CN104675422B - The hydraulic means of coal mine roadway temporary support for drivage face - Google Patents

The hydraulic means of coal mine roadway temporary support for drivage face Download PDF

Info

Publication number
CN104675422B
CN104675422B CN201410824786.9A CN201410824786A CN104675422B CN 104675422 B CN104675422 B CN 104675422B CN 201410824786 A CN201410824786 A CN 201410824786A CN 104675422 B CN104675422 B CN 104675422B
Authority
CN
China
Prior art keywords
hydraulic
jack
support
falsework
head
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410824786.9A
Other languages
Chinese (zh)
Other versions
CN104675422A (en
Inventor
刘增辉
冯英华
孟祥瑞
赵光明
高召宁
唐明云
娄嵩
苏亮文
黄鑫
李志�
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuzhou Saite Machinery Manufacturing Co ltd
Original Assignee
Anhui University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui University of Science and Technology filed Critical Anhui University of Science and Technology
Priority to CN201410824786.9A priority Critical patent/CN104675422B/en
Publication of CN104675422A publication Critical patent/CN104675422A/en
Application granted granted Critical
Publication of CN104675422B publication Critical patent/CN104675422B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D23/00Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor
    • E21D23/16Hydraulic or pneumatic features, e.g. circuits, arrangement or adaptation of valves, setting or retracting devices
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D17/00Caps for supporting mine roofs

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention discloses a kind of hydraulic means for roadway head gib, including Combined hydraulic support, classification telescopic jack, falsework of meeting head on, afterbody falsework;4 groups of hydraulic supports that Combined hydraulic support is made up of back timber, lifting jack, movable jack respectively, 4 classification telescopic jack are installed on the back timber top of Combined hydraulic support, afterbody falsework supporting scope is as roadway support working space, meeting head on the falsework working space as muck, rock drilling and once supporting, Combined hydraulic support realizes moving integrally of tunnelling temporary support system;Falsework is made up of back timber and two hydraulic jack, and falsework back timber is fixed on each classification telescopic jack, and two hydraulic jack are freely dangled as support canopy lower limb, uses pin joint between back timber and hydraulic jack;This patent avoids the top operation of roadway construction sky, it is achieved that country rock immediate support, tunnelling and supporting parallel operations.

Description

The hydraulic means of coal mine roadway temporary support for drivage face
Technical field
The present invention relates to a kind of hydraulic means for roadway head gib.
Background technology
Coal mine roadway tunneling construction mainly uses drilling and blasting method and comprehensive mechanization method two kinds, current coal mine roadway driving face Gib majority uses the advanced gib of metal forestope, and forestope uses and is not less than 2.5 not less than 15kg track or diameter Very little steel pipe manufacturing, length is not less than 5 meters;Suspension ring, the intensity of hanging beam device to match with the intensity of forestope;The anchor of upper lift ring Bar must leave enough screw threads, to ensure the firm of suspension ring;Forestope cannot be greater than 0.3m to the end face distance met head on, and with Construction moves forward in time.The problem that this gib exists has personnel to enter empty top zone operation, and labor intensity is big, safety The shortcomings such as difference.
Patent (CN 102865089A) discloses a kind of advanced falsework of all-hydraulic automatic moving type and using method thereof, by hydraulic pressure Bracket support principle introduces the gib of roadway head, but has the disadvantage that the falsework base of 1. this invention 8 affect mechanical rake muck stone, generally use mechanical rake dress fractured rock, and the falsework base of this invention would interfere with muck machinery Scraper bowl or the operation of cake bucket;2. roadway head working space is narrow and small, is not suitable for using the hydraulic support of this type, The equipment of roadway head has rock drill, dirt loader, elevating conveyor, and mine car or belt conveyor etc. form production line, pick Enter working space and have rock drill and dirt loader, the falsework of this invention will affect dirt loader work, cause working space more simultaneously Add narrow and small.
Patent (CN 103397888A) discloses a kind of frame mounting for the lifting migration of boring head falsework and operation Method, this patent uses hydraulic pressure from shifting system, realizes the movable carrier trolley of falsework and realize falsework lifting Support lifting aid system, but have the disadvantage that the head end of 1. this patent does not has supporting, head section to back Supporting to back needs manually installed back timber;2. head section can not be near driving face crag, owing to digging in tunnel Enter work surface pile up have a large amount of fractured rock to be unfavorable for the carrier trolley of this patent is near driving face crag.
For the deficiency overcoming current coal mine roadway temporary support for drivage face technique and existing patent to exist, ensure tunnel simultaneously Safe and efficient and the mechanization of temporary support for drivage face, it is interim that patent applicant proposes a kind of coal mine roadway driving face The hydraulic means of supporting.
Summary of the invention
In order to overcome the deficiency existing for existing roadway head gib and existing patented technology, the invention reside in offer The hydraulic means of a kind of coal mine roadway temporary support for drivage face, solves roadway head gib and realizes safe and efficient Mechanization.
For achieving the above object, the technical scheme is that
The hydraulic means of coal mine roadway temporary support for drivage face, including Combined hydraulic support, the scalable hydraulic jack of classification, Meet head on falsework and afterbody falsework composition;
Combined hydraulic support is made up of four hydraulic supports, and each hydraulic support is respectively by back timber, lifting jack, movable Jack forms, and the first two hydraulic support is one group, and 2 classification telescopic jack are installed on its back timber top;Latter two hydraulic pressure props up Frame is one group, and 2 classification telescopic jack are installed on its back timber top, and classification telescopic jack realizes meeting head on and afterbody falsework Flexible, afterbody falsework supporting scope is as roadway support working space, and falsework of meeting head on is as muck, rock drilling and one The working space of secondary supporting;
Two groups of Combined hydraulic supports realize tunnelling temporary support system device by jack for moving before and after between sectional shelf-unit Move integrally;
Meeting head on and afterbody falsework is made up of back timber and two hydraulic jack, falsework back timber is fixed on each classification and stretches Jack;Two hydraulic jack are freely dangled as support canopy lower limb, use pin joint between back timber and hydraulic jack.
The Advantageous Effects of the present invention is: can realize the immediate support of rock drilling working space, and after broken rock, classification of meeting head on is stretched Jack forward extends out, and falsework hydraulic jack (falsework canopy lower limb) extends downwardly from, and sets up falsework of meeting head on;Face Time the moving integrally of support, two groups of Combined hydraulic supports realize tunnelling by jack for moving before and after between sectional shelf-unit and face Time the moving integrally of support system device, alleviate the labor intensity of workman;Permanent support and driving parallel operations, reduce two works Interfering between sequence, improves drivage efficiency;The hydraulic means of roadway head gib is along lane side and arranges, Improve enough working spaces can to muck equipment, rock drilling equipment and transporter;Improve driving rock drilling and the safety of supporting, gram Take empty top shop problem, safe and reliable.
