CN104763012A - Special excavating bucket and method for using excavating bucket to excavate underground mine drainage ditch - Google Patents

Special excavating bucket and method for using excavating bucket to excavate underground mine drainage ditch Download PDF

Info

Publication number
CN104763012A
CN104763012A CN201510056324.1A CN201510056324A CN104763012A CN 104763012 A CN104763012 A CN 104763012A CN 201510056324 A CN201510056324 A CN 201510056324A CN 104763012 A CN104763012 A CN 104763012A
Authority
CN
China
Prior art keywords
bucket
special
ditch
shaped
ear
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510056324.1A
Other languages
Chinese (zh)
Inventor
姚金蕊
何忠国
姚华
罗鑫
王勇
段辉
王清平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Kailin Group Co Ltd
Original Assignee
Guizhou Kailin Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Kailin Group Co Ltd filed Critical Guizhou Kailin Group Co Ltd
Priority to CN201510056324.1A priority Critical patent/CN104763012A/en
Publication of CN104763012A publication Critical patent/CN104763012A/en
Pending legal-status Critical Current

Links

Landscapes

  • Sewage (AREA)

Abstract

The invention discloses a special excavating bucket and a method for using the excavating bucket to excavate an underground mine drainage ditch. The special excavating bucket comprises a bucket body and a mounting component, the bucket body is connected with the mounting component through a bucket rod, the bucket body is composed of a bucket bottom, and a right covered edge and a left covered edge arranged at two sides of the bucket, and the bucket bottom is special in structure and narrowed in sequence from the top to bottom; the mounting component is composed of a bucket pin, and a right bucket lug and a left bucket lug arranged at two ends of the bucket pin, and the bucket rod is respectively connected with the bottoms of the right bucket lug and left bucket lug; the drainage ditch excavating method includes steps that confirming the ditch width and depth, confirming the size of the special excavating bucket, excavating the ditch, cleaning waste residue and forming the ditch. According to the method for using the excavating bucket to excavate the underground mine drainage ditch, through using the special excavating bucket to mechanically excavate the underground mine drainage ditch, the mechanical degree and safety are improved, the construction cost is lowered, the construction period is short, people only need to clean the ditch bottom to form the ditch which meets the drainage design requirement, and the construction efficiency is greatly improved.

