CN104652494B - With the method for keel or stick installation plastic draining board - Google Patents

With the method for keel or stick installation plastic draining board Download PDF

Info

Publication number
CN104652494B
CN104652494B CN201410215751.5A CN201410215751A CN104652494B CN 104652494 B CN104652494 B CN 104652494B CN 201410215751 A CN201410215751 A CN 201410215751A CN 104652494 B CN104652494 B CN 104652494B
Authority
CN
China
Prior art keywords
keel
drain bar
stick
draining board
plastic draining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410215751.5A
Other languages
Chinese (zh)
Other versions
CN104652494A (en
Inventor
邹新建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Sancai Technology Development Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201410215751.5A priority Critical patent/CN104652494B/en
Publication of CN104652494A publication Critical patent/CN104652494A/en
Application granted granted Critical
Publication of CN104652494B publication Critical patent/CN104652494B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/74Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls
    • E04B1/76Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to heat only
    • E04B1/7608Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to heat only comprising a prefabricated insulating layer, disposed between two other layers or panels
    • E04B1/7612Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to heat only comprising a prefabricated insulating layer, disposed between two other layers or panels in combination with an air space
    • E04B1/7616Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to heat only comprising a prefabricated insulating layer, disposed between two other layers or panels in combination with an air space with insulation-layer locating devices combined with wall ties
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F16/00Drainage
    • E21F16/02Drainage of tunnels

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Physics & Mathematics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Electromagnetism (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • Acoustics & Sound (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)
  • Building Environments (AREA)

Abstract

With the method for keel or stick installation plastic draining board, it is that plastic draining board is installed on the metope of ground and hypogee, terrace, can be used for cavern tunnel dome installation drain bar, form firm overall clearance layer.Drain bar is fixed on metope through keel with steel nail or expansion bolt, then is painted or mounting plate material and the hollow surface layer for making plating aluminium foil air energy-saving construction;In hollow concrete terrace, gap and the water outlet of drain bar surrounding are sealed with stick or keel, has made hollow floor better quality.Plastic draining board is mutually connected to be sealed with viscose glue, hot weld or stick, becomes one of waterproof damp proof insulation layer.The present invention is applied can make to reach ne-leakage quality in underground engineering room forever in the hollow metope terrace of underground engineering;Apply the hollow layer in ground grain substance warehouse can be with damp proof insulation, ventilative, anti-mildew;Apply becomes heat insulating hollow layer combined wall face in existing thermal insulation wall surface.

Description

With the method for keel or stick installation plastic draining board
First, technical field
The invention belongs to construction techniques fields, and in particular to it is a kind of the metope of ground and hypogee, terrace and The method that fixed plastics drain bar is installed on cavern tunnel dome.
2nd, background technology
The plastic draining board of the present invention is that have intensive empty cup fulcrum on plastic sheet, and fulcrum forms whole with metope, ground Body void layer by the use of cement mortar or plate as composite cover on metope, pours concrete as hollow floor again on the ground.I Patent of invention《Plastic draining board is in the application process of underground engineering wall surface》ZL200610028344.9 is done for hollow rendering layer Being mainly characterized by for method is be bonded with structure inner wall surface glue by drain bar fulcrum.According to follow-up of quality for many years, due to glue Meeting aging, drain bar degumming arch camber makes rendering layer generate crack, so viscose glue is interim measure.And air meeting in hollow layer It expands with heat and contract with cold, it is necessary to design gas vent.When hollow floor is constructed, drain bar to metope has can spillage compared with big gap;On ground Lower engineering bottom plate sump side, drain bar form most important apopore, are also easily blocked by terrace concrete.Vault in cavern tunnel Top is that formwork supporting plate pours reinforced concrete liner to installation drain bar again, and dome concrete infiltration in order to prevent cannot be fixed with steel nail, and installation is very numb Tired, the present invention is the method that the fixed drain bar of installation improves construction quality.
3rd, the content of the invention
In order to solve problem above, I has made long-term observation and analysis, and drain bar is swollen when underground engineering wall surface is constructed Swollen bolt pushes down drain bar by gasket, and compression area is too small, make drain bar have arch camber deform leeway, so to expand by Pressure surface accumulates, and abandons chemical adhesive pressure.Then new hollow wall construction method is had developed, while is also applied for architectural engineering Any metope.
Drain bar is fixed on metope through keel with steel nail or expansion bolt.First with viscose glue or a small amount of steel nail, swollen Drain bar is entirely fixed on metope by swollen bolt, then fixes drain bar comprehensively with keel, and keel can be cutting back, can be with It is strip, can be vertically-mounted, installation can also be horizontally mounted or be optionally combined, can expand pressure area by keel makes Plastic draining board is fixed smooth, and keel can be timber, metal or plastic products.
Fixing steel wire or web, steel wire or web again simultaneously can be attached on drain bar and be fixed by keel, Can be placed on the surfaces of keel with the cap of expansion bolt fix and keel below respectively put with the surface of keel together with steel wire Net or web, then making cement mortar paint;Or plate is fixed on keel, become hollow surface layer;
If cement mortar is changed to thermal insulation mortar, plate is changed to heat preservation plate material, may also reach up energy-saving heat preserving requirement;And One layer of plating aluminum foil film, then fixed plastics drain bar are first pasted on metope, makes aluminum foil air interbed.
If fruit structure metope is uneven, can datum plane first be made with cushion block, first by keel steel nail or expanding screw Bolt is fixed on the wall, then plate is pushed down drain bar, is fixed on plate and drain bar on keel together with self-tapping screw;
Or with drain bar and the prefabricated integral composite board of plate, directly it is fixed on self-tapping screw on keel.
In order to which the air-flow in hollow metope interlayer is made not generate pressure steadily, finally also to be installed on hollow metope ventilative Hole, air hole are circular or strips, are penetrated through through drain bar and hollow sandwich, air hole is suitable for any type of hollow wall Face.In the seam of the top of metope drain bar and superstructure top plate, with keel or stick edge sealing, then surface layer is done.
Hollow floor is made on structural floor with plastic draining board, in drain bar and wall connection place stick or keel Edge sealing prevents concrete terrace spillage.
When drain bar is layered on the side mouth stick of underground engineering bottom sump or keel edge sealing, concrete terrace cement is prevented Slurry seals the water outlet of drain bar.It is the vault that plastic draining board is mounted on to cavern tunnel in the rock mass construction in cavern tunnel Under top, dome is uneven, it is impossible to be fixed with steel nail or expansion bolt, with whole keel of tunnel cross-section length, utilize keel Elasticity drain bar is pressed in the inner wall in tunnel, could fix keel with expansion bolt on vertical wall.
Drain bar can fix or receive side with plastic keel, and there is bound edge on the side mouthful of plastic keel, can encase cement mortar Rendering layer or concrete terrace, the keel of all materials will have certain rigidity;And stick has 20~150mm wide, viscose glue is on one side Plastic foil another side is release paper, and tearing release paper can construct.Drain bar is mutually connected to be sealed with viscose glue, hot weld or stick Side becomes one of waterproof damp proof insulation layer.
The present invention is applied can arrange percolating water, damp proof insulation, every condensed water, heat preservation energy-saving in the hollow metope terrace of underground engineering, Underground engineering is made to reach ne-leakage quality forever;Apply the hollow layer in ground grain substance warehouse can be with damp proof insulation, ventilative, mould proof Become;Apply becomes heat insulating hollow layer combined wall face in existing thermal insulation wall surface, with regard to that can reach draining, waterproof, ventilative, heat preservation Combination function.
4th, illustrate
The present invention is further described with embodiment below in conjunction with the accompanying drawings
Fig. 1~Fig. 3 is the plan view being fixed on drain bar with keel on metope;
Fig. 4~Fig. 5 is that cement mortar or thermal insulation mortar paint hollow wall face sectional view;
Fig. 6 is plate or the hollow metope sectional view of thermal insulation board;
Fig. 7 is plating aluminium foil hollow wall face sectional view;
Fig. 8 is first to install keel, then the sectional view of composite board surface layer;
Fig. 9 is the sectional view of hollow metope air hole;
Figure 10 is in the gap keel on metope drain bar top or stick edge sealing sectional view;
Figure 11 land drainages plate is to wall side and sump edge stick edge sealing sectional view;
The sectional view of drain bar is installed in Figure 12 caverns tunnel;
Figure 13 is plastic keel sectional view;
Figure 14~Figure 16 is the sectional view that drain bar is mutually connected with the sealing of viscose glue, hot weld or stick.
In more than figure:1 plastic draining board;2 keel;3 steel nails or expansion bolt;4 steel wires or web;5 cement mortar Or thermal insulation mortar rendering layer;6 structural walls;7 plates or thermal insulation board;8 tap bolts;9 plating aluminum foil films;10 cushion blocks;11 air holes; 12 sticks;13 sumps;14 cavern rock mass;15 bound edges;16 ribbed stiffeners;17 viscose glues;18 hot welds.
5th, specific embodiment
Plastic draining board 1 is fixed in Fig. 1-Fig. 3 with steel nail or expansion bolt 3 through keel 2 on metope, keel 2 can Be cutting back, can be strip, can be vertical, can also be horizontally mounted or be optionally combined installation, keel are that have one Determine rigidity any material.
Steel wire or fiber mesh cloth 4 are placed on behind keel 2 in Fig. 4, then with steel nail or expansion bolt 3 by steel wire Or web 4, keel 2 and plastic draining board 1 are all tightly secured on the face of structural wall 6;It can also be by steel wire or web 4 It is placed on plastic draining board 1, then steel wire or web 4 and plastic draining board 1 is pushed down with keel 2, with steel nail or expansion bolt 3 It is fixed on the face of structural wall 6, then making cement mortar or thermal insulation mortar rendering layer 5,
After respectively putting one of steel wire or web 4, then whole fixation in Fig. 5 before keel 2, below, mortar is made It paints and thermal insulation mortar paints.
Steel nail or expansion bolt 3 pass through keel 2 and plastic draining board 1 in figure 6, are tightly secured in the interior of structural wall 6 On face, plate or thermal insulation board 7 are finally fixed on keel 2 the upper surface of with tap bolt 8 again.
First pasting one layer of plating aluminum foil film 9 on Fig. 7 metopes, then plastic covering drain bar 1 presses keel 2, then with steel nail or expansion Bolt 3 is fixed on above structural wall 6, finally does surface layer again.
Fig. 8 is uneven when 6 metope of structural wall, makes datum plane with cushion block 10, then is fixed with steel nail or expansion bolt 3 Then keel 2 cover drain bar and the prefabricated integral plate of plate or thermal insulation board 7, are fixed on tap bolt 8 on keel again; Or plastic draining board 1 is pushed down with plate or thermal insulation board 7, it is fixed with tap bolt 8.
Fig. 9 sets up air hole 11 on hollow metope, and air hole 11 puts down the air-flow in interlayer through plastic draining board 1 Surely.
The top of Figure 10 plastic draining boards 1 is structure roof, and edge sealing is done with stick 12 or keel 2.
Figure 11 plastic draining boards 1 on the ground, in the edge of structural wall 6 12 edge sealing of stick;On the side of sump 13 Along 2 edge sealing of stick 12 or keel is also used, prevent terrace concrete from sealing the water outlet of drain bar.
Figure 12 is moulded with flexibly supporting for keel 2 simultaneously under the dome of cavern rock mass 14 along section paving plastic draining board 1 Expect drain bar 1, keel are fixed with steel nail or expansion bolt in vertical side wall.
Figure 13 special plastic keel have ribbed stiffener 16, improve the rigidity of keel, and side mouthful has bound edge 15 that can encase cement bonded sand Slurry or concrete terrace, it is possible to reduce this procedure of interfacial agents.
Figure 14 plastic draining boards 1 are mutually connected, and have overlap joint or flush, there is viscose glue 17 in seam.
Figure 15 plastic draining boards 1 are mutually connected, the mutual hot weld 18 in the flat side of drain bar.
Figure 16 plastic draining boards 1 are mutually connected, and have overlap joint or flush, press strip stick 12 again in seam.

Claims (5)

1. it is that plastic draining board is made into hollow layer on metope with the method for keel or stick installation plastic draining board, it is special Sign is:
Step 1:Drain bar is entirely fixed on metope with viscose glue or a small amount of steel nail, expansion bolt first, then it is complete with keel Drain bar is fixed in face,
Or first fix keel on the wall with steel nail or expansion bolt, then plate is pushed down into drain bar, with self-tapping screw by plate It is fixed on together on keel with drain bar,
Or with drain bar and the prefabricated integral composite board of plate, directly it is fixed on self-tapping screw on keel, passes through keel energy Enough expansion pressure area is fixed plastic draining board smooth;
Step 2:Steel wire or web are fixed on drain bar again simultaneously, steel wire or web are attached to imperial on drain bar Bone fixation or be placed on the surfaces of keel with the cap of expansion bolt fix and keel below respectively put with the surface of keel together with Steel wire or web, then making cement mortar paint or plate are fixed on keel, become hollow surface layer;
Step 3:Air hole is installed on the hollow surface layer, in the seam of the top of metope drain bar and superstructure top plate, With keel or stick edge sealing, then surface layer is done, in drain bar and wall connection place stick or keel edge sealing, prevent concrete terrace from leaking Slurry;When drain bar is layered on the side mouth stick of underground engineering bottom sump or keel edge sealing, prevent concrete terrace cement mortar from sealing The firmly water outlet of drain bar, the keel can be cutting back or strip, and the keel can be vertically-mounted or be horizontally mounted Or combination installation, the keel material are timber or metal or plastic products material.
2. the method for installing plastic draining board with keel or stick as described in claim 1, it is characterized in that:By the cement bonded sand It starches as thermal insulation mortar, the plate is heat preservation plate material, additionally it is possible to reach energy-saving heat preserving requirement;And one layer of plating is first pasted on metope Aluminum foil film, then fixed plastics drain bar, make aluminum foil air interbed.
3. the method for installing plastic draining board with keel or stick as described in claim 1, it is characterized in that:Plastic draining board is pacified Under the dome in cavern tunnel, drain bar is pressed in the inner wall in tunnel using the elasticity of keel.
4. the method for installing plastic draining board with keel or stick as described in claim 1, it is characterized in that:The side of plastic keel Mouth has bound edge, can encase cement mortar rendering layer or concrete terrace;20~150mm wide of stick, viscose glue are that plastic foil is another on one side Face is release paper, and tearing release paper can just construct.
5. as described in claim 1 with keel or stick installation plastic draining board method, drain bar be mutually connected with viscose glue, Hot weld or stick sealing, become one of waterproof damp proof insulation layer.
CN201410215751.5A 2014-05-19 2014-05-19 With the method for keel or stick installation plastic draining board Active CN104652494B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410215751.5A CN104652494B (en) 2014-05-19 2014-05-19 With the method for keel or stick installation plastic draining board

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410215751.5A CN104652494B (en) 2014-05-19 2014-05-19 With the method for keel or stick installation plastic draining board

Publications (2)

Publication Number Publication Date
CN104652494A CN104652494A (en) 2015-05-27
CN104652494B true CN104652494B (en) 2018-05-25

Family

ID=53244088

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410215751.5A Active CN104652494B (en) 2014-05-19 2014-05-19 With the method for keel or stick installation plastic draining board

Country Status (1)

Country Link
CN (1) CN104652494B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106284431A (en) * 2016-09-09 2017-01-04 上海三彩科技发展有限公司 Phenomenon invention structure way according to water is complete waterproof theory
CN107524237A (en) * 2017-08-31 2017-12-29 上海建工七建集团有限公司 A kind of basement inwall fish tail and waterproof layer and construction method
CN107574843A (en) * 2017-09-29 2018-01-12 上海三彩科技发展有限公司 Method using plastic draining board as external wall waterproof protective layer
CN107700800B (en) * 2017-09-29 2022-03-01 上海三彩科技发展有限公司 Hollow painting layer made of drainage plate with plane rib and keel
CN107700554B (en) * 2017-09-29 2021-12-14 上海三彩科技发展有限公司 Moisture insulation method for hollow terrace, wall and column of underground engineering
CN110158957A (en) * 2019-03-19 2019-08-23 上海三彩科技发展有限公司 The method for doing hollow rendering layer with drain bar and plastics fishing net
CN112431615A (en) * 2020-11-27 2021-03-02 中铁四局集团有限公司 Permanent single-layer lining drainage method for underground tank room of hyperboloid dome

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3571933B2 (en) * 1998-09-22 2004-09-29 日本綜合防水株式会社 Water leakage repair method for structures and water leakage repair material injection device
KR100456610B1 (en) * 2000-11-04 2004-11-09 주식회사 경기기술단 Structure method for drainageway of weak stratum and the conduct pipe thereof
CN201738326U (en) * 2010-08-30 2011-02-09 白云鹤 Drainage structure for sole plate and wall surface of underground building
CN202131604U (en) * 2011-06-16 2012-02-01 白云鹤 Improved water drainage plate
CN103195104B (en) * 2012-01-10 2016-04-27 邹新建 A kind of building method adopting anti-row's combination at building structure waterproof position

Also Published As

Publication number Publication date
CN104652494A (en) 2015-05-27

Similar Documents

Publication Publication Date Title
CN104652494B (en) With the method for keel or stick installation plastic draining board
US10513847B2 (en) Continuous wall assemblies and methods
US10961708B2 (en) Prefabricated insulated building panel with cured cementitious layer bonded to insulation
CN110206173B (en) Construction method of heat-insulation external wall
CN101096850B (en) Plastics water discharge plate application method for underground engineering wall surface
CN101113606B (en) Dry type permeable back mounted outer insulation wall
CN108118839A (en) A kind of passive type waterproofing and thermal insulation of roofing slope making system and its construction method
CN202544282U (en) Thermal insulation and decoration composite plate
CN110735499B (en) Parapet waterproof structure and construction method thereof
CN111188475A (en) Moisture-proof heat-preservation decoration integrated plate for assembled building outer wall and mounting method thereof
CN109322392A (en) A kind of light steel house and its build construction method
CN113802760A (en) Heat preservation is decorated and is maintained integration wallboard and wall structure
CN109403520A (en) A kind of viscous anchor combination ceramic thin plate decoration wall and its installation method
CN104532949B (en) solar container house
CN109779163A (en) A kind of light steel construction waterproof parapet and its construction method
EP2744949B1 (en) Method for applying plaster to an external wall and plaster carrier
CN107448006B (en) Reinforced concrete beam column node pastes carbon cloth reinforced structure
CN211080616U (en) Roofing expansion joint structure under prefabricated apron
CN105544745B (en) Assembled sandwich keeps the temperature close rib compound external wall panel partitioning slot device and construction method
CN212453367U (en) Plant roof height movement joint department and prevent root thorn connected node structure
CN209975897U (en) Waterproof parapet of light steel building
CN211080818U (en) Passive ultralow-energy-consumption dry-operation flat roof slope-finding heat-insulation waterproof integrated eaves gutter
CN106437038A (en) Corrugated waterproof heat-insulation integrated plate, processing technique and construction method
CN209723488U (en) A kind of building heat preservation decoration uses keel shoe
KR101466644B1 (en) The construction method for root

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20191223

Address after: 201824 room 404, No. 10, Lane 1930, Cao'an Road, Jiading District, Baoshan District, Shanghai

Patentee after: SHANGHAI SANCAI TECHNOLOGY DEVELOPMENT Co.,Ltd.