CN104660992B - Video goes offline reconnecting system and method - Google Patents

Video goes offline reconnecting system and method Download PDF

Info

Publication number
CN104660992B
CN104660992B CN201510059492.6A CN201510059492A CN104660992B CN 104660992 B CN104660992 B CN 104660992B CN 201510059492 A CN201510059492 A CN 201510059492A CN 104660992 B CN104660992 B CN 104660992B
Authority
CN
China
Prior art keywords
reconnection
video
task
unit
message
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510059492.6A
Other languages
Chinese (zh)
Other versions
CN104660992A (en
Inventor
董忠再
杨涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Zhongke Yilian Communication Technology Co ltd
Original Assignee
Jiangsu Zhongke Yilian Communication Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Zhongke Yilian Communication Technology Co Ltd filed Critical Jiangsu Zhongke Yilian Communication Technology Co Ltd
Priority to CN201510059492.6A priority Critical patent/CN104660992B/en
Publication of CN104660992A publication Critical patent/CN104660992A/en
Application granted granted Critical
Publication of CN104660992B publication Critical patent/CN104660992B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Closed-Circuit Television Systems (AREA)
  • Two-Way Televisions, Distribution Of Moving Picture Or The Like (AREA)

Abstract

The present invention provides a kind of video and gone offline reconnecting system, including:Message monitoring unit, timing reconnection unit, task scheduling unit and task executing units;Message monitoring unit is used to receive the message that video development SDK is sent and be parsed, when the message received is network preview failed message, then produce and the scheduler task of a preservation device numbering is sent to task scheduling unit, be put into and treated in preview queue by the task scheduling unit monitoring device numbering that will go offline;When the message received is alarm reconnection success message, then produces the scheduler task of an execution video reconnection and be sent to task scheduling unit;Timing reconnection unit is used to periodically perform video reconnection task, and reconnection schedule information is sent into task scheduling unit.Task scheduling unit is used to receive the mission bit stream that message monitoring unit is sent and performs corresponding operation task, receives the reconnection schedule information that timing reconnection unit is sent.The present invention improves video and gone offline the comprehensive and real-time of reconnection.

Description

Video goes offline reconnecting system and method
Technical field
The present invention relates to field of video monitoring, more particularly to a kind of it can efficiently realize that video goes offline the side of reconnection comprehensively Method.
Background technology
With the development of society, requirement of the people to safety precaution increasingly improves, video monitoring turns into most important peace One of anti-means.With the increasingly increase and the gradual expansion of monitoring system of monitoring device, the stability of communication network is whole Monitoring system is able to the important leverage of normal operation.Since however, being related to communication network, then asking for net drop is certainly existed Topic, the particularly rapid popularization of various sexual development recently as communication network type, especially wireless communication technology, its is steady The qualitative level for being still unable to reach conventional wireline communication.Therefore, how when communication network goes wrong, i.e., monitoring device goes offline Afterwards, by providing efficient reconnection mechanism comprehensively in video monitoring system so that the video monitoring work(when network recovery is normal Also it can automatically recover normal, so as to improve the abnormal restoring ability of monitoring system and Consumer's Experience, it has also become one need solve Certainly the problem of.
For above-mentioned monitoring device disconnection, although most of video monitoring manufacturer is in its video development SDK A kind of detection network abnormal situation is provided in (Software Development Kit SDKs) and is carried out certainly The function of dynamic reconnection, but such way is only limitted to after just net drop is detected in the video monitoring equipment of preview, progress Periodicity reconnection operation, until network recovery is normal.In the case of just suspension being had occurred and that before video preview operation is carried out, The video that preview failure before being allowed to can be still able to after network recovery without preferable solution automatically turns on.For example, work as After certain communication link net drop, user is attempted to open the camera in this link, and traditional video monitoring system is being examined It will terminate this operation because of network connection failure after measuring connection time-out, this operation information can't be preserved and in network Preview operation is re-executed after recovery.This can cause the abnormal restoring inferior capabilities of whole monitoring system, and then cause user's body Test the problem of poor.
The content of the invention
It is an object of the invention to overcome the deficiencies in the prior art, there is provided a kind of comprehensively efficient video goes offline again Video goes offline reconnection method used by linking system and the system, for ensureing that comprehensive efficient network of video monitoring system is different Normal recovery capability.The technical solution adopted by the present invention is:
A kind of video goes offline reconnecting system, including:Message monitoring unit, timing reconnection unit, task scheduling unit and appoint Business execution unit;
The message monitoring unit, for receiving message that video development SDK sends and being parsed, when the message received When being network preview failed message, then produce and the scheduler task of a preservation device numbering is sent to task scheduling unit, by The task scheduling unit monitoring device numbering that will go offline is put into and treated in preview queue;When the message received is alarm reconnection success message When, then produce the scheduler task of an execution video reconnection and be sent to task scheduling unit;
The timing reconnection unit, for periodically performing video reconnection task, reconnection schedule information is sent to task Scheduling unit, so as to which all monitoring devices treated in preview queue of task scheduling unit are carried out into reconnection operation;Timing reconnection Unit, which is controlled by, treats preview queue, treats that preview queue is changed into sky from non-NULL described in task scheduling unit, then pause is fixed Shi Chonglian units, it is changed into non-NULL from idle running, then starts this timing reconnection unit;
The task scheduling unit, for receiving video reconnection requests and judging the request whether comprising monitoring device volume Number;If comprising, from treating to inquire about whether include this monitoring device numbering in preview queue, if being not present, terminate this subtask, If in the presence of by task delivery task executing units progress video reconnection operation corresponding to video reconnection requests;If not including, time Go through and treat preview queue, extract the corresponding reconnection of each monitoring device numbering and count, if reconnection counts the threshold for exceeding defined Value, then ignore current monitor device numbering and continue traversal and treat preview queue, if reconnection is counted not less than threshold value, by reconnection meter Number adds 1 and the video reconnection requests for being accompanied with current monitor device numbering is sent into task executing units, and it is straight to repeat this operation Completion has been traveled through to all devices numbering treated in preview queue;
The task executing units, for carrying out video reconnection operation after receiving video reconnection requests;Judge what is generated Operating result, if video reconnection fails, terminate this subtask, if video reconnection success, from treating to delete this in preview queue Video equipment is numbered and terminates this subtask..
A kind of video goes offline reconnection method, comprises the steps:
Step S101, message monitoring unit receive the message that video development SDK is reported;
Step S102, when what is received is network preview failed message, message monitoring unit obtains correspondingly from the message The monitoring device that goes offline number and be sent to task scheduling unit, task scheduling unit will go offline monitoring device numbering be put into treat it is pre- Look in queue;
Step S103, when what is received is alarm reconnection success message, message monitoring unit inquires institute from the message Corresponding monitoring device numbering;And the video reconnection requests for being accompanied with monitoring device numbering are sent to task scheduling unit;
Step S104, task scheduling unit receive video reconnection requests and judge that the request bag is numbered containing monitoring device;
Step S105, task scheduling unit is from treating to inquire about whether include this monitoring device numbering in preview queue, if not depositing Then terminating this subtask, if in the presence of by task delivery task executing units progress video weight corresponding to video reconnection requests Even operate;
Step S106, task executing units judge generated operating result, if video reconnection fails, terminate this Business, if video reconnection success, deleted from when preview queue this video equipment numbering and to the end of this subtask;
During above-mentioned steps S101~S106 is carried out, following steps are carried out simultaneously:
Step S201, treat that preview queue is changed into sky from non-NULL described in task scheduling unit, then pause timing weight Even unit, is changed into non-NULL from idle running, then starts this timing reconnection unit;Reconnection schedule information is sent to task scheduling unit, So as to which all monitoring devices treated in preview queue of task scheduling unit are carried out into reconnection operation;
Step S202, timing reconnection unit periodically send video reconnection requests to task scheduling unit;
Step S203, task scheduling unit receive video reconnection requests and judge not including device numbering in the request;
Step S204, task scheduling unit traversal treat preview queue, extract the corresponding reconnection of each monitoring device numbering Count, if reconnection counts the threshold value for exceeding defined, ignore current monitor device numbering and continue traversal and treat preview queue, If reconnection is counted not less than threshold value, by reconnection, count is incremented and will be accompanied with the video reconnection requests of current monitor device numbering Task executing units are sent to, repeat this operation until treating that the numbering of all devices in preview queue has traveled through completion;
Step S205, task executing units carry out video reconnection operation after receiving video reconnection requests;
Step S206, task executing units judge generated operating result, if video reconnection fails, terminate this Business, if video reconnection success, deleted from when preview queue this video equipment numbering and to the end of this subtask.
Further, the threshold value in step S204 takes 3 or 4.
The advantage of the invention is that:The reconnection Mechanism Design that the present invention is combined using message-driven and timed task, is carried High video goes offline the comprehensive and real-time of reconnection, has fully ensured that the Network Abnormal recovery capability of system.In addition, timing weight The setting of threshold value is performed in the setup rule on demand and reconnection task of company's unit, avoids system task expansion, at utmost Ground reduces meaningless overhead.
Brief description of the drawings
Fig. 1 is the structure composition schematic diagram of the present invention.
Fig. 2 is flow chart of the method for the present invention.
Embodiment
With reference to specific drawings and examples, the invention will be further described.
The present invention provides a kind of comprehensively efficient video video used by reconnecting system and the system that goes offline and gone offline reconnection Method, for ensureing comprehensive efficient Network Abnormal recovery capability of video monitoring system.Monitoring device as described herein is refered in particular to Video monitoring equipment.
The video reconnecting system that goes offline is held including message monitoring unit, timing reconnection unit, task scheduling unit and task Row unit.
The message monitoring unit, for receiving message that video development SDK sends and being parsed, when the message received When being network preview failed message, then produce and the scheduler task of a preservation device numbering is sent to task scheduling unit, by The task scheduling unit monitoring device numbering that will go offline is put into and treated in preview queue;When the message received is alarm reconnection success message When, then produce the scheduler task of an execution video reconnection and be sent to task scheduling unit;
Video development SDK, can be regularly to message monitoring unit reporting message according to the network state of video monitoring system.Than Such as when the monitoring device in network goes offline, send network preview failed message, message monitoring unit according to preview handle, from regarding Extraction equipment is numbered in the caching of frequency monitoring system.(because can all generate a preview sentence after each preview success before Handle, then this preview handle is put into caching together with device numbering by programmer, for extraction later.) message prison Listen unit that the monitoring device numbering corresponding to the network preview failed message just is sent into task scheduling unit to be preserved.When When detecting that network recovers normal again, video development SDK can then send alarm reconnection success message, and message monitoring unit is received To after the alarm reconnection success message, just corresponding monitoring device numbering in parsing alarm reconnection success message, and finding Monitoring device numbering be sent to task scheduling unit be used for recover preview.
The timing reconnection unit, for periodically performing video reconnection task, reconnection schedule information is sent to task Scheduling unit, so as to which all monitoring devices treated in preview queue of task scheduling unit are carried out into reconnection operation;Timing reconnection Unit, which is controlled by, treats preview queue, treats that preview queue is changed into sky from non-NULL described in task scheduling unit, then pause is fixed Shi Chonglian units, it is changed into non-NULL from idle running, then starts this timing reconnection unit;
What that is whether timing reconnection unit starting depended in the task scheduling unit described treats preview queue Whether it is empty, is changed into sky if detecting from non-NULL, suspends timing reconnection unit, be changed into non-NULL if detecting from idle running, Start this element.
The task scheduling unit, for receiving video reconnection requests and judging the request whether comprising monitoring device volume Number;If comprising, from treating to inquire about whether include this monitoring device numbering in preview queue, if being not present, terminate this subtask, If in the presence of by task delivery task executing units progress video reconnection operation corresponding to video reconnection requests;If not including, time Go through and treat preview queue, extract the corresponding reconnection of each monitoring device numbering and count, if reconnection counts the threshold for exceeding defined Value, then ignore current monitor device numbering and continue traversal and treat preview queue, if reconnection is counted not less than threshold value, by reconnection meter Number adds 1 and the video reconnection requests for being accompanied with current monitor device numbering is sent into task executing units, and it is straight to repeat this operation Completion has been traveled through to all devices numbering treated in preview queue
Task scheduling unit performs different operation tasks according to the different scheduling types received.Such as when receiving video After reconnection requests, send relevant information to task executing units and carry out video reconnection operation.Again for example when receive message prison During the request for preserving network preview failure device numbering for listening unit to send, just this numbering is put into and treated in preview queue.Treat pre- Queue of looking at is to wait for re-starting the monitoring device list of preview, the mapping relations that to be device numbering count with reconnection, institute It is the reconnection number that current monitor equipment had been carried out to state reconnection counting, is initially 0.
The task executing units, the reconnection schedule information for being sent according to the task scheduling unit carry out specific Tasks carrying is operated, and operating result is returned into task scheduling unit, that is, carries out video reconnection after receiving video reconnection requests Operation;Judge generated operating result, if video reconnection fails, terminate this subtask, if video reconnection success, from treating This video equipment is deleted in preview queue to number and terminate this subtask.
Such as task executing units perform the reconnection task of video and operating result are returned into the task scheduling unit. In addition, if the reconnection task that timing reconnection unit is initiated, then in the process of implementation, to ensure that the tasks carrying of system is opened Because of the accumulation of substantial amounts of reconnection task meaningless expansion will not occur for pin, need to be before tasks carrying from treating to look into preview queue The reconnection for asking current device counts the threshold value for exceeding defined whether, if exceeding, this reconnection for skipping current device is appointed Business, if without departing from count is incremented and performs reconnection task by reconnection.
Video proposed by the present invention goes offline reconnection method, and whole flow process is as shown in Fig. 2 comprise the steps:
Step S101, message monitoring unit receive the message that video development SDK is reported;
Step S102, when what is received is network preview failed message, message monitoring unit is incidental according to the message Preview handle therefrom obtains the corresponding monitoring device that goes offline and numbers and be sent to task scheduling unit, and task scheduling unit will go offline Monitoring device numbering, which is put into, to be treated in preview queue;
Step S103, when what is received is alarm reconnection success message, message monitoring unit is incidental according to the message Preview handle therefrom inquires corresponding monitoring device numbering;And sent to task scheduling unit and be accompanied with monitoring device numbering Video reconnection requests;
Step S104, task scheduling unit receive video reconnection requests and judge that the request bag is numbered containing monitoring device;
Step S105, task scheduling unit is from treating to inquire about whether include this monitoring device numbering in preview queue, if not depositing Then terminating this subtask, if in the presence of by task delivery task executing units progress video weight corresponding to video reconnection requests Even operate;
Step S106, task executing units judge generated operating result, if video reconnection fails, terminate this Business, if video reconnection success, deleted from when preview queue this video equipment numbering and to the end of this subtask;
During above-mentioned steps S101~S106 is carried out, following steps are carried out simultaneously:
Step S201, treat that preview queue is changed into sky from non-NULL described in task scheduling unit, then pause timing weight Even unit, is changed into non-NULL from idle running, then starts this timing reconnection unit;Reconnection schedule information is sent to task scheduling unit, So as to which all monitoring devices treated in preview queue of task scheduling unit are carried out into reconnection operation;
Step S202, timing reconnection unit periodically send video reconnection requests, such as every 10 seconds to task scheduling unit Clock performs once;
Step S203, task scheduling unit receive video reconnection requests and judge not including device numbering in the request;
Step S204, task scheduling unit traversal treat preview queue, extract the corresponding reconnection of each monitoring device numbering Count, if reconnection counts the threshold value for exceeding defined, ignore current monitor device numbering and continue traversal and treat preview queue, If reconnection is counted not less than threshold value, by reconnection, count is incremented and will be accompanied with the video reconnection requests of current monitor device numbering Task executing units are sent to, repeat this operation until treating that the numbering of all devices in preview queue has traveled through completion;This step In the threshold value desirable 3 or 4 that counts of reconnection.
Step S205, task executing units carry out video reconnection operation after receiving video reconnection requests;
Step S206, task executing units judge generated operating result, if video reconnection fails, terminate this Business, if video reconnection success, deleted from when preview queue this video equipment numbering and to the end of this subtask.
In the above-mentioned technical solutions, the successful message of reconnection is alarmed by monitoring device to trigger holding for video reconnection task OK, the accuracy of reconnection task in time is performed so as to improve.In addition, recover after net drop and in very short time In the case of normal, video SDK is that will not send the successful message of alarm reconnection (because SDK does not have after network recovery Detect that network fell line), and if just carried out the preview operation of video during this period, it is clear that no message is driven this Monitoring device is restarted, therefore present invention adds timing reconnection unit, for solving this problem, it is this using message-driven and The design that timed task is combined, the comprehensive and real-time of reconnection is improved, ensure that the Network Abnormal recovery capability of system. Furthermore it is if task scheduling unit, which detects, treats that preview queue is space-time, notice timing reconnection unit is out of service, it is to be checked to measure Treat preview queue and do not reinform its startup optimization for space-time, expense is run so as to reduce meaningless process.It is in addition, fixed to avoid The accumulation for a large amount of reconnection tasks that Shi Chonglian units are initiated makes system can't bear the heavy load, need to be before tasks carrying from treating preview team The reconnection that current monitor equipment is inquired about in row counts the threshold value for exceeding defined whether, if exceeding, skips current monitor and sets Why this standby reconnection task, can make this design, be because the time that just illustrates to go offline when reconnection number is many has reached Certain time, can conclude that this reconnection is not because being gone offline in very short time and caused by recovering, and therefore, treats that network is real During recovery, video SDK obviously can send the alarm successful message of reconnection, carry out video reconnection again at that time, thus for Treat that each equipment in preview queue only needs before periodicity reconnection several times, so as to avoid system task expansion, to enter One step reduces meaningless overhead.
Particular embodiments described above, the purpose of the present invention, technical scheme and beneficial effect are carried out further in detail Describe in detail bright, should be understood that the foregoing is merely illustrative of the preferred embodiments of the present invention, and without the guarantor with limiting the present invention Scope is protected, for those skilled in the art, it can still be repaiied to the involved technical scheme of this embodiment Change, or equivalent substitution is carried out to which part technical characteristic, therefore, within the spirit and principles of the invention, made Any modification, equivalent substitution and improvements etc., should be included in the scope of the protection.

Claims (3)

  1. The reconnecting system 1. a kind of video goes offline, it is characterised in that including:Message monitoring unit, timing reconnection unit, task scheduling Unit and task executing units;
    The message monitoring unit, for receiving message that video development SDK sends and being parsed, when the message received is net During network preview failed message, then produce and the scheduler task of a preservation device numbering is sent to task scheduling unit, by task The scheduling unit monitoring device numbering that will go offline is put into and treated in preview queue;When the message received is alarm reconnection success message, Then produce the scheduler task of an execution video reconnection and be sent to task scheduling unit;
    The timing reconnection unit, for periodically performing video reconnection task, reconnection schedule information is sent to task scheduling Unit, so as to which all monitoring devices treated in preview queue of task scheduling unit are carried out into reconnection operation;Timing reconnection unit It is controlled by and treats preview queue, treat that preview queue is changed into sky from non-NULL described in task scheduling unit, then pause timing weight Even unit, is changed into non-NULL from idle running, then starts this timing reconnection unit;
    The task scheduling unit, for receiving video reconnection requests and judging the request whether comprising monitoring device numbering; If comprising, from treating to inquire about whether include this monitoring device numbering in preview queue, if being not present, terminate this subtask, if In the presence of then by task delivery task executing units progress video reconnection operation corresponding to video reconnection requests;If not including, traversal Preview queue is treated, the corresponding reconnection of each monitoring device numbering is extracted and counts, if reconnection counts the threshold value for exceeding defined, Then ignore current monitor device numbering and continue traversal and treat preview queue, if reconnection is counted not less than threshold value, reconnection is counted Add 1 and the video reconnection requests for being accompanied with current monitor device numbering be sent to task executing units, repeat this operation until Treat that the numbering of all devices in preview queue has traveled through completion;
    The task executing units, for carrying out video reconnection operation after receiving video reconnection requests;Judge generated operation As a result, if video reconnection fails, this subtask is terminated, if video reconnection success, from treating to delete this video in preview queue Device numbering simultaneously terminates this subtask.
  2. The reconnection method 2. a kind of video goes offline, it is characterised in that comprise the steps:
    Step S101, message monitoring unit receive the message that video development SDK is reported;
    Step S102, when what is received is network preview failed message, message monitoring unit obtained from the message corresponding to fall Line monitoring device is numbered and is sent to task scheduling unit, and the task scheduling unit monitoring device numbering that will go offline is put into and treats preview team In row;
    Step S103, when what is received is alarm reconnection success message, message monitoring unit inquires corresponding from the message Monitoring device numbering;And the video reconnection requests for being accompanied with monitoring device numbering are sent to task scheduling unit;
    Step S104, task scheduling unit receive video reconnection requests and judge that the request bag is numbered containing monitoring device;
    Step S105, task scheduling unit is from treating to inquire about whether include this monitoring device numbering in preview queue, if being not present, Terminate this subtask, if in the presence of by task delivery task executing units progress video reconnection behaviour corresponding to video reconnection requests Make;
    Step S106, task executing units judge generated operating result, if video reconnection fails, terminate this subtask, If video reconnection success, deleted from when preview queue this video equipment numbering and to the end of this subtask;
    During above-mentioned steps S101~S106 is carried out, following steps are carried out simultaneously:
    Step S201, treat that preview queue is changed into sky from non-NULL described in task scheduling unit, then suspend timing reconnection list Member, it is changed into non-NULL from idle running, then starts this timing reconnection unit;Reconnection schedule information is sent to task scheduling unit, so as to All monitoring devices treated in preview queue of task scheduling unit are subjected to reconnection operation;Step S202, timing reconnection unit Periodically video reconnection requests are sent to task scheduling unit;
    Step S203, task scheduling unit receive video reconnection requests and judge not including device numbering in the request;
    Step S204, task scheduling unit traversal treat preview queue, extract the corresponding reconnection of each monitoring device numbering and count, If reconnection counts the threshold value for exceeding defined, ignore current monitor device numbering and continue traversal and treat preview queue, if weight Even count not less than threshold value, then by reconnection, count is incremented and sends the video reconnection requests for being accompanied with current monitor device numbering To task executing units, this operation is repeated until treating that the numbering of all devices in preview queue has traveled through completion;
    Step S205, task executing units carry out video reconnection operation after receiving video reconnection requests;
    Step S206, task executing units judge generated operating result, if video reconnection fails, terminate this subtask, If video reconnection success, deleted from when preview queue this video equipment numbering and to the end of this subtask.
  3. The reconnection method 3. video as claimed in claim 2 goes offline, it is characterised in that
    Threshold value in step S204 takes 3 or 4.
CN201510059492.6A 2015-02-04 2015-02-04 Video goes offline reconnecting system and method Active CN104660992B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510059492.6A CN104660992B (en) 2015-02-04 2015-02-04 Video goes offline reconnecting system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510059492.6A CN104660992B (en) 2015-02-04 2015-02-04 Video goes offline reconnecting system and method