Accompanying drawing explanation
Schematic diagram after the hydraulic means afterbody falsework contraction of Fig. 1 gib
Fig. 2 gib hydraulic means meet head on falsework shrink after schematic diagram
The hydraulic means of Fig. 3 gib is met head on and schematic diagram stretched out by afterbody falsework
The hydraulic means of Fig. 4 gib is met head on and afterbody falsework shrinks schematic top plan view
The hydraulic means of Fig. 5 gib is met head on and afterbody falsework is stretched out and fully-mechanized digging machine relation schematic side view
The hydraulic means of Fig. 6 gib is met head on and afterbody falsework is stretched out and fully-mechanized digging machine relation schematic top plan view
The hydraulic means of Fig. 7 gib is met head on and afterbody falsework is stretched out and scraper loader relation schematic side view
Fig. 8 meets head on and afterbody falsework schematic diagram
Fig. 9 afterbody classification telescopic jack schematic diagram
Figure 10 meets head on classification telescopic jack schematic diagram
In figure: the 2-afterbody falsework 3-Combined hydraulic support 4-afterbody classification telescopic jack 5-hydraulic pressure group of 1-tunnel Close support 6-top to move forward and backward jack 7-Combined hydraulic support 8-Combined hydraulic support 9-classification of meeting head on and stretch thousand 10-falsework 11-bottom of meeting head on, jin top moves forward and backward jack 12-clapboard 13-fully-mechanized digging machine 14-scraper loader
Detailed description of the invention
The present invention will be further described below in conjunction with the accompanying drawings.
The hydraulic means of roadway head gib, by Combined hydraulic support (3,5,7,8), classification telescopic jack (4,9), falsework of meeting head on (10), afterbody falsework (2) forms;Combined hydraulic support (3,5,7,8) is respectively 4 groups of hydraulic supports are formed by back timber, lifting jack, movable jack;Combined hydraulic support (3,5,7,8) is real Moving integrally of existing tunnelling temporary support system;4 are installed on the back timber top of Combined hydraulic support (3,5,7,8) Classification telescopic jack (4,9), it is achieved falsework of meeting head on (10) and afterbody falsework (2) flexible, afterbody is interim Support (2) supporting scope is as roadway support working space, and falsework of meeting head on (10) is as muck, rock drilling and once supporting Working space;Falsework (2,10) is made up of back timber (2-1) and two hydraulic jack (2-3), falsework top Beam (2-1) is fixed on each classification telescopic jack (4,9), and two hydraulic jack (2-3) are freely dangled as support canopy Lower limb, uses pin joint between back timber (2-1) and hydraulic jack (2-3).
(1) drill eye blasting sends out construction tunnel operating procedure
Step one: during drilling and blasting method digging laneway (1), tunnel (1) is first tunneled forward 20-30m enough spaces System and device and the muck equipment of temporary support for drivage face are installed;
Step 2: the transport of dirt loader, conveyance and transporting equipment is put in place, and installation and debugging guarantee normally to work;
Step 3: by hydraulic support (3,5,7,8) assembly and accessory, classification telescopic jack (4,9), meet head on interim Driving face position transported to by frame (10) assembly and accessory, afterbody falsework (2) assembly and accessory, hydraulic pump and control station;
Step 4: assemble hydraulic support (3,5,7,8), with movable jack (6-1,6-2,6-3,11-1,11-2, 11-3) four hydraulic supports (3,5,7,8) are joined together to form entirety, wherein with lateral clapboard (12) Hydraulic support (8), near driving face, checks Combined hydraulic support (3,5,7,8) and dirt loader (13,14), turns Whether the safety clearance between fortune machine, transporting equipment etc. meets " safety regulations in coal mine " requirement;
Step 5: the back timber at Combined hydraulic support (3,5,7,8) installs classification telescopic jack (4,9), near meeting head on 3 grades of telescopic jack (9) of the installation in direction, install 6 grades of telescopic jack (4) at afterbody;
Step 6: the different telescopic sections in classification telescopic jack (4,9) install the back timber (2-1) of falsework, and with inserting Pin rigid bar (2-1), back timber (2-1) bottom of falsework installs two hydraulic jack (2-3), back timber (2-1) and Pin joint is used between hydraulic jack (2-3);
Step 7: risen by Combined hydraulic support (3,5,7,8), supports tunnel (1) top board, falsework of meeting head on (10) It is in overhang with afterbody falsework (2), before explosion, the pendency jack of falsework (10) is stretched out and support to base plate, Make falsework (10) have certain support force, prevent explosion from collapsing falsework (10);
Step 8: driving face breaks after rock terminates, and the pendency jack of falsework (10) shrinks (2-3), classification of meeting head on Telescopic jack (9) is stretched over forward distance crag 20cm, two hydraulic jacks of falsework of meeting head on (10) bottom pendency Top (2-3) is stretched out, and tunnel (1) top board is formed gib, can realize clear under falsework of meeting head on (10) is protected The operations such as reason Pumex, muck, rock drilling and once supporting;
