CN104594641A - Reinforcing bar positioning fixture and reinforcing bar positioning method for prefabrication wall installation - Google Patents

Reinforcing bar positioning fixture and reinforcing bar positioning method for prefabrication wall installation Download PDF

Info

Publication number
CN104594641A
CN104594641A CN201510042930.8A CN201510042930A CN104594641A CN 104594641 A CN104594641 A CN 104594641A CN 201510042930 A CN201510042930 A CN 201510042930A CN 104594641 A CN104594641 A CN 104594641A
Authority
CN
China
Prior art keywords
reinforcing bar
wall body
steel
precast wall
positioning fixture
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510042930.8A
Other languages
Chinese (zh)
Other versions
CN104594641B (en
Inventor
张海松
刘涛
周旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Uni-Construction 3rd Development And Construction Co Ltd
BEIJING ZHUZONG GROUP Co Ltd
Original Assignee
Beijing Uni-Construction 3rd Development And Construction Co Ltd
BEIJING ZHUZONG GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Uni-Construction 3rd Development And Construction Co Ltd, BEIJING ZHUZONG GROUP Co Ltd filed Critical Beijing Uni-Construction 3rd Development And Construction Co Ltd
Priority to CN201510042930.8A priority Critical patent/CN104594641B/en
Publication of CN104594641A publication Critical patent/CN104594641A/en
Application granted granted Critical
Publication of CN104594641B publication Critical patent/CN104594641B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention relates to a reinforcing bar positioning fixture and a reinforcing bar positioning method for prefabrication wall installation. The fixture comprises a steel plate with the width adaptive to the thickness of a prefabrication wall, wherein reinforcing bar preformed holes are formed in the steel plate, the size of the pore size of each reinforcing bar preformed hole is adaptive to the diameter of each connecting reinforcing bar exposed out of the top end of a prefabrication wall; the distribution of the reinforcing bar preformed holes is adaptive to the arrangement of the connecting reinforcing bars; vertical short steel sleeves are respectively welded on upper plate faces corresponding to the reinforcing bar preformed holes in two end parts of the steel plate, and have consistent heights; paired horizontal keyholes are formed in the uniform height of a pipe wall; a bolt for controlling the insertion depth of each connecting reinforcing bar is inserted in the corresponding keyhole. The reinforcing bar positioning fixture is used for reinforcing bar positioning during the assembly process of two prefabrication wall plates, is simple in structure, convenient to manufacturing and operate, and accurate in positioning, and can be recycled; during reinforcing bar locating, the fixture is adjusted for multiple times along the construction process, and the fixture is not disassembled during the process, the reinforcing bar position is accurate after positioning, and the assembly efficiency of the prefabrication wall plates is greatly improved.

Description

A kind of steel bar positioning fixture for precast wall body installation and reinforcing bar localization method
Technical field
The present invention relates to prefabricated panel package technique field, particularly a kind of steel bar positioning fixture for precast wall body installation and reinforcing bar localization method.
Background technology
" assembled room " is the popular address of assembled-type house, its full name is prefabricated dwelling house, build house by the industrialized mode of production, that the part or all of component of house has been prefabricated in the factory, then job site is transported to, component is assembled by reliable connected mode and the house that builds up, be referred to as industrialization house or industrialized house in American-European and Japan.The difference in " assembled room ", just part carries out prefabricated, also to equally with traditional architecture build to job site, do not see difference from outward appearance after house builds up at all, compared with the house of traditional construction, component precision is higher, can improve the common quality defect such as wall crazing, seepage to greatest extent, and improve house safety integrity level, fire line and durability.It adopts light partition wall system, and owner can change finishing as required.In view of above-mentioned advantage, assembled-type house is by large-scale popularization, but in the building course of assembled-type house, the vertical connection between its precast wall body relies on grout sleeve to connect, require that bottom reinforcement bars is corresponding with grout sleeve position, the position adjustment for bottom reinforcement bars becomes particularly important.
In prior art, the location of reinforcing bar generally adopts limitting casing etc., intensity difference, and precision does not reach requirement, be not suitable for the vertical connection between precast wall body, when precast wall body is constructed, the reinforcing bar that bottom body of wall stretches out will insert in the grout sleeve bottom the precast wall body of upper strata, engineering in the past find this position to stretch out reinforcement location inaccurate, construction speed and construction quality can be had a strong impact on; And existing limitting casing can not be fixed when building floorslab concrete, can only take off, can not avoid in casting process the displacement that the connecting reinforcement in prefabricated panel causes.Therefore need a kind of not only convenient operation of research at present badly but also the instrument of reinforcing bar positioning requirements can be met.
Summary of the invention
The object of the invention is to provide a kind of steel bar positioning fixture of installing for precast wall body and reinforcing bar localization method, solve existing reinforcing bar location general adopt limitting casing etc., not only intensity difference and precision does not reach requirement, is not suitable for vertical connection between precast wall body, when precast wall body is constructed bottom the reinforcement location that stretches out of body of wall inaccurate, can not fix when building floorslab concrete, can only take off, the displacement in casting process, the connecting reinforcement in prefabricated panel caused, the technical barrier having a strong impact on construction speed and construction quality can not be avoided.
For reaching above-mentioned technical purpose, the present invention takes following technical scheme:
A kind of steel bar positioning fixture installed for precast wall body, it is characterized in that: the steel plate that the thickness comprising width and precast wall body adapts, described steel plate has steel bar preassembling box out, the diameter of the pore size that described steel bar preassembling is boxed out and the connecting reinforcement that precast wall body top is exposed adapts, the arrangement of the distribution that its steel bar preassembling is boxed out and the connecting reinforcement that precast wall body top is exposed adapts, for single or double; On the steel bar preassembling of two ends of described steel plate boxes out corresponding upper face, be welded with internal diameter and steel bar preassembling respectively to box out adapt, vertical short steel sleeve, the height of all short steel sleeves is consistent.
As preferred technical scheme, the uniform height of the tube wall of short steel sleeve has paired horizontal direction keyhole, and keyhole interpolation has the latch of the insertion depth for control connection reinforcing bar.
Further, described steel plate is in-line steel plate for precast wall body stalk part reinforcing bar location or the L shape steel plate that uses around the corner.
Further preferred, the steel bar preassembling being positioned at centre position of described in-line steel plate or L shape steel plate page on corresponding upper face of boxing out is welded with internal diameter and steel bar preassembling and boxes out adapt, vertical short steel sleeve.
Further, the quantity of described short steel sleeve is 2 ~ 6.
Preferred further, the bottom surface of described steel plate is also welded to connect ring box keel.
Further, described frame keel are square steel keel or angle steel keel.
Further, the height of described short steel sleeve is 30 ~ 60mm, and described keyhole has highly do not wait 1 ~ 4 right.
In addition, the invention still further relates to the reinforcing bar localization method that a kind of precast wall body utilizing above-mentioned steel bar positioning fixture to carry out is installed, it is characterized in that, comprise the steps:
Step one, superimposed sheet plays reinforcement location control to borrow line: bottom precast wall body and superimposed sheet are all installed and after adjust, superimposed sheet played reinforcement location and controls by means of line;
Step 2, installation steel bar positioning fixture: install steel bar positioning fixture at the end face of precast wall body, corresponding connecting reinforcement, in boxing out the connecting reinforcement correspondence steel bar preassembling inserted on jig;
Step 3, first time reinforcing bar location: according to the control line on superimposed sheet, carry out bar straightening and location;
Step 4, reinforcing bar binding and build cast-in-situ concrete layer: keep steel bar positioning fixture not take off, carry out reinforcing bar binding, after reinforcing bar binding completes, build the cast-in-situ concrete layer of top board;
Step 5, put on cast-in-situ concrete layer reinforcing bar control borrow line: after the cast-in-situ concrete layer of top board reaches upper people's intensity, again put on cast-in-situ concrete layer reinforcing bar control borrow line;
Step 6, second time reinforcing bar location: control to borrow line according to the reinforcing bar on cast-in-situ concrete layer, again re-start bar straightening and location;
Step 7, third time reinforcing bar location: after the cast-in-situ concrete layer top board of top board reaches lifting intensity, carry out third time bar straightening and location;
Step 8, dismounting steel bar positioning fixture: before installation top layer precast wall body, eject corresponding control line, unload steel bar positioning fixture at top board, so far, the reinforcing bar positioning work that precast wall body is installed completes.
Wherein, in described step 2, steel bar positioning fixture comprises the in-line jig being arranged on precast wall body stalk part and the L shape jig being arranged on precast wall body corner.
Compared with prior art, technical advantage of the present invention is:
1, the present invention is used for the reinforcing bar location in two prefabricated panel assembling process, and structure is simple, draws materials conveniently, can field fabrication;
2, for solving the problem of posting strength deficiency in the past, the bottom surface of the steel plate of positioning fixture of the present invention arranges ring box keel, and general employing wall thickness is 3mm, the length of side is the square steel of 30mm, ensures that the intensity of jig meets the demands;
3, easy to operate, unwrapping wire is adopted repeatedly to locate, accurate positioning, the setting of short steel sleeve, advance reservation keyhole on short steel sleeve, after inserting latch, latch props up connecting reinforcement top, positioning fixture is stable to be placed on connecting reinforcement, a segment distance is had with cast-in-situ floor concrete surface at the bottom of jig, vibrating spear can be held to upper, concrete vibrating between lower precast wall body is closely knit, jig can be realized when building floorslab concrete without the need to taking off, can effectively avoid in casting process the displacement that the connecting reinforcement in prefabricated panel causes, do not affect construction speed and construction quality, behind location, reinforcement location is accurate, greatly improve the packaging efficiency of prefabricated panel,
4, can have enough to meet the need use, cost is low.
Accompanying drawing explanation
Fig. 1 is the top view structural representation of the in-line positioning fixture that the present invention relates to;
Fig. 2 is the upward view structural representation of the in-line positioning fixture that the present invention relates to;
Fig. 3 is the elevation structural representation of the in-line positioning fixture that the present invention relates to;
Fig. 4 is the top view structural representation of the L shape positioning fixture that the present invention relates to;
Fig. 5 is the upward view structural representation of the L shape positioning fixture that the present invention relates to;
Fig. 6 is the elevation structural representation of the L shape positioning fixture that the present invention relates to;
Fig. 7 is steel bar positioning fixture and superimposed sheet 9 view all after installation when inventing the steel bar positioning fixture location prefabricated panel connecting reinforcement related to;
Fig. 8 be when inventing the steel bar positioning fixture location prefabricated panel connecting reinforcement related to cast-in-situ concrete layer 10 complete after view;
Fig. 9 is view when inventing the steel bar positioning fixture location prefabricated panel connecting reinforcement related to after the precast wall body installation of upper strata.
Reference numeral: 1-steel plate, 2-steel bar preassembling are boxed out, 3-frame keel, the short steel sleeve of 4-, 5-latch, 6-precast wall body, 7-connecting reinforcement, 8-keyhole, 9-superimposed sheet, 10-cast-in-situ concrete layer.
Detailed description of the invention
Below in conjunction with accompanying drawing, content of the present invention is made further explanation and description.
As shown in figs. 1 to 6, the present invention relates to a kind of steel bar positioning fixture installed for precast wall body, it is characterized in that: the steel plate 1 that the thickness comprising width and precast wall body adapts, described steel plate 1 has steel bar preassembling and boxes out 2, described steel bar preassembling box out 2 pore size and the diameter of connecting reinforcement 7 that exposes of precast wall body 6 top adapt, its steel bar preassembling box out 2 distribution and the arrangement of connecting reinforcement 7 that exposes of precast wall body 6 top adapt; The steel bar preassembling of two ends of described steel plate 1 box out 2 correspondences upper face on be welded with internal diameter and steel bar preassembling respectively and box out 2 adapt, vertical short steel sleeves 4, the diameter of the short steel sleeve 4 that the present embodiment adopts is 25mm, length is 50mm, the height of all short steel sleeves 4 is consistent, and on the uniform height of tube wall, having paired horizontal direction keyhole 8, keyhole 8 interpolation has the latch 5 for the insertion depth of control connection reinforcing bar 7.
As preferred technical scheme, described steel plate 1 is in-line steel plate for precast wall body stalk part reinforcing bar location or the L shape steel plate that uses around the corner, and if Fig. 1 to 3 is the structural representation of in-line jig, Fig. 4 to 6 is structural representations of L shape jig.The steel bar preassembling being positioned at centre position of described in-line jig or L shape jig box out 2 correspondences upper face on also can weld internal diameter and steel bar preassembling simultaneously and to box out 2 adapt, vertical short steel sleeves 4.The quantity of described short steel sleeve 4 can be 2 ~ 6.The bottom surface of described steel plate 1 has also been welded to connect ring box keel 3, frame keel 3 can be square steel keel or angle steel keel, and the present embodiment employing wall thickness is 3mm, the length of side is the square steel of 30mm.Described keyhole 8 can have highly do not wait 1 ~ 4 right.
The invention still further relates to the reinforcing bar localization method that a kind of precast wall body utilizing above-mentioned steel bar positioning fixture to carry out is installed, it is characterized in that, comprise the steps:
Step one, superimposed sheet plays reinforcement location control to borrow line: bottom precast wall body and superimposed sheet 9 are all installed and after adjust, superimposed sheet played reinforcement location and controls by means of line;
Step 2, steel bar positioning fixture is installed: at the end face of precast wall body, corresponding connecting reinforcement 7, steel bar positioning fixture is installed, the connecting reinforcement 7 correspondence steel bar preassembling inserted on jig is boxed out in 2;
Step 3, first time reinforcing bar location: as Fig. 7, according to the control line on superimposed sheet, carry out bar straightening and location;
Step 4, reinforcing bar binding and build cast-in-situ concrete layer 10: as Fig. 8, keep steel bar positioning fixture not take off, carry out reinforcing bar binding, after reinforcing bar binding completes, build the cast-in-situ concrete layer 10 of top board;
Step 5, put on cast-in-situ concrete layer 10 reinforcing bar control borrow line: after the cast-in-situ concrete layer 10 of top board reaches upper people's intensity, again put on cast-in-situ concrete layer 10 reinforcing bar control borrow line;
Step 6, second time reinforcing bar location: control to borrow line according to the reinforcing bar on cast-in-situ concrete layer 10, again re-start bar straightening and location;
Step 7, third time reinforcing bar location: after cast-in-situ concrete layer 10 top board of top board reaches lifting intensity, carry out third time bar straightening and location;
Step 8, dismounting steel bar positioning fixture: before installation top layer precast wall body, eject corresponding control line, unload steel bar positioning fixture at top board, so far, the reinforcing bar positioning work that precast wall body is installed completes.
Wherein, in described step 2, steel bar positioning fixture comprises the in-line jig being arranged on precast wall body stalk part and the L shape jig being arranged on precast wall body corner.
As Fig. 9, when precast wall body on upper strata is installed, the installation in place of opsition dependent control line, when having deviation, use instrument is finely tuned in time, and the reinforcing bar on precast wall body bottom surface, upper strata is reserved sleeve and is connected with connecting reinforcement 7 accurate match of having good positioning, after using the adjustment of steel plate washer, diagonal brace and jack, carry out reinforced bar sleeve grouting, body of wall installation.

Claims (10)

1. the steel bar positioning fixture installed for precast wall body, it is characterized in that: the steel plate (1) that the thickness comprising width and precast wall body adapts, described steel plate (1) has steel bar preassembling and box out (2), the box out diameter of connecting reinforcement (7) that the pore size of (2) and precast wall body (6) top expose of described steel bar preassembling adapts, and the box out arrangement of connecting reinforcement (7) that the distribution of (2) and precast wall body (6) top expose of its steel bar preassembling adapts; On the steel bar preassembling of two ends of described steel plate (1) boxes out upper face corresponding to (2), be welded with internal diameter respectively and steel bar preassembling boxes out that (2) adapt, vertical short steel sleeve (4), the height of all short steel sleeves (4) is consistent.
2. a kind of steel bar positioning fixture installed for precast wall body according to claim 1, it is characterized in that: the tube wall of described short steel sleeve (4) has keyhole (8), keyhole (8) interpolation has the latch (5) for the insertion depth of control connection reinforcing bar (7).
3. a kind of steel bar positioning fixture installed for precast wall body according to claim 1, is characterized in that: described steel plate (1) be the in-line steel plate or the L shape steel plate that uses around the corner of locating for precast wall body stalk part reinforcing bar.
4. a kind of steel bar positioning fixture installed for precast wall body according to claim 2, is characterized in that: the steel bar preassembling being positioned at centre position of described in-line steel plate or L shape steel plate page on upper face corresponding to (2) of boxing out is welded with internal diameter and steel bar preassembling boxes out that (2) adapt, vertical short steel sleeve (4).
5. a kind of steel bar positioning fixture installed for precast wall body according to claim 1, is characterized in that: the quantity of described short steel sleeve (4) is 2 ~ 6.
6. a kind of steel bar positioning fixture installed for precast wall body according to claim 1, is characterized in that: the bottom surface of described steel plate (1) has also been welded to connect ring box keel (3).
7. a kind of steel bar positioning fixture installed for precast wall body according to claim 1, is characterized in that: described frame keel (3) are square steel keel or angle steel keel.
8. a kind of steel bar positioning fixture installed for precast wall body according to claim 1, is characterized in that: described keyhole (8) has highly do not wait 1 ~ 4 right; The height of described short steel sleeve (4) is 30 ~ 60mm.
9. the reinforcing bar localization method that the precast wall body utilizing the steel bar positioning fixture described in claim 1 ~ 8 any one to carry out is installed, is characterized in that, comprise the steps:
Step one, superimposed sheet plays reinforcement location control to borrow line: bottom precast wall body and superimposed sheet (9) are all installed and after adjust, superimposed sheet played reinforcement location and controls by means of line;
Step 2, installation steel bar positioning fixture: install steel bar positioning fixture at the end face of precast wall body, corresponding connecting reinforcement (7), box out in (2) by the steel bar preassembling that connecting reinforcement (7) correspondence is inserted on jig;
Step 3, first time reinforcing bar location: according to the control line on superimposed sheet, carry out bar straightening and location;
Step 4, reinforcing bar binding and build cast-in-situ concrete layer (10): keep steel bar positioning fixture not take off, carry out reinforcing bar binding, after reinforcing bar binding completes, build the cast-in-situ concrete layer (10) of top board;
Step 5, put on cast-in-situ concrete layer (10) reinforcing bar control borrow line: after the cast-in-situ concrete layer (10) of top board reaches upper people's intensity, again put on cast-in-situ concrete layer (10) reinforcing bar control borrow line;
Step 6, second time reinforcing bar location: control to borrow line according to the reinforcing bar on cast-in-situ concrete layer (10), again re-start bar straightening and location;
Step 7, third time reinforcing bar location: after cast-in-situ concrete layer (10) top board of top board reaches lifting intensity, carry out third time bar straightening and location;
Step 8, dismounting steel bar positioning fixture: before installation top layer precast wall body, eject corresponding control line, unload steel bar positioning fixture at top board, so far, the reinforcing bar positioning work that precast wall body is installed completes.
10. the reinforcing bar localization method of a kind of precast wall body installation according to claim 9, it is characterized in that: in described step 2, steel bar positioning fixture comprises the in-line jig being arranged on precast wall body stalk part and the L shape jig being arranged on precast wall body corner.
CN201510042930.8A 2015-01-28 2015-01-28 The reinforcing bar localization method that a kind of precast wall body is installed Active CN104594641B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510042930.8A CN104594641B (en) 2015-01-28 2015-01-28 The reinforcing bar localization method that a kind of precast wall body is installed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510042930.8A CN104594641B (en) 2015-01-28 2015-01-28 The reinforcing bar localization method that a kind of precast wall body is installed

Publications (2)

Publication Number Publication Date
CN104594641A true CN104594641A (en) 2015-05-06
CN104594641B CN104594641B (en) 2016-08-24

Family

ID=53120658

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510042930.8A Active CN104594641B (en) 2015-01-28 2015-01-28 The reinforcing bar localization method that a kind of precast wall body is installed

Country Status (1)

Country Link
CN (1) CN104594641B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105003029A (en) * 2015-07-22 2015-10-28 山东明达建筑科技有限公司 Sleeve bar straightening butt joint formwork
CN105298140A (en) * 2015-09-25 2016-02-03 长沙远大住宅工业集团有限公司 Reinforcing steel bar positioning frame and positioning method for constructing external shear walls
CN105908977A (en) * 2016-06-08 2016-08-31 成都建筑工程集团总公司 Joint bar construction structure and method
CN106759939A (en) * 2016-12-29 2017-05-31 上海建工五建集团有限公司 The attachment structure and method of vertical precast concrete
CN107165267A (en) * 2017-07-10 2017-09-15 岳阳远大住宅工业有限公司 The double steel bar connecting structure system of precast shear wall
CN109208921A (en) * 2017-07-05 2019-01-15 上海宝冶集团有限公司 The localization method of building element assembled sleeve embedded bar
CN113833183A (en) * 2021-09-22 2021-12-24 北京建工四建工程建设有限公司 Prefabricated hollow shear wall panel system and construction method thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07279437A (en) * 1994-04-12 1995-10-27 Taisei Corp Support mounting member to half pca beam
JPH08254017A (en) * 1995-03-15 1996-10-01 Takenaka Komuten Co Ltd Fixing method for wall reinforcing steel net and fixing method for floor reinforcing steel net
JPH11229402A (en) * 1998-02-17 1999-08-24 Daiwa House Ind Co Ltd Foundation and construction for steel frame structure
JP2002089042A (en) * 2000-09-19 2002-03-27 Maeda Corp Construction method for steel framed reinforced concrete structure wall and hoisting device for steel framed reinforced concrete form unit
CN202047588U (en) * 2011-03-28 2011-11-23 江苏天宇建设工程有限公司 Forming template in concrete structure convenient for reserving reinforcing steel bars
CN203213111U (en) * 2013-04-23 2013-09-25 中建七局第二建筑有限公司 Cap of prefabricated static-pressure square pile
CN204456906U (en) * 2015-01-28 2015-07-08 北京住总集团有限责任公司 A kind of steel bar positioning fixture installed for precast wall body

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07279437A (en) * 1994-04-12 1995-10-27 Taisei Corp Support mounting member to half pca beam
JPH08254017A (en) * 1995-03-15 1996-10-01 Takenaka Komuten Co Ltd Fixing method for wall reinforcing steel net and fixing method for floor reinforcing steel net
JPH11229402A (en) * 1998-02-17 1999-08-24 Daiwa House Ind Co Ltd Foundation and construction for steel frame structure
JP2002089042A (en) * 2000-09-19 2002-03-27 Maeda Corp Construction method for steel framed reinforced concrete structure wall and hoisting device for steel framed reinforced concrete form unit
CN202047588U (en) * 2011-03-28 2011-11-23 江苏天宇建设工程有限公司 Forming template in concrete structure convenient for reserving reinforcing steel bars
CN203213111U (en) * 2013-04-23 2013-09-25 中建七局第二建筑有限公司 Cap of prefabricated static-pressure square pile
CN204456906U (en) * 2015-01-28 2015-07-08 北京住总集团有限责任公司 A kind of steel bar positioning fixture installed for precast wall body

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105003029A (en) * 2015-07-22 2015-10-28 山东明达建筑科技有限公司 Sleeve bar straightening butt joint formwork
CN105298140A (en) * 2015-09-25 2016-02-03 长沙远大住宅工业集团有限公司 Reinforcing steel bar positioning frame and positioning method for constructing external shear walls
CN105298140B (en) * 2015-09-25 2018-03-02 长沙远大住宅工业集团有限公司 Reinforcing bar posting and its localization method are used in outer shear wall construction
CN105908977A (en) * 2016-06-08 2016-08-31 成都建筑工程集团总公司 Joint bar construction structure and method
CN105908977B (en) * 2016-06-08 2019-02-15 成都建筑工程集团总公司 Joint bar constructing structure and method
CN106759939A (en) * 2016-12-29 2017-05-31 上海建工五建集团有限公司 The attachment structure and method of vertical precast concrete
CN109208921A (en) * 2017-07-05 2019-01-15 上海宝冶集团有限公司 The localization method of building element assembled sleeve embedded bar
CN107165267A (en) * 2017-07-10 2017-09-15 岳阳远大住宅工业有限公司 The double steel bar connecting structure system of precast shear wall
CN113833183A (en) * 2021-09-22 2021-12-24 北京建工四建工程建设有限公司 Prefabricated hollow shear wall panel system and construction method thereof

Also Published As

Publication number Publication date
CN104594641B (en) 2016-08-24

Similar Documents

Publication Publication Date Title
CN104594641A (en) Reinforcing bar positioning fixture and reinforcing bar positioning method for prefabrication wall installation
CN108385876B (en) Integral-casting and quick-building process for prefabricated assembly type shear wall
CN201635388U (en) Unilateral supporting formwork system for cast-in-place concrete arc outer wall
CN101839061A (en) Unilateral formwork erecting system of cast-in-site concrete arc outer wall body and construction method thereof
CN104060853B (en) Lightweight steel construction modularization house
CN103982041A (en) Method for constructing reinforced-concrete prefabricated element fabricated building with frame structure system
CN104405062A (en) Integrated column-equipped heat preservation wallboard, production and building techniques and matched equipment
CN111456252A (en) Steel assembled synthetic concrete building and construction method thereof
CN110409811B (en) Non-dismantling forming column template containing reinforcement cage, template structure and building process
CN111926910A (en) Installation method of fabricated building
KR20120096605A (en) Bracket support type downward construction system and method
CN103981998B (en) The construction method of precast shear wall plate and shear wall and shear wall
JP5496732B2 (en) Construction method for reinforced concrete buildings
KR20230090300A (en) A twin wall structure using a PC panel and method for manufacturing of it
CN206873673U (en) A kind of assembling type steel structure out-hung panel node
CN210421617U (en) Take autoclaved lightweight aerated concrete board of pipe strap
CN104929295A (en) Seamless steel tube construction method for double-curvature arc-shaped roof
CN204456906U (en) A kind of steel bar positioning fixture installed for precast wall body
CN104314105A (en) Connecting vertical seaming structure for basement external wall boards and cast-in-situ buttress column and construction method of connecting vertical seaming structure
CN109296117B (en) Composite hollow inner template light partition wall and construction method
CN111719578B (en) Archaized building and construction process
KR101137603B1 (en) A prefabricated house construction method and the construction device
KR101827381B1 (en) Multi-layer construction structure of the structure using double-wall PC and construction method thereof
CN205348461U (en) Empty core plate shear wall structure of assembled
US10934709B2 (en) Prefabricated self-supporting module for making building structures, more particularly swimming pools

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant