CN104603700B - Method and its design tool for designing distribution control system - Google Patents

Method and its design tool for designing distribution control system Download PDF

Info

Publication number
CN104603700B
CN104603700B CN201380018229.1A CN201380018229A CN104603700B CN 104603700 B CN104603700 B CN 104603700B CN 201380018229 A CN201380018229 A CN 201380018229A CN 104603700 B CN104603700 B CN 104603700B
Authority
CN
China
Prior art keywords
equipment
control system
distribution control
fragment
functional block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201380018229.1A
Other languages
Chinese (zh)
Other versions
CN104603700A (en
Inventor
A·格
R·德
R·布霍维
S·斯维瓦斯塔瓦
K·梅蒂
J·克普
B·帕克
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ABB Technology AG
Original Assignee
ABB T&D Technology AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ABB T&D Technology AG filed Critical ABB T&D Technology AG
Publication of CN104603700A publication Critical patent/CN104603700A/en
Application granted granted Critical
Publication of CN104603700B publication Critical patent/CN104603700B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/04Programme control other than numerical control, i.e. in sequence controllers or logic controllers
    • G05B19/042Programme control other than numerical control, i.e. in sequence controllers or logic controllers using digital processors
    • G05B19/0426Programming the control sequence
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B15/00Systems controlled by a computer
    • G05B15/02Systems controlled by a computer electric

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Automation & Control Theory (AREA)
  • General Engineering & Computer Science (AREA)
  • Programmable Controllers (AREA)

Abstract

According to one aspect of the present invention, provide a method that, this method is used to design the distribution control system (DCS) with least one input-output apparatus and at least one controller so that at least one described input-output apparatus and at least one controller have communication connection between them or relative to each other.It the described method comprises the following steps:Ask user's input application type and select deformation from one or more deformation options, at least one equipment is recognized in available multiple equipment from DCS, at least one functional block that selection includes function fragment from storehouse is inputted based on user, the example of function fragment is created in view of at least one equipment recognized from multiple equipment and at least one example of function fragment is arranged, and at least one equipment of identification is configured based on the example of the functional module created.Method is related to deforms the arrangement that option carrys out the example of analytic function fragment for selected solution, and makes dynamic change to meet the DCS needs of one or more identifications.Design tool is also provided based on the method for design.

