CN104727800B - A kind of temporary stall based on the modified vinal in surface is to fracturing process - Google Patents

A kind of temporary stall based on the modified vinal in surface is to fracturing process Download PDF

Info

Publication number
CN104727800B
CN104727800B CN201510030789.XA CN201510030789A CN104727800B CN 104727800 B CN104727800 B CN 104727800B CN 201510030789 A CN201510030789 A CN 201510030789A CN 104727800 B CN104727800 B CN 104727800B
Authority
CN
China
Prior art keywords
fluid
vinal
modified
water
fracturing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510030789.XA
Other languages
Chinese (zh)
Other versions
CN104727800A (en
Inventor
孙虎
温哲豪
张冕
池晓明
白建文
许洪星
刘欢
罗明良
李达
扬国威
杨燕
牛成飞
高红平
衣德强
邝聃
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Petroleum Corp
CNPC Chuanqing Drilling Engineering Co Ltd
Original Assignee
Changqing Downhole Operation Co of CNPC Chuanqing Drilling Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changqing Downhole Operation Co of CNPC Chuanqing Drilling Engineering Co Ltd filed Critical Changqing Downhole Operation Co of CNPC Chuanqing Drilling Engineering Co Ltd
Priority to CN201510030789.XA priority Critical patent/CN104727800B/en
Publication of CN104727800A publication Critical patent/CN104727800A/en
Application granted granted Critical
Publication of CN104727800B publication Critical patent/CN104727800B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The present invention specifically provides a kind of temporary stall based on the modified vinal in surface to fracturing process, comprises the following steps:1) surface modified aqueous vinal;2) preparation of fracturing working fluid;3) using active water for extrusion well liquid within the cartridge;4) setting fracture packer;5) prepad fluid is injected, major fracture is formed;6) the major fracture staged to formation injects water-soluble biodegradable fiber temporarily stifled fracturing fluid, and injection stratum forms new branch's seam;7) to the new branch seam injection prepad fluid of formation, seam length is expanded;8) to the new branch seam staged injection load fluid of formation;9) with active water for load fluid in extrusion pit shaft.The invention is by the way that sand packed fracture is temporarily blocked up by old crack or, with making new seam on primary fracture at an angle direction, link up more intrinsic fractures and region is not employed in first crack, form new crack aerial drainage system, oil and gas production and oil gas field ultimate recovery are improved, the problem recovered old well production and realize new well fracturing yield increasing is solved.

Description

A kind of temporary stall based on the modified vinal in surface is to fracturing process
Technical field
The invention belongs to In Oil Field Exploration And Development underground work technical field, and in particular to one kind is based on the modified poly- second in surface The temporary stall of enol fiber improves recovery ratio to fracturing process for Low permeable oil and gas reservoirs.
Background technology
Long celebrating oil gas field has typical low pressure, hypotonic, low yield feature.With going deep into for exploitation, a class of early stage pressure break The hydraulic fracture of reservoir has failed or produced blocking, and the permeance property of primary fracture substantially reduces even ineffective.Together When, due to early stage fracturing reform scale not enough, either supporting crack is short or fracture condudtiviy is low, and this kind of well must be increased Pressure break scale continues to extend primary fracture, or puies forward high sand ratio/sand amount to increase fracture condudtiviy, could improve the production of well Energy.
In addition, after prolonged exploitation, the crude oil that early stage fracturing fracture is controlled has been adopted to the greatest extent substantially, remote slit band Crude oil can not supplement in time, and prolonged water flooding recovery causes water filling forward position to be promoted to producing well, some old cracks into For the main thoroughfare of water, this largely have impact on production well yield.
Furthermore, for Chan Jian areas, under certain condition, new well, which implements turnaround fracture, can produce many cracks, so as to increase day Right air infiltration flow area, improves gas output per well;But, conventional turnaround fracture technology has that reservoir reconstruction degree is low, and measure is effective Phase is short, and granular pattern diverting agent is big to reservoir damage, the problems such as degrading not thorough.
The content of the invention
The purpose of the present invention be overcome the old crack oil and gas of early stage pressure break to yield poorly, recovery ratio it is low, and conventional turnaround fracture Technology has that reservoir reconstruction degree is low, and the measure term of validity is short, and granular pattern diverting agent is big to reservoir damage, degrades not thorough etc. and to ask Topic.
Therefore, the invention provides a kind of temporary stall based on the modified vinal in surface to fracturing process, wrapping Include following steps:
1) surface modification is carried out to water-soluble polyvinyl alcohol fibers, obtains modified vinal;
2) preparation of fracturing working fluid;Preparing mass fraction, your glue crosslinked fluid makees prepad fluid for 0.3% guanidine, and proppant is accounted for The volume fraction of your glue crosslinked fluid of guanidine is 15%~30%, and the mass fraction that modified vinal accounts for proppant is 1.2% ~1.8%;
3) using active water with 0.4~0.5m3/ min operational discharge capacity is for the liquid in extrusion pit shaft;
4) after the liquid in pit shaft is drained, with 0.6~2.0m3/ min operational discharge capacity setting fracture packer;
5) after fracturing packer is set, with 2.4~3.0m3/ min operational discharge capacity injection prepad fluid 45m3, form master and split Seam;
6) the major fracture staged to formation injects the load fluid of guanidine that glue crosslinked fluid and proppant composition, and staged adds sand Specific concentration is followed successively by 10%-15%-20%-28%-30%, is to add in the 10%-15%-20%-28% stages to be not added with being modified in sand proportion concentration The load fluid of vinal afterwards, starts to be mixed into step 2 in sand proportion concentration is the load fluid in 30% stage) middle preparation The mass fraction for accounting for proppant be 1.2%~1.8% modified vinal, injection stratum forms new branch seam;
7) to the new branch seam injection 27m of formation3Prepad fluid, expand seam length;
8) load fluid constituted to new branch seam staged injection guanidine your glue crosslinked fluid and the proppant of formation, sand proportion is dense Degree is followed successively by 10%-15%-20%-25%-30%;
9) with 2.4~3.0m3/ min operational discharge capacity is with active water for the load fluid in extrusion pit shaft.
The step 1) in using chromic acid solution to water-soluble polyvinyl alcohol fibers carry out surface modification.
The step 1) in use KMnO4/ sulfuric acid carries out grafted propylene as initiator to water-soluble polyvinyl alcohol fibers Acid is modified.
The step 1) in using methacryloxypropyl trimethoxy silane water/ethanol solution to water-soluble Property vinal carry out surface modification.
The step 2) in select modified vinal length be 6~8mm.
The step 2) in select a diameter of 10 μm of modified vinal.
The modified vinal is 1.2% relative to the mass fraction of proppant.
The volume fraction that the proppant accounts for fracturing working fluid is 30%.
The step 3) in active water operational discharge capacity be 0.4m3/min。
The step 5) in prepad fluid operational discharge capacity be 2.4m3/min。
Beneficial effects of the present invention:This temporary stall based on the modified vinal in surface that the present invention is provided to The technology that water-soluble biodegradable fiber is combined into by fracturing process with conventional pressure break, it is proposed that modified by surface You form interim slug by the working solution of glue+proppant composition to water-soluble polyvinyl alcohol fibers+guanidine in old crack, produce necessarily Net-head, the pressure difference presses off new crack this layer of position, forms many cracks system, expands drainage area;Crack is acted on after pressure break The effect time increases, and effect is more preferable;Technical process is simple and easy to apply, and cost is relatively low, can increase substantially oil field productivity effect.
The present invention is described in further details below with reference to accompanying drawing.
Brief description of the drawings
Fig. 1 is the blocking grid signal that modified water-soluble polyvinyl alcohol fibers in the present invention are formed in proppant Figure.
Fig. 2 is that modified water-soluble polyvinyl alcohol fibers in the present invention temporarily block up refracturing and form new branch's seam signal Figure.
Embodiment
Embodiment 1:
Yield poorly for the old crack oil and gas for overcoming early stage pressure break, recovery ratio it is low, and there is storage in conventional turnaround fracture technology Layer transformation degree is low, and the measure term of validity is short, and granular pattern diverting agent is big to reservoir damage, the problems such as degrading not thorough, the present embodiment There is provided a kind of temporary stall based on the modified vinal in surface as depicted in figs. 1 and 2 to fracturing process, including such as Lower step:
1) surface modification is carried out to water-soluble polyvinyl alcohol fibers, obtains modified vinal;
2) preparation of fracturing working fluid;Preparing mass fraction, your glue crosslinked fluid makees prepad fluid for 0.3% guanidine, and proppant is accounted for The volume fraction of your glue crosslinked fluid of guanidine is 15%~30%, and the mass fraction that modified vinal accounts for proppant is 1.2% ~1.8%;
3) using active water with 0.4~0.5m3/ min operational discharge capacity is for the liquid in extrusion pit shaft;
4) after the liquid in pit shaft is drained, with 0.6~2.0m3/ min operational discharge capacity setting fracture packer;
5) after fracturing packer is set, with 2.4~3.0m3/ min operational discharge capacity injection prepad fluid 45m3, form master and split Seam;
6) the major fracture staged to formation injects the load fluid of guanidine that glue crosslinked fluid and proppant composition, and staged adds sand Specific concentration is followed successively by 10%-15%-20%-28%-30%, is to add in the 10%-15%-20%-28% stages to be not added with being modified in sand proportion concentration The load fluid of vinal afterwards, starts to be mixed into step 2 in sand proportion concentration is the load fluid in 30% stage) middle preparation The mass fraction for accounting for proppant be 1.2%~1.8% modified vinal, injection stratum forms new branch seam;
7) to the new branch seam injection 27m of formation3Prepad fluid, expand seam length;
8) load fluid constituted to new branch seam staged injection guanidine your glue crosslinked fluid and the proppant of formation, sand proportion is dense Degree is followed successively by 10%-15%-20%-25%-30%;
9) with 2.4~3.0m3/ min operational discharge capacity is with active water for the load fluid in extrusion pit shaft.
Step 6) in modified vinal by the way that Full-automatic fiber is scattered, metering and adding apparatus are added, it is real Existing fiber addition is efficiently connected with measuring truck, fracturing blender truck, quantified controlling.
This temporary stall based on the modified vinal in surface that the invention is provided is to fracturing process by water solubility The technology that biodegradable fiber is combined into conventional pressure break, it is proposed that pass through the modified water-soluble polyvinyl alcohol fiber in surface You form interim slug by the working solution of glue+proppant composition to dimension+guanidine in old crack, produce certain net-head, the pressure difference exists This layer of position presses off new crack, forms many cracks system, expands drainage area;The crack action effect time increases after pressure break, effect Fruit is more preferably;Technical process is simple and easy to apply, and cost is relatively low, can increase substantially oil field productivity effect.
Embodiment 2:
On the basis of embodiment 1, the step 1) in water-soluble polyvinyl alcohol fibers can be entered using chromic acid solution Row surface is modified, and the formula of chromic acid solution is K2Cr2O7、H2O and dense H2SO4Amount of substance ratio is 5:8:100, by water-soluble polyethylene Alcohol fiber soaks 2.5h under the chromic acid solution chromic acid solution room temperature condition.
The step 1) in can also use KMnO4/ sulfuric acid connects as initiator to water-soluble polyvinyl alcohol fibers Acrylic acid modified, the KMnO of branch4Concentration is 5 × 10-3Mol/L, sulfuric acid concentration be 0.2mol/L, acrylic acid concentration be 0.8mol/L, Reaction time is 3.0h.
The step 1) in can also using methacryloxypropyl trimethoxy silane water/ethanol solution to water Soluble polyvinyl alcohol fiber carries out surface modification, and concentration is 25 × 10-3Mol/L cumyl peroxide makees initiator, methyl Acryloxypropyl trimethoxy silane monomer concentration is 0.1mol/L, by water-soluble polyvinyl alcohol fibers in the metering system Dip time 24 hours, concentration of alcohol 10% in water/ethanol solution of acryloxypropylethoxysilane trimethoxy silane.
Above-mentioned three kinds are carried out to water-soluble polyvinyl alcohol fibers in the method for surface modification, water-soluble polyvinyl alcohol fibers table Methacryloxypropyl trimethoxy silane molecule has been adsorbed in face, and hydroscopicity highest reaches 0.41%.
It is preferred that the water-soluble polyvinyl alcohol fibers used in during temporarily stifled refracturing is constructed, from methacryloxypropyl Water/ethanol solution of trimethoxy silane carries out surface modification to water-soluble polyvinyl alcohol fibers, obtains modified polyethylene Alcohol fiber, this process for modifying surface improves water-soluble polyvinyl alcohol fibers and the uniform mixing velocity more than 30% of fracturing fluid, point The degree of dissipating is good, and without phenomenon of substantially uniting, 10d degradable more than 85%, effectively reduces proppant settlement rate within 90 DEG C More than 50%, modified water-soluble polyvinyl alcohol fibers network of fibers and proppant formation complex, its stabilization time improve 1~2 times, proppant backflow amount reduction by more than 80%.
Embodiment 3:
On the basis of embodiment 1 and embodiment 2, design fiber temporarily block up displacement test, preferably go out the step 2) in change Property after vinal length be 6~8mm.
The process that fiber temporarily blocks up displacement test is as follows:1. it is uniform the two of rectangle by being axially cut into section from centre by rock core Half;2. the proppant for being mixed with the modified vinal of different length uniformly is spread in two semi-synthetic gaps, by it It is fixed;3. under conditions of plus confined pressure, with 1ml/min flow injection guanidine that glue solution, until core holding unit outlet End flows down the first drop of liquid and constantly has liquid outflow later, and now the manometric reading of entrance point is the breakthrough pressure of diverting agent Power.As a result show that the modified vinals of 2mm can not form temporarily stifled, vinal modified 4mm is in mulling Concentration is 10kg/m3Lower breakthrough pressure reaches 0.2MPa, and modified 6~8mm vinal is 10kg/ in mulling concentration m3Lower breakthrough pressure reaches 0.25~0.3MPa, considers, and chooses the modified vinals of 6~8mm.
Design fiber support sand body caves in experiment, preferably goes out the step 2) in selection modified vinal A diameter of 10 μm.
The fiber support sand body experimentation that caves in is as follows:It is the tubing string that 12.7cm, internal diameter are 22mm to choose 4 length, point Pipe is not connected, is furnished with screen cloth in outlet, with the guanidine that glue solution that mass fraction is 0.5%(0.5g guanidines are added i.e. in 100g water That glue)Carrying proppant and diameter are respectively that 5 μm, 10 μm, 15 μm and 20 μm of modified vinal flows through screen cloth, The proppant and modified vinal of 20/40 mesh are left, then is rinsed 30 minutes with running water;Four pipes are independent , flushing hole is the flange that a diameter of 1.27cm is fixed on each tube outlet;Running water passes through each tubing string, the flow of fluid Gradually increase, until the destruction of sand/fiber sand body, record by the flow of tubing string and pressure drop that (result takes being averaged for four tubing strings Value).As a result show, measured using a diameter of 10 μm of modified vinal by the flow of tubing string and pressure drop most Greatly, it is therefore preferable that a diameter of 10 μm of modified vinal.
In addition, design fracture guide instrument simulation fibre fracture temporarily blocks up experiment, preferably modified vinal plus Dosage.
It is as follows that fracture guide instrument simulation fibre fracture temporarily blocks up experimentation:1. the guanidine that configuration 50ml mass fractions are 0.3% Glue solution, will be 0.9%, 1.2%, 1.5% relative to the mass fraction of proppant(14.4kg/m3、19.2kg/m3、24kg/m3) Modified vinal be dispersed in guanidine your glue solution, add crosslinking agent and be allowed to be crosslinked, then add 63g Ceramsite propping agent, by 9.76kg/m2Concentration is laid to add in diversion chamber;2. CDY-2006 proppant fracture condudtiviies are connected Tester;3. diversion chamber is sealed plus 1MPa or so confined pressure using hydraulic press, closes experimental line, opening vacuum machine will be whole Until vacuumizing inside individual laboratory apparatus, then with the distillation whole circuit of water saturation;4. in 2~5MPa of confined pressure, flow 2.5ml/ Measured in the case of min, 5ml/min.As a result show, plus dosage is that 0.9%, 1.2%, 1.5% modified polyvinyl alcohol is fine Dimension, can reach 2.92MPa, 6.00MPa, 6.01MPa respectively in the case of confined pressure 5MPa, consider construction and economic factor, It is preferred that it is 1.2% to go out modified vinal relative to the mass fraction of proppant.
Temporarily chink damage experiment to above-mentioned preferred modified vinal design fiber, and experimentation is such as Under:(1) by rock core vacuumizing, saturation simulation stratum water;(2) it is positive to survey rock core water phase permeability;(3) along rock core axially by rock core Rive a man-made fracture, one layer of proppant is spread in fracture surface, simulation fracturing fracture simultaneously determines fracture permeabgility;(4) will be preferred Modified vinal forward direction drive in rock core, rock core water phase permeability is surveyed in positive displacement.As a result show, using excellent The modified vinal of choosing is temporarily blocked up after pressure break, and resume permeability rate can reach 91.37%~94.17%, with routine temporarily Stifled pressure break is compared, and the resume permeability rate that temporarily chinks can improve 20~30%.
Meanwhile, optimize the keys such as fiber consumption, operational discharge capacity according to reservoir property, hydraulic fluid plus sand concentration and apply Work parameter, improves temporarily stifled pressure break success rate, and the volume fraction that the proppant accounts for fracturing working fluid is 30%;The step 3) in The operational discharge capacity of active water is 0.4m3/min;The step 5) in prepad fluid operational discharge capacity be 2.4m3/min。
In summary, this temporary stall based on the modified vinal in surface that provides of the present invention is to fracturing process By the way that sand packed fracture is temporarily blocked up by old crack or, with making new seam on primary fracture at an angle direction.Formed behind new crack, Old crack temporarily block up fiber can voluntarily de-plugging, link up more intrinsic fractures and first crack and do not employ region, form new splits Aerial drainage system is stitched, so as to improve oil and gas production and oil gas field ultimate recovery, the old well production of recovery is solved and realizes new well The problem of fracturing yield increasing.
It is exemplified as above be only to the present invention for example, do not constitute the limitation to protection scope of the present invention, it is all It is to be belonged to the same or analogous design of the present invention within protection scope of the present invention.The portion that the present embodiment is not described in detail Part and technique belong to the well-known components and conventional means of the industry, do not describe one by one here.

Claims (8)

1. a kind of temporary stall based on the modified vinal in surface is to fracturing process, it is characterised in that:Including following step Suddenly:
1) surface modification is carried out to water-soluble polyvinyl alcohol fibers, obtains modified vinal;
2) preparation of fracturing working fluid;Preparing mass fraction, your glue crosslinked fluid makees prepad fluid for 0.3% guanidine, and proppant accounts for guanidine that The volume fraction of glue crosslinked fluid is 15%~30%, modified vinal account for the mass fraction of proppant for 1.2%~ 1.8%, the length of modified vinal is 6~8mm, a diameter of 10 μm;
3) liquid in extrusion pit shaft is replaced with 0.4~0.5m3/min operational discharge capacity using active water;
4) after the liquid in pit shaft is drained, with 0.6~2.0m3/ min operational discharge capacity setting fracture packer;
5) after fracturing packer is set, with 2.4~3.0m3/ min operational discharge capacity injection prepad fluid 45m3, form major fracture;
6) the major fracture staged to formation injects the load fluid of guanidine that glue crosslinked fluid and proppant composition, and staged sand proportion is dense Degree be followed successively by 10%-15%-20%-28%-30%, sand proportion concentration be the 10%-15%-20%-28% stages add be not added with it is modified The load fluid of vinal, sand proportion concentration for 30% stage load fluid in start to be mixed into step 2) in prepare account for The mass fraction of proppant is 1.2%~1.8% modified vinal, and injection stratum forms new branch's seam;
7) to the new branch seam injection 27m of formation3Prepad fluid, expand seam length;
8) to your glue crosslinked fluid of the new branch of formation seam staged injection guanidine and the load fluid of proppant composition, sand proportion concentration according to Secondary is 10%-15%-20%-25%-30%;
9) with 2.4~3.0m3/ min operational discharge capacity is with active water for the load fluid in extrusion pit shaft.
2. the temporary stall as claimed in claim 1 based on the modified vinal in surface is to fracturing process, its feature exists In:The step 1) in using chromic acid solution to water-soluble polyvinyl alcohol fibers carry out surface modification.
3. the temporary stall as claimed in claim 1 based on the modified vinal in surface is to fracturing process, its feature exists In:The step 1) in use KMnO4/ sulfuric acid carries out grafted propylene acid as initiator, to water-soluble polyvinyl alcohol fibers and changed Property.
4. the temporary stall as claimed in claim 1 based on the modified vinal in surface is to fracturing process, its feature exists In:The step 1) in using methacryloxypropyl trimethoxy silane water/ethanol solution to water-soluble polyethylene Alcohol fiber carries out surface modification.
5. the temporary stall as claimed in claim 1 based on the modified vinal in surface is to fracturing process, its feature exists In:The modified vinal is 1.2% relative to the mass fraction of proppant.
6. the temporary stall as claimed in claim 1 based on the modified vinal in surface is to fracturing process, its feature exists In:The volume fraction that the proppant accounts for fracturing working fluid is 30%.
7. the temporary stall as claimed in claim 1 based on the modified vinal in surface is to fracturing process, its feature exists In:The step 3) in active water operational discharge capacity be 0.4m3/min。
8. the temporary stall as claimed in claim 1 based on the modified vinal in surface is to fracturing process, its feature exists In:The step 5) in prepad fluid operational discharge capacity be 2.4m3/min。
CN201510030789.XA 2015-01-22 2015-01-22 A kind of temporary stall based on the modified vinal in surface is to fracturing process Active CN104727800B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510030789.XA CN104727800B (en) 2015-01-22 2015-01-22 A kind of temporary stall based on the modified vinal in surface is to fracturing process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510030789.XA CN104727800B (en) 2015-01-22 2015-01-22 A kind of temporary stall based on the modified vinal in surface is to fracturing process

Publications (2)

Publication Number Publication Date
CN104727800A CN104727800A (en) 2015-06-24
CN104727800B true CN104727800B (en) 2017-07-25

Family

ID=53452141

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510030789.XA Active CN104727800B (en) 2015-01-22 2015-01-22 A kind of temporary stall based on the modified vinal in surface is to fracturing process

Country Status (1)

Country Link
CN (1) CN104727800B (en)

Families Citing this family (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105089603B (en) * 2015-07-13 2016-12-28 中国石油大学(北京) In a kind of crack, temporary stall is to the reservoir reconstruction method forming seam net
CN105041288A (en) * 2015-07-13 2015-11-11 中国石油大学(北京) Fractural diverting acid-fracturing method for carbonate oil-gas reservoirs
CN105041287B (en) * 2015-07-23 2017-07-07 中国石油天然气股份有限公司 A kind of temporary stall of fiber for improving Low permeability and competent sand Oil & Gas Productivity is to fracturing process
CN105201478A (en) * 2015-09-30 2015-12-30 大庆井泰石油工程技术股份有限公司 Oil and gas well fracture network system fracturing technology
CN105649594B (en) * 2015-12-31 2018-06-01 中国石油天然气股份有限公司 A kind of method that mining site keeps near wellbore zone fracture condudtiviy
CN107268104B (en) * 2016-04-07 2019-09-03 中国石油化工集团公司 A kind of hollow PVA fiber and its preparation method and application
CN107287669A (en) * 2016-04-12 2017-10-24 中国石油化工集团公司 A kind of alkaline-resisting temperature resistance PVA fibers and application thereof
CN105952428B (en) * 2016-05-06 2018-12-28 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 A kind of fiber auxiliary carbon dioxide dry method fracturing process
CN106753312B (en) * 2016-11-25 2020-02-21 成都劳恩普斯科技有限公司 Preparation method of fiber slickwater fracturing fluid
CN106753313B (en) * 2016-11-25 2020-02-21 成都劳恩普斯科技有限公司 Fiber slickwater fracturing fluid
CN108956854B (en) * 2017-05-17 2021-07-02 中国石油天然气股份有限公司 Device for evaluating plugging performance of temporary plugging steering fluid and testing method thereof
CN107090282B (en) * 2017-05-18 2019-12-13 北京世纪中星能源技术有限公司 Mixed temporary plugging agent, temporary plugging agent mixture, temporary plugging method and application thereof
EP3666849A4 (en) * 2017-08-10 2020-08-12 Mitsubishi Chemical Corporation Diverting agent and method using same for filling crack of winze
CN109403038B (en) * 2017-08-17 2021-11-26 中国石油化工股份有限公司 Cationic polymer surface grafted vinylon fiber and preparation method thereof
CN107603575A (en) * 2017-10-23 2018-01-19 北京斯迪莱铂油气技术有限公司 One kind control water reservoir reconstruction method
CN108612507B (en) * 2018-04-16 2020-06-23 西安石油大学 Method for performing temporary plugging diversion fracturing by using shear thickening fluid
CN110173248A (en) * 2019-06-12 2019-08-27 西安方正石油科技有限责任公司 A kind of water blockoff turnaround fracture technique suitable for the old oil of water breakthrough, gas well
CN113913176A (en) * 2020-07-08 2022-01-11 中国石油化工股份有限公司 Fracturing fluid and method for fracturing in shale by using same
CN111961460B (en) * 2020-09-22 2021-08-03 西南石油大学 High-efficiency energy-saving bridge channel fully-coupled fiber proppant system and application method thereof
CN112324411A (en) * 2020-11-02 2021-02-05 中国石油化工股份有限公司 Loose sandstone heavy oil reservoir vertical well complex long-seam fracturing process
CN114718541A (en) * 2021-01-05 2022-07-08 中国石油天然气股份有限公司 Acidification process
CN114412434B (en) * 2022-01-20 2022-09-13 中国矿业大学 Underground in-situ fluidized mining method for deep coal resources
CN114774104A (en) * 2022-05-20 2022-07-22 西南石油大学 High-efficiency conveying filling proppant based on bionics and preparation method
CN115058241B (en) 2022-07-19 2023-07-07 成都劳恩普斯科技有限公司 Structure stabilizer for efficient laying technology of fracturing well propping agent and preparation method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101476452A (en) * 2009-01-16 2009-07-08 庆阳长庆井下油田助剂有限责任公司 Water-control fracturing yield increasing method for oil gas well
CN103306660A (en) * 2012-03-13 2013-09-18 中国石油化工股份有限公司 Shale gas reservoir hydraulic fracturing production increasing method
CN103953323A (en) * 2014-05-08 2014-07-30 西南石油大学 Hydraulic fracturing technology for horizontal well with fractures

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2644213C (en) * 2003-03-18 2013-10-15 Bj Services Company Method of treating subterranean formations using mixed density proppants or sequential proppant stages
US8061424B2 (en) * 2006-01-27 2011-11-22 Schlumberger Technology Corporation Method for hydraulic fracturing of subterranean formation

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101476452A (en) * 2009-01-16 2009-07-08 庆阳长庆井下油田助剂有限责任公司 Water-control fracturing yield increasing method for oil gas well
CN103306660A (en) * 2012-03-13 2013-09-18 中国石油化工股份有限公司 Shale gas reservoir hydraulic fracturing production increasing method
CN103953323A (en) * 2014-05-08 2014-07-30 西南石油大学 Hydraulic fracturing technology for horizontal well with fractures

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
裂缝暂堵转向重复压裂技术;时玉燕等;《海洋石油》;20090630;第60页-第64页 *
转向压裂工艺研究及应用;黄源琳;《油气井测试》;20080831;第17卷(第4期);第53页-第57页 *

Also Published As

Publication number Publication date
CN104727800A (en) 2015-06-24

Similar Documents

Publication Publication Date Title
CN104727800B (en) A kind of temporary stall based on the modified vinal in surface is to fracturing process
CN106350043B (en) Complex Temporary Blocking agent and Complex Temporary Blocking method for temporarily blocking up in turnaround fracture
CN106223922A (en) Staged fracturing technique is blocked up in the seam inner shield of shale gas horizontal well proppant temporarily
CN107387053B (en) Method for collaborative fracturing of main cracks and complex crack network of large channel
CN112175596B (en) Temporary plugging agent for efficiently plugging fractures in deep oil and gas reservoir seams, preparation method of temporary plugging agent and large-seam high-fracturing process
CN105089596B (en) A kind of hydraulic fracturing remodeling method of unconventional reservoir oil/gas well
CN105041287B (en) A kind of temporary stall of fiber for improving Low permeability and competent sand Oil & Gas Productivity is to fracturing process
CN104948134B (en) Memory-type precise quantitative Oil/gas Well underground work agent injected system and method for implanting
CN103912256B (en) Oil-gas well factory fracture modification method
CN109577908A (en) A kind of high grouting pressure of powder particle-blocks the mash gas pumping drilling hole sealing device and method in crack
CN105089600B (en) The method that temporarily stifled diverting material auxiliary water horizontal well carries out drawing type water-jet transformation
CN103195468A (en) System process for conducting efficient strengthened extraction in surrounding rock
CN105863595B (en) A kind of whole process temporarily stifled fracturing process and its application
CN105952428B (en) A kind of fiber auxiliary carbon dioxide dry method fracturing process
CN109577909A (en) A kind of extra permeability oilfield selectivity frothy gel water plugging and profile controlling method
CN101126314A (en) Foam plug flow diverting acidification technique
CN105443098B (en) A kind of coal mine down-hole drilling segmentation fixed point hydraulic fracturing pore-fixing device and method
CN113464087B (en) Selective water plugging method for bottom water reservoir high-water-cut oil well
CN114075960B (en) Shale reservoir hydraulic fracturing reverse-sequence multistage sand adding process
CN108222882A (en) Inwash individual well multi-section multi-layer slip casting new casing and construction method
CN106750345B (en) A kind of synthetic method of the degradable diversion agent of slippery water pressure break
CN106321046A (en) Hydraulic sand fracturing gas extraction method for underground coal seam with low air permeability
CN109826590A (en) A kind of old well water blockoff fracturing process of hypotonic oil gas field High water cut
CN104727787B (en) Pressure wears screen casing filling anti-sand method
CN108625836B (en) Water control and yield increase method for low-permeability bottom water reservoir high-water-content oil well

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20211018

Address after: 100007 Oil Mansion, 9 North Avenue, Dongcheng District, Beijing, Dongzhimen

Patentee after: CHINA NATIONAL PETROLEUM Corp.

Patentee after: CHINA NATIONAL PETROLEUM CORPORATION CHUANQING DRILLING ENGINEERING Co.

Address before: 710018 room 1207, Changqing building, Changqing Xing Long Yuan District, Xi'an, Shaanxi

Patentee before: CHINA NATIONAL PETROLEUM CORPORATION CHUANQING DRILLING ENGINEERING COMPANY LIMITED CHANGQING DOWNHOLE TECHNOLOGY Co.

TR01 Transfer of patent right