Step 9: the broken rock of second time terminates, rear two hydraulic supports (3,5) support tunnel (1) top board as supporting stress point, The pendency hydraulic jack (2-3) of falsework (10) is shunk, and front two hydraulic supports (7,8) are reduced, and classification of meeting head on is stretched Contracting jack (9) and falsework of meeting head on (10) all reduce, rear two Combined hydraulic supports (3,5) with jack between frame (6-1, 6-2,6-3,11-1,11-2,11-3) two Combined hydraulic supports (7,8) are mobile before pushing tow;Front two Combined hydraulic supports (7,8) rise, and support tunnel (1) top board, are formed and support stress point, and rear two Combined hydraulic supports (3,5) are reduced, Rear two Combined hydraulic supports (3,5) are dragged, subsequently with jack (6-1,6-2,6-3,11-1,11-2,11-3) between frame Two Combined hydraulic supports (3,5) after rise;
Step 10: after two Combined hydraulic supports (3,5) move into place after when, afterbody classification telescopic jack (4) trails, Afterbody falsework (2) pendency hydraulic jack (2-3) stretches out, and tunnel (1) top board is formed gib, faces at afterbody Time support (2) protection under realize secondary supporting;
Step 11: when entering next one circulation, repeats step 8 to ten.
(2) comprehensive mechanization method digging laneway operating procedure
Step one: during comprehensive mechanization method digging laneway (1), initially with drilling and blasting method construction tunnel forward (1) 40-50m, There to be system and device and the comprehensive mechanized development machine (13) of enough space mounting temporary support for drivage faces;
Step 2: comprehensive mechanized development machine (13), elevating conveyor, belt haulage are put in place, and installation and debugging guarantee Normal work;
Step 3: by hydraulic support (3,5,7,8) assembly and accessory, classification telescopic jack (4,9), meet head on interim Driving face position transported to by frame (10) assembly and accessory, afterbody falsework (2) assembly and accessory, hydraulic pump and control station;
Step 4: assemble hydraulic support (3,5,7,8), with movable jack (6-1,6-2,6-3,11-1,11-2, 11-3) four hydraulic supports (3,5,7,8) are joined together to form entirety, wherein with the hydraulic pressure of clapboard (12) Support (8) near driving face, check Combined hydraulic support (3,5,7,8) and comprehensive mechanized development machine (13), Whether the safety clearance between conveyance, transporting equipment etc. meets " safety regulations in coal mine " requirement;
Step 5: the back timber at Combined hydraulic support (3,5,7,8) installs classification telescopic jack (4,9), near meeting head on 3 grades of telescopic jack (9) of the installation in direction, install 6 grades of telescopic jack (4) at afterbody;
Step 6: the different telescopic sections in classification telescopic jack (4,9) install the back timber (2-1) of falsework, and with inserting Pin rigid bar (2-1), back timber (2-1) bottom of falsework installs two hydraulic jack (2-3), back timber (2-1) and Pin joint is used between hydraulic jack (2-3);
Step 7: risen by Combined hydraulic support (3,5,7,8), supports tunnel (1) top board, falsework of meeting head on (10) It is in overhang with afterbody falsework (2);
Step 8: comprehensive mechanized development machine (13) cuts head and breaks rock, classification telescopic jack of meeting head on (9), be stretched over forward away from From crag 20cm, two hydraulic jack (2-3) of falsework of meeting head on (10) bottom pendency are stretched out, and push up tunnel (1) Plate forms gib, can realize muck, rock drilling and once supporting under falsework of meeting head on (10) is protected;
Step 9: moving integrally of the hydraulic means of roadway head gib, rear two hydraulic supports (3,5) Support tunnel (1) top board is as supporting stress point, and the pendency hydraulic jack (2-3) of falsework of meeting head on (10) is shunk, front Two hydraulic supports (7,8) are reduced, and classification telescopic jack of meeting head on (9) and falsework (10) all reduce, rear two liquid Two hydraulic pressure groups before jack (6-1,6-2,6-3,11-1,11-2,11-3) pushing tow between pressure sectional shelf-unit (3,5) use frame Close support (7,8) mobile;Front two Combined hydraulic supports (7,8) are risen, and support tunnel (1) top board, form support and are subject to Force, rear two Combined hydraulic supports (3,5) are reduced, with jack (6-1,6-2,6-3,11-1,11-2,11-3) between frame Drag rear two Combined hydraulic supports (3,5), two Combined hydraulic supports (3,5) after rising subsequently;
Step 10: after Combined hydraulic support (3,5) moves into place, afterbody classification telescopic jack (4) trails, afterbody Falsework (2) pendency hydraulic jack (2-3) stretches out, and tunnel (1) top board is formed gib, props up at afterbody temporarily Secondary supporting is realized under frame (2) protection;
Step 11: when entering next one circulation, repeats step 8 to ten.
The above, the only detailed description of the invention of the present invention, but the protection domain of invention is not limited thereto, and any is familiar with basis The engineers and technicians of technical field, in the technical scope of the present invention, can do some conversion, such as rack form, hydraulic support Compound mode, the lifting of Combined hydraulic support and move mode and supporting structure etc., all should be as the protection model invading the present invention Enclose.Therefore protection scope of the present invention should be as the criterion with the protection domain of claims.

Claims (2)

1. the hydraulic means of roadway head gib, by Combined hydraulic support, classification telescopic jack, meets head on interim Support, afterbody falsework forms, it is characterised in that:
1. Combined hydraulic support is made up of 4 hydraulic supports, and the most each hydraulic support is respectively by back timber, lifting jack, front Rear jack for moving is constituted;
2. the first two hydraulic support is one group, and latter two hydraulic support is one group, and two groups of Combined hydraulic supports realize tunnelling and face Time the moving integrally of support system;
3. 4 classification telescopic jack are installed, the back timber top peace of the first two hydraulic support on the back timber top of Combined hydraulic support Fill 2 classification telescopic jack;2 classification telescopic jack are installed on the back timber top of latter two hydraulic support, it is achieved meet head on and Stretching of afterbody falsework, afterbody falsework supporting scope is as roadway support working space, and falsework of meeting head on is as dress The working space of rock, rock drilling and once supporting;
4. falsework is made up of back timber and two hydraulic jack, and falsework back timber is fixed on each classification telescopic jack On column, two hydraulic jack are freely dangled as support canopy lower limb, use pin joint between back timber and hydraulic jack.
The operational approach of the hydraulic means of roadway head gib the most according to claim 1, it is characterised in that:
Step one: hydraulic support assembly and accessory, classification telescopic jack, meet head on falsework assembly and accessory, afterbody are faced Time carriage assembly and accessory, hydraulic pump and control station transport to driving face position;
Step 2: assemble hydraulic support, with movable jack, four hydraulic supports are joined together to form entirety, wherein With the hydraulic support of clapboard near driving face;
Step 3: the back timber at Combined hydraulic support installs classification telescopic jack, the installation 3 grades near direction of meeting head on flexible thousand Jin top, installs 6 grades of telescopic jack at afterbody;
Step 4: the different telescopic sections in classification telescopic jack install the back timber of falsework, and use latch rigid bar, face Time support back timber bottom install two hydraulic jack as support canopy lower limb, between back timber and hydraulic jack use pin joint;
Step 5: risen by Combined hydraulic support, supports back, meets head on and the falsework of afterbody is in overhang;
Step 6: driving face breaks after rock terminates, classification telescopic jack of meeting head on is stretched over forward distance crag 20cm, meets Two hydraulic jack of head falsework bottom pendency are stretched out, and back is formed gib, can meet head on interim Muck, rock drilling and once supporting is realized under frame protection;
Step 7: the broken rock of second time terminates, rear two Combined hydraulic supports support back, as supporting stress point, props up temporarily The pendency hydraulic jack of frame is shunk, and front two hydraulic supports reduce, and classification telescopic jack of meeting head on and falsework all reduce, Rear two Combined hydraulic supports move to specific bit with two Combined hydraulic supports before jack pushing tow between two pack supports and postpone, front Two Combined hydraulic supports rise, and support back, are formed and support stress point, and rear two Combined hydraulic supports reduce, with two Between pack support, jack drags rear two Combined hydraulic supports, two Combined hydraulic supports after rising subsequently;
Step 8: after Combined hydraulic support moves into place, afterbody classification telescopic jack trails, and afterbody falsework dangles Hydraulic jack is stretched out, and back is formed gib, realizes secondary supporting under afterbody falsework is protected, and tunnel is enclosed After rock secondary supporting terminates, pack up afterbody falsework;
Step 9: when entering next one circulation, repeats step 6 to eight.
CN201410824786.9A 2014-12-26 2014-12-26 The hydraulic means of coal mine roadway temporary support for drivage face Expired - Fee Related CN104675422B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410824786.9A CN104675422B (en) 2014-12-26 2014-12-26 The hydraulic means of coal mine roadway temporary support for drivage face

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410824786.9A CN104675422B (en) 2014-12-26 2014-12-26 The hydraulic means of coal mine roadway temporary support for drivage face

Publications (2)

Publication Number Publication Date
CN104675422A CN104675422A (en) 2015-06-03
CN104675422B true CN104675422B (en) 2016-08-24

Family

ID=53310950

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410824786.9A Expired - Fee Related CN104675422B (en) 2014-12-26 2014-12-26 The hydraulic means of coal mine roadway temporary support for drivage face

Country Status (1)

Country Link
CN (1) CN104675422B (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105065048A (en) * 2015-08-23 2015-11-18 河南理工大学 Temporary support for driving working face under coal mine
CN105370308B (en) * 2015-09-24 2018-03-09 北京天地玛珂电液控制***有限公司 Along lane hydraulic support stand system of leaving blank
CN107191208B (en) * 2017-06-26 2019-04-30 永城煤电控股集团有限公司 Rigid protection body Support Method in the lane flexible support Ti Yu by gob side entry retaining lane
CN107651559B (en) * 2017-11-06 2023-05-02 山东建筑大学 Hydraulic stepping type hanging beam equipment
CN110130389B (en) * 2019-05-24 2021-07-13 国网山东省电力公司建设公司 Adjustable GIS equipment foundation concrete winter construction heat preservation shed and adjusting method
CN110219689A (en) * 2019-06-13 2019-09-10 霍州煤电集团河津腾晖煤业有限责任公司 A kind of underground driving face provisional protection bracket and its construction method
CN110130964A (en) * 2019-06-13 2019-08-16 霍州煤电集团河津腾晖煤业有限责任公司 A kind of temporary supporting device of driving working face and construction method
CN110159333B (en) * 2019-06-13 2021-05-14 河南理工大学 Comprehensive mechanized tunneling quick advance support unit and use method thereof
CN112922648B (en) * 2021-04-07 2021-11-09 中国矿业大学 Rail mounted hydraulic pressure sectional shelf-unit
CN113882888B (en) * 2021-11-01 2024-04-19 安徽理工大学 Double-door type efficient and rapid circulation self-moving anchor supporting integrated equipment and control method

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB999943A (en) * 1960-11-29 1965-07-28 Dobson Ltd W E & F Improved mine roof support means
GB966034A (en) * 1961-10-02 1964-08-06 Dowty Mining Equipment Ltd Advanceable roof support suitable for use in mines
CN102383815B (en) * 2011-07-22 2013-11-27 安徽理工大学 Suspension type driftage temporary supporting device and use method thereof
CN102865089B (en) * 2012-10-10 2015-07-15 新汶矿业集团有限责任公司翟镇煤矿 Full-hydraulic self-moving type advancing temporary support and using method thereof
CN203362197U (en) * 2013-05-20 2013-12-25 郭洪飞 Excavation face hydraulic support parallel operation device
CN103382844B (en) * 2013-07-15 2015-09-30 郑东风 A kind of tracked hydraulic sectional shelf-unit temporary lining and permanent support parallel operations piercing technique and equipment
CN103397888B (en) * 2013-08-21 2015-07-01 郑东风 Frame device for lifting and transporting tunneling head-on temporary bracket, and operation method
CN104047627A (en) * 2014-07-15 2014-09-17 沈阳天安矿山机械股份有限公司 Mining roadway frame style advanced support bracket

Also Published As

Publication number Publication date
CN104675422A (en) 2015-06-03

Similar Documents

Publication Publication Date Title
CN104675422B (en) The hydraulic means of coal mine roadway temporary support for drivage face
CN104564050B (en) Equipment for heading and anchoring parallel operation construction
CN103670425B (en) Formula lifting migration rack mechanical hand is carried in an a kind of pick integral method and development machine holder
CN103382844B (en) A kind of tracked hydraulic sectional shelf-unit temporary lining and permanent support parallel operations piercing technique and equipment
CN205578001U (en) Advance support formula integral unit suitable for soft rock tunnelling
CN103742176B (en) A kind of pick anchor one unit
CN103485717A (en) Fully-hydraulic four-arm anchor rod/anchor cable drill carriage
CN104989272B (en) Upward inverse well drilling process
CN202500562U (en) Excavating, supporting and anchoring parallel operating system
CN103104260B (en) Under complex geological condition, comprehensive-machine is to hand-pulled noodles coal-mining method
CN109882175B (en) Cooperative operation method for realizing one-lane three-purpose working face mining and stoping equipment withdrawal
CN103758522A (en) Temporary support method of tunneling working face and equipment thereof
CN104712356B (en) A kind of hydraulic pressure supports tunnel sectional shelf-unit and construction method from moving circulation
CN101824986B (en) Coal mining process of drilling, loading, conveying and anchoring integral machine
CN102418525B (en) Soft coal seam long-wall high-mining-height comprehensive mechanized coal mining end mining method
CN103075153B (en) Drilling type coal mining machine for open air
CN105134212B (en) A kind of method that three soft high seam tunnel ensures the rate of extraction along top driving longwall top coal caving
CN102748055A (en) Circulation advancing type forepoling support
CN104405392B (en) Three soft high seam tunnel jackings are kept on file anchor rete cord active support longwall top coal caving method
CN203742636U (en) Tunneling, supporting and anchoring integrated unit
CN202703579U (en) Large slope inclined shaft rail transport construction apparatus
CN205277431U (en) Coal road tunnelling apparatus
CN104863599B (en) Fully-mechanized mining working synchronously expands side installation method and support system
CN204476407U (en) A kind of pick anchor parallel operations construction equipment
CN204492863U (en) A kind of hydraulic pressure supports tunnel sectional shelf-unit from moving circulation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20191226

Address after: Room c506a-19, University Business Park, No. 99, University Road, Xuzhou hi tech Industrial Development Zone, 221000, Jiangsu Province

Patentee after: Xuzhou Tiancheng Intelligent Technology Co.,Ltd.

Address before: 232001 Anhui Province, Huainan city Shungeng Road No. 168

Patentee before: Anhui University Of Science And Technology

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200610

Address after: 221000 Revitalization Road of Times Avenue, Chengbei Development Zone, Xuzhou City, Jiangsu Province

Patentee after: XUZHOU SAITE MACHINERY MANUFACTURING Co.,Ltd.

Address before: Room c506a-19, University Business Park, No. 99, University Road, Xuzhou hi tech Industrial Development Zone, 221000, Jiangsu Province

Patentee before: Xuzhou Tiancheng Intelligent Technology Co.,Ltd.

TR01 Transfer of patent right