CN104713781A - 大跨索承桥梁拉吊索试验加载装置 - Google Patents

大跨索承桥梁拉吊索试验加载装置 Download PDF

Info

Publication number
CN104713781A
CN104713781A CN201510134854.3A CN201510134854A CN104713781A CN 104713781 A CN104713781 A CN 104713781A CN 201510134854 A CN201510134854 A CN 201510134854A CN 104713781 A CN104713781 A CN 104713781A
Authority
CN
China
Prior art keywords
hoist cable
reaction beam
connecting link
loading unit
web member
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510134854.3A
Other languages
English (en)
Other versions
CN104713781B (zh
Inventor
孙震
张宇峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JSTI Group Co Ltd
Original Assignee
JSTI Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JSTI Group Co Ltd filed Critical JSTI Group Co Ltd
Priority to CN201510134854.3A priority Critical patent/CN104713781B/zh
Publication of CN104713781A publication Critical patent/CN104713781A/zh
Application granted granted Critical
Publication of CN104713781B publication Critical patent/CN104713781B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本发明公开一种大跨索承桥梁拉吊索试验加载装置,连接杆至少为两根,穿过反力墙,在连接杆的一端固定有反力梁,连接杆的另一端通过在上部设置的连接件连接吊索;连接杆之间互相平行设置,反力梁与连接杆相垂直设置,在反力梁与反力墙之间设置有千斤顶;连接件和吊索相连接位置处分别设置有连接孔,在连接件和吊索上的连接孔内设置锚栓,将吊索固定在连接件上。通过不同承载条件下磁致伸缩导波法缆索腐蚀断丝检测结果的对比确定承载条件的影响,为实桥检测提供有力支持,同时,本加载装置结构简单,制备方便,适于实验室操作。