Description

A kind of special-shaped bucket and adopt this bucket to excavate the method in underground mine gutter
Technical field
The invention belongs to mining technique field, specifically relate to a kind of special-shaped bucket and adopt this bucket to excavate the method in underground mine gutter.
Background technology
As shown in Figure 1, underground mine draining mainly by taking drainage trenching groove that swallet is introduced settling sump by gutter in side, tunnel, then takes water pump extraction to be expelled to earth's surface.But for the excavation of drainage underground groove and ditch cleaning, normally can not use mechanical equivalent of light excavation by underground site environment and equipment mechanism restriction in the past always.
Drainage trenching groove is carried out as adopted the original bucket of excavator, bucket can not well excavate at the bottom of the side of tunnel, and equipment large arm unbalance stress easily causes device damage, the groove be simultaneously excavated can not meet design needs, but it is many to there is again required manpower and materials consumption by hand excavation ditch, effect is low, the problem that long construction period, cost are high.Therefore how adopting mechanical equivalent of light excavation underground mine gutter, can meet again its trench design requirement, is technical problem urgently to be resolved hurrily at present.
Summary of the invention
For solving the problem, the invention provides a kind of special-shaped bucket and adopt this bucket to excavate the method in underground mine gutter, thus improve mechanization degree and safety, meet trench design requirement preferably, reduce manpower and materials consumption, reduce construction cost, shorten construction period, improve efficiency of construction.
The present invention is achieved by following technical solution.
A kind of special-shaped bucket, comprise bucket body and installing component, described bucket body is connected with installing component by dipper, and described bucket body, by struggling against the end and be arranged at the right bound edge on both sides of struggling against and left bound edge forms, is the polymorphic structure narrowed successively from top to bottom at the bottom of described bucket; Described installing component is by struggling against pin and be arranged at the bucket pin right bucket ear at two ends respectively and Zuo Douer forms, and described dipper is connected with left bucket eardrum portion with right bucket ear respectively.
Described right bound edge and left bound edge lower end are respectively arranged with stiffener with bucket junction, the end.
Outside the top of described right bound edge and left bound edge, back gauge is 324mm, and middle outer back gauge is 278.57mm, and outside bottom, back gauge is 242mm.
The spacing of described right bucket ear and left bucket ear is 245mm.
The distance of described left bucket ear and right bound edge is more than or equal to 150mm.
The opening degree of depth of described bucket body is 618mm.
The diameter of described bucket pin is 45mm.
Adopt the method in above-mentioned special-shaped bucket excavation underground mine gutter, concrete grammar step is as follows:
(1) groove width and the degree of depth is determined: need it to determine groove width and the degree of depth in vertical direction according to scene at the bottom of the side of tunnel;
(2) special-shaped bucket size is determined: determine special-shaped bucket bucket pin size, bucket ear space, the upper and lower width of the opening degree of depth and bucket limit according to the groove width determined in step (1) and the degree of depth and excavator bucket pin connection dimension;
(3) ditch excavation: adopt step (2) special-shaped bucket to carry out ditch excavation according to the groove width determined and deep exploitation excavator;
(4) cleaning waste slag: the waste residue abnormity shovel board that ditch excavation produces backfills as road surface or utilizes trackless to shovel the standby shovel dress that carries out of installing and discharges;
(5) ditch Slot shaping: make ditch Slot shaping by carrying out labor cleaning to the groove dug.
In described step (1), groove width and depth bounds are: 400mm × 400mm, 500mm × 500mm or 600mm × 600mm.
The invention has the beneficial effects as follows:
The present invention carries out mechanical equivalent of light excavation by adopting different in nature bucket to underground mine drainage ditch, and improve mechanization degree and safety, reduce construction cost, compared with prior art, the present invention has following remarkable advantage:
(1) special-shaped bucket structure is simple, only just need can manufacture special-shaped bucket according to carrying out after machining drawing blanking seamless welding, greatly shortening construction period;
(2) mechanization degree is high, and labour intensity is low: employing mechanical equivalent of light excavation drainage underground groove, special-shaped bucket is connected with special-shaped shovel board bucket ear to adopt and connects fast, and replacing bucket and shovel board comparatively fast, can need to change at any time according to scene.Not only mechanization degree is high, and saves labour, and labor strength reduces greatly, can effectively improve work task efficiency;
(3) short construction period, efficiency are high: adopt mechanical equivalent of light excavation underground mine gutter, construction period is shorter, only manually need carry out bottom of trench cleaning and ditch Slot shaping just can be made to meet Drainage Design needs.Simultaneously also very fast to the drain cleaner of blocking, well solve because gutter construction is slow or groove blocking causes tunnel surface gathered water large, the situation of on-the-spot highly civilized health difference, ditch excavation efficiency is high.
Accompanying drawing explanation
Fig. 1 is drift section structural representation;
Fig. 2 is the structural representation of special-shaped bucket in the present invention;
Fig. 3 is the structural representation of special-shaped shovel board in the present invention.
In figure: 1-bucket body, 2-dipper, 3-installing component, 4-stiffener, 5-shovel board, 11-struggles against at the end, the right bound edge of 12-, the left bound edge of 13-, and 31-struggles against pin, the right bucket ear of 32-, the left bucket ear of 33-.
Detailed description of the invention
Technical scheme of the present invention is further described below in conjunction with accompanying drawing, but described in claimed scope is not limited to.
As shown in Figure 2, the special-shaped bucket of one of the present invention, comprise bucket body 1 and installing component 3, described bucket body 1 is connected with installing component 3 by dipper 2, described bucket body 1 is by the bucket end 11 and be arranged at the bucket right bound edge 12 on both sides and left bound edge 23 forms, and at the bottom of described bucket, 11 is the polymorphic structure narrowed successively from top to bottom; Described installing component 3 is by bucket pin 31 and be arranged at the bucket right bucket ear 32 at pin 31 two ends respectively and left bucket ear 33 forms, and described dipper 2 is connected with bottom right bucket ear 32 and left bucket ear 33 respectively.
Described right bound edge 12 and left bound edge 23 lower end are respectively arranged with stiffener 4 with bucket junction, the end 11.Increase the bucket end 11 and the bonding strength of bound edge, improve the application life of bucket.
Described right bound edge 12 is 324mm with back gauge outside the top of left bound edge 13, and middle outer back gauge is 278.57mm, and outside bottom, back gauge is 242mm.Namely bucket body bound edge upper width is 324mm, and middle part width is 278.57mm, and lower width is 242mm, and whole bucket body 1 forms polymorphic structure wide at the top and narrow at the bottom.
Described right bucket ear 32 is 245mm with the spacing of left bucket ear 33.
Described left bucket ear 33 is more than or equal to 150mm with the distance of right bound edge 12.Namely the ear that struggles against is 150mm with the minimum spacing on bucket limit.
The opening degree of depth of described bucket body 1 is 618mm.
The diameter of described bucket pin 31 is 45mm.
As shown in Figure 3, described installing component 3 lower end directly can be installed shovel board 5 and be formed special-shaped shovel board, and for replacing bucket body 1, described special-shaped bucket and shovel board material therefor thickness are 12mm and 16mm, and mechanical resistance tensile strength is greater than 1700Mpa, and Rockwell hardness is 53HRC.
Adopt the method in above-mentioned special-shaped bucket excavation underground mine gutter, concrete grammar step is as follows:
(1) determine groove width and the degree of depth: as shown in Figure 1, need it to determine groove width and the degree of depth in vertical direction according to scene at the bottom of the side of tunnel;
(2) special-shaped bucket size is determined: determine special-shaped bucket bucket pin size, bucket ear space, the upper and lower width of the opening degree of depth and bucket limit according to the groove width determined in step (1) and the degree of depth and excavator bucket pin connection dimension;
(3) ditch excavation: adopt step (2) special-shaped bucket to carry out ditch excavation according to the groove width determined and deep exploitation excavator;
(4) cleaning waste slag: the waste residue abnormity shovel board that ditch excavation produces backfills as road surface or utilizes trackless to shovel the standby shovel dress that carries out of installing and discharges; Wherein the bucket body 1 in special-shaped bucket is directly replaced by shovel board 5 by special-shaped shovel board, is convenient to manufacture, and use cost is low, greatly can shorten construction period simultaneously.
(5) ditch Slot shaping: make ditch Slot shaping by carrying out labor cleaning to the groove dug.
Above-mentioned special-shaped shovel board is wide is 700mm, and height is 400mm.
Construction sequence of the present invention is further illustrated as follows below in conjunction with embodiment:
(1) determine the construction size in gutter according to the groove width in mine working design and the degree of depth, the width of drift dewatering ditch groove and depth bounds are at 400mm × 400mm, 500mm × 500mm, 600mm × 600mm;
(2) according to gutter working design parameter, selected comparatively moderate special-shaped bucket processing dimension is processed, and so both meets normal operation and the use that also can ensure equipment mechanism while that bucket excavating out the gutter of required size.As Fig. 1, shown in Fig. 2, abnormity bucket machined parameters is: the diameter 45mm of bucket pin 31, the spacing of right bucket ear 32 and left bucket ear 33 is 245mm, opening degree of depth 618mm, bound edge top is wide is 324mm, centre is wide is 278.57mm, bottom is wide is 242mm, bucket ear and bucket limit minimum spacing 150mm, wherein the processing dimension of bucket can need to make an amendment to process according to scene again, the material selection thickness that bucket machining needs is 12mm and 16mm, mechanical resistance tensile strength is greater than 1700Mpa, Rockwell hardness is the wearing plate of 53HRC, the rapidoprint of bucket pin 31 does not do specific requirement, common material can meet performance need, bucket be processed as weldment, welding can not have gap.
Equally, the special-shaped shovel board in above-mentioned also adopts the same material and processing method processed with special-shaped bucket, bucket pin, bucket ear size constancy.Wide according to special-shaped shovel board 5 is 700mm, and height is 400mm, and bucket pin diameter is 45mm, and bucket ear space is that the machined parameters of 245mm carries out special-shaped shovel board processing, and shovel board processing dimension also can be made an amendment as required again and be processed.
(3) after special-shaped bucket and special-shaped shovel board process, select excavator snap joint to carry out bucket and change to excavation or the ditch cleaning that ditch is carried out at scene.Because underground tunnel road is molded by hillock, the groove of required designing requirement so just easier can be dug out when equipment excavation ditch;
(4) by waste residue that mechanical equivalent of light excavation ditch produces, can need as road surface, tunnel has hollow to need backfill according to scene, only needing quick-replaceable abnormity shovel board waste residue to be shoveled hollow place and carry out backfill road surface, backfilling the installing of available trackless shovel if do not needed for being discharged.
(5) drainage groove mechanical equivalent of light excavation gone out only need less manually carry out bottom of trench cleaning just can meet the shaping of gutter.

Claims (9)

1. a special-shaped bucket, it is characterized in that: comprise bucket body (1) and installing component (3), described bucket body (1) is connected with installing component (3) by dipper (2), described bucket body (1) is by the bucket end (11) and be arranged at the bucket right bound edge (12) on both sides and left bound edge (23) forms, and (11) at the bottom of described bucket are the polymorphic structure narrowed successively from top to bottom; Described installing component (3) is by bucket pin (31) and be arranged at the bucket pin right bucket ear (32) at (31) two ends respectively and left bucket ear (33) forms, and described dipper (2) is connected with bottom right bucket ear (32) and left bucket ear (33) respectively.
2. the special-shaped bucket of one according to claim 1, is characterized in that: described right bound edge (12) and left bound edge (23) lower end are respectively arranged with stiffener (4) with the bucket end (11) junction.
3. the special-shaped bucket of one according to claim 1, is characterized in that: described right bound edge (12) is 324mm with back gauge outside the top of left bound edge (13), and middle outer back gauge is 278.57mm, and outside bottom, back gauge is 242mm.
4. the special-shaped bucket of one according to claim 1, is characterized in that: described right bucket ear (32) is 245mm with the spacing of left bucket ear (33).
5. the special-shaped bucket of one according to claim 1, is characterized in that: described left bucket ear (33) is more than or equal to 150mm with the distance of right bound edge (12).
6. the special-shaped bucket of one according to claim 1, is characterized in that: the opening degree of depth of described bucket body (1) is 618mm.
7. the special-shaped bucket of one according to claim 1, is characterized in that: the diameter of described bucket pin (31) is 45mm.
8. adopt the method in special-shaped bucket excavation underground mine gutter as claimed in claim 1, it is characterized in that: concrete grammar step is as follows:
(1) groove width and the degree of depth is determined: need it to determine groove width and the degree of depth in vertical direction according to scene at the bottom of the side of tunnel;
(2) special-shaped bucket size is determined: determine special-shaped bucket bucket pin size, bucket ear space, the upper and lower width of the opening degree of depth and bucket limit according to the groove width determined in step (1) and the degree of depth and excavator bucket pin connection dimension;
(3) ditch excavation: adopt step (2) special-shaped bucket to carry out ditch excavation according to the groove width determined and deep exploitation excavator;
(4) cleaning waste slag: the waste residue abnormity shovel board that ditch excavation produces backfills as road surface or utilizes trackless to shovel the standby shovel dress that carries out of installing and discharges;
(5) ditch Slot shaping: make ditch Slot shaping by carrying out labor cleaning to the groove dug.
9. a kind ofly according to claim 8 adopt special-shaped bucket to excavate the method in underground mine gutter, it is characterized in that: the groove width in described step (1) and depth bounds are: 400mm × 400mm, 500mm × 500mm or 600mm × 600mm.
CN201510056324.1A 2015-02-04 2015-02-04 Special excavating bucket and method for using excavating bucket to excavate underground mine drainage ditch Pending CN104763012A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510056324.1A CN104763012A (en) 2015-02-04 2015-02-04 Special excavating bucket and method for using excavating bucket to excavate underground mine drainage ditch

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510056324.1A CN104763012A (en) 2015-02-04 2015-02-04 Special excavating bucket and method for using excavating bucket to excavate underground mine drainage ditch

Publications (1)

Publication Number Publication Date
CN104763012A true CN104763012A (en) 2015-07-08

Family

ID=53645079

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510056324.1A Pending CN104763012A (en) 2015-02-04 2015-02-04 Special excavating bucket and method for using excavating bucket to excavate underground mine drainage ditch

Country Status (1)

Country Link
CN (1) CN104763012A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050095109A1 (en) * 2003-11-04 2005-05-05 Richard Harris Variable width backhoe bucket
CN201933530U (en) * 2010-12-28 2011-08-17 徐州巴特工程机械股份有限公司 Structure for inserting bottom plate of bucket lug component
CN202936833U (en) * 2012-12-04 2013-05-15 上海尔轩工贸有限公司 Excavator bucket
CN204491690U (en) * 2015-02-04 2015-07-22 贵州开磷集团股份有限公司 A kind of special-shaped bucket

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050095109A1 (en) * 2003-11-04 2005-05-05 Richard Harris Variable width backhoe bucket
CN201933530U (en) * 2010-12-28 2011-08-17 徐州巴特工程机械股份有限公司 Structure for inserting bottom plate of bucket lug component
CN202936833U (en) * 2012-12-04 2013-05-15 上海尔轩工贸有限公司 Excavator bucket
CN204491690U (en) * 2015-02-04 2015-07-22 贵州开磷集团股份有限公司 A kind of special-shaped bucket

Similar Documents

Publication Publication Date Title
JP5163424B2 (en) Groundwater drainage structure and tunnel construction method having the drainage structure
CN106049532B (en) A kind of pipe gallery open-cut branch blocking means and its construction method
CN103882881B (en) Go deep into rock construction method under water
KR20100115019A (en) Panel joint for construction for underground diaphragm well and underground diaphragm well constructing method using the same
JP6661448B2 (en) Construction method of underground diaphragm wall
CN102704480B (en) Construction method for processing ultra-thick quicksand layer of pile foundation by using front-end vibration steel casing
CN110055987A (en) A kind of rich water mobile sand layer foundation pit tool-type dewatering well device
CN203808088U (en) Gabion gully detention structure for top of hydropower station slag yard
CN104895173A (en) Sandy soil buried corrugated pipe subsidence prevention method
CN109630173A (en) A kind of prestress anchorage cable cleaning plant and method
CN209083308U (en) A kind of prestress anchorage cable cleaning plant
CN208733655U (en) A kind of high water level dewatering construction structure
CN204491690U (en) A kind of special-shaped bucket
CN210066792U (en) Rich water quicksand stratum foundation ditch instrument formula precipitation well device
CN209114425U (en) A kind of irrigation canals and ditches that can normally use in a variety of contexts
CN203878638U (en) Bucket for excavating and quickly forming drainage ditch
CN104763012A (en) Special excavating bucket and method for using excavating bucket to excavate underground mine drainage ditch
CN104846837A (en) Construction method for ultra-deep well pit in surface drainage foundation pit
CN205013044U (en) Drought -hit area highway tunnel cable duct and escape canal global design structure
CN214169122U (en) Interim plugging device of precipitation well
CN204435321U (en) A kind of steam power station water intaking open channel
CN105350553A (en) Dewatering tube well for foundation pit construction with cover-excavation method and foundation pit construction method
CN108661669B (en) It is a kind of suitable for Shallow-buried section and under wear the method for tunnel construction of shallow-buried water-rich section
CN109610465B (en) Excavation construction method for ultra-large-area deep foundation pit
CN103337719B (en) High-frequency Interference protection earth electrode and method for embedding thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20150708