Publications (2)

Publication Number Publication Date
CN104660992A CN104660992A (en) 2015-05-27
CN104660992B true CN104660992B (en) 2018-01-19

Family

ID=53251625

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510059492.6A Active CN104660992B (en) 2015-02-04 2015-02-04 Video goes offline reconnecting system and method

Country Status (1)

Country Link
CN (1) CN104660992B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105338314B (en) * 2015-10-28 2018-04-06 上海斐讯数据通信技术有限公司 Video cloud platform control method and system under a kind of radio network conditions
CN111240859A (en) * 2020-01-07 2020-06-05 北京达佳互联信息技术有限公司 Data processing method, device, server and storage medium
CN112948600B (en) * 2021-01-26 2023-06-02 四川天翼网络股份有限公司 High-performance multi-protocol audio and video storage system

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101056202A (en) * 2007-05-31 2007-10-17 武汉虹信通信技术有限责任公司 A method for realizing the multi-task polling in the network management monitoring system
CN101562357A (en) * 2009-05-22 2009-10-21 北京佳讯飞鸿电气股份有限公司 Method for realizing quick response to faults of electric power system
CN101951391A (en) * 2010-04-13 2011-01-19 杭州海康威视***技术有限公司 Method, device and system for remotely upgrading monitoring equipment
CN102595099A (en) * 2012-02-14 2012-07-18 北京交通大学 Cognitive-technology-based video data synthesis method
CN103067740A (en) * 2012-12-31 2013-04-24 浙江元亨通信技术股份有限公司 Trouble intelligent detecting method for video surveillance device and detecting system thereof
CN103686157A (en) * 2013-12-25 2014-03-26 乐视网信息技术(北京)股份有限公司 Method and system for providing alarm in cloud transcoding
CN103761157A (en) * 2014-01-21 2014-04-30 国家电网公司 Method for implementing system fault-tolerant mechanism on basis of multitask patrol strategy

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130215745A1 (en) * 2012-02-16 2013-08-22 Broadcom Corporation Dynamic buffer management in high-throughput wireless systems

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101056202A (en) * 2007-05-31 2007-10-17 武汉虹信通信技术有限责任公司 A method for realizing the multi-task polling in the network management monitoring system
CN101562357A (en) * 2009-05-22 2009-10-21 北京佳讯飞鸿电气股份有限公司 Method for realizing quick response to faults of electric power system
CN101951391A (en) * 2010-04-13 2011-01-19 杭州海康威视***技术有限公司 Method, device and system for remotely upgrading monitoring equipment
CN102595099A (en) * 2012-02-14 2012-07-18 北京交通大学 Cognitive-technology-based video data synthesis method
CN103067740A (en) * 2012-12-31 2013-04-24 浙江元亨通信技术股份有限公司 Trouble intelligent detecting method for video surveillance device and detecting system thereof
CN103686157A (en) * 2013-12-25 2014-03-26 乐视网信息技术(北京)股份有限公司 Method and system for providing alarm in cloud transcoding
CN103761157A (en) * 2014-01-21 2014-04-30 国家电网公司 Method for implementing system fault-tolerant mechanism on basis of multitask patrol strategy

Also Published As

Publication number Publication date
CN104660992A (en) 2015-05-27

Similar Documents

Publication Publication Date Title
CN103685459B (en) Distributed system, server computer, distributed management server and failure prevention method
CN104536809B (en) A kind of distributed timing task scheduling system based on client, server system
CN105677477B (en) Method and device for optimizing application program resources and electronic equipment
US10545807B2 (en) Method and system for acquiring parameter sets at a preset time interval and matching parameters to obtain a fault scenario type
CN104461786B (en) The restoration methods of android system and the recovery system of android system
CN106201844B (en) A kind of log collecting method and device
CN110581852A (en) Efficient mimicry defense system and method
CN104660992B (en) Video goes offline reconnecting system and method
CN104598369B (en) The software supervision method and apparatus realized in a mobile device
CN112527879B (en) Kafka-based real-time data extraction method and related equipment
CN105095008B (en) A kind of distributed task scheduling fault redundance method suitable for group system
CN109274531A (en) Data acquisition equipment method for restarting, system and computer readable storage medium
CN107870948A (en) Method for scheduling task and device
US11294740B2 (en) Event to serverless function workflow instance mapping mechanism
CN103475696A (en) System and method for monitoring state of cloud computing cluster server
CN101610188A (en) Sip server restoring method of service process fault and sip server
CN105553726A (en) System and method for fault processing of home gateway equipment
CN102769533A (en) Data processing method and data processing device
CN106549967A (en) A kind of IEC104 stipulations analysis system and methods based on event-driven mechanism
CN112084087A (en) Industrial equipment state monitoring and operation and maintenance management method and system
CN104243192B (en) Fault handling method and system
CN105069029B (en) A kind of real-time ETL system and method
CN103517292B (en) Mobile terminal information reporting method and apparatus
CN104731683B (en) A kind of method and system of mobile phone EMS memory monitoring
CN103024058A (en) Method and system for invoking web services

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: INST OF MICROELECTRONICS, C. A. S

Free format text: FORMER OWNER: JIANGSU INTERNET OF THINGS RESEARCH + DEVELOMENT CO., LTD.

Effective date: 20150624

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20150624

Address after: 100029 Beijing city Chaoyang District Beitucheng West Road No. 3

Applicant after: Institute of Microelectronics of the Chinese Academy of Sciences

Address before: 214135 Jiangsu New District of Wuxi City Linghu Road No. 200 China Sensor Network International Innovation Park building C

Applicant before: JIANGSU R & D CENTER FOR INTERNET OF THINGS

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20160112

Address after: 214135 Jiangsu Wuxi District Road No. 200 China Linghu Sensor Network International Innovation Park C building 10 floor

Applicant after: JIANGSU ZHONGKE YILIAN COMMUNICATION TECHNOLOGY Co.,Ltd.

Address before: 100029 Beijing city Chaoyang District Beitucheng West Road No. 3

Applicant before: Institute of Microelectronics of the Chinese Academy of Sciences

GR01 Patent grant
GR01 Patent grant
PP01 Preservation of patent right

Effective date of registration: 20230905

Granted publication date: 20180119

PP01 Preservation of patent right
PD01 Discharge of preservation of patent

Date of cancellation: 20240119

Granted publication date: 20180119

PD01 Discharge of preservation of patent