in the section combination of loop path plane cross section with the presence or absence of the segmentation for having completed shaft tower ranking
Flat section, as being directly entered step S102 in the absence of if;
Step S092, calls if existing and enters step 102 after the flat section shaft tower database of segmentation ranked.
Step S10, sets up ground wire database in circuit pole tower annex and shelves;
Step S101, carries out shaft tower ranking, described shaft tower ranking can be using two kinds of works using loop path plane cross section
Make mode, be respectively row's tower and Automatic Optimal ranking by hand;
Step S102, sets up ground wire database in circuit pole tower annex and shelves, and ranking results is write into each segmentation and put down
The corresponding flat section shaft tower database of segmentation of section.
Step S11, arranges out several ground wire hanging wire mode;
Step S111, carries out hanging wire template definition on three-dimensional shaft tower, and described hanging wire template includes ground wire voltage etc.
Level, alternating current-direct current type, phase sequence installation site and loop hanging wire packet template;
Step S112, using the flat profile data storehouse in loop, be segmented flat profile data storehouse, be segmented flat section shaft tower database,
Ground wire database in circuit pole tower annex and shelves, according to loop trend, avoids ground wire intersection, the principle of multiloop negative phase sequence
Auto arrangement goes out several ground wire hanging wire mode.
Step S12, batch optimization, replacing ground wire hanging wire mode;
Step S121, preferably goes out loop, phase sequence hanging wire mode;
Step S122, according to transformer station interval, loop transposition, wire commutation and special overlap joint require to carry out batch optimization,
Ground wire hanging wire mode is changed, while updating ground wire database in circuit pole tower annex and shelves according to ground wire hanging wire mode.
Step S13, completes three-dimensional scenic modeling.
Main chain path, each branch road main chain, segmented paths fragment and corner pile name in the present invention as shown in Figure 2, below
Various name titles are given and explained.
Branch node:The corner pile being connected with each other by 3 and with upper pathway.
Path segments:The strain section set of contiguous branch node composition.
Main chain path:The path that the path segments of corner pile at most (i.e. quantity is higher limit) are combined into, path is not circulated,
Differ and be set to actual loop path trend.
Branch's branch road main chain:The branch on the basis of main chain path, the branch that the most path segments of corner pile are combined into
Branch road, path is not circulated, and is differed and is set to actual loop path trend.
Segmented paths fragment naming method:Sequentially path segments are encoded along main chain path, branch's branch road, one
As represented with " fragment "+Arabic numerals.
Main chain path corner pile naming method:Sequentially corner pile is encoded along main chain path, typically with " J "+
Arabic numerals are represented.
Branch's branch road corner pile naming method:Incrementally numbered from the branch node on primary link footpath, suffix increase branch road generation
Code (degradations), wherein the definition method of branch road code is along main chain path sequential searches, first branch's branch road suffix for finding
Increase letter A codes, second, third, the 4th be respectively B, C, D, the like, same branch's branch road connection different stage divides
During Zhi Huilu, high one-level branch road code is taken.
As shown in Fig. 2 (a), two ends be single loop, the middle transmission line of electricity main chain path set up by common-tower double-return road, each
Road main chain, segmented paths fragment and corner pile name are as follows:
Main chain path:J1、J2、J3、J4、J5
First order branch branch road main chain A:J3、J4A
First order branch branch road main chain B:J4、J5B
Segmented paths fragment:Fragment 1 (J1, J2, J3), fragment 2 (J3, J4), fragment 3 (J4, J5), fragment 4 (J4A, J3),
Fragment 5 (J4, J5B)
Loop path prescription case:Loop one (J1, J2, J3, J4, J5B), loop two (J4A, J3, J4, J5);Or loop
(1) (J1, J2, J3, J4, J5), loop (two) (J4A, J3, J4, J5B).
As shown in Fig. 2 (b), two ends be common-tower double-return road, the middle transmission line of electricity main chain path for pressing single loop erection, each
Road main chain, segmented paths fragment and corner pile name are as follows:
Main chain path:J1、J2、J3、J4、J5、J6、J7
First order branch branch road main chain A:J2、J3A、J4A、J6
Segmented paths fragment:Fragment 1 (J1, J2), fragment 2 (J2, J3, J4, J5, J6), fragment 3 (J6, J7), fragment 4
(J2、J3A、J4A、J6)
Loop path prescription case:Loop one (J1, J2, J3, J4, J5, J6, J7), loop two (J1, J2, J3A, J4A, J6,
J7)。
As shown in Fig. 2 (c), the transmission line of electricity primary link that one end is common-tower double-return road, the other end is set up by two single loops
Footpath, each branch road main chain, segmented paths fragment and corner pile name are as follows:
Main chain path:J1、J2、J3、J4
First order branch branch road main chain A:J2、J3A
Segmented paths fragment:Fragment 1 (J1, J2), fragment 2 (J2, J3, J4), fragment 3 (J2, J3A)
Loop path prescription case:Loop one (J1, J2, J3, J4), loop two (J1, J2, J3A), loop three (J3A, J2,
J3、J4);Or loop (one) (J1, J2, J3, J4), loop (two) (J3A, J2, J3, J4).
Complicated transmission line of electricity main chain path, each branch road main chain, segmented paths fragment and corner pile as shown in Fig. 2 (d)
Name is as follows:
Main chain path:J1、J2、J3、J4、J5、J6、J7、J8
First order branch branch road main chain A:J12A、J11A、J10A、J9A、J8A、J7
Second level branch branch road main chain AA:J11AA、J10AA、J9AA、J8A
Second level branch branch road main chain AB:J11AB、J10AB、J9A
Depend on second level branch branch road main chain AB third level branch branch road main chain ABA:J11ABA、J10AB
Segmented paths fragment:Fragment 1 (J1, J2, J3, J4, J5, J6, J7), fragment 2 (J7, J8), fragment 3 (J7, J8A),
Fragment 4 (J8A, J9A), fragment 5 (J9A, J10A, J11A, J12A), fragment 6 (J8A, J9AA, J10AA, J11AA), fragment 7
(J9A, J10AB), fragment 8 (J10AB, J11AB), fragment 9 (J10AB, J11ABA).
More complicated transmission line of electricity main chain path, each branch road main chain, segmented paths fragment and corner as shown in Fig. 2 (e)
Stake name is as follows:
Main chain path:J1、J2、J3、J4、J5、J6、J7、J8
First order branch branch road main chain A:J2、J3A、J4A、J5A、J6A、J7A
First order branch branch road main chain B:J3、J4B、J6A
Depend on second level branch branch road main chain A third level branch branch road main chain AA:J4A、J5AA、J6AA
Segmented paths fragment:Fragment 1 (J1, J2), fragment 2 (J2, J3), fragment 3 (J3, J4, J5, J6, J7, J8), fragment 4
(J2, J3A, J4A), fragment 5 (J4A, J5A, J6A), fragment 6 (J6A, J7A), fragment 7 (J3, J4B, J6A), fragment 8 (J4A,
J5AA、J6AA)。
Two ends as shown in Fig. 2 (a) and Fig. 3 are single loop, the middle transmission line of electricity set up by common-tower double-return road can be combined
Loop path prescription case:Loop one (J1, J2, J3, J4, J5B), loop two (J4A, J3, J4, J5);Or loop (one) (J1,
J2, J3, J4, J5), loop (two) (J4A, J3, J4, J5B).
Wherein loop one is made up of fragment 1 (J1, J2, J3), fragment 2 (J3, J4), fragment 5 (J4, J5B), and loop two is by piece
4 (J4A, J3) of section, fragment 2 (J3, J4), fragment 3 (J4, J5) composition;Or loop (one) is by fragment 1 (J1, J2, J3), fragment 2
(J3, J4), fragment 3 (J4, J5) are constituted, and loop (two) are by fragment 4 (J4A, J3), fragment 2 (J3, J4), fragment 5 (J4, J5B) group
Into.
As shown in Fig. 3 (a), the row tower locating module 2 shared with being segmented flat profile data storehouse passes through loop one, loop two
Ground wire database in flat section index, circuit pole tower annex and shelves, shares the flat section and tower document data bank of fragment 2, point
Not Gou Cheng loop one (fragment 1, fragment 2, fragment 5), the plane cross section of loop two (fragment 4, fragment 2, fragment 3), towards same
Data source carries out the shaft tower ranking operation in loop one, loop two, it is ensured that the section of fragment 2 and the uniqueness of ranking scheme.
As shown in Fig. 3 (b), the row tower locating module 2 shared with being segmented flat profile data storehouse can also by loop (one),
Ground wire database in the flat section index in loop (two), circuit pole tower annex and shelves, shares the flat section and tower file of fragment 2
Database, respectively constitutes loop (one) (fragment 1, fragment 2, fragment 3), the flat of loop (two) (fragment 4, fragment 2, fragment 5) and breaks
Face figure, towards same data source carries out loop (one), the shaft tower of loop (two) ranks operation, it is ensured that the section of fragment 2 and row
The uniqueness of position scheme.
As shown in figure 4, carrying out the definition that loop hanging wire is grouped template by taking three ground wires, four loop AC linear towers as an example.
As shown in Fig. 4 (a), by method from top to bottom, from left to right complete it is all lead, the definition of ground wire hanging point;According to
The design service condition of four loop AC linear towers, to leading, ground wire hanging point carry out be grouped and can be formed:
Packet one as shown in Fig. 4 (b), loop 1 (hanging point 1), loop 2 (hanging point 2), loop 3 (hanging point 3), loop 4 (are hung
Point 4, hanging point 8, hanging point 12), loop 5 (hanging point 5, hanging point 9, hanging point 13), loop 6 (hanging point 6, hanging point 10, hanging point 14), loop 7
(hanging point 7, hanging point 11, hanging point 15);
Packet two as shown in Fig. 4 (c), loop 1 (hanging point 1), loop 2 (hanging point 2), loop 3 (hanging point 3), loop 4 (are hung
Point 4, hanging point 5, hanging point 9), loop 5 (hanging point 6, hanging point 7, hanging point 10), loop 6 (hanging point 8, hanging point 12, hanging point 13), loop 7
(hanging point 11, hanging point 14, hanging point 15);
Packet three as shown in Fig. 4 (d), loop 1 (hanging point 1), loop 2 (hanging point 2), loop 3 (hanging point 3), loop 4 (are hung
Point 4, hanging point 5, hanging point 8), loop 5 (hanging point 6, hanging point 7, hanging point 11), loop 6 (hanging point 9, hanging point 12, hanging point 13), loop 7
(hanging point 10, hanging point 14, hanging point 15).
The three-dimensional scenic modeling module 3 shared with being segmented flat profile data storehouse can be grouped templates using above-mentioned three kinds, for
Per base shaft tower, moved towards according to loop, avoid ground wire from intersecting, the principle of multiloop negative phase sequence can auto arrangement go out a variety of ground wires
Hanging wire mode, after user's selection preferably loop, phase sequence hanging wire mode, is changed according to transformer station interval, loop transposition, wire
Mutually require the optimization of batch with special overlap, change ground wire hanging wire mode, can realize that the three-dimensional scenic of transmission system is built automatically
Mould.
The innovative point of the present invention is, mould is modeled by Duo Hui branches route selection module, row's tower locating module and three-dimensional scenic
The setting of block, realizes the route selection, ranking interaction, the whole process monoblock type working process of scene modeling of complicated circuit types, not only
Overcome many defects of existing system, such as wire selection system only support it is point-to-point it is simple move towards route selection, can not accurate description answer
Miscellaneous transmission of electricity rack, the isolated ranking of segmented paths, can not realize control voltage and front and rear overlap joint tower uniformity, and automation journey
Degree is not high, relies on artificial operation, and working strength is high, the low aspect of efficiency;And realize corner pile by choosing main chain path
Name, by the associative combination of the flexible realizing route fragment of defined loop group of paths, can accurate description feeder number, voltage class,
The rack logical relation of each loop cabling;The shaft tower for carrying out each loop path towards same data source simultaneously ranks operation, can protect
The uniqueness of Zheng Duohui branches section and ranking scheme, and modeling is efficient, information is comprehensive;Therefore, complicated power transmission network can be met
Frame engineering design demand, so as to improve the integrated level and practicality of the three-dimensional collaborative design system of power transmission engineering.
General principle, principal character and the advantage of the present invention has been shown and described above.The technical staff of the industry should
Understand, the present invention is not limited to the above embodiments, the original for simply illustrating the present invention described in above-described embodiment and specification
Reason, without departing from the spirit and scope of the present invention, various changes and modifications of the present invention are possible, these changes and improvements
It all fall within the protetion scope of the claimed invention.The claimed scope of the invention is by appended claims and its equivalent circle
It is fixed.
Claims (5)
1. a kind of route selection of Duo Hui branches, ranking interaction, scene modeling method, it is characterised in that comprise the following steps:
Step S01, data prepare;
Geo-spatial data, altitude data, the storage of power network topic space data are carried out, shaft tower, the three-dimensional of insulator chain is carried out
Modeling and the type selection of engineering;
Step S02, combination of paths segmentation, generation path segments;
Actual track according to transmission system Duo Hui branches moves towards to draw line route, according to line route, branch's corner pile
Connection carries out combination of paths segmentation, and generation is connected as the path segments of node with branch's corner pile;
Step S03, defines main chain path, each branch road main chain;
On the basis of the path segments of each segmentation, according to the principle that corner pile quantity is higher limit, closed path is not circulated successively
Define main chain path, each branch road main chain;
The name of step S04, path segments and corner pile;
Order according to main chain path, each branch road main chain is named to the path segments and corner pile of each segmentation;
Step S05, generates loop path group navigation scheme;
By defining the terminal of each time line route, generated according to the connection of branch's corner pile several by path segments
The loop path group navigation scheme of composition;
Step S06, chooses loop path group;
By selecting loop path group navigation scheme, preferably go out loop path group;
Step S07, determines transmission system rack logical relation, the flat section index in generation loop, cutting segmented paths sectional drawing, again
The new flat profile data storehouse of write-in segmentation;
On the basis of the loop path group that step S06 has chosen, loop attribute definition is carried out;Further according to loop path group Road
The rack logical relation of footpath fragment, carries out the association of branch's corner pile, and generates the flat profile data storehouse in loop;Simultaneously for step
All path segments, corner pile cutting after S04 names go out segmented paths sectional drawing, re-write the flat profile data of segmentation
Storehouse;
Step S08, reconstructs loop path plane cross section;
According to the flat section index in loop, and utilization is segmented flat profile data storehouse virtual reconstruction loop path plane cross section;
Step S09, if ranking judges;
Judge in the section combination of loop path plane cross section with the presence or absence of the flat section of segmentation for having completed shaft tower ranking, such as exist
Then call and enter next step after the flat section shaft tower database of the segmentation ranked, as being directly entered next step in the absence of if;
Step S10, sets up ground wire database in circuit pole tower annex and shelves;
Shaft tower ranking is carried out by using loop path plane cross section, ground wire database in circuit pole tower annex and shelves is set up,
And ranking results are write into the corresponding flat section shaft tower database of segmentation of each flat section of segmentation;
Step S11, arranges out several ground wire hanging wire mode;
By carrying out hanging wire template definition on three-dimensional shaft tower, using the flat section index in loop, flat profile data storehouse, segmentation are segmented
Ground wire database in flat section shaft tower database, circuit pole tower annex and shelves, moved towards according to loop, avoid ground wire from intersecting,
The principle auto arrangement of multiloop negative phase sequence goes out several ground wire hanging wire mode;
Step S12, batch optimization, replacing ground wire hanging wire mode;
It is preferred that go out loop, phase sequence hanging wire mode, according to transformer station interval, loop transposition, wire commutation and special overlap joint require into
The optimization of row batch, replacing ground wire hanging wire mode, lead while being updated according to ground wire hanging wire mode in circuit pole tower annex and shelves
Ground wire database;
Step S13, completes three-dimensional scenic modeling.
2. a kind of route selection of Duo Hui branches according to claim 1, ranking interaction, scene modeling method, it is characterised in that:
Described transmission system Duo Hui branches include single double back conversion, line disconnection and mixed pressure lines branch.
3. a kind of route selection of Duo Hui branches according to claim 1, ranking interaction, scene modeling method, it is characterised in that:
Described loop attribute includes voltage class, alternating current-direct current type and feeder number.
4. a kind of route selection of Duo Hui branches according to claim 1, ranking interaction, scene modeling method, it is characterised in that:
Described shaft tower ranking can be respectively row's tower and Automatic Optimal ranking by hand using two kinds of working methods.
5. a kind of route selection of Duo Hui branches according to claim 1, ranking interaction, scene modeling method, it is characterised in that:
Described hanging wire template includes ground wire voltage class, alternating current-direct current type, phase sequence installation site and loop hanging wire packet template.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510124891.6A CN104765910B (en) | 2015-03-20 | 2015-03-20 | A kind of route selection of Duo Hui branches, ranking interaction, scene modeling system and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510124891.6A CN104765910B (en) | 2015-03-20 | 2015-03-20 | A kind of route selection of Duo Hui branches, ranking interaction, scene modeling system and method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104765910A CN104765910A (en) | 2015-07-08 |
CN104765910B true CN104765910B (en) | 2017-10-31 |
Family
ID=53647735
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510124891.6A Active CN104765910B (en) | 2015-03-20 | 2015-03-20 | A kind of route selection of Duo Hui branches, ranking interaction, scene modeling system and method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104765910B (en) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105071955B (en) * | 2015-07-20 | 2018-06-29 | 常州大学 | A kind of method for evading route loop to RPL agreements |
CN106557601B (en) * | 2015-09-30 | 2019-10-15 | 中国电力科学研究院 | A kind of transmission line of electricity emulation mode |
CN108646135A (en) * | 2018-04-08 | 2018-10-12 | 中国电建集团河北省电力勘测设计研究院有限公司 | A kind of digitlization selection method of UHV transmission line |
CN109165398A (en) * | 2018-07-02 | 2019-01-08 | 武汉珞珈德毅科技股份有限公司 | A kind of route modeling tool |
CN109583108B (en) * | 2018-12-06 | 2023-04-28 | 中国电力工程顾问集团西南电力设计院有限公司 | Extra-high voltage transmission line scene construction method based on GIS |
CN112749460B (en) * | 2019-10-31 | 2024-06-25 | 北京博超时代软件有限公司 | Method, device, equipment and storage medium for designing transmission bifurcation line |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2874879Y (en) * | 2005-12-31 | 2007-02-28 | 江苏省电力设计院 | Lattice branch tower for multiple loop transmission line |
CN101621186A (en) * | 2008-07-03 | 2010-01-06 | 张兵 | Power supply and distribution method for low-voltage system |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2012075416A1 (en) * | 2010-12-02 | 2012-06-07 | Lighthouse Energy Solutions, Llc | Superconducting direct current transmission system |
-
2015
- 2015-03-20 CN CN201510124891.6A patent/CN104765910B/en active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2874879Y (en) * | 2005-12-31 | 2007-02-28 | 江苏省电力设计院 | Lattice branch tower for multiple loop transmission line |
CN101621186A (en) * | 2008-07-03 | 2010-01-06 | 张兵 | Power supply and distribution method for low-voltage system |
Non-Patent Citations (5)
Title |
---|
史方舟.三维GIS输电线路管理***的研究与应用.《中国优秀硕士学位论文全文数据库 基础科学辑》.2013, * |
架空输电线路同塔多回架设的设计初探;潘广亮;《中国新技术新产品》;20121231(第15期);第139页 * |
输电线路三维可视化辅助设计***的研究;张瑞永等;《电力勘测设计》;20120229;第71-76页 * |
输电线路三维数字化设计平台建设与应用研究;熊晓光;《电力勘测设计》;20130630;全文 * |
输电线路选线三维GIS技术及工程应用;陆小艺;《广西电力》;20120430;第35卷(第2期);全文 * |
Also Published As
Publication number | Publication date |
---|---|
CN104765910A (en) | 2015-07-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104765910B (en) | A kind of route selection of Duo Hui branches, ranking interaction, scene modeling system and method | |
CN111444587B (en) | Electric power graph drawing method based on automatic drawing technology | |
CN107192393B (en) | A kind of maintenance system and method for road-map-data | |
CN110442996B (en) | Intelligent entity cable laying method based on PDMS platform | |
CN104143127B (en) | CIM-based three-diagram linkage processing method for distribution network | |
CN104375992A (en) | Address matching method and device | |
CN102782689A (en) | System and method for automated building services design | |
CN104820707A (en) | Automatic test paper composition method in B/S (Brower/Server) mode based on knowledge hierarchy in field of computers | |
CN110046391B (en) | Automatic transformer substation primary wiring diagram generation method based on monitoring information table | |
CN110427521B (en) | Power distribution network single line diagram generation system | |
CN104133943A (en) | Distribution network pattern automatic generating method based on target guide | |
CN109582943A (en) | A method of automatically generating engineering data sheet | |
CN106815409A (en) | The analysis method of power grid topological relation | |
CN105205203A (en) | Boundless crossed line distribution method of power distribution feeder line single line diagram | |
CN102592005B (en) | Method and device for generating single line drawing | |
CN109830954B (en) | Topology hierarchical identification method suitable for automatic generation of power grid visual simulation model | |
CN103441988B (en) | Across GIS platform data migration method | |
CN113696935A (en) | Signal equipment primitive data model establishing method and system | |
CN103810365A (en) | Automatic grading method based on hydroelectric simulation training system | |
CN104200501A (en) | Rail transit train flow diagram automatic preparation method | |
CN112464545A (en) | Layout method, system, equipment and medium for cables and transformer substation of offshore wind farm | |
CN111078683A (en) | Interpolation search-based power grid ledger data filling and counting method and device | |
CN109460911A (en) | A kind of the path drawing drawing method and device of power equipment | |
CN106557601B (en) | A kind of transmission line of electricity emulation mode | |
CN108805336A (en) | It is a kind of to choose the method and device for sharing shaft tower based on power grid GIS |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
EXSB | Decision made by sipo to initiate substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |