CN104595578A - 一种室内管道更新方法 - Google Patents
一种室内管道更新方法 Download PDFInfo
- Publication number
- CN104595578A CN104595578A CN201510022759.4A CN201510022759A CN104595578A CN 104595578 A CN104595578 A CN 104595578A CN 201510022759 A CN201510022759 A CN 201510022759A CN 104595578 A CN104595578 A CN 104595578A
- Authority
- CN
- China
- Prior art keywords
- pipeline
- indoor
- pipe
- perforate
- boring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L1/00—Laying or reclaiming pipes; Repairing or joining pipes on or under water
- F16L1/024—Laying or reclaiming pipes on land, e.g. above the ground
- F16L1/028—Laying or reclaiming pipes on land, e.g. above the ground in the ground
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Pipeline Systems (AREA)
Abstract
本发明提供一种室内管道更新方法,包括室内外开孔,钻孔,管道安装,压力试验和回填工作坑等步骤。本发明的有益效果是在入户管道更换时,采用本方法解决了管道更换对周围环境造成的影响,不进行大面积开挖就能解决室内管道的更新,该方法成本低,施工方便。
Description
技术领域
本发明属于工程领域,尤其是涉及一种室内管道更新方法。
背景技术
在旧的居民楼或者工厂的室内,市政公用管道常因腐蚀或者年久失修无法再次利用,需要更换新的管道,现有的方法是将原管道的地面路径挖开将原管道取出,铺设新的管道,因涉及到居民或者工厂大面积的开挖,对居民生活或者工厂的生产都造成很大的影响。
发明内容
本发明的目的是解决管道更换对周围环境造成的影响,提供一种不进行大面积开挖就能解决室内管道更新的方法。
本发明的技术方案是:一种室内管道更新方法,本方法用于室内地下长度小于20m管道的更换,其步骤如下:
(1)开孔作业
将需要更新管道的其中一端进行开孔作业;
(2)水平钻孔
从已进行开孔的一端用钻机进行钻进,钻机连接钻杆,钻杆前端安装偏心钻头,配合导向仪器进行钻孔顶进,严格控制方向及高程,如果有偏差迅速调整;
(3)配合钻孔,另一端开孔作业
钻孔完成后,在目的点位置,即需要更新管道的另一端进行开孔作业;
(4)管道安装
在钻孔及两端开孔作业完成后,安装管道,所有管道全部用专用管件连接,管端连接弯头,与室内立管进行连接;
(5)压力试验
管道安装完毕后,检查各连接处,按市政工程要求打压验收;
(6)工作坑回填
各项检验完毕后,按照市政工程相应要求回填工作坑,回填完毕后再将原来的公用设施恢复。
本方法属于非开挖穿越施工工艺,步骤(1)或步骤(3)中,所述开孔作业的深度不得在原管线的深度,具体深度视现场情况而定;室内部分的开孔作业的钻孔直径为100-200mm;室外部分的开孔作业为开挖工作坑,工作坑大小为一米见方。
进一步,步骤(2)所述钻孔的直径为100mm-200mm。
进一步,步骤(4)的弯头前端带封堵,防止顶进过程中泥、水进管。
进一步,步骤(4)中所述专用管件连接为丝扣或管箍连接。
本发明具有的优点和积极效果是:在入户管道更换时,本方法解决了大面积开挖对室内地面装修的破环问题,此工艺与常规开挖换管方法比,避免了破环地面装饰与住户的纠纷,施工便捷,社会效益好。
具体实施方式
本实施方式的实施例具体涉及两种自来水管道的更新方法,第一种为:步骤(1)-(3)的施工作业顺序为室外开孔,钻孔,室内开孔的方法,即由室外向室内的管道更新方法;第二种为:步骤(1)-(3)的施工作业顺序为室内开孔,钻孔,室外开孔的方法,即由室内向室外的管道更新方法。具体方法步骤如下:
实施例1由室外向室内的管道更新方法:
(1)室外开孔
室外开孔即在室外开挖工作坑,根据管线方位,在室外开挖工作坑便于钻机施工,工作坑尺寸定为1500×1500×1000。
(2)水平钻孔
工作坑开挖完毕以后,用吊车将水平定向钻设备吊入工作坑,根据管线要求人工调平,钻杆前端安装导向头,配合导向仪器进行钻孔顶进,严格控制方向及高程,每顶进一根钻杆检测一次,如有偏差迅速调整。
(3)室内开孔
室内开孔即在室内进行垂直钻孔,本方法采用非开挖穿越施工方法,原管无法拆除取出,因此施工中需要把室内钻孔在原立管高程上上移20cm,并且与预定施工线路核准,用电机在室内在检测到钻头的位置处进行钻孔,孔的直径大小100mm。
(4)管道安装
在钻孔结束,并且室内外开孔接通后,将管道从室外向室内沿钻孔顶进,每根管道1.5m,所有管道全部采用丝扣连接,管端连接弯头,弯头带封堵顶进,防止顶进过程中泥、水进管;当管端到达钻孔位置时,用扳手垂直将封堵取出,安装立管。
(5)水压试验
管道安装完毕后,在各出水口安装水阀或封堵,打开进户总水阀,将管道注满水后,检查各连接处,没有渗漏后进行水压试验。水压试验压力为0.3Mpa,10分钟压降不超过0.03Mpa为合格。
(6)工作坑回填
各项检验完毕后,按照市政工程相应要求回填工作坑,工作坑回填土家硝化灰夯实,回填完毕后再将原来的公用设施恢复。
实施例2由室内向室外的管道更新方法:
(1)室内开孔
室内开孔即室内倾斜钻孔,倾斜角度为25度倾斜,在室内开孔时所用设备为锚杆钻机,倾斜向外钻孔,钻孔的直径为200mm,室内开孔在原立管高程上上移15cm。
(2)水平钻孔
在锚杆钻机前端安装钻杆,钻杆前端安装导向头,配合导向仪器进行钻孔顶进,严格控制方向及高程,每顶进一根钻杆检测一次,如有偏差迅速调整。
(3)室外开孔
室外开孔即在室外开挖工作坑,在钻头到达室外目的位置后,在钻头周围开挖工作坑,工作坑尺寸定为1500×1000×1000。
(4)管道安装:
在钻孔结束,并且室内外开孔接通后,将管道从室外向室内沿钻孔顶进,每根管道1.5m,所有管道全部采用丝扣连接,管端连接弯头,弯头带封堵顶进,防止顶进过程中泥、水进管;当管端到达钻孔位置时,用扳手垂直将封堵取出,安装立管。
(5)水压试验
管道安装完毕后,在各出水口安装水阀或封堵,打开进户总水阀,将管道注满水后,检查各连接处,没有渗漏后进行水压试验。水压试验压力为0.3Mpa,10分钟压降不超过0.03Mpa为合格。
(6)工作坑回填
各项检验完毕后,按照市政工程相应要求回填工作坑,工作坑回填土家硝化灰夯实,回填完毕后再将原来的公用设施恢复。
以上对本发明的具体实施案例进行了详细说明,但所述内容仅为本发明的较佳实施例,不能被认为用于限定本发明的实施范围。凡依本发明申请范围所作的均等变化与改进等,均应仍归属于本发明的专利涵盖范围之内。
Claims (4)
1.一种室内管道更新方法,其特征在于:本方法用于室内地下长度小于20m管道的更换,其步骤如下:
(1)开孔作业
将需要更新管道的其中一端进行开孔作业;
(2)水平钻孔
从已进行开孔的一端用钻机进行钻进,钻机连接钻杆,钻杆前端安装偏心钻头,配合导向仪器进行钻孔顶进,严格控制方向及高程,如果有偏差迅速调整;
(3)配合钻孔,另一端开孔作业
钻孔完成后,在目的点位置,即需要更新管道的另一端进行开孔作业;
(4)管道安装
在钻孔及两端开孔作业完成后,安装管道,所有管道全部用专用管件连接,管端连接弯头,与室内立管进行连接;
(5)压力试验
管道安装完毕后,检查各连接处,按市政工程要求打压验收;
(6)工作坑回填
各项检验完毕后,按照市政工程相应要求回填工作坑,回填完毕后再将原来的公用设施恢复。
2.根据权利要求1所述的一种室内管道更新方法,其特征在于:步骤(2)所述钻孔的直径为100mm-200mm。
3.根据权利要求1所述的一种室内管道更新方法,其特征在于:步骤(4)的弯头前端带封堵,防止顶进过程中泥、水进管。
4.根据权利要求1所述的一种室内管道更新方法,其特征在于:步骤(4)中所述专用管件连接为丝扣或管箍连接。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510022759.4A CN104595578A (zh) | 2015-01-16 | 2015-01-16 | 一种室内管道更新方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510022759.4A CN104595578A (zh) | 2015-01-16 | 2015-01-16 | 一种室内管道更新方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104595578A true CN104595578A (zh) | 2015-05-06 |
Family
ID=53121535
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510022759.4A Pending CN104595578A (zh) | 2015-01-16 | 2015-01-16 | 一种室内管道更新方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104595578A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111877463A (zh) * | 2020-07-31 | 2020-11-03 | 蒋小军 | 一种严寒牧区已建房屋自来水管道入户的施工方法 |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5791419A (en) * | 1995-09-14 | 1998-08-11 | Rd Trenchless Ltd. Oy | Drilling apparatus for replacing underground pipes |
EP0872679A1 (en) * | 1997-04-16 | 1998-10-21 | Toho Gas Co., Ltd. | Method for replacement of existing pipes and devices for carrying out the method |
CN101457853A (zh) * | 2008-11-20 | 2009-06-17 | 江苏广宇建设集团有限公司 | 非开挖拉管施工工法 |
CN201875282U (zh) * | 2010-11-17 | 2011-06-22 | 代丽华 | 气动曲线穿孔机 |
CN102734556A (zh) * | 2012-06-15 | 2012-10-17 | 上海市电力公司 | 一种电力排管的非开挖施工方法 |
CN103335169A (zh) * | 2013-07-20 | 2013-10-02 | 福州市规划设计研究院 | 一种岩土工程勘察方法 |
CN103398215A (zh) * | 2013-08-20 | 2013-11-20 | 江苏沃迪建设工程有限公司 | 一种微创非开挖顶拉管工艺 |
CN103791159A (zh) * | 2012-11-02 | 2014-05-14 | 成张佳宁 | 小直径管道的顶管施工方法 |
-
2015
- 2015-01-16 CN CN201510022759.4A patent/CN104595578A/zh active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5791419A (en) * | 1995-09-14 | 1998-08-11 | Rd Trenchless Ltd. Oy | Drilling apparatus for replacing underground pipes |
EP0872679A1 (en) * | 1997-04-16 | 1998-10-21 | Toho Gas Co., Ltd. | Method for replacement of existing pipes and devices for carrying out the method |
CN101457853A (zh) * | 2008-11-20 | 2009-06-17 | 江苏广宇建设集团有限公司 | 非开挖拉管施工工法 |
CN201875282U (zh) * | 2010-11-17 | 2011-06-22 | 代丽华 | 气动曲线穿孔机 |
CN102734556A (zh) * | 2012-06-15 | 2012-10-17 | 上海市电力公司 | 一种电力排管的非开挖施工方法 |
CN103791159A (zh) * | 2012-11-02 | 2014-05-14 | 成张佳宁 | 小直径管道的顶管施工方法 |
CN103335169A (zh) * | 2013-07-20 | 2013-10-02 | 福州市规划设计研究院 | 一种岩土工程勘察方法 |
CN103398215A (zh) * | 2013-08-20 | 2013-11-20 | 江苏沃迪建设工程有限公司 | 一种微创非开挖顶拉管工艺 |
Non-Patent Citations (2)
Title |
---|
刘炜等: "探讨在线不开挖管道更新技术", 《现代涂料与涂装》 * |
谢志平: "排水管道更新的方法", 《给水排水》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111877463A (zh) * | 2020-07-31 | 2020-11-03 | 蒋小军 | 一种严寒牧区已建房屋自来水管道入户的施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105422078B (zh) | 围岩采动破坏范围分段测试方法 | |
CN109139052B (zh) | 一种基于高压深孔注浆的注浆孔装置及施工方法 | |
CN107119669A (zh) | 用于盾构在富水砂层中侧穿房屋的预注浆加固地基方法 | |
CN104790419B (zh) | 一种适用于富水流沙地层隧道的降水施工方法 | |
CN104406003B (zh) | 一种排水管道非开挖压浆修复施工方法 | |
CN109763483A (zh) | 一种厚第四系深埋采空塌陷破碎地层上行式分段注浆工艺 | |
CN101798820A (zh) | 一种隔离桩土接触的钻孔灌注桩双套管 | |
CN101793045A (zh) | 供水管道隐蔽铺设方法 | |
CN110318401A (zh) | 适用于对明挖区大型管线原位保护和基坑支护的施工方法 | |
CN201704688U (zh) | 一种隔离桩土接触的钻孔灌注桩双套管 | |
CN104595578A (zh) | 一种室内管道更新方法 | |
CN103486339B (zh) | 一种防尘穿墙套管 | |
CN205605114U (zh) | 一种喀斯特岩溶地区预应力锚索钻孔装置 | |
CN103629474A (zh) | 用于修复受损铸铁消防管道的连接导水管及其修复方法 | |
CN102434172A (zh) | 壁后注浆充填的巷道围岩稳定控制方法 | |
CN112982364B (zh) | 一种基础地质勘察孔涌水封堵装置及方法 | |
CN107218439A (zh) | 一种用于滴灌玻璃钢夹砂管道安装方法 | |
CN108643898B (zh) | 基于覆岩导水裂隙带探测的钻孔单回路压水控制*** | |
CN107916674B (zh) | 一种浅基坑降水装置 | |
CN208331799U (zh) | 用于水管检漏的高精度定位装置 | |
CN102052517A (zh) | 区域式地埋垂直管水平连接***及其连接施工方法 | |
CN108507927B (zh) | 钻孔裂隙渗透性分段调压型观测方法 | |
CN113217036A (zh) | 一种断层破碎带涌水段隧道结构的后注浆施工方法 | |
CN111851548A (zh) | 一种深基坑内降水斜井及其施工方法 | |
CN106247007B (zh) | 远距离大直径工业管道自重变位下置铺设直埋施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150506 |