CN104732324A - Fuel gas equipment and material picking data processing method and system thereof - Google Patents

Fuel gas equipment and material picking data processing method and system thereof Download PDF

Info

Publication number
CN104732324A
CN104732324A CN201410786431.5A CN201410786431A CN104732324A CN 104732324 A CN104732324 A CN 104732324A CN 201410786431 A CN201410786431 A CN 201410786431A CN 104732324 A CN104732324 A CN 104732324A
Authority
CN
China
Prior art keywords
received
data
gas
data processing
material installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410786431.5A
Other languages
Chinese (zh)
Inventor
李�真
欧大江
陈秋雄
刘钊彦
郭冰竹
郭少明
张静
游海珠
李军
任军
孙伟
钟晓明
甘世杰
冯俊杰
赖嘉兴
刘争明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Gas Corp Ltd
Original Assignee
Shenzhen Gas Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Gas Corp Ltd filed Critical Shenzhen Gas Corp Ltd
Priority to CN201410786431.5A priority Critical patent/CN104732324A/en
Publication of CN104732324A publication Critical patent/CN104732324A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention provides a fuel gas equipment and material picking data process method and a system thereof, wherein, the method comprises the following steps: 1, generating a corresponding material and equipment picking list according to the demand of a practical field operation; 2, numbering the practical field operation; 3, correlating the material and equipment picking list with the number of the practical field operation; 4, correlating data in the material and equipment picking list with an account statement, and updating system data. By numbering the practical field operation and correlating the picking list with the number of the practical field operation, the corresponding field operation can be reflected through the data of the picking list, relevance between the data of the picking list and the field operation is achieved, in addition, the data of the picking list are further in unidirectional relevance with the account statement, and the subsequent data processing is facilitated, so that by means of the system, specific data management requirements for equipment and materials in the fuel gas business field can be satisfied well.

Description

A kind of gas-fired equipment material receives data processing method and system thereof
Technical field
The present invention relates to Oracle CC & B systems technology field, particularly relate to a kind of gas-fired equipment material based on Oracle CC & B system and receive data processing method and system thereof.
Background technology
Oracle CC & B system (i.e. Oracle public utilities-customer service, billing solution) is widely used in government utility, be a set of customer service solution based on JAVA language, B/S framework, be mainly applied to the government utility such as combustion gas, water supply, power supply having 1,000,000 grades of users.As a set of business suite software, its security and integrality are extensively admitted.The basic information management mainly comprising client of CC & B, check meter management, accounting management, equipment control, workform management etc. are based on utility miscellaneous service operational administrative.In equipment control, this system maintenance material code, price, to realize material charging, open single charge.But CC & B system is about neck material management function imperfection, fail to realize generating material requistion, material requistion to associate with work order, and inventory form has to be developed, cannot realize the movable and equipment and materials of site work receive single between contacting, fail good to meet the concrete data management demand of gas industry field to equipment and materials.
Therefore, prior art need development.
Summary of the invention
In view of above-mentioned the deficiencies in the prior art part, a kind of gas-fired equipment material based on Oracle CC & B system is the object of the present invention is to provide to receive data processing method and system thereof, be intended to solve existing Oracle CC & B system cannot realize the movable and equipment and materials of site work receive single between contacting, fail good to meet the problem of gas industry field to the concrete data management demand of equipment and materials.
In order to achieve the above object, this invention takes following technical scheme:
A data processing method received by gas-fired equipment material based on Oracle CC & B system, and wherein, described method comprises: A, foundation actual field operation needs, generate corresponding material installation and receive list; B, this actual field operation to be numbered; C, described material installation received list and this actual field job number contacts; D, material installation received forms data and bill contacts, upgrade system data.
Data processing method received by the described gas-fired equipment material based on Oracle CC & B system, and wherein, in steps A, described material requistion content specifically comprises: equipment and materials is received source and received amount of money involved.
Data processing method received by the described gas-fired equipment material based on Oracle CC & B system, and wherein, described step B specifically comprises: B1, generate corresponding material outbound record; B2, this outbound record to be contacted with corresponding site work, and site work is numbered.
Data processing method received by the described gas-fired equipment material based on Oracle CC & B system, and wherein, described step D specifically comprises: D1, material installation is received forms data be uploaded in system database; D2, gather described material installation and receive forms data; D3, be detailed form by described data processing, form bill, upgrade system data.
A data handling system received by gas-fired equipment material based on Oracle CC & B system, and wherein, described system comprises: receive single generation module, for needing according to site work, generating corresponding material installation and receiving list; Numbering module, for being numbered this actual field operation; Connection Module, for receiving list by described material installation and this actual field job number contacts; Billing module, for material installation being received forms data and bill contacts, upgrades system data.
Data handling system received by the described gas-fired equipment material based on Oracle CC & B system, and wherein, described material requistion content specifically comprises: equipment and materials is received source and received amount of money involved.
Data handling system received by the described gas-fired equipment material based on Oracle CC & B system, wherein, described numbering module specifically comprises, record cell, for generating corresponding material outbound record, setting unit, for being contacted with corresponding site work by this outbound record, and is numbered site work.
Data handling system received by the described gas-fired equipment material based on Oracle CC & B system, and wherein, described billing module specifically comprises: uploading unit, is uploaded in system database for material installation being received forms data; Collection unit, receives forms data for gathering described material installation; Form typing unit, for being detailed form by described data processing, forming bill, upgrading system data.
Beneficial effect: a kind of gas-fired equipment material based on Oracle CC & B system provided by the invention receives data processing method and system thereof, by site work activity is numbered and with receive single-phase association, make to receive forms data and can reflect corresponding site work, achieve contact between the two, in addition, also with account vertical linkage, be convenient to follow-up data process, thus enable this system good meet the concrete data management demand of gas industry field to equipment and materials.
Accompanying drawing explanation
Fig. 1 is the method flow diagram that data processing method received by a kind of gas-fired equipment material based on Oracle CC & B system of the specific embodiment of the invention.
Fig. 2 is that the material installation of the specific embodiment of the invention receives single schematic diagram.
Fig. 3 is the structured flowchart that data handling system received by a kind of gas-fired equipment material based on Oracle CC & B system of the specific embodiment of the invention.
Embodiment
The invention provides a kind of gas-fired equipment material based on Oracle CC & B system and receive data processing method and system thereof.For making object of the present invention, technical scheme and effect clearly, clearly, developing simultaneously referring to accompanying drawing, the present invention is described in more detail for embodiment.Should be appreciated that specific embodiment described herein only in order to explain the present invention, be not intended to limit the present invention.
As shown in Figure 1, for the specific embodiment of data processing method received by a kind of gas-fired equipment material based on Oracle CC & B system of the present invention.Described method comprises:
S100, the operation of foundation actual field need, and generate corresponding material installation and receive list.
S200, this actual field operation to be numbered.
S300, described material installation received list and this actual field job number contacts.
S400, material installation received forms data and bill contacts, upgrade system data.
Concrete, described equipment and materials is received single content and can be comprised: equipment and materials is received source and received amount of money involved.Certainly, as shown in Figure 2, receive a single specific embodiment for described, its content can also comprise the personnel of receiving, the information such as equipment nameplate number.
More specifically, step S300 comprises: first, generates corresponding material outbound record, then, is contacted by this outbound record, and be numbered site work with corresponding site work.
Described material outbound record is specifically as follows work order, so that realize good versatility with available data management process.
It is preferred that step S400 specifically comprises: first, material installation is received forms data and be uploaded in system database, then, gather described material installation and receive forms data; Finally, be detailed form by described data processing, form bill, upgrade system data.By the way, realize equipment and materials and get gathering of situation and reflect that situation got by concrete equipment and materials by detailed form, greatly facilitate making an inventory and adjusting of later stage
In existing system, neck material is by customer address, customer number, bill of materials odd numbers, date of entry these several screening conditions inquiry material requistions, but unrealized with concrete site activity associates, and above-mentioned data managing method, bill, site activity, neck material three are associated, be convenient to query facility material and receive source, and receive the amount of money related to, specification equipment and materials is received, and ensures the equipment and materials of application and the actual equipment and materials consistance received.
As shown in Figure 3, present invention also offers a kind of gas-fired equipment material based on Oracle CC & B system and receive data handling system.Described system comprises: receive single generation module 100, for needing according to site work, generating corresponding material installation and receiving list.Numbering module 200, for being numbered this actual field operation.Connection Module 300, for receiving list by described material installation and this actual field job number contacts.Billing module 400, for material installation being received forms data and bill contacts, upgrades system data.
Concrete, described material requistion content specifically comprises: equipment and materials is received source and received amount of money involved.As detailed above.
As shown in Figure 3, described numbering module specifically comprises, record cell 210, for generating corresponding material outbound record, setting unit 220, for being contacted with corresponding site work by this outbound record, and is numbered site work.
More specifically, as shown in Figure 3, described billing module 400 comprises: uploading unit 410, is uploaded in system database for material installation being received forms data; Collection unit 420, receives forms data for gathering described material installation; Form typing unit 430, for being detailed form by described data processing, forming bill, upgrading system data.
In sum, a kind of gas-fired equipment material based on Oracle CC & B system provided by the invention receives data processing method and system thereof, by site work activity is numbered and with receive single-phase association, make to receive forms data and can reflect corresponding site work, achieve contact between the two, in addition, also with account vertical linkage, be convenient to follow-up data process, thus enable this system good meet the concrete data management demand of gas industry field to equipment and materials.
Be understandable that, for those of ordinary skills, can be equal to according to technical scheme of the present invention and the present invention's design and replace or change, and all these change or replace the protection domain that all should belong to the claim appended by the present invention.

Claims (8)

1. a data processing method received by gas-fired equipment material, it is characterized in that, described method comprises: A, foundation actual field operation needs, generate corresponding material installation and receive list; B, this actual field operation to be numbered; C, described material installation received list and this actual field job number contacts; D, material installation received forms data and bill contacts, upgrade system data.
2. data processing method received by gas-fired equipment material according to claim 1, it is characterized in that, in steps A, described material installation is received single content and specifically comprised: equipment and materials is received source and received amount of money involved.
3. data processing method received by gas-fired equipment material according to claim 1, it is characterized in that, described step B specifically comprises: B1, generate corresponding material outbound record; B2, this outbound record to be contacted with corresponding site work, and site work is numbered.
4. data processing method received by gas-fired equipment material according to claim 3, it is characterized in that, described step D specifically comprises: D1, material installation is received forms data be uploaded in system database; D2, gather described material installation and receive forms data; D3, be detailed form by described data processing, form bill, upgrade system data.
5. a data handling system received by gas-fired equipment material, it is characterized in that, described system comprises: receive single generation module, for needing according to site work, generating corresponding material installation and receiving list; Numbering module, for being numbered this actual field operation; Connection Module, for receiving list by described material installation and this actual field job number contacts; Billing module, for material installation being received forms data and bill contacts, upgrades system data.
6. data handling system received by gas-fired equipment material according to claim 5, it is characterized in that, described material installation is received single content and specifically comprised: equipment and materials is received source and received amount of money involved.
7. data handling system received by gas-fired equipment material according to claim 5, it is characterized in that, described numbering module specifically comprises, record cell, for generating corresponding material outbound record, setting unit, for being contacted with corresponding site work by this outbound record, and is numbered site work.
8. data handling system received by gas-fired equipment material according to claim 5, it is characterized in that, described billing module specifically comprises: uploading unit, is uploaded in system database for material installation being received forms data; Collection unit, receives forms data for gathering described material installation; Form typing unit, for being detailed form by described data processing, forming bill, upgrading system data.
CN201410786431.5A 2014-12-18 2014-12-18 Fuel gas equipment and material picking data processing method and system thereof Pending CN104732324A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410786431.5A CN104732324A (en) 2014-12-18 2014-12-18 Fuel gas equipment and material picking data processing method and system thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410786431.5A CN104732324A (en) 2014-12-18 2014-12-18 Fuel gas equipment and material picking data processing method and system thereof

Publications (1)

Publication Number Publication Date
CN104732324A true CN104732324A (en) 2015-06-24

Family

ID=53456198

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410786431.5A Pending CN104732324A (en) 2014-12-18 2014-12-18 Fuel gas equipment and material picking data processing method and system thereof

Country Status (1)

Country Link
CN (1) CN104732324A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113450488A (en) * 2021-06-30 2021-09-28 贵州电网有限责任公司 Test equipment storehouse management system based on AIoT technology

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101393617A (en) * 2007-09-19 2009-03-25 鸿富锦精密工业(深圳)有限公司 Material logistic system and method on production site
CN102243737A (en) * 2011-07-01 2011-11-16 陈兴民 Material management system and material management method of mine workpiece
CN103116831A (en) * 2013-02-28 2013-05-22 黄晓惠 Method and system for supplying materials for beauty projects

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101393617A (en) * 2007-09-19 2009-03-25 鸿富锦精密工业(深圳)有限公司 Material logistic system and method on production site
CN102243737A (en) * 2011-07-01 2011-11-16 陈兴民 Material management system and material management method of mine workpiece
CN103116831A (en) * 2013-02-28 2013-05-22 黄晓惠 Method and system for supplying materials for beauty projects

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
钱建芬: "基于批次需求计划的某中小企业现场物料管理***的开发", 《中国优秀硕士学位论文全文数据库 信息科技辑》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113450488A (en) * 2021-06-30 2021-09-28 贵州电网有限责任公司 Test equipment storehouse management system based on AIoT technology

Similar Documents

Publication Publication Date Title
US20140222698A1 (en) Systems and Methods for Tracking Renewable Energy Credits
WO2015123810A1 (en) Electric power field operation system combined with smartphone
CN109784689B (en) Power grid infrastructure project report data processing method
CN110334950B (en) Iron tower intelligent production and group management and control system
CN105260857A (en) Intelligent management system and method thereof for rural migrant workers
CN102576451A (en) Building energy consumption analysis system
CN102509401B (en) Industry billing system based on cloud computing technology
CN104615617A (en) Dispatch monitoring information processing system for substation equipment
CN103955783A (en) Low-voltage carrier wave installation site information collecting method
CN110110541A (en) For the Property Management System of charging pile operator
CN111882386A (en) Freight quotation method and device
JP2022174747A (en) support system
CN113362025B (en) Data accounting system, method, computer-readable storage medium, and electronic device
CN103700024A (en) Automatic importing method of provincial and prefectural integrated telecontrol information based on D5000 system
US9047757B2 (en) Systems and methods for remotely controlling an advanced metering infrastructure
Zadorozhnyi et al. Transformation of accounting methods with the use of robotic equipment with Artificial Intelligence
KR102146545B1 (en) Field management information system in specialty construction company based on mobile phone
CN104732324A (en) Fuel gas equipment and material picking data processing method and system thereof
CN104504491A (en) Meter reading control method and system
CN117036062A (en) Accounting resource calculation method and device
CN105373880A (en) Power grid engineering project scheme feedback evaluation and scheme decision system
CN204303014U (en) One is checked meter managing and control system and opertaing device
CN110910008A (en) One-key cost accounting management system and method for visual accounting process
Zatsarinnaya et al. An automated software package creation for energy consumption accounting
CN101877106A (en) Internet banking offline client system and application method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20150624