CN104727829A CN201510101207.2A CN201510101207A CN104727829A CN 104727829 A CN104727829 A CN 104727829A CN 201510101207 A CN201510101207 A CN 201510101207A CN 104727829 A CN104727829 A CN 104727829A
Authority
CN
China
Prior art keywords
steel arch
shelf
tire
lining cutting
tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510101207.2A
Other languages
Chinese (zh)
Other versions
CN104727829B (en
Inventor
刘杰
颜溧洲
李建林
苑腾飞
于振民
张伦
常德龙
陆世轩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Three Gorges University CTGU
Original Assignee
China Three Gorges University CTGU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Three Gorges University CTGU filed Critical China Three Gorges University CTGU
Priority to CN201510101207.2A priority Critical patent/CN104727829B/en
Publication of CN104727829A publication Critical patent/CN104727829A/en
Application granted granted Critical
Publication of CN104727829B publication Critical patent/CN104727829B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere
    • E21F17/18Special adaptations of signalling or alarm devices

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention relates to a tunnel lining structure with a detachable lining tire and a construction installation method thereof. The tunnel lining structure comprises the lining tire, a pressure force meter, an alarm device, strain pieces, U-shaped expansion bolts and the like. By means of the tunnel lining structure with the detachable lining tire and the construction installation method thereof, in the construction process, the internal force of a steel arch does not increase when surrounding rocks deform, the surrounding rocks produce supporting force all the time, local damage does not happen on the surrounding rocks, and it can be guaranteed that when the steel arch is damaged, large internal force does not occur simultaneously. The tunnel lining structure with the detachable lining tire and the construction installation method thereof has the advantages that the tunnel lining structure with the detachable lining tire is suitable for tunnels with various shapes, sustaining strength of the surrounding rocks can be exerted adequately, it is guaranteed that the whole steel arch is uniformly forced, sudden damage of the surrounding rocks is prevented in the construction process, the safety property is improved, the steel arch can be dismantled in the late construction, and the tunnel construction cost is greatly reduced.

Description

A kind of tunnel lining structure and construction installation method thereof with detachable lining cutting tire
Technical field
The present invention relates to the device field of construction of tunnel, be specifically related to a kind of tunnel lining structure and the construction installation method thereof with detachable lining cutting tire.
Background technology
Now, along with the development of China's transportation network, construction of tunnel construction is more and more huger, and tunnel soft rock and dilatancy soil layer problem have become a kind of problem demanding prompt solution.In steel arch-shelf work progress, there are problems: after the tunnel excavation of first dilatancy soil layer, tunnel wall rock deformation is comparatively large, and distortion can reach 20 ~ 40cm, causes steel arch-shelf to bear very large pressure, crimp very easily occurs and destroys.It two is that steel arch-shelf is installed too early, and surrouding rock deformation is carried out, and this can cause steel arch-shelf to bear very large pressure from surrounding rock; Cross and steel arch-shelf is installed late then leaves country rock generation Free Transform, during this period country rock non-support power, easily occur that block destroys, flaking situation.Its three be steel arch-shelf install after, still there is local distortion in country rock, this can cause steel arch-shelf local bear larger pressure.Find a kind of suspension device rapidly, can make surrouding rock deformation and steel arch-shelf internal force does not increase, and country rock existing supporting power all the time, can not there is local failure in country rock, can ensure again that steel arch-shelf can not produce very large internal stress when destroying simultaneously.At present, the device overcome the above problems be found still not exist.
Summary of the invention
The object of this invention is to provide a kind of tunnel lining structure and the construction installation method thereof with detachable lining cutting tire, it is devoted to improve dilatancy soil layer tunnel steel arch frame utilization rate, economizes on resources, realizes green economy; It two prevents the unexpected unstability of country rock, and prevent steel arch-shelf from bearing greater impact power, it is useful in buried country rock cavern, and variations in temperature is little, the lining cutting tire device be arranged between country rock and steel arch-shelf under variations in temperature causes gas pressure intensity to change pole low condition.
A kind of tunnel lining structure with detachable lining cutting tire, it comprises steel arch-shelf, lining cutting tire is provided with between steel arch-shelf and country rock, air is filled with in lining cutting tire, lining cutting tire is provided with to let out and carries device, let out a year bottom of device and be provided with transfer port, steel arch-shelf and lining cutting tire are fixed on country rock by U-shaped expansion bolt, lining cutting tire is provided with pressure dynamometer, gas pressure intensity in pressure dynamometer monitoring tire, be provided with warning device between steel arch-shelf and country rock, described warning device is for monitoring country rock and steel arch-shelf spacing, and distance is less than 20mm and reports to the police immediately, described tire section thickness is 9mm, adopt wear-resistant outside tire, anti-country rock corner angle puncture, anti-aging, corrosion-resistant material thickeies, tyre last is improved, thickening layer thickness is 1mm, between described steel arch-shelf and country rock, spacing is at 200mm-400mm, give country rock certain deformation space, described steel arch-shelf frame pin adopts shallow embedding and crab-bolt link is arranged, be convenient to remove, described transfer port is exhaust, the device that gas transmission is integrated, when in tire, gas pressure intensity reaches 3Mpa, then transfer port valve will by jack-up, gas is discharged, when pressure is less than this value, valve closing, do not discharge gas.
Above-mentioned steel arch-shelf is provided with foil gauge, and foil gauge is for monitoring steel arch-shelf ess-strain situation.
Have a construction installation method for the tunnel lining structure of detachable lining cutting tire, it comprises the steps:
1) road excavates and adopts full section method, and tunnel excavation completes, the concrete that first just spray 28-30mm is thick on country rock wall, then inserted to play anchor pole, installation steel mesh reinforcement, and reinforcing bar grid all covers by jetting cement;
2) body is filled with lining cutting tire from transfer port, in gas transmission process by tire dolly in tunnel, make to be close to country rock outside tire, subsequently pressure dynamometer installed;
3) steel arch-shelf is installed, monitoring steel arch-shelf ess-strain situation; Steel arch-shelf lower end adopts shallow embedding, and arranges bolt connection; " U " type expansion bolt is adopted to fix between steel arch-shelf and lining cutting tire, holdout device stability;
4) alarm device is arranged between country rock and steel arch-shelf, lining cutting tire side;
5) monitor gas pressure intensity in lining cutting tire and be greater than 3Mpa, tire discharges gas immediately automatically, until when pressure is stabilized in 3Mpa, Artificial Release venting body is to pressure to 0.5Mpa, pressure changed and maintains about 10% in 1 month, then can assert that surrouding rock deformation has reached stable, be now dismountable steel arch-shelf, remove steel arch-shelf step: a pulls down strain gauge device and warning device on steel arch-shelf; B removes steel arch arching, takes mode from top to bottom to remove whole steel arch-shelf; The foil gauge that c removes and steel arch-shelf are put in order, can continue to be used in next Pin steel arch-shelf, and the material recovery reprocessing of destruction uses; Or in monitoring lining cutting tire, gas pressure intensity is greater than 3Mpa, and tire discharges gas immediately automatically, and in deflation course, country rock and steel arch-shelf spacing reduce gradually, and when distance reaches 20mm, warning device is reported to the police, then now can remove lining cutting tire, removes step; A removes pressure dynamometer and the warning device of lining cutting tire; B discharges gas, and extracts tire out; C removes pressure dynamometer and tire, can continue to be used in next Pin steel arch-shelf.
The present invention has following beneficial effect: the present invention is under certain supporting condition of foetal sac, and surrouding rock deformation can sustainable development, when there is not country rock local failure, playing country rock self tenability fully, reducing steel arch-shelf stressed.Gassy in foetal sac, gas compression space is large, can provide surrouding rock deformation space, and due to gas fluidity good, then can transmit that country rock transmits preferably extrusion stress, make the stressed approaches uniformity of steel arch-shelf.Because air bag retractility is good, in its deformation range, surrouding rock deformation will cause any internal force to increase to steel arch-shelf.Device can allow country rock have to face dummy status completely, and useful larger distortion, prevents progressive destruction.Can have on the basis of moderate finite deformation at country rock, steel arch-shelf will bear relatively little stress, then steelframe significantly can reduce cross-sectional area, and reduces intensity, thus saving steel.When lining cutting tire itself can bear country rock transmit load, steel arch-shelf then can remove steelframe, greatly reduces the cost of constructing tunnel.When steel arch-shelf can not be removed, lining cutting tire just can be removed, and recycles, and too much can not increase extra cost.Device is applicable to difformity tunnel, such as door opening formula, the shape of a hoof, circle etc., and the simple structure of device, shape can make the appropriate adjustments according to engineering practice and needs and change.When this device is used for scientific research purposes, can camera head be increased, clear monitoring foetal sac deformation, thus analyze country rock trend and details.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the invention will be further described:
Fig. 1 is that front tunnel schematic diagram installed by lining cutting tire;
Fig. 2 is lining cutting tire installation tunnel schematic diagram;
Fig. 3 is lining cutting tire section schematic diagram;
Fig. 4 is that constructing tunnel completes schematic diagram;
Fig. 5 is that U-shaped expansion bolt fixes auspicious figure;
Fig. 6 is that steel arch-shelf frame pin connects detail drawing;
Fig. 7 is warning device detail drawing;
Fig. 8 is tunnel schematic diagram after dismounting steel arch-shelf;
Fig. 9 is tunnel schematic diagram after dismounting lining cutting tire.
Detailed description of the invention
As in Fig. 1-9, a kind of tunnel lining structure with detachable lining cutting tire, it comprises steel arch-shelf 7, lining cutting tire 3 is provided with between steel arch-shelf and country rock 1, air 2 is filled with in lining cutting tire, lining cutting tire is provided with to let out and carries device, let out a year bottom of device and be provided with transfer port 4, steel arch-shelf and lining cutting tire are fixed on country rock by U-shaped expansion bolt 8, lining cutting tire is provided with pressure dynamometer 5, gas pressure intensity in pressure dynamometer monitoring tire, warning device 6 is provided with between steel arch-shelf and country rock, warning device comprises emergency alarm bell 13, the sheet metal 15 at wire 14 and wire two ends, described tire section thickness is 9mm, adopt wear-resistant outside tire, anti-country rock corner angle puncture, anti-aging, corrosion-resistant material thickeies, tyre last is improved, thickening layer thickness is 1mm, between described steel arch-shelf and country rock, spacing is at 200mm-400mm, give country rock certain deformation space, described steel arch-shelf frame pin adopts shallow embedding and crab-bolt link is arranged, be convenient to remove, described transfer port is exhaust, the device that gas transmission is integrated, when in tire, gas pressure intensity reaches 3Mpa, then transfer port valve will by jack-up, gas is discharged, when pressure is less than this value, valve closing, do not discharge gas.Described steel arch-shelf is provided with foil gauge 9, and foil gauge is for monitoring steel arch-shelf ess-strain situation.Described warning device is for monitoring country rock and steel arch-shelf spacing, and distance is less than 20mm and reports to the police immediately, and the time of laying, riding position determined according to country rock later stage surrouding rock deformation situation, and number also can suitably increase after steel arch-shelf and the installation of lining cutting tire; U-shaped expansion bolt is adopted to fix between lining cutting tire and steel arch-shelf, holdout device stability.
This structure construction step is as follows:
1) road excavates and adopts full section method, and tunnel excavation completes, the concrete that first just spray 28-30mm is thick on country rock wall, then inserted to play anchor pole 10, installation steel mesh reinforcement 11, and reinforcing bar grid 12 all covers by jetting cement.(as Fig. 1)
2) body is filled with lining cutting tire from transfer port, in gas transmission process by tire dolly in tunnel, make to be close to country rock outside tire.Subsequently pressure dynamometer is installed.(as Fig. 2)
3) steel arch-shelf, Practical Project need not install foil gauge, if this device is used for scientific research object can install foil gauge, monitoring steel arch-shelf ess-strain situation; Steel arch-shelf lower end adopts shallow embedding, and arranges bolt connection; U-shaped expansion bolt is adopted to fix between steel arch-shelf and lining cutting tire, holdout device stability.(as Fig. 4-7)
4) alarm device is arranged between country rock and steel arch-shelf, lining cutting tire side.
5) utilization of described lining cutting tire in engineering reality, its supporting intensity requires 1.2Mpa, then have following two kinds of situations:

Claims (9)

1. one kind has the tunnel lining structure of detachable lining cutting tire, it comprises steel arch-shelf (7), it is characterized in that, lining cutting tire (3) is provided with between steel arch-shelf and country rock (1), air (2) is filled with in lining cutting tire, lining cutting tire is provided with to let out and carries device, let out a year bottom of device and be provided with transfer port (4), steel arch-shelf and lining cutting tire are fixed on country rock by U-shaped expansion bolt (8), lining cutting tire is provided with pressure dynamometer (5), gas pressure intensity in pressure dynamometer monitoring tire, is provided with warning device (6) between steel arch-shelf and country rock.
2. the tunnel lining structure with detachable lining cutting tire according to claim 1, is characterized in that: described warning device is for monitoring country rock and steel arch-shelf spacing, and distance is less than 20mm and reports to the police immediately.
3. the tunnel lining structure with detachable lining cutting tire according to claim 1, it is characterized in that: described tire section thickness is 9mm, adopt wear-resistant, anti-country rock corner angle to puncture outside tire, anti-aging, corrosion-resistant material thickeies, tyre last is improved, and thickening layer thickness is 1mm.
4. the tunnel lining structure with detachable lining cutting tire according to claim 1, is characterized in that: between described steel arch-shelf and country rock, spacing is at 200mm-400mm, gives country rock certain deformation space.
5. the tunnel lining structure with detachable lining cutting tire according to claim 1, is characterized in that: described steel arch-shelf frame pin adopts shallow embedding and crab-bolt link is arranged, and is convenient to remove.
6. the tunnel lining structure with detachable lining cutting tire according to claim 1, it is characterized in that: the device that described transfer port is exhaust, gas transmission is integrated, when gas pressure intensity in tire reaches, timing is set, transfer port valve will by jack-up, gas is discharged, when pressure is less than this value, valve closing, does not discharge gas.
7. the tunnel lining structure with detachable lining cutting tire according to claim 1, it is characterized in that: described steel arch-shelf is provided with foil gauge (9) in for scientific research process, foil gauge is for monitoring steel arch-shelf ess-strain situation, and Practical Project does not use foil gauge.
8. the construction installation method of the tunnel lining structure in claim 1-7 described in arbitrary claim 1 or 2, is characterized in that: it comprises the steps:
1) road excavation adopts full section method, and tunnel excavation completes, and first on country rock wall, just sprays concrete, then inserted to play anchor pole, installation steel mesh reinforcement, and reinforcing bar grid all covers by jetting cement;
2) body is filled with lining cutting tire from transfer port, in gas transmission process by tire dolly in tunnel, make to be close to country rock outside tire, subsequently pressure dynamometer installed;
3) steel arch-shelf is installed, monitoring steel arch-shelf ess-strain situation; Steel arch-shelf lower end adopts shallow embedding, and arranges bolt connection; Adopt between steel arch-shelf and lining cutting tire " u" type expansion bolt fixes, holdout device stability;
4) alarm device is arranged between country rock and steel arch-shelf, lining cutting tire side;
5) monitor gas pressure intensity in lining cutting tire and be greater than 3Mpa, tire discharges gas immediately automatically, until when pressure is stabilized in 3Mpa, Artificial Release venting body is to pressure to 0.5Mpa, pressure changed and maintains about 10% in 1 month, then can assert that surrouding rock deformation has reached stable, be now dismountable steel arch-shelf, remove steel arch-shelf step: a pulls down strain gauge device and warning device on steel arch-shelf; B removes steel arch arching, takes mode from top to bottom to remove whole steel arch-shelf; The foil gauge that c removes and steel arch-shelf are put in order, can continue to be used in next Pin steel arch-shelf, and the material recovery reprocessing of destruction uses; Or in monitoring lining cutting tire, gas pressure intensity is greater than 3Mpa, and tire discharges gas immediately automatically, and in deflation course, country rock and steel arch-shelf spacing reduce gradually, and when distance reaches 20mm, warning device is reported to the police, then now can remove lining cutting tire, removes step; A removes pressure dynamometer and the warning device of lining cutting tire; B discharges gas, and extracts tire out; C removes pressure dynamometer and tire, can continue to be used in next Pin steel arch-shelf.
9. method according to claim 8, is characterized in that: just the thickness of spray concrete is 28-32mm.
CN201510101207.2A 2015-03-09 2015-03-09 A kind of tunnel lining structure with detachable lining cutting tire and its construction installation method Active CN104727829B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510101207.2A CN104727829B (en) 2015-03-09 2015-03-09 A kind of tunnel lining structure with detachable lining cutting tire and its construction installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510101207.2A CN104727829B (en) 2015-03-09 2015-03-09 A kind of tunnel lining structure with detachable lining cutting tire and its construction installation method

Publications (2)

Publication Number Publication Date
CN104727829A true CN104727829A (en) 2015-06-24
CN104727829B CN104727829B (en) 2017-03-08

Family

ID=53452169

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510101207.2A Active CN104727829B (en) 2015-03-09 2015-03-09 A kind of tunnel lining structure with detachable lining cutting tire and its construction installation method

Country Status (1)

Country Link
CN (1) CN104727829B (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106368720A (en) * 2016-10-10 2017-02-01 三峡大学 Mold type lining and foam concrete combined supporting structure and construction method
CN106437757A (en) * 2016-10-10 2017-02-22 三峡大学 Tire type lining structure between tunnel and shield lining segment and method
CN106555598A (en) * 2016-11-15 2017-04-05 成都天佑智隧科技有限公司 A kind of just two lining leave a blank separate structure and its external mold applies method with cushion
CN107462354A (en) * 2017-07-17 2017-12-12 山东中宏路桥建设有限公司 Pressure from surrounding rock monitoring device
CN108344640A (en) * 2018-02-12 2018-07-31 三峡大学 A kind of device and method of simulation loop tunnel tire formula liner supporting structure stress
CN108708747A (en) * 2018-05-23 2018-10-26 *** A kind of active stress eliminating device for loose sand sand cobble geology constructing tunnel
CN109578012A (en) * 2018-12-13 2019-04-05 天地科技股份有限公司 A kind of roadway support structure and method
CN109653765A (en) * 2019-02-12 2019-04-19 三峡大学 The warehouse separated type lining cutting pressure relief support structure and method of one kind of multiple fillers
CN111608709A (en) * 2020-06-04 2020-09-01 中铁隆昌铁路器材有限公司 Yielding anchor rod suitable for soft rock large-deformation underground space and supporting method
CN112081624A (en) * 2020-09-15 2020-12-15 中南大学 Mining environment reconstruction method based on waste tire recycling
CN113982627A (en) * 2021-10-29 2022-01-28 成都未来智隧科技有限公司 Tunnel supporting method and tunnel supporting structure
CN114135322A (en) * 2021-11-22 2022-03-04 中铁十六局集团第三工程有限公司 Reinforcing method for preventing steel frame from being twisted in large-deformation tunnel

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU563501A1 (en) * 1974-03-04 1977-06-30 Первое Шахтопроходческое Строительуправление Треста Треста "Донецкшахтопроходка Traveling casing for timbering horizontal excavation
GB1508040A (en) * 1976-12-08 1978-04-19 Goldsby E Lining for tunnels
SU620616A1 (en) * 1976-03-30 1978-08-25 Грузинский Научно-Исследовательский Институт Энергетики И Гидротехнических Сооружений Грузнииэгс Method of constructing compressed tunnel lining
GB1556165A (en) * 1975-12-04 1979-11-21 Dunlop Ltd Method of lining a mine passageway
SU866207A1 (en) * 1980-01-04 1981-09-23 Казахский Филиал Всесоюзного Ордена Ленина Проектно-Изыскательского Института "Гидропроект" Им. С.Я. Жука Slide form for tunnel
GB2087953A (en) * 1980-10-25 1982-06-03 Ruhrkohle Ag Cutter shield for provisionally lining a gallery
SU994751A1 (en) * 1981-08-24 1983-02-07 Институт технической теплофизики АН УССР Temporary alarm support for preparatory workings
SU1102967A1 (en) * 1983-03-04 1984-07-15 Центральный Научно-Исследовательский И Проектно-Конструкторский Институт Проходческих Машин И Комплексов Для Угольной,Горной Промышленности И Подземного Строительства Device for erecting tunnel solid securing
DE3641412A1 (en) * 1986-12-04 1988-06-09 Holzmann Philipp Ag Process for lining a tunnel, shaft or the like with tubbing
US4895480A (en) * 1987-09-11 1990-01-23 Signode Corporation Method and apparatus for formation of a tunnel lining
KR20010026452A (en) * 1999-09-07 2001-04-06 고동조 Method of stopping end of moving concrete mold to construct tunnel lining and its apparatus
KR20070095523A (en) * 2005-11-11 2007-10-01 (주)평화엔지니어링 Tunnel lining concrete traveling steel form end face finishing form was used antiquated tire reproduction rubber
CN204024678U (en) * 2014-08-29 2014-12-17 中铁十六局集团有限公司 A kind of tunnel support equipment
CN204532366U (en) * 2015-03-09 2015-08-05 三峡大学 A kind of tunnel lining structure with detachable lining cutting tire

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU563501A1 (en) * 1974-03-04 1977-06-30 Первое Шахтопроходческое Строительуправление Треста Треста "Донецкшахтопроходка Traveling casing for timbering horizontal excavation
GB1556165A (en) * 1975-12-04 1979-11-21 Dunlop Ltd Method of lining a mine passageway
SU620616A1 (en) * 1976-03-30 1978-08-25 Грузинский Научно-Исследовательский Институт Энергетики И Гидротехнических Сооружений Грузнииэгс Method of constructing compressed tunnel lining
GB1508040A (en) * 1976-12-08 1978-04-19 Goldsby E Lining for tunnels
SU866207A1 (en) * 1980-01-04 1981-09-23 Казахский Филиал Всесоюзного Ордена Ленина Проектно-Изыскательского Института "Гидропроект" Им. С.Я. Жука Slide form for tunnel
GB2087953A (en) * 1980-10-25 1982-06-03 Ruhrkohle Ag Cutter shield for provisionally lining a gallery
SU994751A1 (en) * 1981-08-24 1983-02-07 Институт технической теплофизики АН УССР Temporary alarm support for preparatory workings
SU1102967A1 (en) * 1983-03-04 1984-07-15 Центральный Научно-Исследовательский И Проектно-Конструкторский Институт Проходческих Машин И Комплексов Для Угольной,Горной Промышленности И Подземного Строительства Device for erecting tunnel solid securing
DE3641412A1 (en) * 1986-12-04 1988-06-09 Holzmann Philipp Ag Process for lining a tunnel, shaft or the like with tubbing
US4895480A (en) * 1987-09-11 1990-01-23 Signode Corporation Method and apparatus for formation of a tunnel lining
KR20010026452A (en) * 1999-09-07 2001-04-06 고동조 Method of stopping end of moving concrete mold to construct tunnel lining and its apparatus
KR20070095523A (en) * 2005-11-11 2007-10-01 (주)평화엔지니어링 Tunnel lining concrete traveling steel form end face finishing form was used antiquated tire reproduction rubber
CN204024678U (en) * 2014-08-29 2014-12-17 中铁十六局集团有限公司 A kind of tunnel support equipment
CN204532366U (en) * 2015-03-09 2015-08-05 三峡大学 A kind of tunnel lining structure with detachable lining cutting tire

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106437757A (en) * 2016-10-10 2017-02-22 三峡大学 Tire type lining structure between tunnel and shield lining segment and method
CN106437757B (en) * 2016-10-10 2019-03-12 三峡大学 For the tire formula liner structure and method between tunnel and shield lining segment
CN106368720A (en) * 2016-10-10 2017-02-01 三峡大学 Mold type lining and foam concrete combined supporting structure and construction method
CN106555598A (en) * 2016-11-15 2017-04-05 成都天佑智隧科技有限公司 A kind of just two lining leave a blank separate structure and its external mold applies method with cushion
CN106555598B (en) * 2016-11-15 2019-06-04 成都天佑智隧科技有限公司 A kind of two lining of just branch leaves a blank separate structure and its external mold and buffer layer applies method
CN107462354A (en) * 2017-07-17 2017-12-12 山东中宏路桥建设有限公司 Pressure from surrounding rock monitoring device
CN108344640B (en) * 2018-02-12 2021-04-13 三峡大学 Device and method for simulating stress of annular tunnel tire type lining supporting structure
CN108344640A (en) * 2018-02-12 2018-07-31 三峡大学 A kind of device and method of simulation loop tunnel tire formula liner supporting structure stress
CN108708747A (en) * 2018-05-23 2018-10-26 *** A kind of active stress eliminating device for loose sand sand cobble geology constructing tunnel
CN108708747B (en) * 2018-05-23 2019-12-13 南京东南建筑机电抗震研究院有限公司 Active stress relieving device for loose sand-gravel geological tunnel construction
CN109578012A (en) * 2018-12-13 2019-04-05 天地科技股份有限公司 A kind of roadway support structure and method
CN109653765A (en) * 2019-02-12 2019-04-19 三峡大学 The warehouse separated type lining cutting pressure relief support structure and method of one kind of multiple fillers
CN111608709A (en) * 2020-06-04 2020-09-01 中铁隆昌铁路器材有限公司 Yielding anchor rod suitable for soft rock large-deformation underground space and supporting method
CN112081624A (en) * 2020-09-15 2020-12-15 中南大学 Mining environment reconstruction method based on waste tire recycling
CN112081624B (en) * 2020-09-15 2021-09-21 中南大学 Mining environment reconstruction method based on waste tire recycling
CN113982627A (en) * 2021-10-29 2022-01-28 成都未来智隧科技有限公司 Tunnel supporting method and tunnel supporting structure
CN113982627B (en) * 2021-10-29 2024-04-05 成都未来智隧科技有限公司 Tunnel supporting method and tunnel supporting structure
CN114135322A (en) * 2021-11-22 2022-03-04 中铁十六局集团第三工程有限公司 Reinforcing method for preventing steel frame from being twisted in large-deformation tunnel

Also Published As

Publication number Publication date
CN104727829B (en) 2017-03-08

Similar Documents

Publication Publication Date Title
CN104727829A (en) Tunnel lining structure with detachable lining tire and construction installation method thereof
CN103527219B (en) For the construction of the tunnel support structure on large deformation stratum
CN202140098U (en) Large soft rock deformation tunnel supporting structure based on controllable deformation release
CN104373145B (en) Embedded classification constant-resistance shearing resistance large deformation anchor and method
CN203296780U (en) Supporting and protecting lining device used for preventing surrounding rock from large deformation in underground cavern construction
CN105370290B (en) A kind of correcting and then reinforcing method of shield tunnel
CN203515604U (en) Tunnel Support structure for schist layer in deformation
CN203452799U (en) Corrugated steel tunnel supporting structure
CN204456100U (en) A kind of part adhesive type prestress anchorage cable with outer anchoring section
CN103953366B (en) Mid-board top former lining cutting cavity backfill construction method when single hole tunnel changes arcading into
CN204532366U (en) A kind of tunnel lining structure with detachable lining cutting tire
CN107132572A (en) The test platform tested for rock masses fracturing microseism
CN209604074U (en) A kind of light flexible constructing tunnel pipe for escaping
CN104832186A (en) Tunnel lining structure with eternally un-dismountable lining tire and construction installation method of tunnel lining structure
CN203905009U (en) Supporting structure for internal corner of foundation pit
CN202991054U (en) Novel mine tunnel supporting structure
CN202688337U (en) Lining fixing structure of hot disintegration device
CN209369826U (en) A kind of shield duct piece ruggedized construction
CN204457796U (en) A kind of have the tunnel lining structure never removing lining cutting tire
CN203099080U (en) Protecting device of buried gas pipeline
CN106988748B (en) High-order parallel heading construction and capacity expansion revamping are the construction method of double line tunnel
CN106368720A (en) Mold type lining and foam concrete combined supporting structure and construction method
CN204139577U (en) Embedment means formula wall-connecting piece after a kind of
CN102996142A (en) Mine tunnel supporting structure with fixed hanging rings and construction method thereof
CN209212248U (en) Groups of springs component suitable for the stretchable of tunnel-liner and compression

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20150624

Assignee: Hongchuang (Yichang) Architectural Design Co.,Ltd.

Assignor: CHINA THREE GORGES University

Contract record no.: X2023980031470

Denomination of invention: A tunnel lining structure with detachable lining tires and its construction and installation method

Granted publication date: 20170308

License type: Common License

Record date: 20230116

EE01 Entry into force of recordation of patent licensing contract
EC01 Cancellation of recordation of patent licensing contract

Assignee: Hongchuang (Yichang) Architectural Design Co.,Ltd.

Assignor: CHINA THREE GORGES University

Contract record no.: X2023980031470

Date of cancellation: 20230721

EC01 Cancellation of recordation of patent licensing contract