Description

大跨索承桥梁拉吊索试验加载装置
技术领域
本发明涉及一种桥梁检测用加载装置,尤其涉及一种大跨索承桥梁拉吊索试验加载装置。
背景技术
桥梁吊索又称吊杆,主要运用于中、下承式拱桥和悬索桥。近20年来,带吊杆的中、下承式拱桥发展迅速。吊杆是重要的传力构件,尺寸小、构件组成部分多、对疲劳、腐蚀等因素比较敏感,吊杆及其组件的运营状态相当复杂。它的正常与否,关系着整个桥梁的运营安全和寿命。因此需要对桥梁拉吊索服役状况进行检测,桥梁拉吊索检测必须在不破坏索体防护的前提下对缆索内部锈蚀断丝情况进行检查判别。
现有的桥梁拉吊索无损检测技术大致分为电磁法和超声法。在确定采取其中一种判断方法之前最好能对检测的准确度在实验室进行前期判断,以确保检测结果可靠,因此,针对桥梁吊索检测提供一种实验室模拟现场受力条件的加载装置具有重要意义,为提高检测结果准确性提供了可靠的依据。
有鉴于上述现有的检测验证方法存在的缺陷,本发明人基于从事此类产品设计制造多年丰富的实务经验及专业知识,并配合学理的运用,积极加以研究创新,以期创设一种新型大跨索承桥梁拉吊索试验加载装置,使其更具有实用性。经过不断的研究、设计,并经反复试作样品及改进后,终于创设出确具实用价值的本发明。
发明内容
本发明的主要目的在于,克服一般结构实验室无法直接对缆索加载的困难,提供一种新型大跨索承桥梁拉吊索试验加载装置,用于确定检测装置的检测精度,从而更加适于实用,且具有产业上的利用价值。
本发明的目的及解决其技术问题是采用以下技术方案来实现的。依据本发明提出的大跨索承桥梁拉吊索试验加载装置,包括有反力梁、千斤顶、连接件和连接杆,
所述连接杆至少为两根,穿过反力墙,在连接杆的一端固定有反力梁,连接杆的另一端通过在上部设置的连接件连接吊索;
连接杆之间互相平行设置,反力梁与连接杆相垂直设置,在反力梁与反力墙之间设置有千斤顶;
连接件和吊索相连接位置处分别设置有连接孔,在连接件和吊索上的连接孔内设置锚栓,将吊索固定在连接件上。
更进一步的,前述的大跨索承桥梁拉吊索试验加载装置,还包括有垫板,所述垫板设置在所述千斤顶与反力墙之间。
更进一步的,前述的大跨索承桥梁拉吊索试验加载装置,所述连接杆为上部设置有螺纹的钢棒。
更进一步的,前述的大跨索承桥梁拉吊索试验加载装置,所述反力梁上与连接杆相对应位置处设置有安装孔,连接杆设置在反力梁上的安装孔内,通过高强螺母将反力梁固定在连接杆上。
更进一步的,前述的大跨索承桥梁拉吊索试验加载装置,所述反力梁由槽型钢互相组合制成,所述两个相邻的槽型钢端部之间通过连接板固定连接。
更进一步的,前述的大跨索承桥梁拉吊索试验加载装置,在槽型钢内部两个顶端之间设置有加劲肋。
更进一步的,前述的大跨索承桥梁拉吊索试验加载装置,所述连接件由设置有连接孔的连接体与反力梁固定组成。
借由上述技术方案,本发明大跨索承桥梁拉吊索试验加载装置至少具有下列优点:
本发明的大跨索承桥梁拉吊索试验加载装置,通过实验室内模拟桥梁吊索服役过程中产生的应力状态,对吊索服役状态进行检测,从而能够判断采用的无损检测技术的检测结果是否准确,通过不同承载条件下监测结果的对比确定承载条件对缆索检测的影响,为实桥检测提供有力支持。同时,本加载装置结构简单,制备方便,适于实验室操作。
上述说明仅是本发明技术方案的概述,为了能够更清楚了解本发明的技术手段,并可依照说明书的内容予以实施,以下以本发明的较佳实施例详细说明如后。
附图说明
图1所示为本发明大跨索承桥梁拉吊索试验加载装置结构示意图;
图2所示为反力梁主视图;
图3所示为反力梁与连接杆连接结构示意图;
图4所示为反力梁左视图;
图5所示为连接件俯视图;
图6所示为连接件主视图;
图中标记含意:11.反力墙,12.垫板,13.反力梁,14.千斤顶,15.锚栓,16.连接件,17.连接杆,18.高强螺母,19.吊索,20.连接孔,21.连接板,22.加劲肋,23.槽型钢。
具体实施方式
为更进一步阐述本发明为达成预定发明目的所采取的技术手段及功效,对依据本发明提出的大跨索承桥梁拉吊索试验加载装置其具体实施方式、特征及其功效,详细说明如后。
实施例1
如图1~6所示的大跨索承桥梁拉吊索试验加载装置结构示意图,包括有反力墙11、垫板12、反力梁13、千斤顶14、锚栓15、连接件16、连接杆17、高强螺母18、吊索19、连接孔20、连接板21、加劲肋22和槽型钢23。
本发明的加载装置为组合式结构,在反力墙11中间设置有连接杆17,连接杆17为上部设置有螺纹的钢棒,分别贯穿反力墙11,其中连接杆17一端通过高强螺母18固定有反力梁13,另一端通过高强螺母18固定设置有连接件16,连接件16连接吊索19,连接件16和吊索19相连接位置处分别设置有连接孔20,在连接件16和吊索19上的连接孔20内设置锚栓15,将吊索19固定在连接件16上,吊索19的另一端固定在地锚上。
连接杆17之间互相平行设置,并且反力梁13与连接杆17相垂直,在反力梁13与反力墙11之间设置有千斤顶14,为了增加受力面积、减少压强,在千斤顶14与反力墙11之间设置垫板12;其中千斤顶14的个数根据具体实验的要求可以增加或减少。
反力梁13是由槽型钢23互相背靠背组合制成,如图2~4所示,在两个相邻的槽型钢23端部之间通过连接板21固定连接,增加承载能力,连接杆17设置在相邻两个槽型钢23连接位置处形成的安装孔内,在槽型钢23内部两个顶端之间间隔的设置有加劲肋22,进而可以更有效地增加反力梁13的承载能力。
其中连接件16是由设置有连接孔20的连接体与反力梁13焊接固定组成,如图5、6所示,采用一体的连接件16对整个装置的承载能力提出更加有效的保障,连接孔20用于与锚栓15相连接。
在整个装置的制备过程中,锚栓15、反力梁13、连接杆17等部件的结构尺寸都可以根据具体的实验条件进行调整,操作更加灵活,可以使用多种不同承载能力,不同使用条件的吊索进行检验,适用范围更广。
实验过程中:
将吊索19一端固定在地锚上,另一端通过锚栓15的连接作用固定在连接件16上,连接件16与连接杆17相固定,连接杆17的另一端通过反力梁13与千斤顶14之间形成加载力传导整体。
开启千斤顶14,通过反力梁13对连接杆17施加作用力,作用力通过连接件16传递给吊索19,实现力的加载过程。
通过观测实验室内吊索19的承载能力,实现对吊索服役状态的监控。
以上所述,仅是本发明的较佳实施例而已,并非对本发明作任何形式上的限制,虽然本发明已以较佳实施例揭露如上,然而并非用以限定本发明,任何熟悉本专业的技术人员,在不脱离本发明技术方案范围内,当可利用上述揭示的技术内容做出些许更动或修饰为等同变化的等效实施例,但凡是未脱离本发明技术方案的内容,依据本发明的技术实质对以上实施例所作的任何简单修改、等同变化与修饰,均仍属于本发明技术方案的范围内。

Claims (7)

1.一种大跨索承桥梁拉吊索试验加载装置,其特征在于:包括有反力梁(13)、千斤顶(14)、连接件(16)和连接杆(17),
所述连接杆(17)至少为两根,穿过反力墙(11),在连接杆(17)的一端固定有反力梁(13),连接杆(17)的另一端通过在上部设置的连接件(16)连接吊索(19);
连接杆(17)之间互相平行设置,反力梁(13)与连接杆(17)相垂直设置,在反力梁(13)与反力墙(11)之间设置有千斤顶(14);
连接件(16)和吊索(19)相连接位置处分别设置有连接孔(20),在连接件(16)和吊索(19)上的连接孔(20)内设置锚栓(15),将吊索(19)固定在连接件(16)上。
2.根据权利要求1所述的大跨索承桥梁拉吊索试验加载装置,其特征在于:还包括有垫板(12),所述垫板(12)设置在所述千斤顶(14)与反力墙(11)之间。
3.根据权利要求1所述的大跨索承桥梁拉吊索试验加载装置,其特征在于:所述连接杆(17)为上部设置有螺纹的钢棒。
4.根据权利要求3所述的大跨索承桥梁拉吊索试验加载装置,其特征在于:所述反力梁(13)上与连接杆(17)相对应位置处设置有安装孔,连接杆(17)设置在反力梁(13)上的安装孔内,通过高强螺母(18)将反力梁(13)固定在连接杆(17)上。
5.根据权利要求1所述的大跨索承桥梁拉吊索试验加载装置,其特征在于:所述反力梁(13)由槽型钢(23)互相组合制成,所述两个相邻的槽型钢(23)端部之间通过连接板(21)固定连接。
6.根据权利要求5所述的大跨索承桥梁拉吊索试验加载装置,其特征在于:在槽型钢(23)内部两个顶端之间设置有加劲肋(22)。
7.根据权利要求1所述的大跨索承桥梁拉吊索试验加载装置,其特征在于:所述连接件(16)由设置有连接孔(20)的连接体与反力梁(13)固定组成。
CN201510134854.3A 2015-03-25 2015-03-25 大跨索承桥梁拉吊索试验加载装置 Active CN104713781B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510134854.3A CN104713781B (zh) 2015-03-25 2015-03-25 大跨索承桥梁拉吊索试验加载装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510134854.3A CN104713781B (zh) 2015-03-25 2015-03-25 大跨索承桥梁拉吊索试验加载装置

Publications (2)

Publication Number Publication Date
CN104713781A true CN104713781A (zh) 2015-06-17
CN104713781B CN104713781B (zh) 2017-12-12

Family

ID=53413294

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510134854.3A Active CN104713781B (zh) 2015-03-25 2015-03-25 大跨索承桥梁拉吊索试验加载装置

Country Status (1)

Country Link
CN (1) CN104713781B (zh)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101344445A (zh) * 2008-08-18 2009-01-14 山东大学 带滑动墙的自平衡式真三维加载模型试验台架
CN201402221Y (zh) * 2009-02-17 2010-02-10 中铁大桥局集团武汉桥梁科学研究院有限公司 一种可移动式多点同步结构模型静载试验加载装置
CN203475489U (zh) * 2013-10-12 2014-03-12 青岛理工大学 一种非金属抗浮锚杆蠕变试验加载装置
CN104280297A (zh) * 2014-09-23 2015-01-14 同济大学 一种桥梁梁体静载试验用反力梁加载装置及加载方法
CN104631329A (zh) * 2014-12-30 2015-05-20 中铁大桥局集团有限公司 一种悬索桥连续式猫道整体线形调整方法
CN204439465U (zh) * 2015-03-25 2015-07-01 苏交科集团股份有限公司 一种大跨索承桥梁拉吊索试验加载装置

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101344445A (zh) * 2008-08-18 2009-01-14 山东大学 带滑动墙的自平衡式真三维加载模型试验台架
CN201402221Y (zh) * 2009-02-17 2010-02-10 中铁大桥局集团武汉桥梁科学研究院有限公司 一种可移动式多点同步结构模型静载试验加载装置
CN203475489U (zh) * 2013-10-12 2014-03-12 青岛理工大学 一种非金属抗浮锚杆蠕变试验加载装置
CN104280297A (zh) * 2014-09-23 2015-01-14 同济大学 一种桥梁梁体静载试验用反力梁加载装置及加载方法
CN104631329A (zh) * 2014-12-30 2015-05-20 中铁大桥局集团有限公司 一种悬索桥连续式猫道整体线形调整方法
CN204439465U (zh) * 2015-03-25 2015-07-01 苏交科集团股份有限公司 一种大跨索承桥梁拉吊索试验加载装置

Also Published As

Publication number Publication date
CN104713781B (zh) 2017-12-12

Similar Documents

Publication Publication Date Title
CN105651474B (zh) 预应力混凝土整孔预制箱梁梁上运梁模拟加载试验方法
Kim et al. Tensile behaviors of friction bolt connection with bolt head corrosion damage: Experimental research B
Alemdar et al. Repairing distortion-induced fatigue cracks in steel bridge girders using angles-with-plate retrofit technique. I: Physical simulations
CN106289996A (zh) 一种可进行真假三轴试验的装置
CN108195672A (zh) 一种材料拉扭破坏应力及破坏面方向的预测方法
CN204439465U (zh) 一种大跨索承桥梁拉吊索试验加载装置
CN104713781A (zh) 大跨索承桥梁拉吊索试验加载装置
CN205826598U (zh) 基于金属磁记忆的拉索腐蚀检测试验平台
CN104032720B (zh) 适用于深持力层承载力的试验方法及装置
CN205981524U (zh) 一种用于土木工程预应力剪切力检测装置
Campbell et al. Test results for extracted wall-diaphragm anchors from Christchurch unreinforced masonry buildings
Jacob et al. Fretting fatigue crack initiation: An experimental and theoretical study
CN206095771U (zh) 含裂纹缺陷构件的多轴拉压加载装置
Lu et al. Experimental study and numerical analysis of a composite bridge structure
CN112012254B (zh) 基于卸载点法的桩基综合检测方法
Karmazínová et al. Thin-walled cold-formed steel beams with holes in lateral flexural-torsional buckling
CN209243787U (zh) 基桩试验***
Singh et al. Failure analysis of bridle chain used for hoisting in mines
Wilcke et al. The MFL technique–Basic application for PT cable break detection in concrete structures
CN107884292B (zh) 一种防屈曲支撑构件的余能及余命预测方法及装置
Muzhitskii et al. Magnetic measurements of stressed-strained states and remaining service lives of steel structures in hoisting machines and pressurized vessels
Tong et al. Investigation of the relationship between bending capacity and SMFL intensity of existing reinforced concrete hollow slab beams
CN105510022B (zh) 动载管夹拉压测试装置及动载管夹的拉压测试方法
CN211651993U (zh) 一种利用自平衡理论的板梁检测装置
CN203132917U (zh) 一种应力松弛试验装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180820

Address after: 550003 1-3-20 three floor, building 1, Qishan temporary housing estate, Hu Chao New District, Guizhou Province, Guizhou

Patentee after: Guizhou Sujiao engineering survey and Design Co.,Ltd.

Address before: 210117 No. 223, Shui Xi Men street, Jianye District, Nanjing, Jiangsu.

Patentee before: JSTI GROUP Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190417

Address after: 210019 No. 8 East Street, Fuchunjiang, Jianye District, Nanjing City, Jiangsu Province

Patentee after: JSTI GROUP Co.,Ltd.

Address before: 550003 1-3-20 three floor, building 1, Qishan temporary housing estate, Hu Chao New District, Guizhou Province, Guizhou

Patentee before: Guizhou Sujiao engineering survey and Design Co.,Ltd.