CN104729925B - A kind of experimental rig of field test root system of plant pulling test strength - Google Patents

A kind of experimental rig of field test root system of plant pulling test strength Download PDF

Info

Publication number
CN104729925B
CN104729925B CN201510069541.4A CN201510069541A CN104729925B CN 104729925 B CN104729925 B CN 104729925B CN 201510069541 A CN201510069541 A CN 201510069541A CN 104729925 B CN104729925 B CN 104729925B
Authority
CN
China
Prior art keywords
fixed
hook
lever
pipe
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510069541.4A
Other languages
Chinese (zh)
Other versions
CN104729925A (en
Inventor
吕庆
肖志鹏
泮晓华
邱庆莉
徐礼根
赵宇
尚岳全
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang University ZJU
Original Assignee
Zhejiang University ZJU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang University ZJU filed Critical Zhejiang University ZJU
Priority to CN201510069541.4A priority Critical patent/CN104729925B/en
Publication of CN104729925A publication Critical patent/CN104729925A/en
Application granted granted Critical
Publication of CN104729925B publication Critical patent/CN104729925B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

The present invention relates to root system of plant pulling test strength test equipment field, it is desirable to provide a kind of experimental rig of field test root system of plant pulling test strength.This kind of experimental rig of field test root system of plant pulling test strength includes plant roots and stems fixture, fixing bracket system, loading device, retainer ring, lever, displacement readings steel ruler, conversion ring, weight beam and hook, the fixing bracket system includes main anchor, displacement readings steel ruler fixed support, the plant roots and stems fixture includes U-shaped base, connecting screw rod, fishbolt and fixture block, and loading device includes loading scale pan and loading hanging basket.Principle of the invention and simple structure, adapt to different field condition experimental conditions, easy to operate, and device each several part is detachable and assembles, therefore can easily be carried to field carries out live in-situ test, and test result can reflect the actual mechanical characteristic of root system of plant.

Description

A kind of experimental rig of field test root system of plant pulling test strength
Technical field
The present invention is on root system of plant pulling test strength test equipment field, more particularly to a kind of field test root system of plant The experimental rig of pulling test strength.
Background technology
The soil and slope protection effect of root system of plant is a kind of important way for implementing ecological revetment.Root system of plant and the common group of soil Into radical operators, reinforcement anchorage effect is served to the soil body, its destruction mainly has rhizome tensile failure model and Root-soil interface friction Destruction both of which, both failure modes are all relevant with root system pulling test strength.Therefore, the pulling test strength to root system of plant is carried out Test is the important evidence for evaluating root system of plant soil and slope protection effect.
At present, root system of plant pulling test strength test mainly has laboratory test and the class of field test two.Laboratory test is by right Collection root system carries out indoor test and obtains its tensile strength.Due to departing from the soil body environment of plant growth, root system sample is easily caused Dehydration is dried, and is had differences between the result and root tensile strength actual value of acquisition.What indoor test method was obtained is rhizome The tensile strength of material, is only capable of reflecting influence of the rhizome tensile failure model pattern to root system pulling test strength, it is impossible to reflect Root-soil interface The adverse effect of friction destruction pattern.Field test is mainly carried out using the engineering pulling resistance testing device of the class of jack one, operation Complexity, costly, precision is low, the bad adaptability in vegetative coverage environment.
The content of the invention
It is a primary object of the present invention to overcome deficiency of the prior art, there is provided one kind adapts to field condition survey in situ Try desired root system of plant pulling test strength test device.In order to solve the above technical problems, solution of the invention is:
A kind of experimental rig of field test root system of plant pulling test strength, including plant roots and stems fixture are provided, also including solid Fixed rack system, loading device, retainer ring, lever, displacement readings steel ruler, conversion ring, weight beam and hook;The lever The telescopic steel pipe in vertical hole is provided with for two ends, lever includes the activity end pipe inside fixing pipe and retractable fixing pipe, fixing pipe One end be canned paragraph, the other end of fixing pipe is provided with vertical hole, and one end of the activity end pipe can be from the canned paragraph of fixing pipe Stretch into fixing pipe, and activity end pipe can carry out telescopic adjustment in fixing pipe, the other end of activity end pipe is provided with vertical hole;
The fixing bracket system includes main anchor, displacement readings steel ruler fixed support;
The main anchor includes fixed pedestal, rotational support and at least three support feets;The fixed pedestal includes Face plate of foundation, fixed plate and rotating shaft, and fixed plate and rotating shaft are all at least provided with three;Face plate of foundation is provided with tapped through hole A, often Tapped through hole B and two U-lags are designed with individual fixed plate, the tapped through hole B is corresponding with tapped through hole A, and fixed plate passes through Corresponding tapped through hole B is superimposed with tapped through hole A, is fixedly connected on face plate of foundation through upper and lower tapped through hole using bolt; The two ends of rotating shaft are separately fixed in one of U-lag of two neighboring fixed plate, realize the connection of two neighboring fixed plate;
The rotational support includes steel shaft and two bearings;Two lower ends of bearing are fixed on base by connecting bolt respectively On seat surface plate, the two ends of steel shaft are separately fixed on two bearings;The retainer ring includes the upper ring and a lower ring being connected with each other, steel Axle can be connected by interference fit with the lower ring of retainer ring, and the lever energy is connected by interference fit with the upper ring of retainer ring, Realize that main anchor is connected with the canned paragraph middle part of lever;
The support feet includes movable supporting leg and fixed footmuff, and the upper end of movable supporting leg is set in fixed footmuff;It is described The top of fixed footmuff is provided with through hole, and the corresponding rotating shaft on fixed pedestal can pass through the through hole that footmuff is fixed in correspondingly support feet, Realize that fixed footmuff is connected with corresponding rotating shaft, and support feet is rotated around the axis;The bottom of fixed footmuff is provided with locking Bolt, the movable supporting leg in fixed footmuff is set in for fixation, and can be stretched into fixed footmuff by adjusting movable supporting leg Length, realize the telescopic adjustment of support feet length;
The displacement readings steel ruler fixed support includes fixed panel, elongation bar and at least two branch earth-supporting branches;It is described to stretch Stock includes the adjustable pipe inside fixed sleeving, retractable fixed sleeving, and one end of the adjustable pipe stretches into the one of fixed sleeving In end, and adjustable pipe can carry out telescopic adjustment in fixed sleeving, and the other end of adjustable pipe is vertically fixed with described by bolt Displacement readings steel ruler;The other end of fixed sleeving is fixed on fixed panel by connecting bolt, and the fixed panel is provided with Through hole, the upper end of branch earth-supporting branch is threaded, and the upper end of branch earth-supporting branch can pass through the through hole on fixed panel, and using nut with Fixed panel achieves a fixed connection;
The plant roots and stems fixture includes U-shaped base, connecting screw rod, fishbolt and fixture block, and fishbolt, fixture block are each It is provided with two;Two fixture blocks are oppositely arranged in U-shaped base with clamping face, and pass through fishbolt and the two of U-shaped base respectively Individual trough rim connection, one end of connecting screw rod is fixed on outside the bottom land of U-shaped base;
The ring of changing is cyclic structure, and conversion ring is provided with internal thread through hole, and the other end of connecting screw rod is by wearing The internal thread through hole connection of conversion ring is crossed, realizes that connecting screw rod constitutes nut-screw and is connected with the internal thread through hole on conversion ring It is secondary;Hook-shape structure of the conversion ring again with the weight beam lower end is connected, and the lower end of weight beam carries indicator, and refers to Show that pin can point to the displacement readings steel ruler being fixed on displacement readings steel ruler fixed support;The upper end of weight beam, for The vertical hole of fixed tube end of lever, connection is realized using hook;
The loading device includes loading scale pan and loading hanging basket;The loading hanging basket includes that at least two length are identical Steel wire rope, the every lower end of steel wire rope with loading scale pan be connected, the upper end of every steel wire rope links together, for and thick stick The vertical hole of movable end tube end of bar, connection is realized using hook, that is, load hanging basket and be located at lever for loading scale pan to be hung Movable end tube end.
As a further improvement, the experimental rig of the field test root system of plant pulling test strength also includes spring, bullet Spring is arranged between lever and face plate of foundation, and spring and lever tie point on the canned paragraph of lever, canned paragraph middle part and Between activity end pipe is stretched into a little.
As a further improvement, the experimental rig of the field test root system of plant pulling test strength also includes counterweight, weight Code is used to, when the test of root system of plant pulling test strength is carried out, be placed on loading scale pan.
As a further improvement, between the fixing pipe and activity end pipe in the lever, the fixed sleeving in elongation bar And adjustable pipe between, position limiting structure is designed with;Position limiting structure can be in activity end pipe or the optional position of adjustable pipe, realization activity Between end pipe and fixing pipe, or being connected between adjustable pipe and fixed sleeving.
As a further improvement, the position limiting structure tightens bolt for one end is carried (with movable end using bolt is tightened What pipe or movable tube shape matched) intermediate plate.
As a further improvement, the experimental rig of the field test root system of plant pulling test strength also includes adjustable wall Hook, adjustable hook is to be located in the screwed screw rod in the middle of square shape framework, and screw rod lower end carries hook-shape structure, adjustable Section hook by the lifting of screw rod, can realize the height regulation of hook-shape structure;The adjustable hook is provided with two, and one adjustable Section hook is arranged between dynamometer spring meter and lever, the hook-shape structure of adjustable hook lower end and the upper end phase of dynamometer spring meter Even, connection is realized in the upper end of adjustable hook using the vertical hole of fixed tube end of hook and lever;Another adjustable hook It is arranged between loading hanging basket and lever, the hook-shape structure of adjustable hook lower end is connected with the steel wire rope of loading hanging basket, adjustable Connection is realized using the vertical hole of movable end tube end of hook and lever in the upper end for saving hook.
As a further improvement, it is described be arranged on lever two ends hook for lever two ends carry, hook it is upper End is realized fixing through the vertical hole of lever using nut, and the lower end of hook is used for and carry connection.
As a further improvement, the support feet, fixed plate and rotating shaft is all respectively equipped with four, and support feet, fixation Plate and rotating shaft are uniformly arranged respectively, i.e., between adjacent supports pin, between adjacent fixed plate, between adjacent shafts, the angle of formation All it is 90 degree.
Operation principle of the invention:By plant roots and stems clamp, counterweight is continuously increased on loading scale pan, utilized Lever principle, makes root system of plant constantly stretch, until integrally being extracted, the resistance to plucking of root system of plant is measured by weight beam Power, corresponding root system of plant uplift displacement under different withdrawal resistances is measured according to displacement readings steel ruler, obtains withdrawal resistance-uplift displacement Curve.
Compared with prior art, the beneficial effects of the invention are as follows:
1st, principle of the invention and simple structure, adapt to different field condition experimental conditions, easy to operate;
2nd, device each several part of the invention is detachable and assembles, therefore can easily be carried to field carries out live survey in situ Examination, test result can reflect the actual mechanical characteristic of root system of plant;
3rd, because lever can stretch, loading device can be adjusted according to the actual conditions of root system of plant pulling test strength size The torque arm length of side, larger uplift force can be provided by less counterweight;
4th, counterweight can be gathered materials on the spot, and standard test weight is replaced with stone, sand, soil etc., and need not measure its quality, former Cause is the size that weight beam can directly obtain withdrawal resistance.
Brief description of the drawings
Fig. 1 is device overall structure figure of the invention.
Fig. 2 is the close-up schematic view of part A in Fig. 1.
Fig. 3 is the structural representation of fixed pedestal.
Fig. 4 is the structural representation of fixed plate.
Fig. 5 is the structural representation of plant roots and stems fixture.
Fig. 6 is the structural representation of retainer ring.
Reference in figure is:1 lever;2 fixing pipes;3 activity end pipes;4 support feets;5 fix footmuff;6 movable supporting legs; 7 clamping screws;8 fixed pedestals;9 rotational supports;10 hooks;11 adjustable hooks;12 weight beams;13 conversion rings;14 plant Thing rhizome fixture;15 earth-supporting branches;16 elongation bars;17 fixed panels;18 fixed sleevings;19 adjustable pipes;20 displacement readings steel rulers; 21 indicators;22 steel wire ropes;23 counterweights;24 loading scale pans;25 springs;26 retainer rings;27 face plate of foundations;28 fixed plates;29 Rotating shaft;30 bearings;31 steel shafts;32 connecting bolts;Ring on 33;34 times rings;35U type bases;36 fixture blocks;37 fishbolts;38 connect Connect screw rod;281U shape grooves.
Specific embodiment
The present invention is described in further detail with specific embodiment below in conjunction with the accompanying drawings:
A kind of experimental rig of field test root system of plant pulling test strength as shown in Figure 1, including plant roots and stems fixture 14, Fixing bracket system, loading device, retainer ring 26, lever 1, displacement readings steel ruler 20, conversion ring 13, weight beam 12, extension Hook 10, spring 25, counterweight 23 and adjustable hook 11;The each several part of the experimental rig of the field test root system of plant pulling test strength Single-piece can be split as, be easy to carry, be received and in-site installation.
The telescopic steel pipe in the vertical hole for two ends are provided with of the lever 1, lever 1 is included in fixing pipe 2 and retractable fixing pipe 2 The activity end pipe 3 in portion.One end of fixing pipe 2 is canned paragraph, and the other end of fixing pipe 2 is provided with vertical hole, the activity end pipe 3 One end can be stretched into fixing pipe 2 from the canned paragraph of fixing pipe 2, and activity end pipe 3 can carry out telescopic adjustment in fixing pipe 2, living The other end of moved end pipe 3 is provided with vertical hole.Position limiting structure is additionally provided between fixing pipe 2 and activity end pipe 3 in lever 1, it is spacing Structure is that bolt is tightened in one end with the intermediate plate that matched with the shape of activity end pipe 3.The hook 10 is provided with two, is respectively provided with At the two ends of lever 1, the upper end of hook 10 is realized fixing through the vertical hole of lever 1 using nut, and the lower end of hook 10 is used for Connected with carry.The adjustable hook 11 is that screwed screw rod is penetrated in the middle of square shape framework, and screw rod lower end carries hook Shape structure, the regulation of hook height is realized by the lifting of screw rod, also is provided with two;Two upper end difference of adjustable hook 11 Connection is realized using the vertical hole in the two ends of hook 10 and lever 1, the hook-shape structure of lower end is used for and carry connection, that is, is respectively used to Upper end, the steel wire rope 22 of loading hanging basket with dynamometer spring meter are connected.
The fixing bracket system includes main anchor, displacement readings steel ruler fixed support.
The main anchor includes fixed pedestal 8, rotational support 9 and four support feets 4, and support feet 4 is uniformly arranged, The angle formed i.e. between adjacent supports pin 4 is all 90 degree.As shown in figure 3, the fixed pedestal 8 includes face plate of foundation 27, consolidates Fixed board 28 and rotating shaft 29, and fixed plate 28 and rotating shaft 29 are designed with four, fixed plate 28 and rotating shaft 29 are also uniformly arranged respectively, i.e., Between adjacent fixed plate 28, between adjacent shafts 29, the angle of formation is all 90 degree.As shown in figure 4, face plate of foundation 27 is provided with Tapped through hole A, is designed with tapped through hole B and two U-lags 281, the tapped through hole B and tapped through hole in each fixed plate 28 A correspondences, fixed plate 28 is superimposed with tapped through hole A by corresponding tapped through hole B, is fixed through upper and lower tapped through hole using bolt It is connected to face plate of foundation 27;The two ends of rotating shaft 29 are separately fixed in one of U-lag 281 of two neighboring fixed plate 28, Realize the connection of two neighboring fixed plate 28.
As shown in Fig. 2 the rotational support 9 includes steel shaft 31 and two bearings 30.The lower end of two bearings 30 leads to respectively Cross connecting bolt 32 to be fixed on face plate of foundation 27, the two ends of steel shaft 31 are separately fixed on two bearings 30;The retainer ring 26 include the upper ring 33 and lower ring 34 that are connected with each other, and steel shaft 31 can be connected by interference fit with the lower ring 34 of retainer ring 26, institute Stating lever 1 can be connected by interference fit with the upper ring 33 of retainer ring 26, realize the canned paragraph middle part of main anchor and lever 1 It is connected, specifically refers to Fig. 6.The spring 25 is arranged between lever 1 and face plate of foundation 27, and spring 25 and lever 1 company Contact on the canned paragraph of lever 1, canned paragraph middle part and between activity end pipe 3 stretches into a little;Avoid loading device after sample fracture Suddenly fall.
The expansible of the support feet 4 draws in and Retractable, and support feet 4 includes movable supporting leg 6 and fixed footmuff 5, living The upper end of dynamic leg 6 is set in fixed footmuff 5;The top of the fixed footmuff 5 is provided with through hole, the correspondence on fixed pedestal 8 Rotating shaft 29 fixes the through hole of footmuff 5 in passing through correspondence support feet 4, realizes that fixed footmuff 5 is connected simultaneously with corresponding rotating shaft 29 29 can rotate around the shaft, the bottom of fixed footmuff 5 is provided with clamping screw 7, the activity branch in fixed footmuff 5 is set in for fixation Pin 6.
The displacement readings steel ruler fixed support includes fixed panel 17, elongation bar 16 and at least two branch earth-supporting branches 15. The elongation bar 16 includes the adjustable pipe 19 inside fixed sleeving 18, retractable fixed sleeving 18, one end of the adjustable pipe 19 Stretch into one end of fixed sleeving 18, and adjustable pipe 19 can carry out telescopic adjustment in the fixed sleeving 18, adjustable pipe 19 it is another End is vertically fixed with the displacement readings steel ruler 20 by bolt;The other end of fixed sleeving 18 is fixed on by connecting bolt 32 On fixed panel 17, the fixed panel 17 is provided with through hole, and the upper end of branch earth-supporting branch 15 is threaded, branch earth-supporting branch 15 it is upper End can pass through the through hole on fixed panel 17, and be achieved a fixed connection with fixed panel 17 using nut.In elongation bar 16 Position limiting structure also is provided between fixed sleeving 18 and adjustable pipe 19, position limiting structure matches for one end carries with the shape of adjustable pipe 19 Intermediate plate tightens bolt.
The fixing bracket system is away from test sample root system, it is to avoid influence of the tester to test result, reduces extraneous Interference.
The plant roots and stems fixture 14 includes U-shaped base 35, connecting screw rod 38, fishbolt 37 and fixture block 36, and clamps Bolt 37, fixture block 36 are respectively provided with two pieces;The two pieces of identical fixture blocks 36 in left and right are oppositely arranged in U-shaped base 35 with clamping face, and It is connected with two trough rims of U-shaped base 35 by fishbolt 37 respectively, one end of connecting screw rod 38 is fixed on U-shaped base 35 Outside bottom land.
The ring 13 of changing is cyclic structure, and conversion ring 13 is provided with internal thread through hole, the other end of connecting screw rod 38 Connected by through the internal thread through hole of conversion ring 13, realize that connecting screw rod 38 constitutes spiral shell with the internal thread through hole on conversion ring 13 Female screw rod auxiliary connection;Hook-shape structure of the conversion ring 13 again with the lower end of the weight beam 12 is connected, under weight beam 12 End carries indicator 21, and indicator 21 can point to the displacement readings steel ruler 20 being fixed on displacement readings steel ruler fixed support; The upper end of weight beam 12, for the vertical hole in the end of fixing pipe 2 with lever 1, realizes connecting using adjustable hook 11.
The loading device includes loading scale pan 24, counterweight 23 and loading hanging basket.The loading hanging basket includes at least two Root length identical steel wire rope 22, the every lower end of steel wire rope 22 is connected with loading scale pan 24, the every upper end of steel wire rope 22 Link together, for the vertical hole in the end of activity end pipe 3 with lever 1, realize connecting using adjustable hook 11, be i.e. loading is hung Basket is used to for loading scale pan 24 to hang the end of activity end pipe 3 for being located at lever 1.The counterweight 23 be used for carry out root system of plant resist When pulling out strength test, it is placed on loading scale pan 24.
During experimental test:The each several part of experimental rig is re-assemblied first, lever 1 is by interference fit and retainer ring 26 Upper ring 33 be connected, the steel shaft 31 of rotational support 9 is connected by interference fit with the lower ring 34 of retainer ring 26, and is fixed on On the bearing 30 of rotational support 9, the lower end of bearing 30 is fixed on face plate of foundation 27 by connecting bolt 32, and formation is with bearing 30 Fulcrum and (steel shaft 31 is fixed on bearing 30, and steel shaft 31 is rotated and drives lever 1 to rotate, but can only be for the lever 1 that can rotate around it The rotation with surface of the upside of face plate of foundation 27, can not 360 ° of rotations);One spring is installed again between lever 1 and face plate of foundation 27 25, it is to avoid the unexpected rotation of lever 1;Face plate of foundation 27 and fixed plate 28 are connected by rotating shaft 29 with support feet 4, and several persons are connected as Integrally.The steel wire rope 22 for loading hanging basket is connected with the lower end of adjustable hook 11, and by linking up with 10 with lever 1 with activity One end of end pipe 3 is connected;Hook 10 is fixed on the end of lever 1 by nut through the vertical hole of lever 1;Weight beam 12 upper ends are connected with adjustable hook 11, and are connected with the other end of lever 1 by hook 10.The connection of plant roots and stems fixture 14 Screw rod 38 from conversion ring 13 screw pass through, with screw constitute nut-screw auxiliary connection, conversion ring 13 again with weight beam 12 The hook-shape structure of lower end is connected.
Branch earth-supporting branch 15 is fixedly connected, elongation bar by nut through the through hole on fixed panel 17 with fixed panel 17 16 one end of fixed sleeving 18 is fixed on fixed panel 17 by connecting bolt 32, and three is connected to one, and forms position Move reading steel ruler fixing bracket system.Displacement readings steel ruler 20 is vertically fixed on the adjustable pipe 19 1 of elongation bar 16 by bolt End.The indicator 21 of the lower end of weight beam 12 points to displacement readings steel ruler 20.
During specifically used:Testing crew adjusts movable supporting leg 6 to suitable length first, and by main anchor System is erected at by root system of plant to be measured, and then displacement readings steel ruler fixing bracket system is erected at the non-displacement of side, its Middle branch earth-supporting branch 15 is anchored at underground, by adjusting expansion link by displacement readings steel ruler 20 close to indicator 21, by adjustable 11 are linked up with to change indicator 21 for suitable position.
As shown in figure 5, the rhizome that root system of plant upper end is basseted is from two pieces of fixture blocks 36 of plant roots and stems fixture 14 Between pass through, fishbolt 37 is tightened respectively to clamp the rhizome of plant.
As shown in figure 1, the length of activity end pipe 3 of adjustment lever 1 applies weight to suitable position on loading scale pan 24 Code 23, root system of plant will be stretched constantly, and the anti-of root system of plant is read by weight beam 12 and displacement readings steel ruler 20 Pull out force, uplift displacement amount, until root system of plant is pulled out, complete a measurement for root system of plant anti-pulling mechanical characteristic;Again The position of erection bracket can carry out the measurement of next root system of plant.After the completion of all measurement experiments, can by the present apparatus disassemble for Each single-piece, is easy to carry.
Finally it should be noted that listed above is only specific embodiment of the invention.It is clear that the invention is not restricted to Above example, can also there is many variations.One of ordinary skill in the art can directly lead from present disclosure The all deformations for going out or associating, are considered as protection scope of the present invention.

Claims (8)

1. a kind of experimental rig of field test root system of plant pulling test strength, including plant roots and stems fixture, it is characterised in that also wrap Include fixing bracket system, loading device, retainer ring, lever, displacement readings steel ruler, conversion ring, weight beam and hook;It is described The telescopic steel pipe in lever vertical hole for two ends are provided with, lever includes the activity end pipe inside fixing pipe and retractable fixing pipe, Gu One end of fixed tube is canned paragraph, and the other end of fixing pipe is provided with vertical hole, and one end of the activity end pipe can consolidating from fixing pipe Determine section to stretch into fixing pipe, and activity end pipe can carry out telescopic adjustment in fixing pipe, the other end of activity end pipe is provided with vertically Hole;
The fixing bracket system includes main anchor, displacement readings steel ruler fixed support;
The main anchor includes fixed pedestal, rotational support and at least three support feets;The fixed pedestal includes pedestal Panel, fixed plate and rotating shaft, and fixed plate and rotating shaft are all at least provided with three;Face plate of foundation is provided with tapped through hole A, and each is consolidated Tapped through hole B and two U-lags are designed with fixed board, the tapped through hole B is corresponding with tapped through hole A, fixed plate is by correspondence Tapped through hole B be superimposed with tapped through hole A, be fixedly connected on face plate of foundation through upper and lower tapped through hole using bolt;Rotating shaft Two ends be separately fixed in one of U-lag of two neighboring fixed plate, realize the connection of two neighboring fixed plate;
The rotational support includes steel shaft and two bearings;Two lower ends of bearing are fixed on seat surface by connecting bolt respectively On plate, the two ends of steel shaft are separately fixed on two bearings;The retainer ring includes the upper ring and a lower ring being connected with each other, steel shaft energy It is connected with the lower ring of retainer ring by interference fit, the lever energy is connected by interference fit with the upper ring of retainer ring, is realized Main anchor is connected with the canned paragraph middle part of lever;
The support feet includes movable supporting leg and fixed footmuff, and the upper end of movable supporting leg is set in fixed footmuff;The fixation The top of footmuff is provided with through hole, and the corresponding rotating shaft on fixed pedestal fixes the through hole of footmuff in passing through correspondence support feet, realizes Fixed footmuff is connected with corresponding rotating shaft, and support feet is rotated around the axis;The bottom of fixed footmuff is provided with clamping screw, The movable supporting leg in fixed footmuff is set in for fixation, and can be by adjusting the length that movable supporting leg stretches into fixed footmuff Degree, realizes the telescopic adjustment of support feet length;
The displacement readings steel ruler fixed support includes fixed panel, elongation bar and at least two branch earth-supporting branches;The elongation bar Including the adjustable pipe inside fixed sleeving, retractable fixed sleeving, one end of the adjustable pipe is stretched into one end of fixed sleeving, And adjustable pipe can carry out telescopic adjustment in fixed sleeving, the other end of adjustable pipe is vertically fixed with the displacement and reads by bolt Number steel ruler;The other end of fixed sleeving is fixed on fixed panel by connecting bolt, and the fixed panel is provided with through hole, branch The upper end of earth-supporting branch is threaded, and the upper end of branch earth-supporting branch can pass through the through hole on fixed panel, and utilize nut and stationary plane Plate achieves a fixed connection;
The plant roots and stems fixture includes U-shaped base, connecting screw rod, fishbolt and fixture block, and fishbolt, fixture block are respectively provided with Two;Two fixture blocks are oppositely arranged in U-shaped base with clamping face, and pass through two grooves of fishbolt and U-shaped base respectively Side is connected, and one end of connecting screw rod is fixed on outside the bottom land of U-shaped base;
The ring of changing is cyclic structure, and conversion ring is provided with internal thread through hole, and the other end of connecting screw rod is by through turning The internal thread through hole connection of ring change, realizes that connecting screw rod constitutes nut-screw auxiliary connection with the internal thread through hole on conversion ring;Turn Hook-shape structure of the ring change again with the weight beam lower end is connected, and the lower end of weight beam carries indicator, and indicator The displacement readings steel ruler being fixed on displacement readings steel ruler fixed support can be pointed to;The upper end of weight beam, for and lever The vertical hole of fixed tube end, using hook realize connection;
The loading device includes loading scale pan and loading hanging basket;The loading hanging basket includes at least two length identical steel Cord, the every lower end of steel wire rope with loading scale pan be connected, the upper end of every steel wire rope links together, for lever The vertical hole of movable end tube end, connection is realized using hook, that is, load hanging basket for that will load scale pan and hang the work for being located at lever Moved end tube end.
2. a kind of experimental rig of field test root system of plant pulling test strength according to claim 1, it is characterised in that institute Stating the experimental rig of field test root system of plant pulling test strength also includes spring, and spring is arranged between lever and face plate of foundation, And the tie point of spring and lever is on the canned paragraph of lever, between canned paragraph middle part and activity end pipe are stretched into a little.
3. a kind of experimental rig of field test root system of plant pulling test strength according to claim 1, it is characterised in that institute Stating the experimental rig of field test root system of plant pulling test strength also includes counterweight, and counterweight is used to carry out root system of plant pulling test strength During test, it is placed on loading scale pan.
4. a kind of experimental rig of field test root system of plant pulling test strength according to claim 1, it is characterised in that institute State between the fixing pipe in lever and activity end pipe, between the fixed sleeving in elongation bar and adjustable pipe, be designed with position limiting structure; Position limiting structure can be realized between activity end pipe and fixing pipe in activity end pipe or the optional position of adjustable pipe, or adjustable pipe Being connected between fixed sleeving.
5. a kind of experimental rig of field test root system of plant pulling test strength according to claim 4, it is characterised in that institute Position limiting structure is stated using bolt is tightened, bolt is tightened for one end carries intermediate plate.
6. a kind of experimental rig of field test root system of plant pulling test strength according to claim 1, it is characterised in that institute Stating the experimental rig of field test root system of plant pulling test strength also includes adjustable hook, and adjustable hook is to be located in square shape Screwed screw rod in the middle of framework, screw rod lower end carries hook-shape structure, and adjustable hook can be realized by the lifting of screw rod The height regulation of hook-shape structure;The adjustable hook is provided with two, and an adjustable hook is arranged on dynamometer spring meter and thick stick Between bar, the hook-shape structure of adjustable hook lower end is connected with the upper end of dynamometer spring meter, and the upper end of adjustable hook is using extension Realize connection in the vertical hole of fixed tube end of hook and lever;Another adjustable hook is arranged between loading hanging basket and lever, The hook-shape structure of adjustable hook lower end is connected with the steel wire rope of loading hanging basket, and the upper end of adjustable hook is using hook and lever The vertical hole of movable end tube end realize connection.
7. a kind of experimental rig of field test root system of plant pulling test strength according to claim 6, it is characterised in that institute The carry for being arranged on the hook at lever two ends for lever two ends is stated, the upper end of hook utilizes spiral shell through the vertical hole of lever Mother realizes fixing, and the lower end of hook is used for and carry connection.
8. the experimental rig of a kind of field test root system of plant pulling test strength according to claim 1 to 7 any one, its It is characterised by, the support feet, fixed plate and rotating shaft are all respectively equipped with four, and support feet, fixed plate and rotating shaft are uniform respectively Between adjacent supports pin, between adjacent fixed plate, between adjacent shafts set, i.e., the angle of formation is all 90 degree.
CN201510069541.4A 2015-02-10 2015-02-10 A kind of experimental rig of field test root system of plant pulling test strength Active CN104729925B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510069541.4A CN104729925B (en) 2015-02-10 2015-02-10 A kind of experimental rig of field test root system of plant pulling test strength

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510069541.4A CN104729925B (en) 2015-02-10 2015-02-10 A kind of experimental rig of field test root system of plant pulling test strength

Publications (2)

Publication Number Publication Date
CN104729925A CN104729925A (en) 2015-06-24
CN104729925B true CN104729925B (en) 2017-06-16

Family

ID=53454023

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510069541.4A Active CN104729925B (en) 2015-02-10 2015-02-10 A kind of experimental rig of field test root system of plant pulling test strength

Country Status (1)

Country Link
CN (1) CN104729925B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107589024A (en) * 2017-10-10 2018-01-16 佛山智北汇科技有限公司 A kind of wire bend degree detection means based on mechanics feedback
CN107796550B (en) * 2017-11-23 2023-09-15 湖北工业大学 Device and method for measuring and calculating pulling resistance of actual section of in-situ plant root system soil
CN109696351A (en) * 2019-01-21 2019-04-30 中国林业科学研究院木材工业研究所 It is a kind of for recombinating the long-term tensile load test device of composite construction bamboo
US11703404B2 (en) 2019-06-17 2023-07-18 Colorado State University Research Foundation Device for automated crop root sampling
CN110487543A (en) * 2019-09-09 2019-11-22 山东理工大学 A kind of luffing pulsating cyclic load loading experimental apparatus
CN113959828B (en) * 2021-10-21 2023-12-19 宁波康伯斯电器有限公司 Power supply linear energy detection device
CN114838857B (en) * 2022-05-16 2023-12-05 华中农业大学 Multi-dimensional anti-slip pulling force measuring device and test method

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1004792A1 (en) * 1981-05-18 1983-03-15 Зональный научно-исследовательский и проектный институт типового и экспериментального проектирования жилых и общественных зданий Device for testing cross-shaped building structures
CN201628673U (en) * 2010-04-06 2010-11-10 广东省建筑科学研究院 Reinforced concrete water drainage pipe lined modified PVC sheet retaining key tensile strength measuring device
CN102680321A (en) * 2012-05-18 2012-09-19 河海大学 Lever-type drawing device for testing anchoring performance of planting bar and implementation method thereof
CN103454156B (en) * 2012-05-28 2018-01-26 富泰华工业(深圳)有限公司 Pulling capacity mechanism for testing and drawing force test method
CN202974756U (en) * 2012-12-26 2013-06-05 北京林业大学 Auxiliary support utilized by anchor rod drawing instrument
CN103592059B (en) * 2013-11-12 2015-08-05 三峡大学 The device of pulling capacity and displacement is measured in the drawing of plant original position
CN103557979B (en) * 2013-11-18 2015-07-15 北京林业大学 Portable root system anchoring force tester
CN203929508U (en) * 2014-04-22 2014-11-05 宁夏大学 Root system of plant tensile test system
CN204405448U (en) * 2015-02-10 2015-06-17 浙江大学 A kind of test unit of field test root system of plant pulling test strength

Also Published As

Publication number Publication date
CN104729925A (en) 2015-06-24

Similar Documents

Publication Publication Date Title
CN104729925B (en) A kind of experimental rig of field test root system of plant pulling test strength
CN105158064B (en) A kind of Multifunctional self-leveling weighing apparatus continuous beam test counter-force loading frame of formula
CN106006404A (en) Super high-rise external hanging movable arm tower crane climbing supporting device
AU2012101235B4 (en) Rapid load capacity test
CN102589973B (en) Pullout test auxiliary device for hook anchor rod and test method
CN204405448U (en) A kind of test unit of field test root system of plant pulling test strength
CN110029582B (en) Device and method for synchronous tensioning of double suspenders of tied-arch bridge
CN110376061A (en) A kind of double lever tensile creep device and its test method that load is continuously adjustable
CN207739295U (en) A kind of uplift pile detection device
KR101285439B1 (en) Performance Tester and the Methods of Spring Hanger
CN212432397U (en) Steel structure bridge steel arch rib vertical cable stress adjustment testing device
KR20100117213A (en) Rigid hanger load measure test & load adjustable method
CN113863178B (en) Tree anchor type flexible protection system and inspection and evaluation method thereof
CN109916706A (en) A kind of experimental rig of the clamped component capability of antidetonance of concrete
CN105509683B (en) Displacement measuring device for self-balancing pile testing method
CN112816205A (en) Pipeline gallows detection device
CN101261125A (en) Large-sized rotating curved face foundation surface calibration method and apparatus
CN209892387U (en) Wind power generation anemometer tower capable of accurately correcting verticality
KR100305107B1 (en) an process of loading teste for loading structure use of transferable loading-apparatus
CN203594057U (en) Detecting device for vertical extraction-resistant static test of single pile through buttress method
CN103743584B (en) Wire netting Mechanics Performance Testing device
CN207295480U (en) Bridge chamber prestressed stretch-draw jack positioning apparatus
CN210487507U (en) Test device for testing dynamic and static bearing performance of building guardrail
CN107655662B (en) A kind of installation of screw pile and combined loading test device
CN215165892U (en) Pile foundation static load test counterforce device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant