CN104633173A - Novel SF6 gas splitter - Google Patents

Novel SF6 gas splitter Download PDF

Info

Publication number
CN104633173A
CN104633173A CN201510055673.1A CN201510055673A CN104633173A CN 104633173 A CN104633173 A CN 104633173A CN 201510055673 A CN201510055673 A CN 201510055673A CN 104633173 A CN104633173 A CN 104633173A
Authority
CN
China
Prior art keywords
way valve
pressure gauge
communicated
check valve
valve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510055673.1A
Other languages
Chinese (zh)
Inventor
韩相锋
陆彦虎
蒋超伟
李国胜
梁莹莹
敬尧
张永辉
童洁
高文婷
杨璐蕾
翟同乐
杨丽萍
夏绪卫
陈巳阳
李建华
刘扬
陆颖杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Ningxia Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Ningxia Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Ningxia Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201510055673.1A priority Critical patent/CN104633173A/en
Publication of CN104633173A publication Critical patent/CN104633173A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16KVALVES; TAPS; COCKS; ACTUATING-FLOATS; DEVICES FOR VENTING OR AERATING
    • F16K11/00Multiple-way valves, e.g. mixing valves; Pipe fittings incorporating such valves
    • F16K11/10Multiple-way valves, e.g. mixing valves; Pipe fittings incorporating such valves with two or more closure members not moving as a unit
    • F16K11/105Three-way check or safety valves with two or more closure members
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16KVALVES; TAPS; COCKS; ACTUATING-FLOATS; DEVICES FOR VENTING OR AERATING
    • F16K11/00Multiple-way valves, e.g. mixing valves; Pipe fittings incorporating such valves
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16KVALVES; TAPS; COCKS; ACTUATING-FLOATS; DEVICES FOR VENTING OR AERATING
    • F16K37/00Special means in or on valves or other cut-off apparatus for indicating or recording operation thereof, or for enabling an alarm to be given

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)

Abstract

The invention relates to a novel SF6 gas splitter which is characterized in that the novel SF6 gas splitter comprises a sixth three-way valve and a first four-way valve, a first outlet of the sixth three-way valve is communicated with a first inlet of the first four-way valve, a first inlet of the sixth three-way valve is communicated with a gas inlet connector after sequentially passing through a first check valve, a first pressure meter and a first three-way valve, and a second inlet of the sixth three-way valve is communicated with a gas bottle connector after sequentially passing through a second check valve, a second pressure meter and a second three-way valve; a first outlet of the first four-way valve is communicated with a first instrument connector after sequentially passing through a third check valve, a third three-way valve and a third pressure meter, and a second outlet of the first four-way valve is communicated with a second instrument connector after sequentially passing through a fourth check valve, a fourth three-way valve and a fourth pressure meter. The novel SF6 gas splitter can achieve brackish water, purity and a product decomposing test at the same time and can flexible achieve the purpose that three instruments conduct the comparison test at the same time.

Description

New type of S F6 gas diverter
Technical field
The present invention relates to a kind of New type of S F6 gas diverter.
Background technique
The test of the micro-water of SF6 gas, purity, decomposition product is the routine test project of SF6 equipment, also be the test event of hidden troubles removing, summer peak meeting, special examination, warping apparatus tracking, " Q/GDW168-2008 State Overhaul Test code " and " Ningxia electric power company's Prophylactic test code (version in 2010) " has all done concrete requirement to micro-water, purity, decomposition product test, but the Detection task that how heavy face is, traditional carry out in turn micro-water, purity, decomposition product test test method obviously delayed, efficiency is not high.First, many testing of equipments holding time is long; The micro-water of SF6 of an electric substation, purity, decomposition product test cost tens even tens hours; Secondly, during contrast experiment, because test period is long, the temperature of test conditions-especially there occurs change, and the comparative of test result is had a greatly reduced quality; In addition, the degree of drying testing pipeline is different also in the accuracy affecting SF6 test result.
Summary of the invention
The object of this invention is to provide a kind of New type of S F6 gas diverter, effectively can shorten the time of the micro-water of SF6, purity, decomposition product test, improve the confidence level of comparative test result, reduce instrument pipeline to the impact of experimental result.
A kind of New type of S F6 gas diverter, its specialization is: comprise the 6th three-way valve and the first four-way valve, first outlet of the 6th three-way valve and the first inlet communication of this first four-way valve, and the first import of the 6th three-way valve is communicated with intake interface by the first check valve, the first pressure gauge, the first three-way valve successively, and the second import of this 6th three-way valve is communicated with cylinder interface by the second check valve, the second pressure gauge, the second three-way valve successively; Wherein the first outlet of the first four-way valve is communicated with the first tool interface system by the 3rd check valve, the 3rd three-way valve, the 3rd pressure gauge successively, and the second outlet of this first four-way valve is communicated with the second tool interface system by the 4th check valve, the 4th three-way valve, the 4th pressure gauge successively, and the 3rd of this first four-way valve the outlet is communicated with the 3rd tool interface system by the 5th check valve, the 5th three-way valve, the 5th pressure gauge successively.
Wherein also comprise casing, this casing is separately installed with the first pressure gauge, the second pressure gauge, the 3rd pressure gauge, the 4th pressure gauge and the 5th pressure gauge.
Intake interface, cylinder interface, the first tool interface system, the second tool interface system and the 3rd tool interface system are wherein also installed on casing.
Through probationary certificate, carry out while adopting part flow arrangement of the present invention can ensure the test of micro-water, purity, decomposition product, also can realize three instruments flexibly and carry out contrast test simultaneously, the design of flushing of pipeline interface can ensure flushing line whenever and wherever possible.The development of SF6 gas diverter of the present invention substantially reduces the SF6 gas site test test time, save manpower consumption, achieve the effect that multiple stage instrument carries out testing simultaneously, the confidence level of contrast test is improved, achieve the effect of rinsing instrument pipeline before and after experiment at any time, also carry out fast providing Reliable guarantee for emergency first-aid repair.
Accompanying drawing explanation
Accompanying drawing 1 is structural representation of the present invention, in figure, three-way valve 1 to 6 represents the first three-way valve successively to the 6th three-way valve, pressure gauge 1 to 5 represents the first pressure gauge successively to the 5th pressure gauge, and check valve 1 to 5 represents the first check valve successively to the 5th check valve, and four-way valve 1 represents the first four-way valve.
Embodiment
As shown in Figure 1, the invention provides a kind of New type of S F6 gas diverter, comprise the 6th three-way valve and the first four-way valve, first outlet of the 6th three-way valve and the first inlet communication of this first four-way valve, and the first import of the 6th three-way valve is communicated with intake interface by the first check valve, the first pressure gauge, the first three-way valve successively, and the second import of this 6th three-way valve is communicated with cylinder interface by the second check valve, the second pressure gauge, the second three-way valve successively; Wherein the first outlet of the first four-way valve is communicated with the first tool interface system by the 3rd check valve, the 3rd three-way valve, the 3rd pressure gauge successively, and the second outlet of this first four-way valve is communicated with the second tool interface system by the 4th check valve, the 4th three-way valve, the 4th pressure gauge successively, and the 3rd of this first four-way valve the outlet is communicated with the 3rd tool interface system by the 5th check valve, the 5th three-way valve, the 5th pressure gauge successively.
Wherein also comprise casing, this casing is separately installed with the first pressure gauge, the second pressure gauge, the 3rd pressure gauge, the 4th pressure gauge and the 5th pressure gauge.Further on casing, be also provided with intake interface, cylinder interface, the first tool interface system, the second tool interface system and the 3rd tool interface system, these tool interface systems are for connecting SF6 test instrument.
Using method of the present invention and working principle are:
During experiment, SF6 gas is by intake interface inletting device, (now need closedown second check valve, open the 3rd check valve, 4th check valve, 5th check valve) gas is through the first three-way valve, flow through the first pressure gauge, again through the first check valve, arrive the 6th three-way valve, enter the first four-way valve again, first four-way valve by SF6 gas distribution to the 3rd check valve, 4th check valve, 5th check valve, then gas is through the 3rd pressure gauge, 4th pressure gauge, 5th pressure gauge arrives the first tool interface system, second tool interface system and the 3rd tool interface system, thus achieve the shunting of SF6 gas.
When needs flushing line, nitrogen enters from cylinder interface, (now need closedown first check valve, open the 3rd check valve, 4th check valve, 5th check valve) gas is through the second three-way valve, flow through the second pressure gauge, again through the second check valve, arrive the 6th three-way valve, enter the first four-way valve again, first four-way valve by SF6 gas distribution to the 3rd check valve, 4th check valve, 5th check valve, then nitrogen is through the 3rd pressure gauge, 4th pressure gauge, 5th pressure gauge arrives the first tool interface system, second tool interface system and the 3rd tool interface system, flushing line can be realized.

Claims (3)

1. a New type of S F6 gas diverter, it is characterized in that: comprise the 6th three-way valve and the first four-way valve, first outlet of the 6th three-way valve and the first inlet communication of this first four-way valve, and the first import of the 6th three-way valve is communicated with intake interface by the first check valve, the first pressure gauge, the first three-way valve successively, and the second import of this 6th three-way valve is communicated with cylinder interface by the second check valve, the second pressure gauge, the second three-way valve successively; Wherein the first outlet of the first four-way valve is communicated with the first tool interface system by the 3rd check valve, the 3rd three-way valve, the 3rd pressure gauge successively, and the second outlet of this first four-way valve is communicated with the second tool interface system by the 4th check valve, the 4th three-way valve, the 4th pressure gauge successively, and the 3rd of this first four-way valve the outlet is communicated with the 3rd tool interface system by the 5th check valve, the 5th three-way valve, the 5th pressure gauge successively.
2. New type of S F6 gas diverter as claimed in claim 1, is characterized in that: wherein also comprise casing, this casing is separately installed with the first pressure gauge, the second pressure gauge, the 3rd pressure gauge, the 4th pressure gauge and the 5th pressure gauge.
3. New type of S F6 gas diverter as claimed in claim 2, is characterized in that: on casing, be wherein also provided with intake interface, cylinder interface, the first tool interface system, the second tool interface system and the 3rd tool interface system.
CN201510055673.1A 2015-02-03 2015-02-03 Novel SF6 gas splitter Pending CN104633173A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510055673.1A CN104633173A (en) 2015-02-03 2015-02-03 Novel SF6 gas splitter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510055673.1A CN104633173A (en) 2015-02-03 2015-02-03 Novel SF6 gas splitter

Publications (1)

Publication Number Publication Date
CN104633173A true CN104633173A (en) 2015-05-20

Family

ID=53212246

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510055673.1A Pending CN104633173A (en) 2015-02-03 2015-02-03 Novel SF6 gas splitter

Country Status (1)

Country Link
CN (1) CN104633173A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108843842A (en) * 2018-07-14 2018-11-20 浙江春晖智能控制股份有限公司 A kind of four way solenoid valve

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100764109B1 (en) * 2007-03-16 2007-10-05 우성진공기술(주) Sf6-gas liquefaction device
CN101266083A (en) * 2007-03-15 2008-09-17 爱信精机株式会社 Refrigeration circulation device
CN201575947U (en) * 2009-09-01 2010-09-08 陕西电力科学研究院 Environment-friendly anti-pollution SF6 collection and detection device
CN201575970U (en) * 2009-11-26 2010-09-08 安徽省电力公司阜阳供电公司 SF6 comprehensive tester
CN203479582U (en) * 2013-09-29 2014-03-12 河南省日立信股份有限公司 Online sampling and measurement device for high-voltage switch SF6 gas decomposition products
CN204512514U (en) * 2015-02-03 2015-07-29 国家电网公司 New type of S F6 gas diverter

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101266083A (en) * 2007-03-15 2008-09-17 爱信精机株式会社 Refrigeration circulation device
KR100764109B1 (en) * 2007-03-16 2007-10-05 우성진공기술(주) Sf6-gas liquefaction device
CN201575947U (en) * 2009-09-01 2010-09-08 陕西电力科学研究院 Environment-friendly anti-pollution SF6 collection and detection device
CN201575970U (en) * 2009-11-26 2010-09-08 安徽省电力公司阜阳供电公司 SF6 comprehensive tester
CN203479582U (en) * 2013-09-29 2014-03-12 河南省日立信股份有限公司 Online sampling and measurement device for high-voltage switch SF6 gas decomposition products
CN204512514U (en) * 2015-02-03 2015-07-29 国家电网公司 New type of S F6 gas diverter

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108843842A (en) * 2018-07-14 2018-11-20 浙江春晖智能控制股份有限公司 A kind of four way solenoid valve

Similar Documents

Publication Publication Date Title
WO2014076593A3 (en) A system and method for facilitating property management
CN103777124B (en) Based on the breakdown fault localization method of the GIS On-Site Testing of vibration-testing
CN204882628U (en) SF6 circuit breaker switch detects tight specialized tool of connector clamp
CN204512514U (en) New type of S F6 gas diverter
CN104633173A (en) Novel SF6 gas splitter
CA2964025C (en) Test set-up and method for testing a substation.
CN104916336A (en) Reactor protection command logical processing module testing apparatus
CN204369583U (en) A kind of sewage disposal intermittent discharge device
CN204008999U (en) SF6 density monitor verification servicing unit
CN203708291U (en) Debugging meter reading system for collective meter reading of electric energy meters
ATE540459T1 (en) METHOD FOR DETECTING A GROUND FAULT IN A THREE-PHASE POWER TRANSMISSION NETWORK THAT IS CANCELED OR ISOLATED FROM EARTH POTENTIAL
CN204241462U (en) A kind of for SF in GIS 6the calibration system of gas micro water content detector
CN203870214U (en) power dispatching control board maintenance and detection platform
CN204528455U (en) A kind of conveyor line detecting device
CN204373962U (en) The micro-water of GIS device SF6 gas, composition, purity test threeway sample valve
CN202083528U (en) High-voltage breaker high-voltage air seepage detection apparatus
CN204086229U (en) A kind of transformer oil chromatographic on-line monitoring special-purpose air generator
CN205663600U (en) System for testing energy-saving rate of air compressor
CN204944630U (en) Monitor station Quick clamping device
CN103217657B (en) Detection method of switch cabinet measuring and controlling device of converting station
CN204405802U (en) A kind of detection SF 6the device of density monitor
CN205301501U (en) High voltage measurement device based on fiber optic technology
CN203465083U (en) Special-purpose testing device for brake portions of monorail crane
CN202734729U (en) Pneumatic fixed seat pitch detection tool
CN103489345A (en) Communication equipment simulated failure occurrence system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20150520

RJ01 Rejection of invention patent application after publication