Description

Method and its design tool for designing distribution control system
Technical field
The present invention relates to distribution control system, and the method for more particularly relating to design distribution control system.
Background technology
Distribution control system (DCS below) is used to control processing factory, and realize in factory risen in automation it is important Effect.Design these controls and automation function by the various equipment via DCS realize control for processing factory and from Dynamicization function.
The method of design is typically based on standard, such as IEC 61499 (International Electrotechnical Commission), and it is provided by equipment mould The system model of type, resource model and application model composition is for configuration system.Device model regulation represents equipment, its process Interface, communication interface and the data flow for event.Resource in DCS can be configured, be represented, opened with parameter (start up), deletion etc..Resource model provides predetermined function, and it is equipped with functional block specification.Application model regulation is senior should With with sub- application build and behavior.Among some resources that can be distributed in identical or different equipment.
Design process comprises the following steps:Analysis is with P&I charts, the description of input/output (I/O) point and some additional use The input come in of form of family input and functional block network is created based on the input, linkage function block and based on setting in advance Equipment/controller for putting creates application.
Each equipment/controller type occurs together with its storehouse, and the storehouse includes the functional block that can be used from controller Type.Equally, controller type occurs together with some descriptions of its ability, for example they support what be used for communicate connect Mouthful.These controller type storehouses occur in design station tool box.Engineer according to similar following principle by these functions or Functional Design person is given in application type towing (drag drops):
1. write-in/wiring needs and scene input and the physical location exported
2. CPU when loading control logic and then checking operation is utilized
3. communication logic is configured to standard interface (communication) block and is connected to control logic and as data or event Expression is on control network.
4.I/O quantity and its type determine distribution, and controller has access to limited I/O, or I/O directly attached It is connected to controller.
5. current engineer's selection control type, controller type will work together with I/O information.
These applications have time-constrain, and define and downloaded execution sequence so that they are performed defined Order is lower to be operated.
In modern comfort, sensor, I/O, controller (communication interface or control module) and people can be intelligently resided in The system for being capable of dynamic calculation is created from anywhere in machine interface (operation side's real-time component and non real-time part).
In modern system, all data can be available (or can enter via agency/gateway on unified bus Unified bus), and Dynamic link library equipment is possible.
In order to using the ability of conventional equipment and make full use of with for Dynamic link library ability and programmable intelligence The new technology that the relatively new equipment of energy occurs together, for the balance application distribution in the equipment in control system, is present dynamic Method the need for.
In modern system, the consideration of propinquity can no longer be constraint, because with cable broadband/wireless network, we can Across distance talk remote enough.The availability of all data in a bus means that we can be based on relatively being distributed Mode and data in more local mode and various decision-makings are taken to the response of data.In order to effectively realize distribution and Still worked together as system, it is necessary to which soft on transmitting assorts/soft line and line is dynamic again.
The present invention is intended to provide design DCS method, this method can consider all be previously noted in the DCS in generation at the same time Structure and function improvement.
The content of the invention
One aspect of the present invention is the method for designing DCS.DCS, which has, includes at least one input/output (I/O) Equipment and at least one controller equiment, the multiple equipment that is connected on DCS networks so that I/O equipment can be with least one Individual controller equiment communication.In modern DCS, any one in I/O equipment can be with any one in controller equiment Communication, and process control associate with controller/supervision activity can in controller or I/O equipment any one of itself reality It is existing.The present invention is provided to design the method for this system.This method includes multiple steps, and the multiple step includes:Request User inputs application type, and for the application type asked from design tool storehouse available one or more solution party Selection solution deformation in case deformation option.Based on user's input, recognized from multiple available devices in DCS for configuring At least one equipment.Equally, deformed for the application type and solution asked, recognize corresponding functional block.
Functional block is made up of the multiple function fragments linked together, the configuration feature fragment in one or more equipment. The example of function fragment is created in design tool, and considers that at least one equipment (such as I/O equipment) of identification is arranged. Equipment code, process and the communication overhead that the establishment of example includes involved by consideration carry out analytic function fragment so that can be according to DCS (process, equipment or interaction) is it needs to be determined that the feature of whole.It is used to lead to according to created example and suitable arrange is analyzed Design tool is crossed to configure equipment.Design tool can dynamically rearrange the reality initially created of function fragment during analyzing Example, to meet the distribution control system needs of one or more identifications.
Moreover, will be related to option or equipment or (by algorithm steps number) algorithm types are deformed for various solutions Function fragment the option analyzed reported with collect user input with find be adapted to configuration solution.Design work Tool can also be selected the function fragment for configuration and the most suitable combination of equipment by itself.
There is provided the design tool using the method described in the present invention for another aspect of the present invention.Design tool has The storehouse of required functional block, the storehouse has the algorithm types associated with communication block type and the device type used in dcs With algorithm steps number and specification.Moreover, design tool for the equipment in DCS have be used for create function fragment module and There is the module of the example for analytic function fragment for the equipment used in dcs.Design tool is according to the work(created Can the example of fragment perform the configuration of equipment.
Brief description of the drawings
In order to comprehensively and be more fully understood from invention claimed, with reference to accompanying drawing herein below:
Fig. 1 shows the block diagram of the method for design according to the present invention.
Embodiment
Refer to the attached drawing provides following description to help comprehensive understanding by claim and its this equivalent defined hair Bright preferred embodiment.It includes various details to help to understand, but it is exemplary that these, which are served only as,.
Receive to include process for designing DCS exemplary design instrument using functional block network and instruct (P&I) chart, I/O points describe the input with user's input to design DCS based on the input.Design tool includes equipment/control storehouse, described Equipment/control storehouse includes the information on device type, function block type and the block type that communicates.
The present invention is intended to provide supporting the design DCS of dynamic capability method.The instrument further comprises equipment/control Storehouse, also comprising definition, (with procedure correlation), algorithm types-such as PI or PID and algorithm steps number (are inputted based on framework Execution sequence step) new attribute.If there is polyalgorithm type that can be alternatively, then algorithm steps number being capable of base Distinguished in algorithm types.
Fig. 1 shows methods described [100].According to current invention, this method comprises the following steps:Ask user's input Application type and the selection solution deformation [110] from one or more solutions deformation option, based on user's input At least one equipment [120] is recognized from for the design available multiple equipments of DCS, based on user input from design work At least one functional block is selected together with its function fragment [130] in available multiple functional blocks in tool storehouse, it is considered to from multiple equipment At least one equipment of middle identification come the example for creating function fragment and the example for arranging at least one function fragment [140], And at least one equipment [150] that the exemplary configuration based on the function fragment created is recognized from multiple equipment.
Here, in the method that provides of the present invention, deform option for selected solution and associate/can use Device analysis function fragment example arrangement after, perform create function fragment and arrangement function fragment the step of, it is described Function fragment for the specific equipment in DCS with specifying function fragment to associate so that the arrangement is met and DCS or process needs Or the design specification of the functional association of used equipment.In the present invention, such specification is herein referred to as " distribution control System processed needs ".
Analysis also includes a series of available options in DCS design tools, by design tool function block piece section cloth setting and counting The various combinations of method (based on the algorithm steps number and algorithm types associated with available functional block) or solution deformation are attempted Available equipment, to meet distribution control system needs in optimal possible mode.Instrument also advise available option with The optimal use of available resources in design DCS.User's input can equally be handled with based on the functional sheet analyzed and (created) The example of section confirms the specific option for device configuration.
Therefore, design tool provides the DYNAMIC DISTRIBUTION of function fragment that can be different from the initial selected of function fragment, is based on A series of analyses are used as system best effort to find most suitable function fragment for selected/available equipment To meet DCS needs.
Method and design tool also are shown by for the exemplary illustrated of the application in boiler implosion.Make during configuring User's given application type is asked with design tool, and user selects application type for example boiler protection.The instrument please User is asked to be selected from the deformation of multiple solutions, in order to illustrate to assume solution deformation 1 or solution deformation 2, wherein, Solution deformation includes following information:
A. Time Synchronizing
I. source device type and precision
Ii. time synchronized communication mechanism and protocol scheme
B. communicate and decision scheme
I. it is used for the voting protocol scheme of decision-making
Ii. decision makers and participant's scheme
C. alarm schemes
I. for alarm propagation and the definition of the communication path of protocol scheme
Ii. precision is described and timing
In order to illustrate, for boiler protection application type, it is contemplated that solution deformation below is used as illustrative example.
Solution deformation 1
A. Time Synchronizing
1. source device type=controller, and precision=1ms
2. time synchronized communication mechanism and protocol scheme=SNMP
B. communicate and decision scheme
1. voting protocol scheme=ALP (proprietary protocol) for decision-making
2. decision makers and participant's scheme (2/3 ballot) defer to the redundancy of PRP standards
3. the ability of the factory more than 210MW and less than 1000MW
C. alarm schemes
1. for alarm propagation and the definition of the communication path of protocol scheme=standards of EEMUA 191 based on HMI guiding
2. the order of precision description=event keeps 1ms for process and keeps 1 microsecond for power system event
Solution deformation 2
A. Time Synchronizing
1. source device type=external time source, the microsecond of and precision=1
2. time synchronized communication mechanism and protocol scheme=PTP 1588
B. communicate and decision scheme
1. the voting protocol scheme (2/3 ballot) for decision-making
2. decision makers and participant's scheme (based on ballot or based on the decision support for mixing quick/precision) and base In the redundancy of HSR schemes
C. alarm schemes
1. for network (including the scene of alarm propagation and the definition of the communication path of protocol scheme=include all-links And controller)=based on SysLog and more there is Radio Link by Ethernet
2. precision description=in process and power system event 1 microsecond
User selects solution from two options, such as user's selection solution deformation 1 is with complete design First step 210.
Instrument is subsequently based on the support of interface identification equipment.Interface for SNTP represents in a device-such as pass through filtering In controller type can with deformation come selection control 1 (deformation in controller type).If I/O is intelligent I/O, I/ O processing can be on I/O.Synchronization accuracy adds time synchronized function in millisecond magnitude in controller storehouse over time.Base In system safety (safety integrity level standard) grade, correct interface and equipment are selected.
Interface is by including outwardly and inwardly interface=processor interface for example CPU, Ethernet card=communication interface, Specific agreement (such as SNTP) is supported to be counted as the complete interface of supported protocol.Based on device type information, these are available.
The instrument of tissue based on function is currently browsed with selection function block by storehouse, and the functional block is used as function fragment Or the group of logic gate component is available, including:
Time synchronized block
The functional block that I/O is handled is used for based on interface type
It is responsible for the functional block of peer-to-peer communications
It is responsible for the functional block of HMI interactions
Preprocessing function block
Basic logic functions block
It is responsible for the functional block of decision-making or major function
More specific examples of functional block include
The extension that time synchronized block-EXEXEC- is used with the time synchronized for functional block and time cycle setting is performed Functional block
Functional block relevant I/O
Pulse input/cycle (PIPER) functional block, simulation input slave unit (AIS/FBS- fieldbus slave unit)
Functional block related HMI
Simulate exception report functional block (AO/L).
The ability of the order of SOE/S- slave unit events -32-bit number input, is enclosed them based on required precision Timestamp is used as identification alarm and event and their order.
Basic functional blocks can include AND block, RCM- remote-controlled storage blocks.
The functional block relevant with execution with decision-making
Can multimode device drives-MSDVDR can dominate motor, and four states with band feedback are controlled..
In the error signal from process variable and set-point input, PID mistakes can provide proportional, complete And the action derived from.
In design system, the example of system creation functionally or logically block.Functional block or logic are being come from as described above In the combination of the selection of gating element, functional block or logic are arranged from output is input to based on the algorithm steps attribute defined in storehouse Example.Consider that these combinations, as initial fragment, can offline be used in design tool.
For example, initial inspection fragment, which can be fragment 1-, includes input block and time synchronized block.Fragment 2- simulation exception reports Accuse and event slave unit order together, and fragment 3- decision block PID mistakes and MSDVDR- can control many of field mounted device Status devices drive.
Instrument performs how positive link analysis is to show arrangement or logical block that solution becomes Shape definition and function example Meet these standards.
A. system detectio time started and event synchronization fragment from being input to output, network analysis execution sequence and Check and perform the spent time.
B. consider fragment by enter multiple equipment from the point of view of virtual unit box and in view of 20% communication overhead because Element, execution time and the < 20ms of the requirement of boiler protection solution total reaction time are compared
C. checking all fragment blocks, whether they have the input from time synchronized fragment and cycle time so that origin 1ms precision can be kept from their timestamp of alarm and the output generation of event.
D. analysis continues iteration, until the condition of solution standard is met.
E. it can be derived that the result of analysis
I. the proposed modification in existing serial number is to match standard
Ii. the reorganization of the functional block in proposed fragment will move on to another
One of input and selection solution can also be provided a user, or design tool may be selected to meet standard First solution.
This analysis will cause the modification of these execution sequences number functionally or logically.Analysis, which equally can solve the problem that, to be made Logic or function are preferably placed in another functional network connected using communication logic.These multipaths after analysis System reaches the functional block network of fragment and the optimal path of tissue.
Instrument is subsequently based on the fragment resided in multiple equipment, creates communication function or logical instance to connect fragment Together.Therefore, these blocks are added to fragment input and exported.Current each fragment will have clearly input and export or Defined result.Once having organized communication block, then another of positive chain as described above performed in view of these blocks changes Generation.
Current each fragment has input and the output point of their own.Current system stops from desired result, for Stopping desired by each fragment, they will meet together, and expected standard is with the load of uniform striding equipment and connects processing Mouth more hand-in-glove.20ms total reaction times are for example, realized, fragment 1 can be acted in 10ms, and fragment 2 is in another 5ms In, fragment 3 considers some additional traffic loads (5ms) in 10ms.This termination is currently based on, analysis is each Whether it meets termination to fragment, and therefore, it is possible to be worked with processing interface capability.For example, device type has higher processing Power, bigger fragment (similar fragment 1) can be associated there.
It may be noted that exception report even future is simulated in fragment to be resided in defined ability in I/O simultaneously And order of event etc. can be defined elsewhere.I/O can be equally more closely similar to handle PID mistakes.
Although some features of the present invention only have shown and described herein, it will be sent out for those skilled in the art Raw many modifications and changes.It is, therefore, to be understood that appended claims are intended to cover fall within the true spirit of the invention all These modifications and changes.

Claims (9)

1. a kind of method for designing distribution control system, the distribution control system has comprising at least one input/defeated Go out the multiple equipment of equipment and at least one controller equiment so that at least one described input-output apparatus and it is described at least One controller equiment has communication connection, the described method comprises the following steps:
A. request user input application type, and selection solution becomes from one or more solutions deformation option Shape;
B. inputted based on the user, at least one equipment is recognized from the multiple equipment;
C. deformed, selected from storehouse in available multiple functional blocks based on the application type asked and selected solution At least one functional block is selected together with its function fragment, each functional block is made up of the multiple function fragments linked together;
D. consider at least one equipment recognized from the multiple equipment, create the example and arrangement work(of function fragment At least one example of energy fragment;
E. consider involved equipment code, process and communication overhead to analyze the function fragment, with according to it is described at least The design specification of the functional association of one equipment or process or the distribution control system come determine whole feature;
F. rearrange at least one example of function fragment in any middle dynamic of the multiple equipment, with find meet with The solution of the design specification of the functional association of described at least one equipment or process or the distribution control system;
G. example is created based on function fragment, configures at least one equipment recognized from the multiple equipment.
2. the method for claim 1, wherein deform option for selected solution and recognized at least One equipment, the arrangement of the example of analytic function fragment is met and at least one described equipment or process or described with finding The step of the solution of the design specification of the functional association of distribution control system, it is further comprising the steps of:Report The analysis result is accused to collect user's input, is met and at least one described equipment or process or the distributed controll with finding The solution of the design specification of the functional association of system.
3. method as claimed in claim 2, wherein, the analysis result is reported to collect the step bag of user's input Include:Solution deformation is reselected from one or more of solutions deformation option.
4. the method as described in claim 2 or claim 3, wherein, the analysis result is reported to collect user's input The step includes:Deform to reselect at least one described functional block together with its work(based on the solution reselected Can fragment.
5. the solution deformation the method for claim 1, wherein based on the application type and selection asked, from At least one functional block is selected also to include together with the step of its function fragment in available the multiple functional block in storehouse:Base In selecting at least one described functional block together with its work(with multiple algorithm types that can be associated with functional block and algorithm steps number Can fragment.
6. method as claimed in claim 5, wherein, based on the algorithm types and algorithm associated with the multiple available functional block Step number selects at least one described functional block to be performed together with the step of its function fragment by design tool, to find Suitable functional block is met and at least one described equipment or process or the distribution control system together with its function fragment The design specification of functional association.
7. a kind of design tool for distribution control system, the design tool is performed such as any one of claim 1-6 Described method, the design tool is used including functional block together with the storehouse of its function fragment, in the distribution control system Equipment and communication type storehouse, for creating function at least one equipment used in the distribution control system The module of fragment and for carrying out analytic function fragment at least one equipment used in the distribution control system The module of example.
8. it is used for the design tool of distribution control system as claimed in claim 7, wherein, the example for analytic function fragment The module include and the device type used in the distribution control system and the specification storehouse of communication block type association.
9. a kind of distribution control system, the distribution control system, which has, includes at least one input-output apparatus and at least one The multiple equipment of individual controller equiment so that at least one described input-output apparatus and at least one described controller equiment With communication connection, and wherein, usage right requires the design tool described in 7 to configure at least one in the multiple equipment Individual equipment.
CN201380018229.1A 2012-03-30 2013-03-29 Method and its design tool for designing distribution control system Active CN104603700B (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
IN1256/CHE/2012 2012-03-30
IN1256CH2012 2012-03-30
PCT/IB2013/000555 WO2013144705A1 (en) 2012-03-30 2013-03-29 A method for engineering a distributed control system and an engineering tool thereof

Publications (2)

Publication Number Publication Date
CN104603700A CN104603700A (en) 2015-05-06
CN104603700B true CN104603700B (en) 2017-08-15

Family

ID=48289514

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201380018229.1A Active CN104603700B (en) 2012-03-30 2013-03-29 Method and its design tool for designing distribution control system

Country Status (4)

Country Link
US (1) US9989940B2 (en)
EP (1) EP2831682B1 (en)
CN (1) CN104603700B (en)
WO (1) WO2013144705A1 (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8756041B2 (en) 2011-03-07 2014-06-17 Rockwell Automation Technologies, Inc. Industrial simulation using redirected I/O module configurations
US10037443B2 (en) * 2011-03-07 2018-07-31 Rockwell Automation Technologies, Inc. Industrial simulation using redirected I/O module configurations
EP3029535A3 (en) * 2014-12-03 2016-07-13 Rockwell Automation Technologies, Inc. P&ID and control system synchronization
US11212175B2 (en) * 2016-06-22 2021-12-28 EMC IP Holding Company, LLC Configuration management for cloud storage system and method
JP2020052812A (en) * 2018-09-27 2020-04-02 横河電機株式会社 Engineering system and engineering method
CN113949601B (en) * 2021-11-12 2023-04-28 杭州和利时自动化有限公司 Inter-controller station communication method, device and computer readable storage medium

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2002103539A2 (en) * 2001-06-14 2002-12-27 Hallenbeck, Peter, D Distributed, packet-based premises automation system
CN1950771A (en) * 2004-05-04 2007-04-18 费舍-柔斯芒特***股份有限公司 Integrated user interface for process control
CN101231525A (en) * 2008-02-21 2008-07-30 四方电气(集团)有限公司 Method for implementing DCS controller real-time data base of distributed control system
WO2011018684A1 (en) * 2009-08-14 2011-02-17 Abb Technology Ltd Method and system for engineering a substation automation system

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2000070417A1 (en) * 1999-05-17 2000-11-23 The Foxboro Company Process control configuration system with parameterized objects
US7707550B2 (en) * 2001-06-22 2010-04-27 Invensys Systems, Inc. Supervisory process control and manufacturing information system application having an extensible component model
US7729789B2 (en) * 2004-05-04 2010-06-01 Fisher-Rosemount Systems, Inc. Process plant monitoring based on multivariate statistical analysis and on-line process simulation
CN102356370A (en) * 2008-02-25 2012-02-15 因文西斯***公司 System and method for generating control system database and graphics from schema-based intermediate descriptions
WO2010037146A2 (en) * 2008-09-29 2010-04-01 Fisher-Rosemount Systems, Inc. Efficient design and configuration of elements in a process control system
US8578059B2 (en) * 2010-02-01 2013-11-05 Invensys Systems, Inc. Deploying a configuration for multiple field devices
CN104838324B (en) * 2012-10-08 2017-09-12 费希尔-罗斯蒙特***公司 Dynamic reusable class
US10120350B2 (en) * 2013-03-11 2018-11-06 Fisher-Rosemount Systems, Inc. Background collection of diagnostic data from field instrumentation devices

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2002103539A2 (en) * 2001-06-14 2002-12-27 Hallenbeck, Peter, D Distributed, packet-based premises automation system
CN1950771A (en) * 2004-05-04 2007-04-18 费舍-柔斯芒特***股份有限公司 Integrated user interface for process control
CN101231525A (en) * 2008-02-21 2008-07-30 四方电气(集团)有限公司 Method for implementing DCS controller real-time data base of distributed control system
WO2011018684A1 (en) * 2009-08-14 2011-02-17 Abb Technology Ltd Method and system for engineering a substation automation system

Also Published As

Publication number Publication date
EP2831682B1 (en) 2018-03-07
EP2831682A1 (en) 2015-02-04
US9989940B2 (en) 2018-06-05
US20150012118A1 (en) 2015-01-08
WO2013144705A1 (en) 2013-10-03
CN104603700A (en) 2015-05-06

Similar Documents

Publication Publication Date Title
CN104603700B (en) Method and its design tool for designing distribution control system
JP6892704B2 (en) Smart factory parallel control method and system
US20110029140A1 (en) Central control and instrumentation system for a technical installation and method for operating a central control and instrumentation system
US8543370B2 (en) Multiple PLC simulation system
CN107037782B (en) The method and apparatus for monitoring lathe
CN105204463B (en) A kind of marking machine system and its marking method based on Internet of Things
CN105629926B (en) Input/output module and method for industrial control unit (ICU)
CN109564411A (en) For further using the platform for controling the existing software of industrial field device
US20110320017A1 (en) Integrated drive management and configuration using instantiated objects
CN110300055B (en) Gateway system for heterogeneous field bus
CN114095311A (en) Power Internet of things gateway, power system and method for configuring newly-added power equipment
CN100498618C (en) Computer network monitoring system for flexible electric PC board stitching machine
CN104184215A (en) Substation dispatching automation joint debugging method and device and system using same
CN109074065A (en) For numerical control device to be matched with to the device and method of machine to be controlled
CN111610725A (en) Combined simulation method
CN107924722A (en) Nuclear plant safety management system
US11209787B2 (en) Method and control device for controlling a field device
CN109214638A (en) The synchronization of multiple simulations
CN108115680A (en) Robot control method, robot control system and control logic collocation method
Brad et al. Novel architecture of intelligent axes for fast integration into reconfigurable robot manipulators: A step towards sustainable manufacturing
CN106843161A (en) A kind of production equipment operation conditions method for visually monitoring
CN107924723A (en) Nuclear plant safety management system
CN116029799B (en) Micro-service architecture management platform based on intelligent decision
CN109683031A (en) A kind of full production cycle automatic test device of distribution terminal and method
JP6352966B2 (en) Control device and control system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant