CN104625018A CN201510100326.6A CN201510100326A CN104625018A CN 104625018 A CN104625018 A CN 104625018A CN 201510100326 A CN201510100326 A CN 201510100326A CN 104625018 A CN104625018 A CN 104625018A
Authority
CN
China
Prior art keywords
stopper
operating room
aluminium liquid
breach
chamber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510100326.6A
Other languages
Chinese (zh)
Inventor
张培军
张达鑫
叶松军
潘益琴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Tianhong Machinery Industry Co Ltd
Original Assignee
Jiangsu Tianhong Machinery Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Tianhong Machinery Industry Co Ltd filed Critical Jiangsu Tianhong Machinery Industry Co Ltd
Priority to CN201510100326.6A priority Critical patent/CN104625018A/en
Publication of CN104625018A publication Critical patent/CN104625018A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D18/00Pressure casting; Vacuum casting
    • B22D18/04Low pressure casting, i.e. making use of pressures up to a few bars to fill the mould

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Waste-Gas Treatment And Other Accessory Devices For Furnaces (AREA)

Abstract

The invention discloses a three-chamber electrical heating and heat preserving furnace for continuously-pressurized molten aluminum, which comprises two working chambers and one still standing chamber, wherein a liquid rising tube (2) and an immersed heating tube (9) are arranged in the working chamber I (1) and the working chamber II (8), a degassing rod (7) and the immersed heating tube (9) are arranged in the still standing chamber (6), the lower parts of the two sides of the still standing chamber (6) are respectively provided with a gap (12), the upper end of each gap (12) is provided with a stopper (10) and a stopper seat (11), and the furnace is characterized in that the connection of the still standing chamber (6) and the two working chambers is realized through the press fitting of the stopper (10) and the stopper seat (11). According to the invention, under the condition that molten aluminum in the two working chambers is respectively completely used, respectively through the gaps, interconnected with the working chambers, of the working chambers, molten aluminum in the still standing chamber flows to the working chambers by using the self-gravity thereof, so that a situation that the working chambers continuously provide molten aluminum to a low-pressure casting machine is ensured well, and then the low-pressure casting machine can realize continuous production.

Description

Three Room continuous pressure aluminium liquid electrical heating holding furnaces
Technical field
The present invention relates to three Room continuous pressure aluminium liquid electrical heating holding furnaces used when aluminium liquid produced by a kind of air injection machine.
Background technology
To air injection machine matching used aluminium liquid electrical heating holding furnace, shell is formed by iron plate integral solder, and attach heat-insulation layer and working lining successively from outside to inside, heat-insulation layer is high temperature insulating material, and working lining is containing Al 2o 3be not stained with aluminium material, enable to be stored in 650 DEG C of interior aluminium liquid and be well incubated.When air injection machine needs aluminum liquid filling type, system, to injecting compressed air in holding furnace, makes aluminium liquid inject the mold cavity of air injection machine by stalk.In this cavity filling process, the heat in holding furnace can run off, then need the electric heater for heating in holding furnace, makes the aluminium liquid in holding furnace maintain about 650 DEG C.Weak point: after the aluminium liquid 1, in holding furnace exhausts, needs again to add aluminium liquid in holding furnace, and within this time period again adding aluminium liquid, air injection machine is halted state always, can not produce by continuous print, causes waste of time.2, outside aluminium liquid is poured in holding furnace, and aluminium liquid does not effectively leave standstill and filters, and include a lot of oxide impurity, air injection machine directly utilizes the aluminium liquid cast article in holding furnace, easily produces defective product.
Summary of the invention
For above deficiency, the object of the present invention is to provide a kind of three Room continuous pressure aluminium liquid electrical heating holding furnaces, Fen Liangge operating room and a rest chamber, Liang Ge operating room provides aluminium liquid to use to two air injection machines respectively, rest chamber stores a certain amount of aluminium liquid and carries out leaving standstill filtration, when Liang Ge operating room aluminium liquid separately uses, respectively by operating room separately with the breach of rest chamber UNICOM, aluminium liquid in rest chamber utilizes the gravity of self to flow to operating room, well ensure that operating room provides aluminium liquid to air injection machine continuously, air injection machine is enable to realize continuous seepage.
Technical scheme of the present invention is achieved in the following ways: three Room continuous pressure aluminium liquid electrical heating holding furnaces, comprise Liang Ge operating room and a rest chamber, stalk and immersion heating tube is provided with in described operating room I and operating room II, degasification rod and immersion heating tube is provided with in rest chamber, two side lower parts of rest chamber have breach, the upper end of breach is provided with stopper and stopper seat, it is characterized in that: the connection of described rest chamber and two operating rooms is realized by the pressing of stopper and stopper seat, the breach connected between rest chamber and Liang Ge operating room is drive stopper to block the stopper be located on breach downwards by cylinder II respectively, stopper half-twist is driven to block breach by cylinder I again, oxide impurity is rolled, ensure that binding face seals completely.
Described cylinder II drives stopper downward, stopper and the laminating of stopper seat, blocks the breach between rest chamber and operating room I or operating room II.
Described cylinder I drives stopper half-twist, and the oxide impurity of indentation, there is rolled, and ensures that binding face seals completely.
An aluminium liquid liquid level sensor is had, for spending most when detecting aluminium liquid liquid level in described operating room I and operating room II.
Described operating room I and operating room II can work simultaneously, also can not simultaneously work.
The present invention, adopts immersion heating technique, and the most effective directly heat conduction, to aluminium liquid, saves the energy; The oxide generated reduces, and guarantees the cleannes of aluminium liquid.When Liang Ge operating room aluminium liquid separately uses, respectively by operating room separately with the breach of rest chamber UNICOM, aluminium liquid in rest chamber utilizes the gravity of self to flow to operating room, well ensure that operating room provides aluminium liquid to air injection machine continuously, enable air injection machine realize continuous seepage.The situation that three Room holding furnaces are put side by side for two low-pressure machine, saves more space and the energy.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention.
Fig. 2 is the I enlarged drawing of stopper and breach.
Detailed description of the invention
Known by Fig. 1, three Room continuous pressure aluminium liquid electrical heating holding furnaces, three Room holding furnace shells are formed by iron plate integral solder, comprise Liang Ge operating room and a rest chamber 6, stalk 2 and immersion heating tube 9 is provided with in described operating room I 1 and operating room II8, degasification rod 7 and immersion heating tube 9 is provided with in rest chamber 6, two side lower parts of rest chamber 6 have breach 12, the upper end of breach 12 is provided with stopper 10 and stopper seat 11 by stopper seat 11, described rest chamber 6 and the connection of two operating rooms are realized by stopper 10 pressing, breach 12 between UNICOM's rest chamber 6 and Liang Ge operating room is that cylinder II 5 drives stopper 10 to block the stopper 11 be located on breach 12 downwards respectively, stopper 10 half-twist is driven to block breach 13 by cylinder I 4 again, oxide impurity is rolled, ensure that binding face seals completely.
Being known by Fig. 2, is stopper and breach schematic diagram.Cylinder II 5 drives stopper 10 downward, and stopper 10 and stopper seat 11 are fitted, and blocks the breach between rest chamber 6 and operating room I 1 or operating room II8; Cylinder I 4 drives stopper 10 half-twist, and the oxide impurity at breach 12 place is rolled, and ensures that binding face seals completely.An aluminium liquid liquid level sensor 3 is had, for spending most when detecting aluminium liquid liquid level in described operating room I 1 and operating room II8.
Three described Room holding furnace shells are formed by iron plate integral solder, there are heat-insulation layer and working lining successively from outside to inside, according to the coefficient of heat transfer of heat-insulation layer and working lining, calculate the thickness of heat-insulation layer and working lining, ensure that the skin temperature of holding furnace is below 60 DEG C of safe temperatures.
Breach between UNICOM's rest chamber 6 and Liang Ge operating room, drives stopper 10 clogging by cylinder II 5, ensures that air injection machine is in compression casting, can carry out the supply to rest chamber 6 aluminium liquid, when the supply of aluminium liquid, not have an impact to pressurized control; Stopper is driven by cylinder I 4 and moves up and down, when stopper seat blocked by stopper, in order to the binding face preventing oxide impurity to be stuck in stopper 10 and stopper seat 11, then drive stopper half-twist by cylinder I 4, oxide impurity is rolled, ensures that binding face seals completely.Aluminium liquid through refinery by de-gassing operation is added to rest chamber 6, in transhipment aluminium liquid and toppling process, also can produce hydrogen is blended in aluminium liquid, after aluminium liquid adds rest chamber 6 to, the hydrogen in aluminium liquid is again removed by degasification rod, refining is carried out to aluminium liquid, farthest ensures the degree of purity that can use aluminium liquid.There is an aluminium liquid liquid level sensor 3 in operating room I 1 and operating room II8, when aluminium liquid being detected, illustrating that aluminium liquid liquid level has arrived the highest spacing, need to stop adding aluminium liquid.
There is provided aluminium liquid in the process of air injection machine in operating room, between two Room, the breach 12 of UNICOM is blocked all the time, do not affect the interpolation aluminium liquid to rest chamber 6, refinery by de-gassing work is carried out to the aluminium liquid in rest chamber 6, before reopening breach and aluminium liquid added to operating room I 1 and operating room II8, there is time enough to leave standstill the aluminium liquid in rest chamber 6, make the oxide impurity in aluminium liquid be deposited to bottom rest chamber 6, ensure the clarity flowing into aluminium liquid in operating room.While aluminium liquid is added to one of them operating room, do not affect the normal pressurization work of another operating room.
Illustrate:
1, cylinder II 5 drives stopper 10 downward, and stopper 10 and stopper seat 11 are fitted, and block the breach between operating room I 1 and operating room II8;
2, cylinder II 5 drives stopper 10 to rotate, and what stopper 10 and stopper seat 11 were fitted is tighter;
3, aluminium liquid is added in rest chamber 6, and degasification rod starts nitrogen injection, removes the hydrogen in aluminium liquid;
4, the aluminium liquid in rest chamber 6 starts to leave standstill, precipitated oxides impurity;
5, cylinder II 5 drives stopper 10 upwards, and stopper 10 leaves stopper seat 11, and the breach 12 between operating room I 1 and rest chamber 6 is opened;
6, the aluminium liquid in rest chamber 6, under self gravitation effect, flow into operating room I 1 by the breach 12 between operating room I 1 and rest chamber 6;
7, in operating room I 1, aluminium liquid liquid level sensor detects aluminium liquid;
8, operating room I 1 is injected into compressed air, and compressing aluminium liquid enters in the mold cavity of air injection machine by stalk;
9, the aluminium liquid circulation between operating room II8 and rest chamber 6 is circulated consistent with the aluminium liquid between operating room I 1 and rest chamber 6.

Claims (5)

1. three Room continuous pressure aluminium liquid electrical heating holding furnaces, comprise Liang Ge operating room and a rest chamber, described operating room I (1) and operating room II(8) in be provided with stalk (2) and immersion heating tube (9), degasification rod (7) and immersion heating tube (9) is provided with in rest chamber (6), two side lower parts of rest chamber (6) have breach (12), the upper end of breach (12) is provided with stopper (10) and stopper seat (11), it is characterized in that: described rest chamber (6) and the connection of two operating rooms are realized by the pressing of stopper (10) with stopper seat (11), the breach (12) connected between rest chamber (6) and Liang Ge operating room is drive stopper (10) to block the stopper (11) be located on breach (12) downwards by cylinder II (5) respectively, stopper (10) half-twist is driven to block breach (12) by cylinder I (4) again, oxide impurity is rolled, ensure that binding face seals completely.
2. three Room continuous pressure aluminium liquid electrical heating holding furnaces according to claim 1, it is characterized in that: described cylinder II (5) drives stopper (10) downward, stopper (10) and stopper seat (11) laminating, block rest chamber (6) and operating room I (1) or operating room II(8) between breach (12).
3. three Room continuous pressure aluminium liquid electrical heating holding furnaces according to claim 1, is characterized in that: described cylinder I (4) drives stopper (10) half-twist, and the oxide impurity at breach (12) place is rolled, and ensure that binding face seals completely.
4. three Room continuous pressure aluminium liquid electrical heating holding furnaces according to claim 1, is characterized in that: described operating room I (1) and operating room II(8) in all have an aluminium liquid liquid level sensor (3), for spending most when detecting aluminium liquid liquid level.
5. three Room continuous pressure aluminium liquid electrical heating holding furnaces according to claim 1, is characterized in that: described operating room I (1) and operating room II(8) can work simultaneously, also can not simultaneously work.
CN201510100326.6A 2015-03-09 2015-03-09 Three-chamber electrical heating and heat preserving furnace for continuously-pressurized molten aluminum Pending CN104625018A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510100326.6A CN104625018A (en) 2015-03-09 2015-03-09 Three-chamber electrical heating and heat preserving furnace for continuously-pressurized molten aluminum

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510100326.6A CN104625018A (en) 2015-03-09 2015-03-09 Three-chamber electrical heating and heat preserving furnace for continuously-pressurized molten aluminum

Publications (1)

Publication Number Publication Date
CN104625018A true CN104625018A (en) 2015-05-20

Family

ID=53204515

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510100326.6A Pending CN104625018A (en) 2015-03-09 2015-03-09 Three-chamber electrical heating and heat preserving furnace for continuously-pressurized molten aluminum

Country Status (1)

Country Link
CN (1) CN104625018A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105772653A (en) * 2016-05-17 2016-07-20 昆山六丰机械工业有限公司 Gating system for automobile hubs
CN105772681A (en) * 2016-05-17 2016-07-20 昆山六丰机械工业有限公司 Casting equipment for automobile hubs
CN107052303A (en) * 2016-12-11 2017-08-18 贵阳煜兴车轮制造有限公司 A kind of big stove of aluminium alloy smelting
CN107470586A (en) * 2017-08-31 2017-12-15 江苏天宏机械工业有限公司 A kind of Room holding furnace of low pressure casting three with aluminium liquid suspension function
CN107952945A (en) * 2017-12-26 2018-04-24 江苏凯特汽车部件有限公司 Semi solid aluminum wheel hub rheology twin furnace apparatus for continuous formation

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0846509A1 (en) * 1996-12-05 1998-06-10 General Motors Corporation Two-chamber furnace for countergravity casting
CN101094740A (en) * 2004-11-25 2007-12-26 株式会社东热 Holding furnace for low pressure casting
CN201147829Y (en) * 2007-12-12 2008-11-12 湖州郎立电工器材制造有限公司 Apparatus for producing copper rod and copper belt
CN201940577U (en) * 2011-04-20 2011-08-24 中信戴卡轮毂制造股份有限公司 Heat preserving furnace of low-pressure casting wheel
CN202143945U (en) * 2011-05-24 2012-02-15 李福金 Up-drawing continuous casting machine for super-wide type copper strip embryo
CN202779702U (en) * 2012-10-15 2013-03-13 江苏天宏自动化科技有限公司 Double-chamber heat-preserving furnace of low-pressure casting machine
CN103495718A (en) * 2013-09-17 2014-01-08 浙江万丰科技开发有限公司 Continuous low pressure casting production method and device
CN103862023A (en) * 2014-03-27 2014-06-18 中信戴卡股份有限公司 Casting equipment
CN203887206U (en) * 2014-06-11 2014-10-22 烟台路通精密铝业有限公司 Holding furnace of low-pressure die casting machine
CN204565088U (en) * 2015-03-09 2015-08-19 江苏天宏机械工业有限公司 Three Room continuous pressure aluminium liquid electrical heating holding furnaces

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0846509A1 (en) * 1996-12-05 1998-06-10 General Motors Corporation Two-chamber furnace for countergravity casting
CN101094740A (en) * 2004-11-25 2007-12-26 株式会社东热 Holding furnace for low pressure casting
CN201147829Y (en) * 2007-12-12 2008-11-12 湖州郎立电工器材制造有限公司 Apparatus for producing copper rod and copper belt
CN201940577U (en) * 2011-04-20 2011-08-24 中信戴卡轮毂制造股份有限公司 Heat preserving furnace of low-pressure casting wheel
CN202143945U (en) * 2011-05-24 2012-02-15 李福金 Up-drawing continuous casting machine for super-wide type copper strip embryo
CN202779702U (en) * 2012-10-15 2013-03-13 江苏天宏自动化科技有限公司 Double-chamber heat-preserving furnace of low-pressure casting machine
CN103495718A (en) * 2013-09-17 2014-01-08 浙江万丰科技开发有限公司 Continuous low pressure casting production method and device
CN103862023A (en) * 2014-03-27 2014-06-18 中信戴卡股份有限公司 Casting equipment
CN203887206U (en) * 2014-06-11 2014-10-22 烟台路通精密铝业有限公司 Holding furnace of low-pressure die casting machine
CN204565088U (en) * 2015-03-09 2015-08-19 江苏天宏机械工业有限公司 Three Room continuous pressure aluminium liquid electrical heating holding furnaces

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105772653A (en) * 2016-05-17 2016-07-20 昆山六丰机械工业有限公司 Gating system for automobile hubs
CN105772681A (en) * 2016-05-17 2016-07-20 昆山六丰机械工业有限公司 Casting equipment for automobile hubs
CN107052303A (en) * 2016-12-11 2017-08-18 贵阳煜兴车轮制造有限公司 A kind of big stove of aluminium alloy smelting
CN107470586A (en) * 2017-08-31 2017-12-15 江苏天宏机械工业有限公司 A kind of Room holding furnace of low pressure casting three with aluminium liquid suspension function
WO2019041390A1 (en) * 2017-08-31 2019-03-07 江苏天宏机械工业有限公司 Low-pressure die casting three-chamber holding furnace with aluminum liquid suspension function
CN107952945A (en) * 2017-12-26 2018-04-24 江苏凯特汽车部件有限公司 Semi solid aluminum wheel hub rheology twin furnace apparatus for continuous formation

Similar Documents

Publication Publication Date Title
CN104625018A (en) Three-chamber electrical heating and heat preserving furnace for continuously-pressurized molten aluminum
CN204565088U (en) Three Room continuous pressure aluminium liquid electrical heating holding furnaces
CN103934431B (en) A kind of titanium or titanium alloy complex thin wall castings antigravity building mortion and manufacturing process
CN103495718A (en) Continuous low pressure casting production method and device
CN104550805A (en) Device and method for preparing magnesium alloy ingot blank for deformation
CN104646646A (en) Double-chamber continuous-pressurization molten aluminum electrical heating and holding furnace
CN203764923U (en) Die casting mechanism of hot chamber die casting machine
CN203495184U (en) Pressure regulating cast device for thin section casting
CN204449266U (en) Two rooms continuous pressure aluminium liquid electrical heating holding furnace
CN103862023A (en) Casting equipment
CN106956001B (en) A kind of FDM type low-melting alloy 3D printer nozzle system and its application
CN205254096U (en) Supporting quantitative gravity -assist pouring stove of continuous calciner
CN203737996U (en) Casting device
CN201748796U (en) Half-continuous vacuum smelting furnace
CN208322064U (en) A kind of vacuum pressing and casting molding equipment
CN106925752A (en) A kind of water-cooled low pressure casting die
CN207071670U (en) A kind of big part forming machine of crucible furnace formula compression solidification aluminium alloy
CN205732822U (en) A kind of automatization low-temperature wax dewaxing device
CN106312019A (en) Continuous pressurizing and heating insulating furnace
CN202123223U (en) Calcium ingot smelting and pouring system
CN103614570B (en) Device and method of producing zinc ingot by zinc sediment
CN205008554U (en) High -efficient portable stalk
CN205057011U (en) Shedder who uses in titanium spindle production process
CN211057201U (en) Molten aluminum high-temperature melting furnace with auxiliary furnace
CN203018725U (en) Electro-slag liquid pouring system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20150520