CN104754655B - A kind of business reorganization method and apparatus - Google Patents
A kind of business reorganization method and apparatus Download PDFInfo
- Publication number
- CN104754655B CN104754655B CN201510090147.9A CN201510090147A CN104754655B CN 104754655 B CN104754655 B CN 104754655B CN 201510090147 A CN201510090147 A CN 201510090147A CN 104754655 B CN104754655 B CN 104754655B
- Authority
- CN
- China
- Prior art keywords
- cell
- rnc
- load
- load condition
- business
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W28/00—Network traffic management; Network resource management
- H04W28/16—Central resource management; Negotiation of resources or communication parameters, e.g. negotiating bandwidth or QoS [Quality of Service]
- H04W28/18—Negotiating wireless communication parameters
Landscapes
- Engineering & Computer Science (AREA)
- Quality & Reliability (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Mobile Radio Communication Systems (AREA)
Abstract
This application discloses a kind of business reorganization method and apparatus, this method includes:RNC obtains the information on load of multiple cells;RNC determines the load condition of each cell in the multiple cell by the information on load and preset threshold value;Wherein, different load conditions corresponds to different adjusting parameters;RNC determines adjusting parameter corresponding with the load condition of cell;RNC selects adjusting parameter corresponding with the load condition of cell to be grouped the business of user in the cell and exchanges PS adjustment, with this by the way that more set scheduling parameters are arranged, it realizes and selects corresponding scheduling parameter based on needing, realize the flexible use to scheduling parameter, preferably to realize the adaptation to complex situations, to improve yard resource utilization and user throughput and user perceptibility.
Description
Technical field
The invention relates to field of communication technology, more particularly to a kind of business reorganization method and apparatus.
Background technology
In mobile communication network, user uses in PS (packet switching, packet switch) data service
Net, service-user activate PDP (Packet Data Protocol, Packet Data Protocol);Wait for the activation PDP successes of PS service-users
Afterwards, RNC (Radio Network Controller, radio network controller) can initiate to carry out the uplink and downlink business of user
Measuring business volume, to monitor subscriber traffic situation in real time;RNC carries out PS scheduling based on monitoring situation to the uplink and downlink of user,
But RNC is when implementing PS scheduling in the prior art, only a set of lifting speed parameter, wherein used parameter is excessively single, does not have
Have in view of in practice scene, there are multiple cells, and the different situation of load condition of multiple cells, lead to not height
The utilization resource and raising user throughput of effect.
Invention content
The embodiment of the present application provides a kind of business reorganization method and apparatus, to overcome defect in the prior art, leads to
The more set scheduling parameters of setting are crossed, realize and select corresponding scheduling parameter based on needing, realizing flexibly makes scheduling parameter
With preferably to realize the adaptation to complex situations, to improve yard resource utilization and user throughput and user's perception
Degree.
For this purpose, the embodiment of the present application provides a kind of business reorganization method, including:
Radio network controller (RNC) obtains the information on load of multiple cells;
The RNC determines the load shape of each cell in the multiple cell by the information on load and preset threshold value
State;Wherein, different load conditions corresponds to different adjusting parameters;
The RNC determines adjusting parameter corresponding with the load condition of cell;
The RNC selects adjusting parameter corresponding with the load condition of cell to divide the business of user in the cell
Group exchanges PS adjustment.
Specifically, the RNC determines the load condition of the cell by the information on load and preset threshold value, specifically
For:
The RNC judges whether the information on load is more than preset threshold value;
If the determination result is YES, the RNC determines that the cell is in overload state;
If judging result is no, the RNC determines that the cell is in non-overload state.
Preferably, the load condition of the cell is marked by status indicator;
After the RNC determines the load condition of the cell by the information on load and preset threshold value, also wrap
It includes:
The status indicator that load conditions of the RNC based on presently described cell stores itself is updated.
When the business of user is adjusted in needing to the multiple cell, the RNC is by identifying the state mark
Know to determine the load condition of each cell.
Preferably, the RNC selects industry of the adjusting parameter corresponding with the load condition of cell to user in the cell
Business, which is grouped, exchanges PS adjustment, specially:
For the cell in overload state, RNC selection and cell are in the corresponding adjustment ginseng of overload state
Several business to user in the cell carry out PS scheduling;
For the cell in non-overload state, RNC selection and cell are in the corresponding tune of non-overload state
Whole parameter carries out PS scheduling to the business of user in the cell.
Preferably, the information on load is specially:The utilization rate or H carrier wave H numbers of users of H carrier wave uplink code resources.
The embodiment of the present application also discloses a kind of radio network controller (RNC), including:
Acquisition module, the information on load for obtaining multiple cells;
First determining module is each small in the multiple cell for being determined by the information on load and preset threshold value
The load condition in area;Wherein, different load conditions corresponds to different adjusting parameters;
Second determining module, for determining adjusting parameter corresponding with the load condition of cell;
Module is adjusted, for selecting business of the adjusting parameter corresponding with the load condition of cell to user in the cell
It is grouped and exchanges PS adjustment.
Specifically, first determining module, is specifically used for judging whether the information on load is more than preset threshold value;
If the determination result is YES, determine that the cell is in overload state;If judging result is no, the cell is determined
In non-overload state.
Preferably, the load condition of the cell is marked by status indicator;
The equipment further includes:Update module, the shape that itself is stored for the load condition based on presently described cell
State mark is updated;
Identification module, when the business for the user in needing to the multiple cell is adjusted, described in identification
Status indicator determines the load condition of each cell.
Specifically, the adjustment module, is specifically used for:For the cell in overload state, RNC selection with it is small
Area is in the corresponding adjusting parameter of overload state and carries out PS scheduling to the business of user in the cell;
For the cell in non-overload state, RNC selection and cell are in the corresponding tune of non-overload state
Whole parameter carries out PS scheduling to the business of user in the cell.
Preferably, the information on load is specially:The utilization rate or H carrier wave H numbers of users of H carrier wave uplink code resources.
Compared with prior art, the preferred information on load for obtaining multiple cells in the application;And pass through the information on load
The load condition of each cell in the multiple cell is determined with preset threshold value;Wherein, different load conditions corresponds to different
Adjusting parameter;Determine adjusting parameter corresponding with the load condition of cell;It finally selects corresponding with the load condition of cell
Adjusting parameter, which is grouped the business of user in the cell, exchanges PS adjustment, real with this by the way that more set scheduling parameters are arranged
Corresponding scheduling parameter is selected now and based on needing, and the flexible use to scheduling parameter is realized, preferably to realize to complexity
The adaptation of situation, to improve yard resource utilization and user throughput and user perceptibility.
Description of the drawings
Fig. 1 is a kind of flow diagram for business reorganization method that the embodiment of the present application proposes;
Fig. 2 is a kind of flow diagram of the update cell load status proposed in the embodiment of the present application;
Fig. 3 is the flow diagram that PS scheduling is carried out based on cell load status;
Fig. 4 is a kind of structural schematic diagram for RNC that the embodiment of the present application proposes.
Specific implementation mode
For the above-mentioned problems in the prior art, the embodiment of the present application provides a kind of business reorganization method and sets
It is standby, to overcome defect in the prior art.
The embodiment of the present invention is described in detail below in conjunction with the accompanying drawings.
The embodiment of the present application one provides a kind of business reorganization method, as shown in Figure 1, including the following steps:
Step 101, radio network controller (RNC) obtains the information on load of multiple cells;
Specifically, information on load involved in the application is specifically as follows the H carrier wave uplink code resources of multiple cells
Utilization rate or H carrier wave H numbers of users.
Specifically, based on current realization method, the main carry voice traffic of R4 carrier waves, and speech business is to be unable to reduction of speed
, in addition R4 terminals can not be dropped since resource not enough cause the PS business on R4 carrier waves to be accessed with minimum-rate
Speed, so PS dispatching algorithms are primarily directed to the PS user on the H carrier waves of R5 terminals, in addition, only for code resource utilization
Consider uplink, be because on H carrier waves PS business downlink all carried using HSDPA, just at present realization for will not reduction of speed,
So code resource utilization refer to H carrier wave uplink code resource utilizations, and the information on load of the application be for subsequently to
The business at family carries out the foundation of PS adjustment, and the utilization rate for the H carrier wave uplink code resources that also therefore can obtain multiple cells carrys out body
The load condition of existing cell, naturally it is also possible to which by the number of users in cell, i.e. H carrier waves H numbers of users embody cell
Load condition.And specifically, can using the calculation formula of code resource utilization come the utilization rate to H carrier wave uplink code resources into
Row calculates:Specifically, cell uplink DPCH codes resource utilization=all H carrier waves ascending time slots of cell have used DPCH total/small
All H carrier waves ascending time slots in area can use DPCH sums.
Step 102, the RNC determines each cell in the multiple cell by the information on load and preset threshold value
Load condition;Wherein, different load conditions corresponds to different adjusting parameters;
Specifically, the RNC determines the load condition of the cell by the information on load and preset threshold value, specifically
For:The RNC judges whether the information on load is more than preset threshold value;If the determination result is YES, the RNC determines described small
Area is in overload state;If judging result is no, the RNC determines that the cell is in non-overload state.
In concrete scene in the application, load condition only has two states, excess load, or non-excess load, therefore
One preset threshold value is set, and the information on load by being obtained from step 101 is compared and can obtain with preset threshold value
To load condition, and different load conditions is corresponding with different adjusting parameters, and the state of specific excess load is corresponding with super
The parameter being adjusted in the case of load, is named as parameter 1 herein, and the state of non-excess load is corresponding with the feelings in non-excess load
The parameter being adjusted under condition, is named as parameter 2, and wherein parameter is termed to be distinguished and named, it is not specific its
His physical meaning.
Step 103, the RNC determines adjusting parameter corresponding with the load condition of cell;
Since there are multiple cells, after the load condition that all cells are determined, further it is based on all small
The load condition of each cell in area determines the corresponding adjusting parameter of each cell.Specifically, it is assumed that there are 3 cells, point
It is not named as cell 1, cell 2, cell 3, and the load condition of cell 1 is overload state, the load condition of cell 2 is not surpass
The load condition of load condition, cell 3 is overload state, in the case, determines that 1 corresponding adjusting parameter of cell is parameter
1,2 corresponding adjusting parameter of cell is parameter 2, and 3 corresponding adjusting parameter of cell is parameter 1.
Step 104, the RNC selects industry of the adjusting parameter corresponding with the load condition of cell to user in the cell
Business, which is grouped, exchanges PS adjustment.
In all cells are determined after the corresponding adjusting parameter of each cell, based on determining adjusting parameter to each
The business of user carries out PS adjustment in cell, specifically, for the cell in overload state, the RNC selections and cell
PS scheduling is carried out to the business of user in the cell in overload state corresponding adjusting parameter;For in non-excess load
The cell of state, RNC selection and cell are in the corresponding adjusting parameter of non-overload state to user in the cell
Business carries out PS scheduling.
Here, still being illustrated with above-mentioned example, it is determined that cell 1 corresponding adjusting parameter is parameter 1, and cell 2 is right
The adjusting parameter answered is parameter 2, and 3 corresponding adjusting parameter of cell is parameter 1, in the case, to the customer service in cell 1
PS adjustment is carried out according to parameter 1, PS adjustment, the user in cell 3 are carried out according to parameter 2 to the customer service in cell 2
Business carries out PS adjustment according to parameter 1.Wherein, specific PS adjustment process is:
When being in non-overload state namely resource abundance for cell, multiple reduction of speed gears are configured, in the business of user
When amount reduces (namely needing to carry out reduction of speed to it), one grade one grade of reduction of speed, until minimum-rate, and when the portfolio of user increases
When more, raising speed is carried out to it, one raising speed gear of configuration therein directly ensures that the rate of user reaches maximum.
And when being in overload state for cell, multiple raising speed gears are configured, when the portfolio of user increases, one grade
One grade of carry out raising speed, the rate that one grade of highest are also relatively small rate;A reduction of speed gear is configured, in the business of user
When amount is reduced, it is directly preferably minimized speed.
Certainly, in specific scene as shown in Figures 2 and 3, the load condition of the cell can also pass through state mark
Know to be marked;In the case, the negative of the cell is determined by the information on load and preset threshold value in the RNC
After lotus state, namely after step 102, further include:
The status indicator that load conditions of the RNC based on presently described cell stores itself is updated;
When the business of user is adjusted in needing to the multiple cell, the RNC is by identifying the state mark
Know to determine the load condition of each cell.
Specifically, as shown in Fig. 2, the load condition due to cell can change, in this situation it is desirable to cell
Load condition be updated, it is more obtaining specifically, can be identified to the load condition of cell by status indicator
The information on load namely step 101 of a cell can be carried out periodically, can specifically be controlled by timer
System, and compare information on load (utilization rate or H carrier wave H numbers of users of H carrier wave uplink code resources) and compared with preset threshold value
Compared with to determine the current state of cell (excess load or non-excess load).
For the cell in overload state, whether further reading state mark is in determine before the cell
The state of excess load determines that the load condition of the cell is changed if not having, and in the case, the event instruction of transmission (refers to
Show that the load condition of cell is changed) and CDL (content therein include cell status and resource service condition) to after
Platform equipment or server side, so that staff can check and operate, while based on the current load shape of the cell
State is updated status indicator, and updated cell ID indicates that the cell is currently at the state of excess load, if cell
It is also in the state of excess load before, status indicator can also be updated based on the cell current load condition,
Or without any operation.
For the cell in non-overload state, reading state identifies whether be in super negative before determining the cell
The state of lotus determines that the load condition of the cell does not change if not having, in this case, it is possible to be worked as based on the cell
Preceding load condition is updated status indicator, can not also carry out any operation, and if being to determine before cell is also
State in excess load can then determine that the load condition of the cell has sent change, in the case, send event instruction
And CDL so that staff can check and operate, while being worked as to background devices or server side based on the cell
Preceding load condition is updated status indicator.
Subsequently as shown in figure 3, when the business of user is adjusted in needing to the multiple cell, the RNC passes through
The status indicator is identified to determine the load condition of each cell, and based on the selection pair of the load condition of determining each cell
The adjusting parameter answered carries out PS adjustment to each cell.
In order to which the application is further detailed, the embodiment of the present application two also discloses a kind of radio network controller
RNC, as shown in figure 4, including:
Acquisition module 401, the information on load for obtaining multiple cells;
First determining module 402, it is every in the multiple cell for being determined by the information on load and preset threshold value
The load condition of a cell;Wherein, different load conditions corresponds to different adjusting parameters;
Second determining module 403, for determining adjusting parameter corresponding with the load condition of cell;
Module 404 is adjusted, for selecting adjusting parameter corresponding with the load condition of cell to user in the cell
Business, which is grouped, exchanges PS adjustment.
Specifically, first determining module 402, is specifically used for judging whether the information on load is more than preset threshold
Value;
If the determination result is YES, determine that the cell is in overload state;If judging result is no, the cell is determined
In non-overload state.
Specifically, the load condition of the cell can be marked by status indicator;
The equipment described in the case further includes:Update module, for the load condition based on presently described cell to certainly
The status indicator of body storage is updated.
Identification module, when the business for the user in needing to the multiple cell is adjusted, described in identification
Status indicator determines the load condition of each cell.
The adjustment module 404, is specifically used for:For the cell in overload state, at the RNC selections and cell
The business of user carries out PS scheduling in the corresponding adjusting parameter of overload state is to the cell;
For the cell in non-overload state, RNC selection and cell are in the corresponding tune of non-overload state
Whole parameter carries out PS scheduling to the business of user in the cell.
The involved information on load is specially in the application:The utilization rate or H carrier waves H of H carrier wave uplink code resources are used
Amount amount.
Compared with prior art, the preferred information on load for obtaining multiple cells in the application;And pass through the information on load
The load condition of each cell in the multiple cell is determined with preset threshold value;Wherein, different load conditions corresponds to different
Adjusting parameter;Determine adjusting parameter corresponding with the load condition of cell;It finally selects corresponding with the load condition of cell
Adjusting parameter, which is grouped the business of user in the cell, exchanges PS adjustment, real with this by the way that more set scheduling parameters are arranged
Corresponding scheduling parameter is selected now and based on needing, and the flexible use to scheduling parameter is realized, preferably to realize to complexity
The adaptation of situation, to improve yard resource utilization and user throughput and user perceptibility.
Through the above description of the embodiments, those skilled in the art can be understood that the application can lead to
Hardware realization is crossed, the mode of necessary general hardware platform can also be added to realize by software.Based on this understanding, this Shen
Technical solution please can be expressed in the form of software products, which can be stored in a non-volatile memories
In medium (can be CD-ROM, USB flash disk, mobile hard disk etc.), including some instructions are used so that a computer equipment (can be
Personal computer, server or network equipment etc.) execute each implement scene of the application described in method.
It will be appreciated by those skilled in the art that the accompanying drawings are only schematic diagrams of a preferred implementation scenario, module in attached drawing or
Flow is not necessarily implemented necessary to the application.
It will be appreciated by those skilled in the art that the module in device in implement scene can be described according to implement scene into
Row is distributed in the device of implement scene, can also be carried out respective change and is located at the one or more dresses for being different from this implement scene
In setting.The module of above-mentioned implement scene can be merged into a module, can also be further split into multiple submodule.
Above-mentioned the application serial number is for illustration only, does not represent the quality of implement scene.
Disclosed above is only several specific implementation scenes of the application, and still, the application is not limited to this, Ren Heben
What the technical staff in field can think variation should all fall into the protection domain of the application.
Claims (10)
1. a kind of business reorganization method, which is characterized in that including:
Radio network controller (RNC) obtains the information on load of multiple cells;
The RNC determines the load condition of each cell in the multiple cell by the information on load and preset threshold value;
Wherein, different load conditions corresponds to different adjusting parameters;
The RNC determines adjusting parameter corresponding with the load condition of cell;
The RNC selects adjusting parameter corresponding with the load condition of cell to be grouped friendship to the business of user in the cell
Change PS adjustment.
2. the method as described in claim 1, which is characterized in that the RNC is true by the information on load and preset threshold value
The load condition of the fixed cell, specially:
The RNC judges whether the information on load is more than preset threshold value;
If the determination result is YES, the RNC determines that the cell is in overload state;
If judging result is no, the RNC determines that the cell is in non-overload state.
3. the method as described in claim 1, which is characterized in that the load condition of the cell is by status indicator come into rower
Note;
After the RNC determines the load condition of the cell by the information on load and preset threshold value, further include:
The status indicator that load conditions of the RNC based on presently described cell stores itself is updated;
When the business of user is adjusted in needing to the multiple cell, the RNC by identify the status indicator come
Determine the load condition of each cell.
4. the method as described in claim 1, which is characterized in that the RNC selects adjustment corresponding with the load condition of cell
Parameter, which is grouped the business of user in the cell, exchanges PS adjustment, specially:
For the cell in overload state, RNC selection and cell are in the corresponding adjusting parameter pair of overload state
The business of user carries out PS scheduling in the cell;
For the cell in non-overload state, RNC selection and cell are in the corresponding adjustment ginseng of non-overload state
Several business to user in the cell carry out PS scheduling.
5. the method as described in any one of claim 1-4, which is characterized in that the information on load is specially:On H carrier waves
The utilization rate or H carrier wave H numbers of users of row code resource.
6. a kind of radio network controller (RNC), which is characterized in that including:
Acquisition module, the information on load for obtaining multiple cells;
First determining module, for determining each cell in the multiple cell by the information on load and preset threshold value
Load condition;Wherein, different load conditions corresponds to different adjusting parameters;
Second determining module, for determining adjusting parameter corresponding with the load condition of cell;
Module is adjusted, for selecting adjusting parameter corresponding with the load condition of cell to carry out the business of user in the cell
Packet switch PS adjustment.
7. RNC as claimed in claim 6, which is characterized in that
First determining module is specifically used for judging whether the information on load is more than preset threshold value;
If the determination result is YES, determine that the cell is in overload state;If judging result is no, determine that the cell is in
Non- overload state.
8. RNC as claimed in claim 6, which is characterized in that the load condition of the cell is by status indicator come into rower
Note;
The RNC further includes:Update module, the status indicator that itself is stored for the load condition based on presently described cell
It is updated;
Identification module, when the business for the user in needing to the multiple cell is adjusted, by identifying the state
It identifies to determine the load condition of each cell.
9. RNC as claimed in claim 6, which is characterized in that
The adjustment module, is specifically used for:For the cell in overload state, the RNC selections are in super negative with cell
The corresponding adjusting parameter of lotus state carries out PS scheduling to the business of user in the cell;
For the cell in non-overload state, RNC selection and cell are in the corresponding adjustment ginseng of non-overload state
Several business to user in the cell carry out PS scheduling.
10. the RNC as described in any one of claim 6-9, which is characterized in that the information on load is specially:On H carrier waves
The utilization rate or H carrier wave H numbers of users of row code resource.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510090147.9A CN104754655B (en) | 2015-02-27 | 2015-02-27 | A kind of business reorganization method and apparatus |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510090147.9A CN104754655B (en) | 2015-02-27 | 2015-02-27 | A kind of business reorganization method and apparatus |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104754655A CN104754655A (en) | 2015-07-01 |
CN104754655B true CN104754655B (en) | 2018-10-23 |
Family
ID=53593610
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510090147.9A Active CN104754655B (en) | 2015-02-27 | 2015-02-27 | A kind of business reorganization method and apparatus |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104754655B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113038452A (en) * | 2021-05-28 | 2021-06-25 | 中兴通讯股份有限公司 | User data system management method, communication device, and storage medium |
CN113344367B (en) * | 2021-05-31 | 2023-04-07 | 青岛奥利普奇智智能工业技术有限公司 | Equipment load adjusting method, device, equipment, storage medium and product |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101868008A (en) * | 2009-04-16 | 2010-10-20 | 联芯科技有限公司 | Method and device for automatically adjusting RRC state at terminal |
WO2010134311A1 (en) * | 2009-05-18 | 2010-11-25 | 日本電気株式会社 | Wireless base station device and method of control thereof |
CN103023795A (en) * | 2012-12-17 | 2013-04-03 | 大唐移动通信设备有限公司 | Method and system for controlling packet switching rate based on cell condition |
CN103188731A (en) * | 2013-03-12 | 2013-07-03 | 北京电旗通讯技术股份有限公司 | Business statistics data-based method for balancing mobile communication network business |
Family Cites Families (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1128554C (en) * | 2000-12-06 | 2003-11-19 | 深圳市中兴通讯股份有限公司 | Switching method for equalizing traffic distribution in mobile communication system |
CN1305318C (en) * | 2003-09-17 | 2007-03-14 | 松下电器产业株式会社 | Color demodulation circuit |
CN101895934B (en) * | 2009-05-20 | 2013-02-13 | 电信科学技术研究院 | Method and device for optimizing system capacity dynamically |
CN102244869B (en) * | 2010-05-14 | 2013-12-18 | 华为技术有限公司 | Primary user network spectrum management and sharing methods and systems |
CN102752032B (en) * | 2011-04-22 | 2015-04-22 | 艾利森电话股份有限公司 | Same frequency load balance method and device thereof |
CN103200613A (en) * | 2012-01-05 | 2013-07-10 | 中兴通讯股份有限公司 | Decision-making method for frequency balancing of cells in same sector, base station and wireless network controller |
CN102905317B (en) * | 2012-10-25 | 2014-12-17 | 西安电子科技大学 | Mobile load balancing method used for multiple cells |
CN103052112B (en) * | 2012-12-24 | 2016-07-06 | 工业和信息化部电信研究院 | A kind of load balancing method between cells and base station |
-
2015
- 2015-02-27 CN CN201510090147.9A patent/CN104754655B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101868008A (en) * | 2009-04-16 | 2010-10-20 | 联芯科技有限公司 | Method and device for automatically adjusting RRC state at terminal |
WO2010134311A1 (en) * | 2009-05-18 | 2010-11-25 | 日本電気株式会社 | Wireless base station device and method of control thereof |
CN103023795A (en) * | 2012-12-17 | 2013-04-03 | 大唐移动通信设备有限公司 | Method and system for controlling packet switching rate based on cell condition |
CN103188731A (en) * | 2013-03-12 | 2013-07-03 | 北京电旗通讯技术股份有限公司 | Business statistics data-based method for balancing mobile communication network business |
Also Published As
Publication number | Publication date |
---|---|
CN104754655A (en) | 2015-07-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104918283B (en) | A kind of jamming control method and equipment | |
EP3739929A1 (en) | Network parameter optimization adjustment method and device | |
US10701706B2 (en) | Resource allocation method, apparatus, and system, and base station | |
EP2871897B1 (en) | Base station device, communication control method, and non-transitory computer-readable medium containing communication control program | |
CN104768197B (en) | The method and apparatus of channel selection | |
CN104661296B (en) | The device and method for determining the transmission power of user equipment | |
CN106900010B (en) | A kind of method and device carrying out load balancing based on RRC connection | |
CN103686826B (en) | A kind of acceptance controlling method in carrier aggregation system | |
CN110121213A (en) | A kind of multi-service resource dispatching method and device | |
CN103874133B (en) | A kind of method, device and the access point apparatus of bandwidth control | |
CN104754655B (en) | A kind of business reorganization method and apparatus | |
CN105846974B (en) | Method and equipment for configuring control channel resources | |
CN107529173A (en) | A kind of method, apparatus of semi-persistent scheduling reactivation and base station | |
WO2018077042A1 (en) | Downlink power control method and apparatus for emtc, and base station | |
EP2929715A1 (en) | Method and apparatus for determining dormancy timer value | |
CN106162747B (en) | A kind of method and device of load balancing | |
CN107787016A (en) | A kind of method and device for realizing interregional load balancing | |
CN105766040B (en) | The method and apparatus that group scheduling is carried out to MTC UE | |
CN106941729A (en) | It is a kind of to upload and receive the method for buffer state, device | |
CN108541059B (en) | Power control method and device | |
CN106572536A (en) | Scheduling method and system of multi-cluster resources in uplink shared channel | |
CN105307210A (en) | Inter-cell coordination method and inter-cell coordination device | |
CN112544093B (en) | Method, device, electronic equipment and storage medium for displaying service identification | |
CN105517155B (en) | Carrier resource dynamic adjusting method and device based on carrier wave polymerization | |
CN111954292B (en) | Resource allocation method and device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |