CN104743418B - Method for achieving self-learning leveling function of lifter used for building construction and position correction method - Google Patents

Method for achieving self-learning leveling function of lifter used for building construction and position correction method Download PDF

Info

Publication number
CN104743418B
CN104743418B CN201510124398.4A CN201510124398A CN104743418B CN 104743418 B CN104743418 B CN 104743418B CN 201510124398 A CN201510124398 A CN 201510124398A CN 104743418 B CN104743418 B CN 104743418B
Authority
CN
China
Prior art keywords
switch
elevator
floor
speed
maintenance
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510124398.4A
Other languages
Chinese (zh)
Other versions
CN104743418A (en
Inventor
郑伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Hpmont Technology Co Ltd
Original Assignee
Shenzhen Hpmont Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Hpmont Technology Co Ltd filed Critical Shenzhen Hpmont Technology Co Ltd
Priority to CN201510124398.4A priority Critical patent/CN104743418B/en
Publication of CN104743418A publication Critical patent/CN104743418A/en
Application granted granted Critical
Publication of CN104743418B publication Critical patent/CN104743418B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B1/00Control systems of elevators in general
    • B66B1/34Details, e.g. call counting devices, data transmission from car to control system, devices giving information to the control system
    • B66B1/36Means for stopping the cars, cages, or skips at predetermined levels
    • B66B1/40Means for stopping the cars, cages, or skips at predetermined levels and for correct levelling at landings
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B3/00Applications of devices for indicating or signalling operating conditions of elevators
    • B66B3/002Indicators

Landscapes

  • Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Elevator Control (AREA)

Abstract

The invention discloses a method for achieving the self-learning leveling function of a lifter used for building construction. A traditional elevator integrated controller is applied to the lifter used for building construction, a leveling switch is removed in consideration of space, then the self-learning leveling function is achieved through operating an overhauling switch, a hoistway self-learning switch, a floor determination switch and an overhauling low-speed switch, and the lifter used for building construction achieves the leveling function without the leveling switch. The invention further discloses a position correction method. When the position of the lifter deviates, the traditional mode that people need to lower an elevator to the bottom layer or lift the elevator the top layer at a low speed, and then perform position correction through a lowering forcible speed decrease switch on the bottom layer or a lifting forcible speed decrease switch on the top layer is abandoned, the lifter can directly reach the position of an actual floor platform and then perform correction by the utilization of data obtained through self-learning, and therefore operating efficiency is remarkably improved compared with the traditional mode.

Description

The method of lifter for building construction self study story-leveling function and method for correcting position
Technical field
The present invention relates to elevators field, particularly to a kind of method of lifter for building construction self study story-leveling function and Method for correcting position.
Background technology
With the quickening of Urbanization in China, building machinery industry has also welcome the golden period of its development.Building lifting Machine is as the requisite plant equipment of construction, production capacity cumulative year after year.
The rising of common lift machine, decline, stopping function are all to be realized by catalyst, Control, and fast Degree is wayward, start/stop machine moment impact is big, and the damage to frame for movement and mechanism is more serious;The speed of service is non-adjustable, impact Construction enterprises' benefit, parking stability is poor.Using VFC, the startup acceleration and deceleration of achievable building hoist, braking procedure Stepless speed regulation, reduce the impact to mechanical system for motor during start/stop machine, improve flat in building hoist running Stability and comfort, extend the service life of building hoist, drastically increase work efficiency.
In building construction hoist field, much adopt VFC at present.But this control mode, with traditional electricity Ladder is compared, no automatic leveling function, needs dedicated driver frequent operation, and efficiency is extremely low.Due to limited in space, build Build building hoist and be typically all fitted without the devices such as leveling switch and the flat bed plate of similar elevator.
Traditional building construction hoist, when deviation in the position of elevator, (position of elevator and floor are put down Deviation in platform position), it usually needs elevator is reached at a slow speed bottom or top layer, then pass through to force speed reducing switch under bottom Or top layer on force speed reducing switch to carry out position correction again, lead to operational efficiency very low, especially for high-storey For elevator.
Content of the invention
Based on this it is necessary to provide a kind of method of lifter for building construction self study story-leveling function, the method can be Lifter for building construction is made to realize story-leveling function in the case of not having leveling switch;In addition provide a kind of method for correcting position, The operational efficiency of elevator can be improved.
A kind of method of lifter for building construction self study story-leveling function, is applied to be fitted without the building of leveling switch Construction elevator, described elevator includes elevator integrated controller, described elevator integrated controller include inspection switch, Hoistway self study switch, floor confirm switch and maintenance switch at a slow speed, by respective switch be closed into corresponding pattern or Realize corresponding function;Roof together with uppermost storey can be regarded as one layer, then the floor number of plies is n;
The method of described lifter for building construction self study story-leveling function includes step:
Close described inspection switch, elevator enters maintenance model, and goes downwards to lower position switch position;
Close described hoistway self study switch, elevator enters hoistway self-studying mode;
Close described maintenance to switch at a slow speed, lifting machine overhauling is up, when elevator comes the position being confirmed to be 1 floor platform When, elevator is out of service, and closure floor confirms switch to confirm floor;
After each floor i-1 confirms floor, close described maintenance and switch at a slow speed, elevator continuation maintenance is up, when When elevator comes the position being confirmed to be i floor platform, elevator is out of service, and closure floor confirms switch to confirm floor, And confirm the floor height in i-1 building;Wherein, 2≤i≤n;
All confirmations preserve after validation.
Wherein in an embodiment, also include validating that force speed reducing switch position and under force speed reducing switch position Step.
Wherein in an embodiment, elevator also includes attention gatter, and described attention gatter is when floor confirms switch closure Light, extinguish when floor confirms to switch off.
Wherein in an embodiment, after the described maintenance of closure switchs at a slow speed, elevator insopection traveling speed is normal inspection Repair the 1/6~1/2 of the speed of service.
Wherein in an embodiment, after the described maintenance of closure switchs at a slow speed, elevator insopection traveling speed is normal inspection Repair the 1/3 of the speed of service.
The method of above-mentioned lifter for building construction self study story-leveling function, by traditional elevator integrated controller application To in lifter for building construction, and consider to remove leveling switch for space etc., then pass through inspection switch, hoistway certainly Study switch, floor confirm the sequence of operations self study story-leveling function that switch and maintenance switch at a slow speed, are not having leveling switch In the case of make lifter for building construction realize story-leveling function.
A kind of method for correcting position, is applied to be fitted without the lifter for building construction of leveling switch, described elevator Including elevator integrated controller, described elevator integrated controller includes inspection switch, hoistway self study switch, floor confirmation Switch and maintenance switch at a slow speed, being closed into corresponding pattern or realizing corresponding function by respective switch;
Described method for correcting position includes step:
Close described inspection switch, elevator enters maintenance model;
Close described maintenance to switch at a slow speed, elevator is run to correct position;
Closure floor confirms switch to confirm floor, and according to floor information and above-mentioned lifter for building construction self study The confirmation preserving in the method for story-leveling function is correcting current positional information.
Wherein in an embodiment, after correcting current positional information, disconnect described inspection switch, elevator is normally transported OK.
Above-mentioned method for correcting position, (position of elevator and floor levels position when deviation in the position of elevator Put and deviation occur), as traditional method, no longer need to reach at a slow speed elevator bottom or top layer, then pass through under bottom again Force speed reducing switch or top layer on force speed reducing switch to carry out position correction, but can directly allow elevator come reality Floor levels position then using self study to data be corrected, operational efficiency is lifted bright for traditional method Aobvious, for the elevator of high-storey.
Brief description
Fig. 1 is the method flow diagram of lifter for building construction self study story-leveling function;
Fig. 2 is method for correcting position flow chart.
Specific embodiment
For the ease of understanding the present invention, below with reference to relevant drawings, the present invention is described more fully.In accompanying drawing Give presently preferred embodiments of the present invention.But, the present invention can realize in many different forms however it is not limited to this paper institute The embodiment of description.On the contrary, providing the purpose of these embodiments to be to make the understanding to the disclosure more thorough Comprehensively.
Unless otherwise defined, all of technology used herein and scientific terminology and the technical field belonging to the present invention The implication that technical staff is generally understood that is identical.The term being used in the description of the invention herein is intended merely to description tool The purpose of the embodiment of body is it is not intended that limit the present invention.Term as used herein "and/or" includes one or more correlations Listed Items arbitrary and all of combination.
Fig. 1 is the method flow diagram of lifter for building construction self study story-leveling function.
A kind of method of lifter for building construction self study story-leveling function, is applied to be fitted without the building of leveling switch Construction elevator, elevator includes elevator integrated controller, and elevator integrated controller includes inspection switch, hoistway is learnt by oneself Practise switch, floor confirms switch and maintenance switchs at a slow speed, being closed into corresponding pattern or realizing corresponding by respective switch Function.Roof together with uppermost storey can be regarded as one layer, then the floor number of plies is n.
The method of lifter for building construction self study story-leveling function includes step:
Step s11: closure inspection switch, elevator enters maintenance model, and goes downwards to lower position switch position.
Step s12: closure hoistway self study switch, elevator enters step s13: hoistway self-studying mode.
Step s13 include step 1,2,3,4 ..., (n-2), (n-1), due to do not have leveling switch peace layer signal, lifting Machine position to be stopped is determined by operator completely.In the present embodiment, with the up hoistway self-studying mode of elevator, its Descending hoistway self-studying mode is can also be in his embodiment.
Step 1: closure maintenance switchs at a slow speed, and lifting machine overhauling is up, when elevator comes the position being confirmed to be 1 floor platform When putting (it has been 1 floor platform that operator think herein), elevator (operator make elevator stop) out of service, (behaviour Make personnel) close floor confirmation switch to confirm floor.
Step 2: closure maintenance switchs at a slow speed, elevator continuation maintenance is up, comes when elevator and is confirmed to be 2 floor platforms Position when (it has been 2 floor platforms that operator think herein), elevator (operator make elevator stop) out of service, (operator) closure floor confirms switch to confirm floor, and confirms the floor height of 1st floor.
Step 3: closure maintenance switchs at a slow speed, elevator continuation maintenance is up, comes when elevator and is confirmed to be 3 floor platforms Position when (it has been 3 floor platforms that operator think herein), elevator (operator make elevator stop) out of service, (operator) closure floor confirms switch to confirm floor, and confirms the floor height of 2nd floors.
Step 4: closure maintenance switchs at a slow speed, elevator continuation maintenance is up, comes when elevator and is confirmed to be 4 floor platforms Position when (it has been 4 floor platforms that operator think herein), elevator (operator make elevator stop) out of service, (operator) closure floor confirms switch to confirm floor, and confirms the floor height of 3rd floors.
……
Step (n-2): closure maintenance switchs at a slow speed, elevator continuation maintenance is up, comes when elevator and is confirmed to be n-2 During the position of floor platform (it has been n-2 floor platform that operator think herein), elevator is out of service, and (operator make lifting Machine stops), (operator) closure floor confirms switch to confirm floor, and confirms the floor height in n-3 building.
Step (n-1): closure maintenance switchs at a slow speed, elevator continuation maintenance is up, comes when elevator and is confirmed to be n-1 During the position of floor platform (it has been n-1 floor platform that operator think herein), elevator is out of service, and (operator make lifting Machine stops), (operator) closure floor confirms switch to confirm floor, and confirms the floor height in n-2 building.Meanwhile, by floor n (roof of uppermost storey) is as uppermost storey.
Above-mentioned steps 2~step (n-1) can be summarized as: after each floor i-1 confirms floor, closure maintenance is at a slow speed Switch, elevator continuation maintenance is up, and when elevator comes the position being confirmed to be i floor platform, elevator is out of service, closes Close floor and confirm switch to confirm floor, and confirm the floor height in i-1 building;Wherein, 2≤i≤n.
In step s13, after closure maintenance switchs at a slow speed, during lifting machine overhauling is up, elevator inspection travel speed Spend 1/6~1/2 for the normal service speed of service, preferably the 1/3 of the normal service speed of service.Slow running, can make behaviour Make personnel more easily position location.
Step s14: all confirmations preserve after validation, is stored into internal system chip.It is of course also possible to confirm Preserve after each information at once.
Due to above forcing speed reducing switch to be generally arranged at top layer, under force speed reducing switch to be generally arranged at bottom, therefore exist In above-mentioned steps, also include validating that the step (after step 1) forcing speed reducing switch position and force deceleration to open under confirming The step (in step n-1) of off position, above force speed reducing switch position and under force speed reducing switch position can serve as position letter Number correction.
Elevator can also include attention gatter, and attention gatter is lighted when floor confirms switch closure, confirms switch in floor Extinguish during disconnection, facilitate operator's acknowledgement state.
The method of above-mentioned lifter for building construction self study story-leveling function, by traditional elevator integrated controller application To in lifter for building construction, and consider to remove leveling switch for space etc., then pass through inspection switch, hoistway certainly Study switch, floor confirm the sequence of operations self study story-leveling function that switch and maintenance switch at a slow speed, are not having leveling switch In the case of make lifter for building construction realize story-leveling function.
After elevator utilizes said method self study story-leveling function, when elevator is normally run, if there is coding When device power down, encoder receive interference or code device signal loss, position school can be carried out by following method for correcting position Just.
Fig. 2 is method for correcting position flow chart.
A kind of method for correcting position, is applied to be fitted without the lifter for building construction of leveling switch, and elevator includes Elevator integrated controller, elevator integrated controller includes inspection switch, hoistway self study switch, floor confirmation switch and examines Repair and switch at a slow speed, being closed into corresponding pattern or realizing corresponding function by respective switch.
Method for correcting position includes step:
Step s21:(operator) closure inspection switch, elevator entrance maintenance model.
Step s22:(operator) closure maintenance switchs at a slow speed, and elevator runs that (operator think to correct position It has been actual floor levels herein), elevator stops (operator's system for stopping elevators).
Step s23:(operator), to confirm floor, elevator integrated controller is according to floor for closure floor confirmation switch The confirmation preserving in the method for information and above-mentioned lifter for building construction self study story-leveling function to correct currently automatically Positional information.
Step s24: after the current positional information of elevator integrated controller correction, (operator) disconnect inspection switch, Elevator enters normal operation mode thus continuing normal operation.
Above-mentioned method for correcting position, (position of elevator and floor levels position when deviation in the position of elevator Put and deviation occur), as traditional method, no longer need to reach at a slow speed elevator bottom or top layer, then pass through under bottom again Force speed reducing switch or top layer on force speed reducing switch to carry out position correction, but can directly allow elevator come reality Floor levels position then using self study to data be corrected, operational efficiency is lifted bright for traditional method Aobvious, for the elevator of high-storey.
Embodiment described above only have expressed the several embodiments of the present invention, and its description is more concrete and detailed, but simultaneously Therefore the restriction to the scope of the claims of the present invention can not be interpreted as.It should be pointed out that for those of ordinary skill in the art For, without departing from the inventive concept of the premise, some deformation can also be made and improve, these broadly fall into the guarantor of the present invention Shield scope.Therefore, the protection domain of patent of the present invention should be defined by claims.

Claims (6)

1. a kind of method for correcting position is it is characterised in that be applied to be fitted without the lifter for building construction of leveling switch, institute State elevator and include elevator integrated controller, described elevator integrated controller includes inspection switch, hoistway self study switchs, Floor confirms that switch and maintenance switch at a slow speed, being closed into corresponding pattern or realizing corresponding function by respective switch; Described lifter for building construction has a self study story-leveling function, and the method for described self study story-leveling function includes step:
Close described inspection switch, elevator enters maintenance model, and goes downwards to lower position switch position;
Close described hoistway self study switch, elevator enters hoistway self-studying mode;
Close described maintenance to switch at a slow speed, lifting machine overhauling is up, when elevator comes the position being confirmed to be 1 floor platform, Elevator is out of service, and closure floor confirms switch to confirm floor;
After each floor i-1 confirms floor, close described maintenance and switch at a slow speed, elevator continuation maintenance is up, works as lifting When the position being confirmed to be i floor platform come by machine, elevator is out of service, and closure floor confirms switch to confirm floor, and really Recognize the floor height in i-1 building;Wherein, 2≤i≤n;
All confirmations preserve after validation;
Described method for correcting position includes step:
Close described inspection switch, elevator enters maintenance model;
Close described maintenance to switch at a slow speed, elevator is run to correct position;
Closure floor confirms switch to confirm floor, and corrects current position letter according to floor information and described confirmation Breath.
2. method for correcting position according to claim 1 is it is characterised in that after the current positional information of correction, disconnect institute State inspection switch, elevator is normally run.
3. method for correcting position according to claim 1 is it is characterised in that the method for described self study story-leveling function is also wrapped Include force in confirmation speed reducing switch position and under force the step of speed reducing switch position.
4. method for correcting position according to claim 1 is it is characterised in that elevator also includes attention gatter, described prompting Lamp is lighted when floor confirms switch closure, extinguishes when floor confirms to switch off.
5. method for correcting position according to claim 1 is it is characterised in that the described maintenance of closure, at a slow speed after switch, lifts The machine overhauling speed of service is the 1/6~1/2 of the normal service speed of service.
6. method for correcting position according to claim 1 is it is characterised in that the described maintenance of closure, at a slow speed after switch, lifts The machine overhauling speed of service is the 1/3 of the normal service speed of service.
CN201510124398.4A 2015-03-19 2015-03-19 Method for achieving self-learning leveling function of lifter used for building construction and position correction method Active CN104743418B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510124398.4A CN104743418B (en) 2015-03-19 2015-03-19 Method for achieving self-learning leveling function of lifter used for building construction and position correction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510124398.4A CN104743418B (en) 2015-03-19 2015-03-19 Method for achieving self-learning leveling function of lifter used for building construction and position correction method

Publications (2)

Publication Number Publication Date
CN104743418A CN104743418A (en) 2015-07-01
CN104743418B true CN104743418B (en) 2017-02-01

Family

ID=53583805

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510124398.4A Active CN104743418B (en) 2015-03-19 2015-03-19 Method for achieving self-learning leveling function of lifter used for building construction and position correction method

Country Status (1)

Country Link
CN (1) CN104743418B (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105110113A (en) * 2015-07-28 2015-12-02 苏州汇川技术有限公司 Elevator floor leveling position control system and method
CN105668360A (en) * 2016-03-18 2016-06-15 深圳市海浦蒙特科技有限公司 Automatic elevator parameter learning method
CN109110598B (en) * 2017-06-26 2021-05-25 上海三菱电梯有限公司 Elevator floor position learning system
EP3587323A1 (en) * 2018-06-22 2020-01-01 Otis Elevator Company Elevator system
CN108910641A (en) * 2018-07-24 2018-11-30 日立楼宇技术(广州)有限公司 Elevator landing information processing method, system, equipment and readable storage medium storing program for executing
US11649136B2 (en) 2019-02-04 2023-05-16 Otis Elevator Company Conveyance apparatus location determination using probability
CN110683437A (en) * 2019-10-08 2020-01-14 广州广日电梯工业有限公司 Semi-automatic learning system and method for elevator shaft floor position information
CN113023515B (en) * 2021-04-15 2023-06-23 上海高仙自动化科技发展有限公司 Method, device, equipment, system and storage medium for determining position of carrying equipment
CN113666210B (en) * 2021-08-16 2023-03-28 杭州西奥电梯有限公司 Debugging method for absolute position control system
CN114906690B (en) * 2022-05-24 2024-05-31 无锡英威腾电梯控制技术有限公司 Elevator limiting method and device, electronic equipment and readable storage medium

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2050031U (en) * 1988-09-16 1989-12-27 上海市建筑科学研究所 Monoboard computer plane-layer device
JPH11200629A (en) * 1998-01-09 1999-07-27 Ohbayashi Corp Temporary elevator post disassembling and assembling method for building construction
WO2004069719A1 (en) * 2003-01-28 2004-08-19 Thyssen Elevator Capital Corp. Method and device for mounting the shaft equipment
CN102887403A (en) * 2012-10-19 2013-01-23 南宁科拓自动化设备有限公司 Construction hoist integrated controller
CN103407847A (en) * 2013-08-12 2013-11-27 无锡华科机械设备有限公司 Automatic leveling control device
CN103449271A (en) * 2013-08-20 2013-12-18 哈尔滨东建机械制造有限公司 DSP (Digital Signal Processor)-based control device of variable-frequency construction lifting device and method for realizing automatic leveling of lifting device by adopting control device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2050031U (en) * 1988-09-16 1989-12-27 上海市建筑科学研究所 Monoboard computer plane-layer device
JPH11200629A (en) * 1998-01-09 1999-07-27 Ohbayashi Corp Temporary elevator post disassembling and assembling method for building construction
WO2004069719A1 (en) * 2003-01-28 2004-08-19 Thyssen Elevator Capital Corp. Method and device for mounting the shaft equipment
CN102887403A (en) * 2012-10-19 2013-01-23 南宁科拓自动化设备有限公司 Construction hoist integrated controller
CN103407847A (en) * 2013-08-12 2013-11-27 无锡华科机械设备有限公司 Automatic leveling control device
CN103449271A (en) * 2013-08-20 2013-12-18 哈尔滨东建机械制造有限公司 DSP (Digital Signal Processor)-based control device of variable-frequency construction lifting device and method for realizing automatic leveling of lifting device by adopting control device

Also Published As

Publication number Publication date
CN104743418A (en) 2015-07-01

Similar Documents

Publication Publication Date Title
CN104743418B (en) Method for achieving self-learning leveling function of lifter used for building construction and position correction method
WO2008062500A1 (en) Elevator system
FI20106401A0 (en) METHOD AND LIFT SYSTEM
WO2010116022A8 (en) Method and elevator arrangement
CN109292576A (en) Elevator car safety
CN104918873A (en) Elevator control device
CN103086221B (en) Extension protecting structure for hoisting rope of elevator
CN201089686Y (en) Observation elevator device
WO2013076866A1 (en) Elevator system
CN110902526B (en) Single-drive parallel elevator, elevator running system and control method
JP4919593B2 (en) Elevator operation device
JP2012171771A (en) Double-deck elevator and control method of the same
KR100975758B1 (en) Rescue circuit of elevator
CN205555796U (en) Car elevating gear of elevator
CN104870358A (en) Maintenance method for a lift
JP2004338891A (en) Elevator system
CN202936051U (en) Elevator hoist rope extension protection structure
CN202449696U (en) Counterpoise-free double-cage elevator
CN203269287U (en) Underneath type elevator without machine room
CN106081797A (en) A kind of novel elevator mounting process lifting
CN104150298B (en) A kind of elevator and its control method with Auxiliary Control Element
JP2013245033A (en) Method of installing hoisting machine
CN107187998B (en) A kind of elevator easy to repair
JP2016008131A (en) Elevator and remodeling method of existing elevator
JPH0769559A (en) Elevator device for construction work

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant