CN104619001B - Base station ascending power control method and system - Google Patents

Base station ascending power control method and system Download PDF

Info

Publication number
CN104619001B
CN104619001B CN201410850911.3A CN201410850911A CN104619001B CN 104619001 B CN104619001 B CN 104619001B CN 201410850911 A CN201410850911 A CN 201410850911A CN 104619001 B CN104619001 B CN 104619001B
Authority
CN
China
Prior art keywords
noise ratio
plus noise
interference plus
signal
cell
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410850911.3A
Other languages
Chinese (zh)
Other versions
CN104619001A (en
Inventor
林敏�
廖礼宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Comba Network Systems Co Ltd
Original Assignee
Comba Telecom Systems China Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Comba Telecom Systems China Ltd filed Critical Comba Telecom Systems China Ltd
Priority to CN201410850911.3A priority Critical patent/CN104619001B/en
Publication of CN104619001A publication Critical patent/CN104619001A/en
Application granted granted Critical
Publication of CN104619001B publication Critical patent/CN104619001B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W52/00Power management, e.g. TPC [Transmission Power Control], power saving or power classes
    • H04W52/04TPC
    • H04W52/06TPC algorithms
    • H04W52/14Separate analysis of uplink or downlink
    • H04W52/146Uplink power control
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W52/00Power management, e.g. TPC [Transmission Power Control], power saving or power classes
    • H04W52/04TPC
    • H04W52/18TPC being performed according to specific parameters
    • H04W52/24TPC being performed according to specific parameters using SIR [Signal to Interference Ratio] or other wireless path parameters
    • H04W52/241TPC being performed according to specific parameters using SIR [Signal to Interference Ratio] or other wireless path parameters taking into account channel quality metrics, e.g. SIR, SNR, CIR, Eb/lo

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Quality & Reliability (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

A kind of base station ascending power control method of present invention offer and system, wherein method includes the following steps:Periodically acquire the mobile message that the intra-cell users of this base station report;Wherein, the mobile message includes the signal quality that user completes this cell where report of user when handover measurement;Statistics and average treatment are carried out to the mobile message, obtain the user location decision threshold needed for power control;According to user location decision threshold, cell is marked off into different Signal to Interference plus Noise Ratio and adjusts section;The corresponding channel compensation factor and minimum target Signal to Interference plus Noise Ratio are respectively set to the different Signal to Interference plus Noise Ratio adjustment section;Section and its corresponding channel compensation factor are adjusted according to the Signal to Interference plus Noise Ratio and minimum target Signal to Interference plus Noise Ratio is updated the target Signal to Interference plus Noise Ratio of user.Above-mentioned base station ascending power control method can simplify implementation process by periodically acquiring the mobile message that intra-cell users report come demarcation interval, improve uplink power control efficiency.

Description

Base station ascending power control method and system
Technical field
The present invention relates to mobile communication technology fields, more particularly on a kind of base station ascending power control method and base station Row power control system.
Background technology
For the cellular communication system of multiple cell, inter-cell interference is OFDM (Orthogonal Frequency Division Multiple, orthogonal frequency division multiplexing) main uplink interference in system, largely affect the property of system Energy.Wherein, it is influenced maximum to be Cell Edge User by inter-cell interference.In order to avoid intra-cell users are sent with maximum power Caused high interference levels and the performance for being degrading cell edge, and caused by each user power for reaching receiving terminal is identical The problems such as system spectral efficiency is low, LTE (Long Term Evolution, long term evolution) system propose Partial Power compensation Poewr control method so that the transmission power of UE (User Equipment, user equipment) is in maximum power and complete Between path loss compensation, the user of Intra-cell reaches SINR (the Signal to of receiving terminal closer to center of housing estate Interference plus Noise Ratio, Signal to Interference plus Noise Ratio) it is higher, there is higher transmission rate.
The common technology means for the solution uplink interference that the Poewr control method compensated by Partial Power is derived are general It is to be adjusted to the SINR of user based on user location division and use path loss difference or interference path loss difference method, such as incite somebody to action User in cell is divided into center of housing estate or cell edge, determines the region corresponding to user, centered on user setting target Classics SINR closed loop power control algorithms are still used when SINR value, are considered as when for Cell Edge User, target sinr values are set Path loss difference is based on path loss difference method, needs to know the interference information of the neighboring BS information of user and base station during realizing, The measuring configuration of user need to be increased and increase interactive operation between base station, it is multiple to increase user's power consumption, implementation process for operation in this way It is miscellaneous and cumbersome.
In conclusion there is neighboring BS information because needing to know user and base station in the existing mode for solving uplink interference Implementation process complexity caused by interference information and cumbersome problem.
Invention content
Based on this, it is necessary to for the existing mode for solving the problems, such as uplink interference there are implementation process complexity and cumbersome, A kind of base station ascending power control method and base station upstream power control system are provided.
A kind of base station ascending power control method, includes the following steps:
Periodically acquire the mobile message that the intra-cell users of this base station report;Wherein, the mobile message includes user Complete the signal quality of this cell where report of user when handover measurement;
Statistics and average treatment are carried out to the mobile message, obtain the user location decision threshold needed for power control;
According to user location decision threshold, cell is marked off into different Signal to Interference plus Noise Ratio and adjusts section;
The corresponding channel compensation factor is respectively set to the different Signal to Interference plus Noise Ratio adjustment section and minimum target letter is dry It makes an uproar ratio;
According to the corresponding Signal to Interference plus Noise Ratio adjustment section of user and its corresponding channel compensation factor and minimum target letter It is dry to make an uproar than calculating and updating the corresponding target Signal to Interference plus Noise Ratio of the user.
A kind of base station upstream power control system, including:
Acquisition module, the mobile message that the intra-cell users for periodically acquiring this base station report;Wherein, the movement Information includes the signal quality that user completes this cell where report of user when handover measurement;
Threshold module, the mobile message for being obtained to the acquisition module carry out statistics and average treatment, obtain power User location decision threshold needed for control;
Division module, the user location decision threshold for being obtained according to the threshold module, difference is marked off by cell Signal to Interference plus Noise Ratio adjust section;
Corresponding letter is respectively set in setup module, the different Signal to Interference plus Noise Ratio adjustment section for being divided to the division module Road compensation factor and minimum target Signal to Interference plus Noise Ratio;
Update module is calculated, for according to the corresponding Signal to Interference plus Noise Ratio adjustment section of user and its corresponding channel compensation The factor and minimum target Signal to Interference plus Noise Ratio calculate and update the corresponding target Signal to Interference plus Noise Ratio of the user.
Above-mentioned base station ascending power control method and base station upstream power control system, are used by periodically acquiring in cell The mobile message that family reports calculates the average value of signal quality in mobile message, and area is adjusted to obtain different Signal to Interference plus Noise Ratio Between, then the corresponding channel compensation factor and minimum target Signal to Interference plus Noise Ratio that Signal to Interference plus Noise Ratio adjusts section are set, according to the letter Dry make an uproar can believe dry make an uproar than adjustment section and its corresponding channel compensation factor and minimum target Signal to Interference plus Noise Ratio to the target of user Than being updated, it then can preferably control ascending power and provide preferable performance to the user, meanwhile, pass through periodicity The mobile message that acquisition intra-cell users report, which carrys out demarcation interval, can simplify implementation process, improve uplink power control efficiency.
Description of the drawings
Fig. 1 is an embodiment base station ascending power control method flow chart;
Fig. 2 is another embodiment base station ascending power control method flow chart;
Fig. 3 is an embodiment base station upstream power control system structural schematic diagram.
Specific implementation mode
Below in conjunction with the accompanying drawings to the tool of the base station ascending power control method and base station upstream power control system of the present invention Body embodiment is described in detail.
Referring to Fig. 1, Fig. 1 is an embodiment base station ascending power control method flow chart.
A kind of base station ascending power control method, includes the following steps:
Step S101:Periodically acquire the mobile message that the intra-cell users of this base station report;Wherein, the mobile message The signal quality of this cell where report of user when including user's completion handover measurement;
In step S101, mobile message refers mainly to the handover information of user, i.e. user completes to report use when handover measurement The signal quality of this cell where family, such as user pass through RSRP (Reference Signal Receiving Power, reference Signal reception power) this cell signal quality for reporting, it is user to obtain the mobile message that the intra-cell users of this base station report The foundation of ascending power is controlled when being moved.
Step S102:Statistics and average treatment are carried out to the mobile message, obtain the user location needed for power control Decision threshold;
In step s 102, statistics and average treatment are carried out to the mobile message, can preferably obtains the movement The average value of information, the user location decision threshold can have it is multiple, such as three, including cell switching band decision threshold, Secondary center of housing estate decision threshold, center of housing estate decision threshold, so as to better demarcation interval, the entirety for improving cell gulps down The amount of spitting.
In one embodiment, described that statistics and average treatment are carried out to the mobile message, it obtains needed for power control The step of user location decision threshold may include:
Statistical weight is carried out averagely to the mobile message or statistics arithmetic average is handled, cell switching band is obtained and adjudicates Thresholding;
Time center of housing estate decision threshold is obtained by calculation formula according to cell switching band decision threshold and center of housing estate is sentenced Certainly thresholding;Wherein, calculation formula is A=B+ Δs1=C+2* Δs1, the A expressions center of housing estate decision threshold, described time of B expressions Center of housing estate decision threshold, C indicate the cell switching band decision threshold, Δ1Indicate the signal quality difference of setting.
The signal quality difference of setting can be set according to the experience of previous base station uplink power control, Ke Yiwei 2dB, or 5dB etc. can make the mapping of the section divided and user more accurate by the signal quality difference of setting, So as to improve the entire throughput of cell.
Step S103:According to user location decision threshold, cell is marked off into different Signal to Interference plus Noise Ratio and adjusts section;
Further, in one embodiment, described according to user location decision threshold, cell is marked off into different letters and is done It makes an uproar and may include than adjustment section step:
According to user location decision threshold, adjudicated not less than the center of housing estate according to the signal quality in center of housing estate section The signal quality of thresholding, secondary center of housing estate section is sentenced not less than the secondary center of housing estate decision threshold and less than the center of housing estate The signal quality of certainly thresholding, cell impulsive switches band decision threshold not less than the cell and is less than the secondary center of housing estate Decision threshold, the signal quality in cell edge section are less than cell switching band decision threshold and are divided into four Signal to Interference plus Noise Ratio tune Between main plot.
Being divided into four Signal to Interference plus Noise Ratio adjustment sections includes:Center of housing estate section, secondary center of housing estate section, cell switch area Between, cell edge section, the interference of cell can also be reduced while can to meet the performance requirement of different user.
Step S104:The corresponding channel compensation factor and minimum are respectively set to the different Signal to Interference plus Noise Ratio adjustment section Target Signal to Interference plus Noise Ratio;
In step S104, the corresponding channel compensation factor and minimum are respectively set to different Signal to Interference plus Noise Ratio adjustment sections Target Signal to Interference plus Noise Ratio is handled up so as to which corresponding target Signal to Interference plus Noise Ratio is arranged according to different user to improve entire cell Amount.
Further, in one embodiment, described that corresponding channel is arranged to the different Signal to Interference plus Noise Ratio adjustment section In compensation factor and minimum target Signal to Interference plus Noise Ratio step, the mode of setting may include:
The center of housing estate section, secondary center of housing estate section, cell impulsive, cell edge section channel compensation because Son and minimum target Signal to Interference plus Noise Ratio successively decrease successively, and the section minimum target in two neighboring section close to center of housing estate believes dry make an uproar Than more than the section maximum target Signal to Interference plus Noise Ratio close to cell edge.
The center of housing estate section, secondary center of housing estate section, cell impulsive, cell side are set in the way of successively decreasing The channel compensation factor and minimum target Signal to Interference plus Noise Ratio in edge section can make the target letter of the user close to center of housing estate is dry to make an uproar Than the target Signal to Interference plus Noise Ratio more than the user far from center of housing estate, so as to reduce cell edge section and cell impulsive Interference to the center section, secondary center of housing estate section of the cell, improves the entire throughput of cell.
Step S105:According to the corresponding Signal to Interference plus Noise Ratio adjustment section of user and its corresponding channel compensation factor and most Small object Signal to Interference plus Noise Ratio calculates and updates the corresponding target Signal to Interference plus Noise Ratio of the user.
Section is adjusted according to the channel compensation factor and minimum target Signal to Interference plus Noise Ratio and the corresponding Signal to Interference plus Noise Ratio of user, is passed through The mode of calculating can obtain the target Signal to Interference plus Noise Ratio of user, to update the target Signal to Interference plus Noise Ratio of user.
In one embodiment, described according to the corresponding Signal to Interference plus Noise Ratio adjustment section of user and its corresponding channel compensation The factor and minimum target Signal to Interference plus Noise Ratio calculate and may include the step of updating the user corresponding target Signal to Interference plus Noise Ratio:
Obtain the current location information of user;The corresponding Signal to Interference plus Noise Ratio of the user is searched according to the current location information Adjust section;
Section and its corresponding channel compensation factor are adjusted according to the Signal to Interference plus Noise Ratio and minimum target Signal to Interference plus Noise Ratio calculates Go out the Signal to Interference plus Noise Ratio needed for user's corresponding position, the Signal to Interference plus Noise Ratio is updated to the target Signal to Interference plus Noise Ratio of user.
Location information refers mainly to the path loss of user distance service base station in this serving cell, can pass through UE (User Equipment, user terminal) measures the RSRP reported or PHR (Power Headroom Report, power headroom Report) it is estimated;The method of lookup is mapped to corresponding Signal to Interference plus Noise Ratio adjustment section simultaneously according to the location information of user The calculation formula of the target Signal to Interference plus Noise Ratio in section where obtaining user, calculates the target Signal to Interference plus Noise Ratio for obtaining user.
Above-mentioned base station ascending power control method, the mobile message reported by periodically acquiring intra-cell users calculate The average value of signal quality in mobile message adjusts section to obtain different Signal to Interference plus Noise Ratio, Signal to Interference plus Noise Ratio tune is then arranged The corresponding channel compensation factor between main plot and minimum target Signal to Interference plus Noise Ratio adjust section and its correspondence according to the Signal to Interference plus Noise Ratio The channel compensation factor and minimum target Signal to Interference plus Noise Ratio the target Signal to Interference plus Noise Ratio of user can be updated, then can be more preferable Control ascending power and provide preferable performance to the user, in this way will not because the coverage area of base station adjust and influence use The target Signal to Interference plus Noise Ratio that family physical location is mapped to corresponding section calculates, and has stronger operability.Meanwhile passing through periodicity The mobile message that acquisition intra-cell users report, which carrys out demarcation interval, can simplify implementation process, improve uplink power control efficiency.
For the further base station ascending power control method that the present invention will be described in detail, below in conjunction with concrete application Example illustrates.
Referring to Fig. 2, Fig. 2 is another embodiment base station ascending power control method flow chart.
For dynamically adjusted in the embodiment of the present invention user location and different location interval parameter method exemplary stream Cheng Tu, this method are used in base station, the method comprising the steps of S201- steps S207:
Step S201, the mobile message of base station periodic harvest intra-cell users;
Mobile message in the step S201 refers mainly to the handover information of user, i.e. user completes to report when handover measurement The signal quality of this cell where user, such as RSRP.
Periodic harvest user in the step S201 mobile message operation can according to actual application scenarios come Determine the period length collected, indoors under scene, the number that movement occurs for user is less, therefore can be by the period under the scene Setting is longer;Indoors in outdoor overlapping region, the number that movement occurs for user is more, therefore can be by the period under the scene Setting is shorter;
Step S202, base station carry out statistical disposition according to the mobile message being collected into, and obtain the user needed for power control Position decision threshold;
User location decision threshold in the step S202 is mainly sentenced including center of housing estate decision threshold, secondary center of housing estate Certainly thresholding and cell switching band decision threshold three, wherein cell switching band decision threshold is that base station is collected in measurement period To mobile message carry out that statistical weight is average or the method for arithmetic average obtains, which corresponds to user and completes switching survey The place reported when amount services the signal quality average value of this cell;Secondary center of housing estate decision threshold=cell switching band decision gate Limit+Δ1, the thresholding correspond to user start handover measurement when signal quality average value;Center of housing estate decision threshold=secondary cell Center decision threshold+Δ1=cell switching band decision threshold+2* Δs1, the thresholding respective cell center and subcenter user adjudicate The signal quality average value of thresholding;Δ1Indicate that signal quality difference, the size of the value influence center of housing estate and edge customer place The division in region can be configured according to covering and switching signal situation between base station in practical application, configuration range (0, 10) dB, such as it is configured to 5dB, it is assumed that base station carries out statistical weight according to the mobile message being collected into and averagely obtains cell switching Band decision threshold is -95dBm, then secondary center of housing estate decision threshold is -90dBm, and center of housing estate decision threshold is -85dBm;
Step S203:Base station marks off different position sections according to user location decision threshold;
Position section in the step S203 includes mainly center of housing estate, secondary center of housing estate, cell switching band and cell Four, edge section, wherein center of housing estate section are that signal quality is adjudicated more than or equal to center of housing estate in serving cell where user Corresponding position when thresholding;Secondary center of housing estate section is that signal quality is less than center of housing estate decision gate in serving cell where user It limits and is more than or equal to corresponding position when secondary center of housing estate decision threshold;Cell switching band section is serving cell where user Interior signal quality is less than time center of housing estate decision threshold and position corresponding more than or equal to when switching with decision threshold;Cell side Edge section is that signal quality is less than corresponding position when switching band decision threshold in serving cell where user;
Step S204:Different power contorl parameters are arranged to different position sections in base station:The channel compensation factor With minimum target Signal to Interference plus Noise Ratio;
The channel compensation factor and minimum target Signal to Interference plus Noise Ratio in the step S204 are matched according to four positions section It sets, following criterion may be used in the principle of configuration:Four center of housing estate, secondary center of housing estate, cell switching band and cell edge areas Between the channel compensation factor be gradually reduced, and the minimum target Signal to Interference plus Noise Ratio in four sections is gradually reduced, and ensures each area Between the maximum target Signal to Interference plus Noise Ratio that calculates be less than the minimum target Signal to Interference plus Noise Ratio close to center of housing estate section, for example, secondary small The maximum target Signal to Interference plus Noise Ratio of district center should be smaller than the minimum target Signal to Interference plus Noise Ratio of center of housing estate, wherein maximum target Signal to Interference plus Noise Ratio According to the channel compensation factor and minimum target Signal to Interference plus Noise Ratio, it is calculated by Signal to Interference plus Noise Ratio calculation formula.
This concrete application example realizes that dynamic position section is drawn by the user mobile information in periodic harvest cell Point, the target Signal to Interference plus Noise Ratio meter that user's physical location is mapped to corresponding section will not be influenced because of the adjustment of the coverage area of base station It calculates, there is stronger operability.In addition, different path loss is arranged to different position sections in this concrete application example Compensation factor and minimum target Signal to Interference plus Noise Ratio ensure that the user for switching band and cell edge in cell will not be to subcenter Cell and Cell Center User interfere, and ensure that user's lowest performance of cell switching band and cell edge is wanted It asks, under the premise of avoiding interference, improves cell entire throughput and handover success rate.
Step S205:Base station obtains the location information of user;
Location information in the step S205 refers mainly to the path damage of user distance service base station in this serving cell Consumption can be estimated by RSRP that UE measurements report or PHR;
Step S206:Corresponding Signal to Interference plus Noise Ratio (SINR) is searched according to customer position information and adjusts section in base station;
The method of lookup in the step S206 is mapped to according to the location information of user in center of housing estate, secondary cell One of section in four heart, cell switching band and cell edge sections, and the target letter for obtaining user place section is dry Make an uproar than calculation formula;
Step S207, base station calculate the Signal to Interference plus Noise Ratio needed for corresponding position, update the target Signal to Interference plus Noise Ratio of user (SINRtar);
This concrete application example obtains the location information of user by the mobile message that user's measurement reports, and searches corresponding Signal to Interference plus Noise Ratio calculation formula, the target Signal to Interference plus Noise Ratio of this user is calculated according to Signal to Interference plus Noise Ratio calculation formula.This is specifically answered With the Signal to Interference plus Noise Ratio calculation formula of location information of the example based on user and different sections, ensure that in cell switch band and The user of cell edge will not interfere secondary middle cell heart user and center of housing estate, while also ensure that cell switches band And user's minimum performance requirement of cell edge improves cell entire throughput and switching under the premise of avoiding interference Success rate.
Referring to Fig. 3, Fig. 3 is an embodiment base station upstream power control system structural schematic diagram.
A kind of base station upstream power control system, including:
Acquisition module 310, the mobile message that the intra-cell users for periodically acquiring this base station report;Wherein, described Mobile message includes the signal quality that user completes this cell where report of user when handover measurement;
Threshold module 320, the mobile message for being obtained to the acquisition module 310 carry out statistics and average treatment, obtain Take the user location decision threshold needed for power control;
Division module 330, the user location decision threshold for being obtained according to the threshold module 320, by small Division Go out different Signal to Interference plus Noise Ratio adjustment sections;
Phase is respectively set in setup module 340, the different Signal to Interference plus Noise Ratio adjustment section for being divided to the division module 330 The channel compensation factor and minimum target Signal to Interference plus Noise Ratio answered;
Update module 350 is calculated, for according to the corresponding Signal to Interference plus Noise Ratio adjustment section of user and its corresponding channel Compensation factor and minimum target Signal to Interference plus Noise Ratio calculate and update the corresponding target Signal to Interference plus Noise Ratio of the user.
Above-mentioned base station upstream power control system, mobile message refer mainly to the handover information of user, i.e. user completes switching The signal quality of this cell where report of user when measurement, such as user pass through RSRP (Reference Signal Receiving Power, Reference Signal Received Power) this cell signal quality for reporting, obtain the intra-cell users of this base station The mobile message reported is the foundation that user controls ascending power when moving.Statistics peace is carried out to the mobile message Processing can be in such a way that statistical weight be average or counts arithmetic average, so as to preferably obtain the mobile letter The average value of breath, the user location decision threshold can have it is multiple, such as three.To different Signal to Interference plus Noise Ratio adjustment sections point The corresponding channel compensation factor and minimum target Signal to Interference plus Noise Ratio are not set, so as to which corresponding target is arranged according to different user Signal to Interference plus Noise Ratio, to improve entire cell throughout.
In one embodiment, the calculating update module 350 executes described according to the corresponding Signal to Interference plus Noise Ratio tune of user Between main plot and its corresponding channel compensation factor and minimum target Signal to Interference plus Noise Ratio calculate and update the corresponding target letter of the user It is dry make an uproar than process can be further used for:
Obtain the current location information of user;The corresponding Signal to Interference plus Noise Ratio of the user is searched according to the current location information Adjust section;
Section and its corresponding channel compensation factor are adjusted according to the Signal to Interference plus Noise Ratio and minimum target Signal to Interference plus Noise Ratio calculates Go out the Signal to Interference plus Noise Ratio needed for user's corresponding position, the Signal to Interference plus Noise Ratio is updated to the target Signal to Interference plus Noise Ratio of user.
Location information refers mainly to the path loss of user distance service base station in this serving cell, can pass through UE (User Equipment, user terminal) measures the RSRP reported or PHR (Power Headroom Report, power headroom Report) it is estimated;The method of lookup is mapped to corresponding Signal to Interference plus Noise Ratio adjustment section simultaneously according to the location information of user The calculation formula of the target Signal to Interference plus Noise Ratio in section where obtaining user, calculates the target Signal to Interference plus Noise Ratio for obtaining user.
In one embodiment, the threshold module 320 execute it is described to the mobile message carry out statistics and average treatment, The process for obtaining the user location decision threshold needed for power control is further used for:
Statistical weight is carried out averagely to the mobile message or statistics arithmetic average is handled, cell switching band is obtained and adjudicates Thresholding;
Time center of housing estate decision threshold is obtained by calculation formula according to cell switching band decision threshold and center of housing estate is sentenced Certainly thresholding;Wherein, calculation formula is A=B+ Δs1=C+2* Δs1, the A expressions center of housing estate decision threshold, described time of B expressions Center of housing estate decision threshold, C indicate the cell switching band decision threshold, Δ1Indicate the signal quality difference of setting.
The signal quality difference of setting can be set according to the experience of previous base station uplink power control, Ke Yiwei 2dB, or 5dB etc. can make the mapping of the section divided and user more accurate by the signal quality difference of setting, So as to improve the entire throughput of cell.
Further, in one embodiment, the division module 330 executes described according to user location decision threshold, will Cell, which marks off different Signal to Interference plus Noise Ratio adjustment section processes, to be further used for:
According to user location decision threshold, adjudicated not less than the center of housing estate according to the signal quality in center of housing estate section The signal quality of thresholding, secondary center of housing estate section is sentenced not less than the secondary center of housing estate decision threshold and less than the center of housing estate The signal quality of certainly thresholding, cell impulsive switches band decision threshold not less than the cell and is less than the secondary center of housing estate Decision threshold, the signal quality in cell edge section are less than cell switching band decision threshold and are divided into four Signal to Interference plus Noise Ratio tune Between main plot.
Being divided into four Signal to Interference plus Noise Ratio adjustment sections includes:Center of housing estate section, secondary center of housing estate section, cell switch area Between, cell edge section the interference of cell can also be reduced while can to meet the performance requirement of different user.
Further, in one embodiment, the setup module 340 executes described to the different Signal to Interference plus Noise Ratio adjustment Section is arranged during the corresponding channel compensation factor and minimum target Signal to Interference plus Noise Ratio, and the mode of setting can be further used for:
It is mended according to the channel in the center of housing estate section, secondary center of housing estate section, cell impulsive, cell edge section It repays the factor and minimum target Signal to Interference plus Noise Ratio successively decreases successively, and close to the section minimum target letter of center of housing estate in two neighboring section It is dry to make an uproar than more than the section maximum target Signal to Interference plus Noise Ratio close to cell edge.
The center of housing estate section, secondary center of housing estate section, cell impulsive, cell side are set in the way of successively decreasing The channel compensation factor and minimum target Signal to Interference plus Noise Ratio in edge section can make the target letter of the user close to center of housing estate is dry to make an uproar Than the target Signal to Interference plus Noise Ratio more than the user far from center of housing estate, so as to reduce cell edge section and cell impulsive Interference to the center section, secondary center of housing estate section of the cell, improves the entire throughput of cell.
The base station upstream power control system of the present invention and the base station ascending power control method of the present invention correspond, The technical characteristic and advantage that the embodiment of above-mentioned base station ascending power control method illustrates are suitable for base station uplink work( In the embodiment of rate control system, hereby give notice that.
Several embodiments of the invention above described embodiment only expresses, the description thereof is more specific and detailed, but simultaneously Cannot the limitation to the scope of the claims of the present invention therefore be interpreted as.It should be pointed out that for those of ordinary skill in the art For, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to the guarantor of the present invention Protect range.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.

Claims (6)

1. a kind of base station ascending power control method, which is characterized in that include the following steps:
Periodically acquire the mobile message that the intra-cell users of this base station report;Wherein, the mobile message includes user's completion The signal quality of this cell where report of user when handover measurement;
Statistics and average treatment are carried out to the mobile message, obtain the user location decision threshold needed for power control;
According to user location decision threshold, cell is marked off into different Signal to Interference plus Noise Ratio and adjusts section;
The corresponding channel compensation factor and minimum target Signal to Interference plus Noise Ratio are respectively set to the different Signal to Interference plus Noise Ratio adjustment section;
Believe dry make an uproar according to the corresponding Signal to Interference plus Noise Ratio adjustment section of user and its corresponding channel compensation factor and minimum target Than calculating and updating the corresponding target Signal to Interference plus Noise Ratio of the user;
It is described according to the Signal to Interference plus Noise Ratio adjust section and its corresponding channel compensation factor and minimum target Signal to Interference plus Noise Ratio to The target Signal to Interference plus Noise Ratio at family is updated step and includes:
Obtain the current location information of user;The corresponding Signal to Interference plus Noise Ratio adjustment of the user is searched according to the current location information Section;
Section and its corresponding channel compensation factor are adjusted according to the Signal to Interference plus Noise Ratio and minimum target Signal to Interference plus Noise Ratio calculates use The Signal to Interference plus Noise Ratio is updated to the target Signal to Interference plus Noise Ratio of user by the Signal to Interference plus Noise Ratio needed for the corresponding position of family;It is described to the shifting Dynamic information carry out statistics and average treatment, obtain power control needed for user location decision threshold the step of include:
Statistical weight is carried out averagely to the mobile message or statistics arithmetic average is handled, obtains cell switching band decision gate Limit;
Switch band decision threshold according to cell and time center of housing estate decision threshold and center of housing estate decision gate are obtained by calculation formula Limit;Wherein, calculation formula is A=B+ Δs1=C+2* Δs1, the A expressions center of housing estate decision threshold, the B expressions secondary cell Center decision threshold, C indicate the cell switching band decision threshold, Δ1Indicate the signal quality difference of setting.
2. base station ascending power control method according to claim 1, which is characterized in that described to be adjudicated according to user location Thresholding, cell, which is marked off different Signal to Interference plus Noise Ratio adjustment section steps, includes:
According to user location decision threshold, it is not less than the center of housing estate decision gate according to the signal quality in center of housing estate section The signal quality of limit, secondary center of housing estate section is adjudicated not less than the secondary center of housing estate decision threshold and less than the center of housing estate The signal quality of thresholding, cell impulsive switches band decision threshold not less than the cell and sentences less than the secondary center of housing estate Certainly thresholding, the signal quality in cell edge section are less than cell switching band decision threshold and are divided into four Signal to Interference plus Noise Ratio adjustment Section.
3. base station ascending power control method according to claim 2, which is characterized in that described dry to the different letter It makes an uproar and is arranged in the corresponding channel compensation factor and minimum target Signal to Interference plus Noise Ratio step than adjustment section, the mode of setting includes:
The center of housing estate section, secondary center of housing estate section, cell impulsive, cell edge section the channel compensation factor and Minimum target Signal to Interference plus Noise Ratio successively decreases successively, and the section minimum target Signal to Interference plus Noise Ratio in two neighboring section close to center of housing estate is big In the section maximum target Signal to Interference plus Noise Ratio close to cell edge.
4. a kind of base station upstream power control system, which is characterized in that including:
Acquisition module, the mobile message that the intra-cell users for periodically acquiring this base station report;Wherein, the mobile message The signal quality of this cell where report of user when including user's completion handover measurement;
Threshold module, the mobile message for being obtained to the acquisition module carry out statistics and average treatment, obtain power control Required user location decision threshold;
Cell, is marked off different letters by division module, the user location decision threshold for being obtained according to the threshold module It is dry to make an uproar than adjusting section;
Setup module, the different Signal to Interference plus Noise Ratio adjustment section for being divided to the division module are respectively set corresponding channel and mend Repay the factor and minimum target Signal to Interference plus Noise Ratio;
Update module is calculated, for according to the corresponding Signal to Interference plus Noise Ratio adjustment section of user and its corresponding channel compensation factor It is calculated with minimum target Signal to Interference plus Noise Ratio and updates the corresponding target Signal to Interference plus Noise Ratio of the user;
The calculating update module execute it is described according to the Signal to Interference plus Noise Ratio adjust section and its corresponding channel compensation factor and Minimum target Signal to Interference plus Noise Ratio, which calculates and updates the corresponding target Signal to Interference plus Noise Ratio process of the user, to be further used for:
Obtain the current location information of user;The corresponding Signal to Interference plus Noise Ratio adjustment of the user is searched according to the current location information Section;
Section and its corresponding channel compensation factor are adjusted according to the Signal to Interference plus Noise Ratio and minimum target Signal to Interference plus Noise Ratio calculates use The Signal to Interference plus Noise Ratio is updated to the target Signal to Interference plus Noise Ratio of user by the Signal to Interference plus Noise Ratio needed for the corresponding position of family;The threshold module Execute the user location decision threshold that statistics and average treatment are carried out to the mobile message, obtain needed for power control Process is further used for:
Statistical weight is carried out averagely to the mobile message or statistics arithmetic average is handled, obtains cell switching band decision gate Limit;
Switch band decision threshold according to cell and time center of housing estate decision threshold and center of housing estate decision gate are obtained by calculation formula Limit;Wherein, calculation formula is A=B+ Δs1=C+2* Δs1, the A expressions center of housing estate decision threshold, the B expressions secondary cell Center decision threshold, C indicate the cell switching band decision threshold, Δ1Indicate the signal quality difference of setting.
5. base station upstream power control system according to claim 4, which is characterized in that described in the division module executes According to user location decision threshold, cell is marked off into different Signal to Interference plus Noise Ratio adjustment section processes and is further used for:
According to user location decision threshold, it is not less than the center of housing estate decision gate according to the signal quality in center of housing estate section The signal quality of limit, secondary center of housing estate section is adjudicated not less than the secondary center of housing estate decision threshold and less than the center of housing estate The signal quality of thresholding, cell impulsive switches band decision threshold not less than the cell and sentences less than the secondary center of housing estate Certainly thresholding, the signal quality in cell edge section are less than cell switching band decision threshold and are divided into four Signal to Interference plus Noise Ratio adjustment Section.
6. base station upstream power control system according to claim 5, which is characterized in that described in the setup module executes During to the different Signal to Interference plus Noise Ratio adjustment section, the corresponding channel compensation factor and minimum target Signal to Interference plus Noise Ratio are set, if The mode set is further used for:
According to the center of housing estate section, secondary center of housing estate section, cell impulsive, cell edge section channel compensation because Son and minimum target Signal to Interference plus Noise Ratio successively decrease successively, and the section minimum target in two neighboring section close to center of housing estate believes dry make an uproar Than more than the section maximum target Signal to Interference plus Noise Ratio close to cell edge.
CN201410850911.3A 2014-12-29 2014-12-29 Base station ascending power control method and system Active CN104619001B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410850911.3A CN104619001B (en) 2014-12-29 2014-12-29 Base station ascending power control method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410850911.3A CN104619001B (en) 2014-12-29 2014-12-29 Base station ascending power control method and system

Publications (2)

Publication Number Publication Date
CN104619001A CN104619001A (en) 2015-05-13
CN104619001B true CN104619001B (en) 2018-11-02

Family

ID=53153217

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410850911.3A Active CN104619001B (en) 2014-12-29 2014-12-29 Base station ascending power control method and system

Country Status (1)

Country Link
CN (1) CN104619001B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107889207B (en) * 2016-09-30 2022-07-15 中兴通讯股份有限公司 Uplink signal quality compensation method and device
CN113810959B (en) * 2020-06-15 2022-04-29 大唐移动通信设备有限公司 Cell switching method and equipment
CN114173385B (en) * 2020-09-10 2023-06-02 华为技术有限公司 Cell measurement method, device and system
CN112312533B (en) * 2020-11-05 2023-05-12 京信网络***股份有限公司 Power adjustment method, device, access network equipment and storage medium

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101127540A (en) * 2006-08-15 2008-02-20 大唐移动通信设备有限公司 A power control method and device
CN101272172A (en) * 2008-05-09 2008-09-24 中兴通讯股份有限公司 Road loss compensation factor configuration method and device
CN101489231A (en) * 2008-01-15 2009-07-22 上海贝尔阿尔卡特股份有限公司 Inter cell interference control method and apparatus in wireless communication network
CN101494898A (en) * 2008-01-25 2009-07-29 中兴通讯股份有限公司 Method for coordinating interference between districts
CN104168635A (en) * 2014-08-05 2014-11-26 大唐移动通信设备有限公司 Uplink power control method and device

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5109856B2 (en) * 2008-07-30 2012-12-26 富士通株式会社 Radio mobile station apparatus and radio base station apparatus

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101127540A (en) * 2006-08-15 2008-02-20 大唐移动通信设备有限公司 A power control method and device
CN101489231A (en) * 2008-01-15 2009-07-22 上海贝尔阿尔卡特股份有限公司 Inter cell interference control method and apparatus in wireless communication network
CN101494898A (en) * 2008-01-25 2009-07-29 中兴通讯股份有限公司 Method for coordinating interference between districts
CN101272172A (en) * 2008-05-09 2008-09-24 中兴通讯股份有限公司 Road loss compensation factor configuration method and device
CN104168635A (en) * 2014-08-05 2014-11-26 大唐移动通信设备有限公司 Uplink power control method and device

Also Published As

Publication number Publication date
CN104619001A (en) 2015-05-13

Similar Documents

Publication Publication Date Title
CN104619001B (en) Base station ascending power control method and system
US9220017B2 (en) Radio parameter control apparatus, base station apparatus, radio parameter control method, and non-transitory computer readable medium
EP2205015B1 (en) Wireless communication system, base station, wireless resource management method and base station control program
CN104053222B (en) Base station transmitting power method of adjustment and device
US9426706B2 (en) User equipment and measurement method
EP2728926A1 (en) Load balancing in mobile telecommunications networks
US20130157680A1 (en) Radio communication system, radio resource determination method therefor, communication management device, and control method and control program for communication management device
KR101977668B1 (en) Method and apparatus for trnasmitting and receiving a uplink signal in a communication system
Weber et al. Self-organizing adaptive clustering for cooperative multipoint transmission
CN104285479A (en) System and method for optimizing uplink power-control parameters in lte
CN103167557B (en) Method for balancing load based on virtual cell breathing in long term evolution-advanced (LTE-A) system
JP5299135B2 (en) COMPUTER DEVICE, BASE STATION CONTROL DEVICE, WIRELESS COMMUNICATION SYSTEM, AND CALCULATION METHOD
EP3228119A1 (en) Measurement report triggering for inter-cell coordination in cellular deployment
KR20080044593A (en) Apparatus and method for executing handover in broadband wireless communication systme
CN105163344A (en) Method for positioning TD-LTE intra-system interference
CN101873686A (en) Power control method of TD-LTE (TD-SCDMA Long Term Evolution) system
CN104955116B (en) Dense network self-optimizing handover method
US10439741B2 (en) Method, device and user terminal for measuring with discovery signal
Li et al. A distributed cell outage compensation mechanism based on RS power adjustment in LTE networks
CN113115325B (en) Wireless network quality optimization method and device
Halifa et al. Investigating the best radio propagation model for 4G-WiMAX networks deployment in 2530MHz Band in Sub-Saharan Africa
CN108990079B (en) Method and device for acquiring inter-cell system interference strength
US20140254391A1 (en) Estimation of small cell density
US9674793B2 (en) Walk-assisted automated AP coverage adjustment
US20190098636A1 (en) Interference based resource allocation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 510663 No. 10 Shenzhou Road, Science City, Luogang District, Guangzhou City, Guangdong Province

Patentee after: Jingxin Network System Co.,Ltd.

Address before: 510663 No. 10 Shenzhou Road, Science City, Luogang District, Guangzhou City, Guangdong Province

Patentee before: Comba Telecom System (China) Ltd.

CP01 Change in the name or title of a patent holder