CN104730480B - The calibration equipment and system of split core type current transformer - Google Patents

The calibration equipment and system of split core type current transformer Download PDF

Info

Publication number
CN104730480B
CN104730480B CN201310706533.7A CN201310706533A CN104730480B CN 104730480 B CN104730480 B CN 104730480B CN 201310706533 A CN201310706533 A CN 201310706533A CN 104730480 B CN104730480 B CN 104730480B
Authority
CN
China
Prior art keywords
reference test
test bar
phases
bar
core type
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310706533.7A
Other languages
Chinese (zh)
Other versions
CN104730480A (en
Inventor
靳阳
赵成
李之彧
陈旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Beijing Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Beijing Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Beijing Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201310706533.7A priority Critical patent/CN104730480B/en
Publication of CN104730480A publication Critical patent/CN104730480A/en
Application granted granted Critical
Publication of CN104730480B publication Critical patent/CN104730480B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Measuring Instrument Details And Bridges, And Automatic Balancing Devices (AREA)

Abstract

The invention discloses a kind of calibration equipment of split core type current transformer and system.Wherein, the calibration equipment of split core type current transformer includes:Hanger bracket, with cross bar, the first support member, the second support member and fixture;Electric energy meter standard component, for providing stable test electric current;Reference test bar, is located on the first support member, the second support member and fixture, and the two ends of reference test bar are connected with electric energy meter standard component, forms the test loop for transmitting test electric current;And powermeter verification instrumeter, it is connected with electric energy meter standard component and split core type current transformer, the test current calculation for being detected according to split core type current transformer measures electric flux, and measurement electric flux is fed back into electric energy meter standard component.By the present invention, the problem of powermeter verification instrumeter easily larger error occurs in the prior art is solved, and then has reached the effect for reducing powermeter verification instrumeter error, improving the field-checking degree of accuracy.

Description

The calibration equipment and system of split core type current transformer
Technical field
The present invention relates to field of electrical equipment, a kind of calibration equipment in particular to split core type current transformer and it is System.
Background technology
Electric energy meter on-site calibrator is used at the installing type electric energy meter actual motion such as transformer station, resident place scene Test the measuring equipment of electric energy meter error.At the scene, electric energy meter is in energization operation conditions, due to client's needs, experiment safety Consider Deng many factors, tend not to take disconnection electric energy meter circuit, electric energy meter on-site calibrator is then accessed in the line Mode carry out the error measure of electric energy meter.Now, the means taken are to use split core type current transformer(Also referred to as electric current split-core type meter) Current sample is carried out, by the way that electric current line is inserted in the jaw of electric current split-core type meter, current loop is obtained using electromagnetic induction principle Current value, so as to calculate electric energy error.
Due to the position and angle by electric current split-core type meter jaw clean-up performance, the degree of wear, and the electric current line extended there through Often there is certain error in degree influence, the current value that sampling is obtained, the sampling error of electric current split-core type meter is to constitute field-checking electricity One of important sources and factor of energy Watch Error.Thus, when verifying in the electric energy meter on-site calibrator cycle, laboratory needs verification The overall measurement error of electric energy meter on-site calibrator and electric current split-core type meter, is met with the elementary error for ensureing electric energy meter on-site calibrator Use requirement.
At present, for the verification of split core type current transformer, take more device for energy meter standard electric current it is high-end and low The connection of electricity consumption streamline is held, the mode that then split core type current transformer is clipped on electric current line carries out verification.Such a mode exist with Under several deficiencies:
Firstly, since electric current line is generally flexible cord, and line footpath is mostly different from the jaw bore of electric current split-core type meter, therefore current clamp When table vises electric current line, it is impossible to obtain position and the angle of fixation, suffer from this, the stability of check results is very poor, repeating It is difficult to agreeing property preferable data during measurement, measurement result does not possess repdocutbility.
Secondly as during the internal resistance very little access device for energy meter standard of electric current line, device is substantially to operate in unloaded shape State, thus may be impacted to measurement result.In addition, such connected mode, when the electric current passed through is larger, can be produced strong Space magnetic field, so as to influence measurement result accuracy.
Furthermore, because the specification of electric current split-core type meter is different, generally require to change electric current according to the specification of electric current split-core type meter in experiment Line, adds the complexity of operation, is also unfavorable for the holding of test environment.
The problem of easily larger error occur for powermeter verification instrumeter in correlation technique, not yet proposes effective solution at present Certainly scheme.
The content of the invention
It is existing to solve it is a primary object of the present invention to provide the calibration equipment and system of a kind of split core type current transformer The problem of easily there is larger error in powermeter verification instrumeter in technology.
To achieve these goals, according to an aspect of the invention, there is provided a kind of verification of split core type current transformer Device, including:Hanger bracket, with cross bar, the first support member, the second support member and fixture, wherein, the first supports support exists The lower section of cross bar first end, the second supports support is fixed on hanger bracket in the lower section at the end of cross bar second, the first end of fixture Lower section;Electric energy meter standard component, for providing stable test electric current;Reference test bar, is located in the first support member, the second support member On fixture, and the two ends of reference test bar are connected with electric energy meter standard component, form the test for transmitting test electric current Loop;And powermeter verification instrumeter, it is connected with electric energy meter standard component and split core type current transformer, for according to pincerlike electric current The test current calculation measurement electric flux that transformer is detected, and measurement electric flux is fed back into electric energy meter standard component.
Further, the first wire is laid along the first support member, wherein, the first wire is connecting test bar first end and electricity The wire of energy table standard component;And second wire laid successively along the second support member, cross bar and the first support member, wherein, second Wire is the wire of the end of connecting test bar second and electric energy meter standard component.
Further, reference test bar includes:First reference test bar;And second reference test bar, wherein, the cross section of the second reference test bar Cross-sectional area of the product less than the first reference test bar.
Further, horizontal plane residing for the first reference test bar is higher than horizontal plane residing for the second reference test bar.
Further, the first reference test bar and the second reference test bar include:A phase reference test bars;B phase reference test bars;And C phases are tested Bar, wherein, A phases reference test bar, the B phases reference test bar for belonging to the first reference test bar are identical with the cross-sectional area of C phase reference test bars, belong to second A phases reference test bar, the B phases reference test bar of reference test bar are identical with the cross-sectional area of C phase reference test bars.
Further, horizontal plane residing for A phases reference test bar is higher than horizontal plane residing for B phase reference test bars, level residing for B phase reference test bars Face is higher than horizontal plane residing for C phase reference test bars.
Further, calibration equipment also includes:A phases are switched, on the test loop for being arranged on A phase reference test bars;B phases are switched, On the test loop for being arranged on B phase reference test bars;And C phases are switched, on the test loop for being arranged on C phase reference test bars, electric energy meter mark Quasi- part includes:Control panel, is switched, B phases are switched and C phases are switched and are connected with A phases.
Further, the quantity of fixture is multiple, and the first end of each fixture is each attached to the lower section of hanger bracket, many The midpoint of individual fixture line and the center of hanger bracket are on same vertical curve.
To achieve these goals, there is provided a kind of verification of split core type current transformer according to another aspect of the present invention System, including:Split core type current transformer;And calibration equipment, wherein, calibration equipment is appointing that the above of the present invention is provided A kind of calibration equipment of split core type current transformer.
The present invention uses the calibration equipment of the split core type current transformer with following structure:Hanger bracket, with cross bar, first Support member, the second support member and fixture, wherein, the first supports support is in the lower section of cross bar first end, the second support member branch Support is in the lower section at the end of cross bar second, and the first end of fixture is fixed on the lower section of hanger bracket;Electric energy meter standard component is steady for providing Fixed test electric current;Reference test bar, is located on the first support member, the second support member and fixture, and the two ends of reference test bar are equal It is connected with electric energy meter standard component, forms the test loop for transmitting test electric current;And powermeter verification instrumeter, with electric energy meter Standard component is connected with split core type current transformer, and the test current calculation for being detected according to split core type current transformer is measured Electric flux, and measurement electric flux is fed back into electric energy meter standard component.By the school for the split core type current transformer for setting said structure Experiment device, can hang on split core type current transformer on reference test bar, and the test by reference test bar is detected by electromagnetic induction Electric current, the verifying attachment of such a structure is by reference test bar transmission test electric current, when split core type current transformer is hung on reference test bar Fixed position and angle can be obtained, it is ensured that the stability of check results, and then split core type current transformer can be adopted Sample error is accurately verified, it is to avoid follow-up to constitute site error to powermeter verification instrumeter, solves electric energy meter in the prior art The problem of easily there is larger error in tester, and then reached that reduction powermeter verification instrumeter error, raising field-checking are accurate The effect of degree.
Brief description of the drawings
The accompanying drawing for constituting the part of the application is used for providing a further understanding of the present invention, schematic reality of the invention Apply example and its illustrate to be used to explain the present invention, do not constitute inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 is the schematic diagram of the calibration equipment of split core type current transformer according to embodiments of the present invention;
Fig. 2 is the enlarged drawing of 21 parts in Fig. 1;
Fig. 3 is the verification schematic diagram of the calibration equipment of split core type current transformer according to embodiments of the present invention;
Fig. 4 is the schematic diagram of the calibration equipment of current transformer according to the preferred embodiment of the invention;
Fig. 5 be the split core type current transformer of the embodiment of the present invention calibration equipment in control panel control test loop principle Figure;And
Fig. 6 and Fig. 7 be split core type current transformer according to embodiments of the present invention calibration equipment in two pieces of control panels show It is intended to.
Embodiment
It should be noted that in the case where not conflicting, the feature in embodiment and embodiment in the application can phase Mutually combination.Describe the present invention in detail below with reference to the accompanying drawings and in conjunction with the embodiments.
The embodiments of the invention provide a kind of calibration equipment of split core type current transformer, the embodiment of the present invention is carried below The calibration equipment of the split core type current transformer of confession is specifically introduced:
Fig. 1 is the structure chart of the calibration equipment of split core type current transformer according to embodiments of the present invention, and Fig. 2 is 21 in Fig. 1 The enlarged drawing at place, as depicted in figs. 1 and 2, the calibration equipment mainly include hanger bracket 10, electric energy meter standard component 20, reference test bar 30 And powermeter verification instrumeter(Not shown in figure), wherein:
Hanger bracket 10 has cross bar 11, the first support member 12, the second support member 13 and fixture 14, wherein, the first support Part 12 is supported on the lower section of the first end of cross bar 11, and the second support member 13 is supported on the lower section at the end of cross bar 11 second, i.e. the first support The support member 13 of part 12 and second is supported on the two ends of hanger bracket 10, and the first end of fixture 14 is fixed on the lower section of hanger bracket 10.
Electric energy meter standard component 20 is used to provide stable test electric current.
Reference test bar 30 is located on the first support member 12, the second support member 13 and fixture 14, and the two of reference test bar 30 End is connected with electric energy meter standard component 20, forms the test loop for transmitting test electric current.
Powermeter verification instrumeter is connected with electric energy meter standard component 20 and split core type current transformer, for according to pincerlike electric current The test current calculation measurement electric flux that transformer is detected, and measurement electric flux is fed back into electric energy meter standard component 20.Specifically Ground, powermeter verification instrumeter can be counted using any method for calculating measurement electric flux in the prior art to measurement electric flux Calculate, the test electric current mainly detected according to split core type current transformer, and the magnitude of voltage in test loop, calculate measurement electricity Energy, then feeds back to electric energy meter standard component 20 by measurement electric flux equal proportion in electric pulse form.The energy of electric energy meter standard component 20 The preferable electric flux itself provided, and the measurement electric flux phase that the preferable electric flux is measured with powermeter verification instrumeter are enough provided Compare, obtain measurement error, complete verification.
Fig. 3 is the verification schematic diagram of calibration equipment according to embodiments of the present invention, as shown in figure 3, split core type current transformer The verification principle of calibration equipment be:Electric energy meter standard component 20 provides the test electric current transmitted on reference test bar 30, by pincerlike electricity Current transformer is suspended on reference test bar 30, is able to detect that test electric current, and powermeter verification instrumeter is examined according to split core type current transformer The test current calculation measurement electric flux measured, and measurement electric flux is fed back into electric energy meter standard component 20, electric energy meter standard component The 20 preferable electric fluxs for being provided itself compare with the measurement electric flux that powermeter verification instrumeter is measured, and obtain measurement error, Complete verification.
By the calibration equipment of the split core type current transformer of the embodiment of the present invention, split core type current transformer can be hung on On reference test bar 30, the test electric current by reference test bar 30 is detected by electromagnetic induction, the verifying attachment of such a structure is by surveying The transmission test electric current of bar 30, split core type current transformer, which is hung on, can obtain fixed position and angle when on reference test bar 30, The stability of check results is ensure that, and then the sampling error of split core type current transformer can accurately be verified, it is to avoid after Continue and constitute site error to powermeter verification instrumeter, solve powermeter verification instrumeter in the prior art and asking for larger error easily occur Topic, and then reached the effect for reducing powermeter verification instrumeter error, improving the field-checking degree of accuracy.
Preferably, the first wire is laid along first support member 12, wherein, first wire is the connection test The wire of the first end of bar 30 and the electric energy meter standard component 20.Second wire is successively along second support member 13, the cross bar 11 and first support member 12 lay, wherein, second wire is connects the end of reference test bar 30 second and the electric energy The wire of table standard component 20.That is, electric current line enters hanger bracket 10 from the collateral support of hanger bracket 10 first, reaches and hangs through fixture 14 The collateral support of the second of frame 10, returns to the first collateral support of hanger bracket 10 through top cross bar 11 upwards, downwards from the first collateral support bottom Portion returns to electric energy meter standard component 20.
Due to that when being passed through electric current, when electric current formation ring-type, stronger magnetic field can be produced at the center of ring, so as to measurement Have a huge impact.Therefore the mode of backtracking is taken, reduces the size of electric current loop as far as possible, so as to reduce space magnetic , to reduce the influence that test electric current is detected to split core type current transformer, reach the effect for ensureing the verification degree of accuracy.
Fig. 4 is the schematic diagram of the calibration equipment of split core type current transformer according to the preferred embodiment of the invention, such as Fig. 4 institutes Show, in the preferred embodiment, the quantity of reference test bar 30 includes diagrammatically illustrating two kinds in the reference test bar of plurality of specifications, Fig. 4, its In, the first reference test bar 31 and the second reference test bar 32 are located on the first support member 12, the second support member 13 and fixture 14, are surveyed The specification of bar can be embodied by the size of reference test bar cross section, and the horizontal stroke of the second reference test bar 32 is diagrammatically illustrated in Fig. 4 Sectional area is less than the cross-sectional area of the first reference test bar 31, in embodiments of the present invention, the first reference test bar 31 can be set into horizontal stroke Sectional area is 25mm2Reference test bar, the second reference test bar 32 is set to cross-sectional area for 4mm2Reference test bar.
By setting the different reference test bar of specification on hanger bracket, electric current line need not be changed by realizing, you can to different rule The split core type current transformer of lattice is verified, and reduces the complexity of operation, and is conducive to testing and verifies the holding of environment.
Preferably, horizontal plane residing for the first reference test bar 31 is higher than horizontal plane residing for the second reference test bar 32, i.e. cross-sectional area Horizontal plane residing for larger reference test bar, higher than the horizontal plane residing for the less reference test bar of cross-sectional area.
The larger reference test bar of cross-sectional area is used to transmit larger test electric current, and the less reference test bar of cross-sectional area is used to pass Defeated less test electric current, and the bigger magnetic field of electric current is stronger, by the way that the larger reference test bar of cross-sectional area is arranged on by the top Position, is more nearly the return current line of top cross bar, reaches the effect for further reducing space magnetic field.
Preferably, the first reference test bar 31 and the second reference test bar 32 are tested including A phases reference test bar, B phases reference test bar with C phases Bar, wherein, A phases reference test bar, the B phases reference test bar for belonging to the first reference test bar 31 are identical with the cross-sectional area of C phase reference test bars, belong to A phases reference test bar, the B phases reference test bar of two reference test bars 32 are identical with the cross-sectional area of C phase reference test bars.
By the way that the first reference test bar 31 and the second reference test bar 32 are disposed as into three-phase reference test bar, realizing directly to be carried out Three-phase is verified.
Preferably, horizontal plane residing for A phases reference test bar is higher than horizontal plane residing for B phase reference test bars, horizontal plane residing for B phase reference test bars Higher than horizontal plane residing for C phase reference test bars.
Because in actual verification, the single-phase verification to split core type current transformer is relatively more, so, by by A phase reference test bars Position by the top is arranged on, the return current line of top cross bar is more nearly, the space reduced in test checking procedure is reached Magnetic field.
Further, the calibration equipment of the split core type current transformer of the embodiment of the present invention also includes control test loop conducting Or the switch disconnected, the switch can be relay switch.Specifically, A phases are set to open on the test loop of A phase reference test bars Close, set B phases to switch on the test loop of B phase reference test bars, set C phases to switch on the test loop of C phase reference test bars.Electric energy Table standard component 20 then includes control panel, and the control panel is mainly used in control calibration equipment and provides survey on the reference test bar of which kind of specification Electric current is tried, and for controlling which phase current line to reference test bar to provide test electric current, wherein, control panel is switched with A phases, B phases Switch is switched with C phases to be connected, for the closure by controlling switch or disconnection, to control whether to carry to a certain phase current line For whether testing electric current.
Fig. 5 is the schematic diagram that control panel controls test loop, as shown in figure 5, being illustrated exemplified by carrying out A phase current verifications former Reason:AIH point of the electric current from three-phase current case(A-A phases, I- electric currents, H- is high-end, input)On input to electric energy meter standard component 20 No. 1 point knob, enter the standard scale built in electric energy meter standard component 20 through No. 1 point knob connection, standard gone out from No. 2 point knobs Table, comes on the A phase test loops of the first reference test bar 31, on the A phase test loops of the second reference test bar 32 and electric energy meter standard component On 20 built-in A phases loop, respectively there is a relay switch on this 3 test loops.When needing the A by the first reference test bar 31 During phase loop, the relay of No. 5 points of control is connected, and 3, No. 4 point relays disconnect;When needing the A phases by the second reference test bar 32 During loop, the relay of No. 4 points is connected, and 3, the relay of No. 5 points disconnects;When needing by A phases built in electric energy meter standard component 20 During current loop, the relay of No. 3 points is connected, 4, the relay of No. 5 points disconnect, be achieved in the current switching in three loops. After 3 or 4 or No. 5 points, electric current passes through reference test bar or built-in current loop, from AIL points(A-A phases, I- electric currents are L- low sides, defeated Go out end)Return to three-phase current case.
That is, the calibration equipment for the split core type current transformer that the embodiment of the present invention is provided, with the two circuit electric current of three-phase Line, there is two current loops, and electric energy meter standard component 20 has a current loop in itself, therefore when the installation pincer on reference test bar During current transformer, device for energy meter standard is required to be controlled three road current loops.This programme is taken to return in electric current The mode for installing relay in road additional is controlled, and 9 Control current switchings are designed in the loop of three-phase three altogether, is that this can be adopted Take the mode of dual control board.Control command is write to the soft and hardware control system of electric energy meter standard component 20, so that in electric energy meter mark The control to three loop currents is realized in the verification software that the manually operated keyboard and computer of quasi- part 20 are installed.
Fig. 6 and Fig. 7 be split core type current transformer according to embodiments of the present invention calibration equipment in two pieces of control panels show It is intended to, as shown in Figure 6 and Figure 7, three relays in A phases loop are controlled by XSB7, XSB8, XSB5 of No. 2 control panels 42, B phases Three relays in loop are controlled by XSB3, XSA3, XSA5 of No. 1 control panel 41, and three relays in C phases loop are by No. 1 control XSB11, XSA8, XSA11 control of making sheet 41.
Preferably, in embodiments of the present invention, the quantity of fixture 14 is multiple, and the first end of each fixture 14 is solid The lower section of hanger bracket 10 is scheduled on, the midpoint of multiple lines of fixture 14 is on same vertical curve with the center of hanger bracket 10.Fig. 3 In diagrammatically illustrate the calibration equipment of split core type current transformer and include two fixtures 14.
It is multiple by the way that the quantity of fixture is set to, the stability of reference test bar is further ensured, and then further protect Card split core type current transformer, which is hung on, can obtain fixed position and angle when on reference test bar.
The embodiment of the present invention additionally provides a kind of check system of split core type current transformer, and the check system is except including pincers Outside shape current transformer, include the verification dress of any split core type current transformer for being provided of the above of the embodiment of the present invention Put.
As can be seen from the above description, the present invention realizes following technique effect:
By being supported the use with existing electric energy meter standard component 20, the standardization school to split core type current transformer is realized Test, and then realize the verification of the standardization to the electric energy meter on-site calibrator with split core type current transformer.Due to reference test bar 30 Hard material is taken, and is fixed on hanger bracket 10,4mm2And 25mm2The pincers of the secondary current split-core type meter of current main-stream are corresponded to respectively Mouthful size, realize the purpose through electric current line position and the angle fixation of electric current split-core type meter jaw, it is to avoid because orientation problem Cause measurement error change greatly, inaccurate technical problem, it is ensured that uniformity, the accuracy of measurement result.Simultaneously as same When possess two lines road, also eliminate according to specification change electric current line work, simplify work flow.
Also, the need for considering automation verification simultaneously, all controls to loop current can be selected by software, Set, simple, intuitive, the different scheme by setting, it is possible to achieve higher automation level check, improve operating efficiency.
The preferred embodiments of the present invention are the foregoing is only, are not intended to limit the invention, for the skill of this area For art personnel, the present invention can have various modifications and variations.Within the spirit and principles of the invention, that is made any repaiies Change, equivalent substitution, improvement etc., should be included in the scope of the protection.

Claims (9)

1. a kind of calibration equipment of split core type current transformer, it is characterised in that including:
Hanger bracket (10), with cross bar (11), the first support member (12), the second support member (13) and fixture (14), wherein, institute The lower section that the first support member (12) is supported on the cross bar (11) first end is stated, second support member (13) is supported on the horizontal stroke The lower section at the end of bar (11) second, the first end of the fixture (14) is fixed on the lower section of the hanger bracket (10);
Electric energy meter standard component (20), for providing stable test electric current;
Reference test bar (30), is located on first support member (12), second support member (13) and the fixture (14), And the two ends of the reference test bar (30) are connected with the electric energy meter standard component (20), formed for transmitting the test electricity The test loop of stream;And
Powermeter verification instrumeter, is connected with the electric energy meter standard component (20) and split core type current transformer, for according to described The test current calculation that split core type current transformer is detected measurement electric flux, and the measurement electric flux fed back to described Electric energy meter standard component (20),
Wherein, the test of kilo watthour meter instrument is tested in electric current and test loop according to what the split core type current transformer was detected Magnitude of voltage, calculating obtains measuring electric flux;The measurement electric flux equal proportion is fed back into electric energy meter standard in electric pulse form Part (20), wherein, the electric energy meter standard component (20) calculates the preferable electric flux itself provided, and according to the preferable electric energy The measurement electric flux that amount is measured with the powermeter verification instrumeter determines measurement error.
2. calibration equipment according to claim 1, it is characterised in that:
First wire is laid along first support member (12), wherein, first wire is connects the reference test bar (30) the One end and the wire of the electric energy meter standard component (20);And
Second wire is laid along second support member (13), the cross bar (11) and first support member (12) successively, its In, second wire is the connection end of reference test bar (30) second and the wire of the electric energy meter standard component (20).
3. calibration equipment according to claim 1, it is characterised in that the reference test bar (30) includes:
First reference test bar (31);And
Second reference test bar (32), wherein, the cross-sectional area of second reference test bar (32) is less than first reference test bar (31) Cross-sectional area.
4. calibration equipment according to claim 3, it is characterised in that horizontal plane residing for first reference test bar (31) is higher than Horizontal plane residing for second reference test bar (32).
5. calibration equipment according to claim 3, it is characterised in that first reference test bar (31) and second test Bar (32) includes:
A phase reference test bars;
B phase reference test bars;And
C phase reference test bars, wherein, belong to the A phases reference test bar, the B phases reference test bar and the C of first reference test bar (31) The cross-sectional area of phase reference test bar is identical, belong to the A phases reference test bar of second reference test bar (32), the B phases reference test bar and The cross-sectional area of the C phases reference test bar is identical.
6. calibration equipment according to claim 5, it is characterised in that horizontal plane residing for the A phases reference test bar is higher than the B Horizontal plane residing for phase reference test bar, horizontal plane residing for the B phases reference test bar is higher than horizontal plane residing for the C phases reference test bar.
7. calibration equipment according to claim 5, it is characterised in that:
The calibration equipment also includes:
A phases are switched, on the test loop for being arranged on the A phases reference test bar;
B phases are switched, on the test loop for being arranged on the B phases reference test bar;And
C phases are switched, on the test loop for being arranged on the C phases reference test bar,
The electric energy meter standard component (20) includes:
Control panel, is switched, the B phases are switched and the C phases are switched and are connected with the A phases.
8. calibration equipment according to claim 1, it is characterised in that the quantity of the fixture (14) be it is multiple, each The first end of the fixture (14) is each attached in the lower section of the hanger bracket (10), multiple fixture (14) lines The center of point and the hanger bracket (10) is on same vertical curve.
9. a kind of check system of split core type current transformer, it is characterised in that including:
Split core type current transformer;And
Calibration equipment, wherein, the calibration equipment is the school of the split core type current transformer any one of claim 1 to 8 Experiment device.
CN201310706533.7A 2013-12-19 2013-12-19 The calibration equipment and system of split core type current transformer Active CN104730480B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310706533.7A CN104730480B (en) 2013-12-19 2013-12-19 The calibration equipment and system of split core type current transformer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310706533.7A CN104730480B (en) 2013-12-19 2013-12-19 The calibration equipment and system of split core type current transformer

Publications (2)

Publication Number Publication Date
CN104730480A CN104730480A (en) 2015-06-24
CN104730480B true CN104730480B (en) 2017-10-27

Family

ID=53454559

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310706533.7A Active CN104730480B (en) 2013-12-19 2013-12-19 The calibration equipment and system of split core type current transformer

Country Status (1)

Country Link
CN (1) CN104730480B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2071792U (en) * 1990-04-15 1991-02-20 *** Electric energy metering on-line detector for clamp mutual-inductor
CN101556322A (en) * 2009-05-27 2009-10-14 深圳市科陆电子科技股份有限公司 Auto-calibration method for single-phase electric energy meter on-site calibrator split-core type current mutual inductor
CN202025044U (en) * 2011-04-19 2011-11-02 *** Portable current transformer detector
CN202330692U (en) * 2011-11-17 2012-07-11 宁夏电力公司电力科学研究院 Field check equipment for accuracy of current transformer
CN203606480U (en) * 2013-12-19 2014-05-21 国家电网公司 Verification apparatus of split core type current transformer and system thereof

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4109970B2 (en) * 2002-11-18 2008-07-02 株式会社東芝 Test apparatus and test method for electrical equipment protection circuit
US7305310B2 (en) * 2004-10-18 2007-12-04 Electro Industries/Gauge Tech. System and method for compensating for potential and current transformers in energy meters

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2071792U (en) * 1990-04-15 1991-02-20 *** Electric energy metering on-line detector for clamp mutual-inductor
CN101556322A (en) * 2009-05-27 2009-10-14 深圳市科陆电子科技股份有限公司 Auto-calibration method for single-phase electric energy meter on-site calibrator split-core type current mutual inductor
CN202025044U (en) * 2011-04-19 2011-11-02 *** Portable current transformer detector
CN202330692U (en) * 2011-11-17 2012-07-11 宁夏电力公司电力科学研究院 Field check equipment for accuracy of current transformer
CN203606480U (en) * 2013-12-19 2014-05-21 国家电网公司 Verification apparatus of split core type current transformer and system thereof

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
张丽伟 等.电能表现场校验仪中钳形电流互感器误差的检定方法.《河北电力技术》.2010,第29卷(第3期),第20-22页. *
李振华 等.一种高压电子式电流互感器在线校验***.《电工技术学报》.2014,第29卷(第7期),第229-236页. *

Also Published As

Publication number Publication date
CN104730480A (en) 2015-06-24

Similar Documents

Publication Publication Date Title
Sun et al. Novel application of magnetoresistive sensors for high-voltage transmission-line monitoring
CN106569170B (en) A kind of metering device secondary circuit detector and its detection method
WO2012059061A1 (en) Method and device for quality-monitoring of high-voltage electrical energy
CN207663042U (en) 1000kV AC extra high voltage current transformer errors verify mobile platform
CN201072597Y (en) Automatic detection instrument for aviation electronic flight instrument
CN110174548A (en) Measuring method, measuring device and measuring system for long straight conductor potential
CN104730480B (en) The calibration equipment and system of split core type current transformer
CN103576032B (en) The on-line measuring device of a kind of power equipment and method
CN109116136A (en) The electrification recognition methods of low-voltage cable route
CN203606480U (en) Verification apparatus of split core type current transformer and system thereof
CN107607888A (en) A kind of three-dimensional transient transcendence measuring system
CN106842102A (en) A kind of emulation testing equipment of terminal and electric energy meter one
CN106597356A (en) Single-phase electric energy meter power frequency magnetic field influence quantity testing apparatus
CN206193129U (en) Millimeter wave detector automatic test system
CN203981796U (en) Power transmission line power frequency parameter tester with electronic high-induction voltage interference resistance
CN110161448A (en) A kind of 10kV portable high-pressure wideband electric energy on-site calibrating method and device
CN206557369U (en) High-voltage electric-energy meter on-line monitoring system based on carrier communication
CN110208631A (en) A kind of transformer overload test macro
CN202256525U (en) Device for testing parameters of high-voltage circuit
CN213364891U (en) Nuclear phase detection device based on low-voltage transformer area grid connection
CN204855778U (en) A 0. 02 grade of miniature standard electric energy meter for examineing and determine check during directly going into formula three -phase intelligent ammeter verification system
KR20150062462A (en) Apparatus for checking of cable
CN104820199B (en) Large direct current measuring device ripple response performance test system and method
CN106291440A (en) A kind of electric energy meter environmental suitability evaluating platform
CN103278735B (en) Multifunctional three-phase transformer CT loop-around test instrument

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant