CN104631466A - Construction method of structural system with structural floors as horizontal braces - Google Patents

Construction method of structural system with structural floors as horizontal braces Download PDF

Info

Publication number
CN104631466A
CN104631466A CN201510064558.0A CN201510064558A CN104631466A CN 104631466 A CN104631466 A CN 104631466A CN 201510064558 A CN201510064558 A CN 201510064558A CN 104631466 A CN104631466 A CN 104631466A
Authority
CN
China
Prior art keywords
construction
support
structural
reserved
structural floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510064558.0A
Other languages
Chinese (zh)
Inventor
孙海峰
严青荣
毛钦辉
吴存富
王君红
汪慧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANSONG CONSTRUCTION GROUP CO Ltd
Original Assignee
TIANSONG CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANSONG CONSTRUCTION GROUP CO Ltd filed Critical TIANSONG CONSTRUCTION GROUP CO Ltd
Priority to CN201510064558.0A priority Critical patent/CN104631466A/en
Publication of CN104631466A publication Critical patent/CN104631466A/en
Pending legal-status Critical Current

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The invention belongs to the technical field of buildings and particularly relates to a construction method of a structural system with structural floors as horizontal braces. The method comprises the steps that 1, an envelope structure, cement-mixed piles, engineering pile foundations, structure columns, first steel latticework columns, a supporting pile foundation, a supporting column and second steel latticework columns are constructed in a foundation pit; 2 and 3, earth is excavated to the bottom of first reinforced concrete inner supports, and the first reinforced concrete inner supports and first enclosing purlins are constructed; 4, the earth continues to be excavated downwards, and temporary supports or all floor structures and concrete inner supports are constructed; 5, the earth is excavated to a foundation slab, and a bedding layer, a bearing platform and the foundation slab are constructed; 6, the contained temporary supports are dismantled, and if the temporary supports are not contained, the next step is executed; 7, side walls of all the floor structures, earth outlet holes reserved in all the structural floors and a beam and slab structure on the top are constructed. According to the construction method, foundation engineering and upper structures are constructed at the same time, the construction time can be greatly shortened, the construction cost can be saved, and therefore the total cost of a project can be saved.

Description

A kind of structural floor that utilizes is as the construction method of the structural system of horizontal support
Technical field:
The invention belongs to technical field of buildings, refer in particular to a kind of structural floor that utilizes as the construction method of the structural system of horizontal support.
Background technology:
Along with the fast development of urban construction, the problems such as urban land resource is nervous, congested in traffic become increasingly conspicuous, and the development of the underground space becomes inexorable trend.Thereupon; contradiction between underground space development and environmental protection progressively manifests; for solving this contradiction; people set about research Base hole supporting technology and Construction Techniques for Deep Foundation Pit, and along with excavation of foundation pit is more and more darker, area is increasing, design and the construction of foundation pit enclosure structure become increasingly complex; for reducing foundation pit deformation to the impact of surrounding enviroment; the number of plies of inner support also gets more and more, and the ratio that base pit engineering accounts for project total cost is increasing, and resource consumption is larger.Therefore the integrated conduct method that combines with construction method of a kind of space enclosing structure of necessary exploration.
Foundation Design is the most frequently used construction method of excavation of foundation pit along practice construction, and most base pit engineering is all adopt along way construction.It has, and construction is simple, cost is low, and speed is fast, be convenient to the advantages such as big machinery operation.But be reinforced concrete inner support system or bracing members all exists some problems, bracing members construction precision requires higher, by component processing, man's activity degree is larger, careless slightly with the node processing going along with sb. to guard him junction, foundation pit enclosure structure can be caused to produce moderate finite deformation, affect the use of foundation ditch, severe patient affects the construction of Foundation Design; Although reinforced concrete support inner support rigidity is larger, space enclosing structure distortion effectively can be controlled in the excavation stage, but need support replacement in the structure construction stage, in support replacement process, space enclosing structure is a kind of new force status, and reinforced concrete inner support needs to cut, affect surrounding environment and waste resource.
Foundation Design reverse construction mainly applies to that foundation ditch is comparatively dark, surrounding environment is complicated, go along with sb. to guard him Deformation control requires higher engineering, namely first construction is gone along with sb. to guard him and central pile, post construction, by certain supplementary means (as increased bracing members etc. in position by calculating), be excavated to absolute altitude at the bottom of every layer of beam slab successively from top to bottom subsequently, to construct this Rotating fields floor, using the inner support of this Rotating fields floor as space enclosing structure.
Summary of the invention:
The object of this invention is to provide a kind of safety increasing foundation ditch, reduce surrounding enviroment impact, what ensure that the construction of base pit engineering carries out smoothly utilizes structural floor as the construction method of the structural system of horizontal support.
The present invention is achieved in that
Utilize structural floor as a construction method for the structural system of horizontal support, concrete steps are as follows:
(1) construct in foundation ditch space enclosing structure, Reinforcement with Cement-mixed Piles foundation soil and engineering pile foundation and support pile foundation;
(2) constructing structure post on engineering pile foundation, Construction Support post in support pile foundation, installs in the first steel lattice column, support column and arranges the second steel lattice column in structural column;
(3) cut the earth from top to bottom according to Foundation Design contrary sequence method, while cutting the earth, corresponding cement mixing pile is excavated, dig the bottom to first reinforced concrete inner support, then construction first reinforced concrete inner support and first enclose purlin simultaneously, described enclosing on purlin is reserved with pouring hole and steel bushing, pouring hole is used for pouring structure side wall, and steel bushing connects the vertical reinforcement of corresponding structure side wall;
(4) continue to cut the earth downwards, according to design needs, if need to arrange temporary support, then dig the bottom to first bracing members, then construction first bracing members, if do not need to arrange bracing members, directly carries out next step construction, i.e. step (5);
(5) continue to cut the earth downwards, dig the bottom to B1 structural floor, then construction second concrete inner support, B1 structural floor and second enclose purlin simultaneously, described enclosing on purlin is reserved with pouring hole and steel bushing, pouring hole is used for pouring structure side wall, steel bushing connects the vertical reinforcement of corresponding structure side wall, and B1 structural floor is reserved with unearthed hole;
(6) repeat step (4), (5) continuation is cut the earth downwards, according to design needs, if need to arrange temporary support, then first repeat step (4), corresponding bracing members is installed, continue again to cut the earth downwards and repeat step (5) and to construct corresponding concrete inner support, structural floor and enclose purlin simultaneously, described enclosing on purlin is reserved with pouring hole and steel bushing, pouring hole is used for pouring structure side wall, steel bushing connects the vertical reinforcement of corresponding structure side wall, and each structural floor is reserved with unearthed hole;
If do not need to arrange temporary support, then directly repeat step (5) to construct corresponding concrete inner support, structural floor and enclose purlin simultaneously, described enclosing on purlin is reserved with pouring hole and steel bushing, pouring hole is used for pouring structure side wall, steel bushing connects the vertical reinforcement of corresponding structure side wall, and each structural floor is reserved with unearthed hole;
(7) cut the earth to sole plate, construction cushion coat, cushion cap and base plate;
(8) include temporary support in above-mentioned steps, then first remove temporary support, if do not comprise temporary support, directly carry out next step construction;
(9) to construct successively from the bottom up each Rotating fields side wall along the practice according to Foundation Design;
(10) unearthed hole reserved in each structural floor of constructing;
(11) beam and slab structure at construction top.
Above-mentioned reinforced concrete inner support is all reserved with sleeve, and sleeve is for connecting reinforcing bar when building reserved unearthed hole place structural floor.
Above-mentioned space enclosing structure is diaphragm wall or campshed.
Spacing≤1m between above-mentioned pouring hole.
Above-mentioned cement mixing pile is positioned at reinforced concrete inner support both sides, width >=3m, and this cement mixing pile and space enclosing structure are constructed simultaneously, is grouser.
The advantage that the present invention gives prominence to compared to existing technology is:
1, the present invention uses corresponding structural floor as inner support, because this structural floor is overall as inner support, integral rigidity is large, particularly horizontal in-plane stiffness is very large, increase a lot with the inner support rigidity designed separately, can control and reduce space enclosing structure distortion better, increase the safety of foundation ditch, ensure that the construction of base pit engineering is carried out smoothly.
2, the present invention adopts reverse construction to underground structural floor, Foundation Design and superstructure can be made to construct, the saving engineering time that can be larger simultaneously, saves operating expenses, thus also saves the total cost of project.
3, the dust that the present invention can save a large amount of inner support material, the work such as dismounting that avoids inner support bring and the impact that noise brings to surrounding enviroment, have that high financial profit, social benefit are large, the effect of environmental protection.
Accompanying drawing illustrates:
Fig. 1 is structural representation of the present invention;
Fig. 2 is the arrangement diagram of first reinforced concrete inner support of the present invention;
Fig. 3 is the arrangement diagram of first bracing members of the present invention;
Fig. 4 is the arrangement diagram of second reinforced concrete inner support of the present invention;
Fig. 5 is the schematic diagram of the second steel lattice column of the present invention;
Fig. 6 is the 1-1 sectional view of Fig. 5;
Fig. 7 is the schematic diagram of the first steel lattice column of the present invention;
Fig. 8 is the 2-2 sectional view of Fig. 7;
Fig. 9 is the 3-3 sectional view of Fig. 7;
Figure 10 is structure side wall pouring hole detail drawing of the present invention.
Detailed description of the invention:
With specific embodiment, the invention will be further described below, see Fig. 1-10:
Utilize structural floor as a construction method for the structural system of horizontal support, concrete steps are as follows:
(1) construct in foundation ditch space enclosing structure 1, cement mixing pile 2 consolidated subsoil soil and engineering pile foundation 3 and support pile foundation 4;
(2) constructing structure post 5 on engineering pile foundation 3, Construction Support post 6 in support pile foundation 4, installs in the first steel lattice column 7, support column 6 and arranges the second steel lattice column 8 in structural column 5;
(3) cut the earth from top to bottom according to Foundation Design contrary sequence method, while cutting the earth, corresponding cement mixing pile 2 is excavated, dig the bottom to first reinforced concrete inner support 9, then construction first reinforced concrete inner support 9 and first enclose purlin 10 simultaneously, described enclosing on purlin is reserved with pouring hole 11 and steel bushing 12, pouring hole 11 is for pouring structure side wall 13, and steel bushing 12 connects the vertical reinforcement 14 of corresponding structure side wall 13;
(4) continue to cut the earth downwards, according to design needs, if need to arrange temporary support, then dig the bottom to first bracing members 16, then construction first bracing members 16, if do not need to arrange bracing members, directly carries out next step construction, i.e. step (5);
(5) continue to cut the earth downwards, dig the bottom to B1 structural floor 17, then construction second concrete inner support 24, B1 structure building 17 floor and second enclose purlin 18 simultaneously, described enclosing on purlin is reserved with pouring hole 11 and steel bushing 12, pouring hole 11 is for pouring structure side wall 13, steel bushing 12 connects the vertical reinforcement 14 of corresponding structure side wall 13, and B1 structural floor 17 is reserved with unearthed hole 19;
(6) repeat step (4), (5) continuation is cut the earth downwards, according to design needs, if need to arrange temporary support, then first repeat step (4), corresponding bracing members is installed, continue again to cut the earth downwards and repeat step (5) and to construct corresponding concrete inner support, structural floor and enclose purlin simultaneously, described enclosing on purlin is reserved with pouring hole 11 and steel bushing 12, pouring hole 11 is for pouring structure side wall 13, steel bushing 12 connects the vertical reinforcement 14 of corresponding structure side wall 13, and each structural floor is reserved with unearthed hole 19;
If do not need to arrange temporary support, then directly repeat step (5) to construct corresponding concrete inner support, structural floor and enclose purlin simultaneously, described enclosing on purlin is reserved with pouring hole 11 and steel bushing 12, pouring hole 11 is for pouring structure side wall 13, steel bushing 12 connects the vertical reinforcement 14 of corresponding structure side wall 13, and each structural floor is reserved with unearthed hole 19;
(7) cut the earth to sole plate, construction cushion coat, cushion cap and base plate 20;
(8) include temporary support in above-mentioned steps, then first remove temporary support, if do not comprise temporary support, directly carry out next step construction;
(9) to construct successively from the bottom up each Rotating fields side wall 13 along the practice according to Foundation Design;
(10) unearthed hole 19 reserved in each structural floor of constructing, builds unearthed hole 19 place;
(11) beam and slab structure 21 at construction top.
Above-mentioned reinforced concrete inner support is all reserved with sleeve 22, and sleeve 22 is for connecting the reinforcing bar 23 when building reserved unearthed hole 19 place's structural floor.
Above-mentioned space enclosing structure 1 is diaphragm wall or campshed, also can be that other concrete are gone along with sb. to guard him.
Spacing≤1m between above-mentioned pouring hole 11.
Above-mentioned cement mixing pile 2 is positioned at reinforced concrete inner support both sides, and the end of to the width >=3m on top, this cement mixing pile 2 is constructed with space enclosing structure 1 simultaneously, is grouser.
The present invention uses corresponding structural floor as inner support, because this structural floor is overall as inner support, integral rigidity is large, particularly horizontal in-plane stiffness is very large, increase a lot with the inner support rigidity designed separately, can control and reduce space enclosing structure distortion better, increase the safety of foundation ditch, ensure that the construction of base pit engineering is carried out smoothly.
Below for the structure of lower four layers of construction ground:
Present case concrete steps are as follows:
(1) construct space enclosing structure 1 and cement mixing pile 2 consolidated subsoil soil and engineering pile foundation 3 and support pile foundation 4;
(2) constructing structure post 5 on engineering pile foundation 3, Construction Support post 6 in support pile foundation 4, installs in the first steel lattice column 7, support column 6 and arranges the second steel lattice column 8 in structural column 5;
(3) cut the earth from top to bottom according to Foundation Design contrary sequence method, while cutting the earth, corresponding cement mixing pile 2 is excavated, dig the bottom to first reinforced concrete inner support 9, then construction first reinforced concrete inner support 9 and first enclose purlin 10 simultaneously, described enclosing on purlin is reserved with pouring hole 11 and steel bushing 12, pouring hole 11 is for pouring structure side wall 13, and steel bushing 12 connects the vertical reinforcement 14 of corresponding structure side wall 13;
(4) continue to cut the earth downwards, dig the bottom to first bracing members 16, first bracing members 16 of then constructing;
(5) continue to cut the earth downwards, dig the bottom to B1 structural floor 17, then construction second concrete inner support 24, B1 structure building 17 floor and second enclose purlin 18 simultaneously, described enclosing on purlin is reserved with pouring hole 11 and steel bushing 12, pouring hole 11 is for pouring structure side wall 13, steel bushing 12 connects the vertical reinforcement 14 of corresponding structure side wall 13, and B1 structural floor 17 is reserved with unearthed hole 19;
(6) continue to cut the earth downwards, dig the bottom to underground two-layer structure floor 25, construction the 3rd road concrete inner support 15, underground two-layer structure floor 25 and second encloses purlin 26 simultaneously, described enclosing on purlin 26 is reserved with pouring hole 11 and steel bushing 12, pouring hole 11 is for pouring structure side wall 13, steel bushing 12 connects the vertical reinforcement 14 of corresponding structure side wall 13, and underground two-layer structure floor 25 is reserved with unearthed hole 19;
(7) continue to cut the earth downwards, dig the bottom to second bracing members 27, second bracing members 27 of then constructing;
(8) continue to cut the earth downwards, dig the bottom to F3/B3 structural floor 28, construction the 4th road concrete inner support 29, F3/B3 structural floor 28 and the 3rd road encloses purlin 30 simultaneously, described enclosing on purlin 30 is reserved with pouring hole 11 and steel bushing 12, pouring hole 11 is for pouring structure side wall 13, steel bushing 12 connects the vertical reinforcement 14 of corresponding structure side wall 13, and F3/B3 structural floor 28 is reserved with unearthed hole 19;
(9) cut the earth to sole plate, construction cushion coat, cushion cap and base plate 20;
(10) first bracing members 16 and the second bracing members 25 of above-mentioned setting is removed;
(11) to construct successively from the bottom up each Rotating fields side wall 13 along the practice according to Foundation Design:
The structure side wall of first lower four layers of construction ground, then the structure side wall of F3/B3 of constructing successively, the structure side wall of two layers, underground and the structure side wall of B1;
(12) unearthed hole 19 reserved in each structural floor of constructing, builds unearthed hole 19 place;
(13) beam and slab structure 21 at construction top.
Above-mentioned reinforced concrete inner support is all reserved with sleeve 22, and sleeve 22 is for connecting the reinforcing bar 23 when building reserved unearthed hole 19 place's structural floor.
The first above-mentioned steel lattice column 7 is connected with each structural floor of underground, and the second steel lattice column 8 is connected with each road reinforced concrete inner support.
Spacing≤1 meter between above-mentioned concreting hole 7.
To sum up, what suppose to construct is F3/B3 structure, and also can construct according to above-mentioned method, arranging of temporary support is carried out calculating see the need of setting according to actual.
Above-described embodiment is only one of preferred embodiment of the present invention, not limits practical range of the present invention with this, therefore: all equivalence changes done according to shape of the present invention, structure, principle, all should be covered by within protection scope of the present invention.

Claims (5)

1. utilize structural floor as a construction method for the structural system of horizontal support, it is characterized in that: concrete steps are as follows:
(1) construct in foundation ditch space enclosing structure, Reinforcement with Cement-mixed Piles foundation soil and engineering pile foundation and support pile foundation;
(2) constructing structure post on engineering pile foundation, Construction Support post in support pile foundation, installs in the first steel lattice column, support column and arranges the second steel lattice column in structural column;
(3) cut the earth from top to bottom according to Foundation Design contrary sequence method, while cutting the earth, corresponding cement mixing pile is excavated, dig the bottom to first reinforced concrete inner support, then construction first reinforced concrete inner support and first enclose purlin simultaneously, described enclosing on purlin is reserved with pouring hole and steel bushing, pouring hole is used for pouring structure side wall, and steel bushing connects the vertical reinforcement of corresponding structure side wall;
(4) continue to cut the earth downwards, according to design needs, if need to arrange temporary support, then dig the bottom to the first bracing members, the first bracing members of then constructing, if do not need to arrange bracing members, directly carry out next step construction, i.e. step (5);
(5) continue to cut the earth downwards, dig the bottom to B1 structural floor, then construction second concrete inner support, B1 structural floor and second enclose purlin simultaneously, described enclosing on purlin is reserved with pouring hole and steel bushing, pouring hole is used for pouring structure side wall, steel bushing connects the vertical reinforcement of corresponding structure side wall, and B1 structural floor is reserved with unearthed hole;
(6) repeat step (4), (5) continuation is cut the earth downwards, according to design needs, if need to arrange temporary support, then first repeat step (4), corresponding bracing members is installed, continue again to cut the earth downwards and repeat step (5) and to construct corresponding concrete inner support, structural floor and enclose purlin simultaneously, described enclosing on purlin is reserved with pouring hole and steel bushing, pouring hole is used for pouring structure side wall, steel bushing connects the vertical reinforcement of corresponding structure side wall, and each structural floor is reserved with unearthed hole;
If do not need to arrange temporary support, then directly repeat step (5) to construct corresponding concrete inner support, structural floor and enclose purlin simultaneously, described enclosing on purlin is reserved with pouring hole and steel bushing, pouring hole is used for pouring structure side wall, steel bushing connects the vertical reinforcement of corresponding structure side wall, and each structural floor is reserved with unearthed hole;
(7) cut the earth to sole plate, construction cushion coat, cushion cap and base plate;
(8) include temporary support in above-mentioned steps, then first remove temporary support, if do not comprise temporary support, directly carry out next step construction;
(9) to construct successively from the bottom up each Rotating fields side wall along the practice according to Foundation Design;
(10) unearthed hole reserved in each structural floor of constructing;
(11) beam and slab structure at construction top.
2. a kind of structural floor that utilizes according to claim 1 is as the construction method of the structural system of horizontal support, it is characterized in that: described each reinforced concrete inner support is all reserved with sleeve, sleeve is for connecting reinforcing bar when building reserved unearthed hole place structural floor.
3. a kind of structural floor that utilizes according to claim 1 is as the construction method of the structural system of horizontal support, it is characterized in that: described space enclosing structure is diaphragm wall or campshed.
4. a kind of structural floor that utilizes according to claim 1 is as the construction method of the structural system of horizontal support, it is characterized in that: the spacing≤1m between described pouring hole.
5. a kind of structural floor that utilizes according to claim 1 is as the construction method of the structural system of horizontal support, it is characterized in that: described cement mixing pile is positioned at reinforced concrete inner support both sides, width >=3m, this cement mixing pile and space enclosing structure are constructed simultaneously, are grouser.
CN201510064558.0A 2015-02-06 2015-02-06 Construction method of structural system with structural floors as horizontal braces Pending CN104631466A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510064558.0A CN104631466A (en) 2015-02-06 2015-02-06 Construction method of structural system with structural floors as horizontal braces

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510064558.0A CN104631466A (en) 2015-02-06 2015-02-06 Construction method of structural system with structural floors as horizontal braces

Publications (1)

Publication Number Publication Date
CN104631466A true CN104631466A (en) 2015-05-20

Family

ID=53210664

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510064558.0A Pending CN104631466A (en) 2015-02-06 2015-02-06 Construction method of structural system with structural floors as horizontal braces

Country Status (1)

Country Link
CN (1) CN104631466A (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105133645A (en) * 2015-08-18 2015-12-09 中铁第一勘察设计院集团有限公司 Vertical shaft body structure internally provided with lattice stand columns and reverse construction method of vertical shaft body structure
CN105178327A (en) * 2015-07-17 2015-12-23 上海建工七建集团有限公司 Composite retaining structure of foundation pit project and construction method thereof
CN108755701A (en) * 2018-06-21 2018-11-06 腾达建设集团股份有限公司 The construction method of the support construction of deep basal pit
CN108930275A (en) * 2018-07-25 2018-12-04 中国铁路设计集团有限公司 It is a kind of to face forever in conjunction with the ultra-deep shaft rapid constructing method along inverse combination
CN110093929A (en) * 2019-05-20 2019-08-06 中铁隧道局集团有限公司 A kind of underground engineering is along practice construction method and structure
CN110777846A (en) * 2019-10-22 2020-02-11 中国建筑第八工程局有限公司 Local reverse construction soil matrix construction method for high-rise residential buildings
CN113175075A (en) * 2021-05-08 2021-07-27 中建八局第一建设有限公司 Construction method of large-span steel-concrete structure building
CN114263188A (en) * 2021-12-30 2022-04-01 上海市机械施工集团有限公司 Double-support platform structure for foundation pit engineering and construction method
CN114875972A (en) * 2022-04-21 2022-08-09 中铁隧道集团二处有限公司 Open-cut top-down foundation pit main structure construction method
CN115369916A (en) * 2022-09-21 2022-11-22 上海市机械施工集团有限公司 Underground building construction method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101117805A (en) * 2007-08-22 2008-02-06 浙江大学 Underground engineering one-pile multi-use semi reverse construction method
KR101014796B1 (en) * 2008-03-03 2011-02-15 주식회사 한빛구조엔지니어링 Top-down underground construction method using prefabricated concrete column member as temporary bridge column
CN104196032A (en) * 2014-08-12 2014-12-10 上海隧道工程有限公司 Subway station supporting plate and inversed operation combined construction method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101117805A (en) * 2007-08-22 2008-02-06 浙江大学 Underground engineering one-pile multi-use semi reverse construction method
KR101014796B1 (en) * 2008-03-03 2011-02-15 주식회사 한빛구조엔지니어링 Top-down underground construction method using prefabricated concrete column member as temporary bridge column
CN104196032A (en) * 2014-08-12 2014-12-10 上海隧道工程有限公司 Subway station supporting plate and inversed operation combined construction method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
孔加银: "杭州元华广场深基工程半逆作法施工", 《浙江建筑》 *
王民权: "利用部分结构楼板作支撑的支护设计", 《天津建设科技》 *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105178327A (en) * 2015-07-17 2015-12-23 上海建工七建集团有限公司 Composite retaining structure of foundation pit project and construction method thereof
CN105133645A (en) * 2015-08-18 2015-12-09 中铁第一勘察设计院集团有限公司 Vertical shaft body structure internally provided with lattice stand columns and reverse construction method of vertical shaft body structure
CN108755701A (en) * 2018-06-21 2018-11-06 腾达建设集团股份有限公司 The construction method of the support construction of deep basal pit
CN108930275A (en) * 2018-07-25 2018-12-04 中国铁路设计集团有限公司 It is a kind of to face forever in conjunction with the ultra-deep shaft rapid constructing method along inverse combination
CN110093929A (en) * 2019-05-20 2019-08-06 中铁隧道局集团有限公司 A kind of underground engineering is along practice construction method and structure
CN110777846A (en) * 2019-10-22 2020-02-11 中国建筑第八工程局有限公司 Local reverse construction soil matrix construction method for high-rise residential buildings
CN113175075A (en) * 2021-05-08 2021-07-27 中建八局第一建设有限公司 Construction method of large-span steel-concrete structure building
CN114263188A (en) * 2021-12-30 2022-04-01 上海市机械施工集团有限公司 Double-support platform structure for foundation pit engineering and construction method
CN114875972A (en) * 2022-04-21 2022-08-09 中铁隧道集团二处有限公司 Open-cut top-down foundation pit main structure construction method
CN114875972B (en) * 2022-04-21 2024-06-25 中铁隧道集团二处有限公司 Construction method for open cut reverse foundation pit main structure
CN115369916A (en) * 2022-09-21 2022-11-22 上海市机械施工集团有限公司 Underground building construction method

Similar Documents

Publication Publication Date Title
CN104631466A (en) Construction method of structural system with structural floors as horizontal braces
CN205776249U (en) A kind of combined inner supporting structure
CN103195085B (en) Downward story-adding basement and construction method thereof
CN105155549A (en) Partition support system for large-area deep foundation pit under forward and backward working condition, and construction method thereof
CN108278116B (en) Shallow-buried large-span pipe curtain supporting system and construction method thereof
CN102031785A (en) Foundation pit supporting technique for replacing temporary enclosing purlin by using plate belt of permanent structure
CN103696429A (en) Concrete support and fish-belly sill combined supporting system of special-shaped foundation pit and construction method
CN109505298A (en) A kind of self-balancing foundation pit enclosure method
CN204715366U (en) A kind of large-area deep foundation pit subregion is along the support system under inverse operating mode
CN103410152A (en) Construction method for long, narrow and deep foundation pit soil excavation
CN105113514B (en) Foundation pit enclosure system with underground continuous wall as vertical cantilever fulcrum and construction method
CN204456131U (en) A kind of structural floor that utilizes is as the structural system of horizontal support
CN101498133B (en) Method and supporting construction for enlarging basement top-down method earth excavation space
CN104196032A (en) Subway station supporting plate and inversed operation combined construction method
CN208517810U (en) A kind of temporary trestle bridge for deep big foundation pit excavation construction
KR20090090742A (en) Bottom-up construction method of underground structure using permanent strut
CN110616739B (en) Vertical construction method for underground space of existing building
CN110904992B (en) Elevator foundation member for integrally assembling elevator and construction method thereof
CN211257915U (en) Floor-adding structure of existing building underground space
CN205000340U (en) Regard as foundation ditch of vertical cantilever fulcrum to go along with sb. to guard him system with underground continuous wall
CN101307602A (en) Elevated large-sized apparatus foundation structure
KR20000058239A (en) Multi-phased underground construction method for wide excavation using permanent structural members as temporary struts
CN204151662U (en) A kind of one across the temporary trestle bridge crossing over river valley
CN109138484B (en) Construction method for connecting jacking layer-added concrete-filled steel tubular column with foundation
CN207727587U (en) A kind of preassembling supporting beam composite structure suitable for deposited reinforced concrete pile

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20150520

RJ01 Rejection of invention patent application after publication