CN104594568B - Abnormal curved surface hollow transparent plank house plane system construction method - Google Patents

Abnormal curved surface hollow transparent plank house plane system construction method Download PDF

Info

Publication number
CN104594568B
CN104594568B CN201410743619.1A CN201410743619A CN104594568B CN 104594568 B CN104594568 B CN 104594568B CN 201410743619 A CN201410743619 A CN 201410743619A CN 104594568 B CN104594568 B CN 104594568B
Authority
CN
China
Prior art keywords
transparent
plate
square tube
lower floor
aluminium alloy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410743619.1A
Other languages
Chinese (zh)
Other versions
CN104594568A (en
Inventor
张军
陈耀钢
顾春明
张雷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Zhongnan Construction Industry Group Co Ltd
Original Assignee
Jiangsu Zhongnan Construction Industry Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Zhongnan Construction Industry Group Co Ltd filed Critical Jiangsu Zhongnan Construction Industry Group Co Ltd
Priority to CN201410743619.1A priority Critical patent/CN104594568B/en
Publication of CN104594568A publication Critical patent/CN104594568A/en
Application granted granted Critical
Publication of CN104594568B publication Critical patent/CN104594568B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Floor Finish (AREA)

Abstract

nullThe invention discloses a kind of abnormal curved surface hollow transparent plank house plane system construction method,It is on the basis of tradition common transparent glass steel roofing, to combine BIM technology and a kind of new construction technology that aluminum alloy materials grows up,Pass through surveying setting-out,Corner brace is installed successively、Square tube、Aluminium alloy bearing、Attaching plate elements、Lower floor's transparent PC plate、Aluminium alloy connector with tooth、Main joist、Upper strata transparent PC plate,And edges of boards cutting the construction procedure cleared up,Make full use of the mechanical performance that aluminium alloy joist is excellent、And utilize transparent PC plate to have good performance of moulding to make roof boarding,Special-shaped curved moulding the most attractive in appearance can be assembled,And it is respectively mounted transparent PC plate in aluminium alloy joist levels,Form hollow transparent plate structure,Thus there is heat-insulating property and the anti-ultraviolet property of excellence simultaneously,It is particularly well-suited to large-scale stadium、Station、Exhibition center、In the large-scale public utility Roof system work progress such as museum.

Description

Abnormal curved surface hollow transparent plank house plane system construction method
Technical field
The present invention relates to a kind of abnormal curved surface hollow transparent plank house plane system construction method, belong to building field.
Background technology
The roofing of light weight steel structure usually needs arrange some ribbon skylights, make interior of building by day There is certain illumination, to ensure that it uses function.At present, this ribbon skylight many employings glass-reinforced plastic material system Become.This is owing to fiberglass has good light transmission, and thickness is that the translucent glass fibre board actual measurement of 1mm is complete Light transmission rate is up to 90%, and the light passed through is scattered light, is highly suitable for the daylighting of building, The most this material also has the advantages such as intensity is high, density is low, corrosion-resistant, easily manufactured, can be made into and presses Shape steel plate has the longitudinal ripple of same shape and is used in conjunction with each other, and is to support the use most a kind of roofings to adopt Light sheet material.
It addition, for the effect realizing heat preservation energy-saving, the roofing of current lightweight steel construction uses color steel ripple folder Central layer, this plate is the heat insulation structural sandwiching insulation material between two-layer color steel.
But, common transparent glass steel roof boarding is single layer structure, so being difficult to have excellent heat-insulating property And anti-ultraviolet property;Meanwhile, although common transparent glass steel roof boarding intensity is high, but shape is plastic Property is the best, is difficult to meet the esthetic requirement of modern architecture.
Summary of the invention
Present invention is primarily targeted at, overcome deficiency of the prior art, it is provided that a kind of abnormal curved surface hollow Lamella lucida Roof system construction method, is to combine BIM skill on the basis of tradition common transparent glass steel roofing A kind of new construction technology that art and aluminum alloy materials grow up, this construction method makes full use of aluminium alloy dragon Mechanical performance that bone is excellent and utilize transparent PC plate to have good performance of moulding to make roof boarding, can Assemble special-shaped curved moulding the most attractive in appearance, and be respectively mounted transparent PC plate in aluminium alloy joist levels, Form hollow transparent plate structure, thus there is heat-insulating property and the anti-ultraviolet property of excellence simultaneously, the suitableeest For large-scale public utility Roof system work progress such as large-scale stadium, station, exhibition center, museums In.
In order to achieve the above object, the technical solution adopted in the present invention is:
A kind of abnormal curved surface hollow transparent plank house plane system construction method, comprises the following steps:
Step 1: surveying setting-out;
The scope of operation submitted to according to steel construction, will need to build the Roof system of abnormal curved surface structure on steel construction Junction point correspondence position ejects location line;
Step 2: install corner brace;
Steel construction girder is equidistantly installed the paired corner brace for the lower floor's square tube that is fixedly clamped, described angle Code is connected with steel construction Main Girder Welding, brushing antirust paint after having welded;
Step 3: install lower floor's square tube, square tube bearing and upper strata square tube successively;
According to the paired corner brace of equidistantly distribution, lower floor's square tube fallen between paired corner brace and pressed from both sides Tightly, the rear corner brace using bolt-through the most paired realizes fixed installation;Described lower floor square tube is also formed equidistantly Distribution;
Described upper strata square tube is paralleled with lower floor square tube, and is obtained by square tube bearing and be connected;
The end face of described lower floor square tube and the bottom surface of upper strata square tube are provided with square tube core print seat respectively;
The square tube core print seat of lower floor's square tube and upper strata square tube is inserted at the two ends of described square tube bearing respectively, uses spiral shell afterwards Bolt fixedly mounts;
Step 4: install aluminium alloy bearing;
Aluminium alloy bearing for Fan Diao lower floor transparent PC plate is installed in the bottom surface of described lower floor square tube, described Aluminium alloy bearing uses tapping screw to fix;
Step 5: install attaching plate elements;
End face at described upper strata square tube welds the attaching plate elements for installing aluminium alloy connector with tooth, described Attaching plate elements is vertically arranged;
Step 6: install lower floor's transparent PC plate;
Hang counter for transparent for lower floor PC plate in lower floor's square tube, the plate end edge curved groove card of described lower floor transparent PC plate Press-fit upper aluminium alloy gland after entering aluminium alloy bearing, then external decoration buckle closure is installed;
The anti-ultraviolet one of described lower floor transparent PC plate faces up installation, and in a pre-installation transparent for lower floor PC 5-10cm uncovered by the protecting film of plate surrounding, keeps protecting film not clamped by aluminium alloy bearing;
Step 7: install aluminium alloy connector with tooth;
Bolt and spacer for bolt is used to be connected in attaching plate elements connector with tooth for aluminium alloy;
Step 8: install the main joist of upper strata transparent PC plate;
Elongated installation main joist on aluminium alloy connector with tooth, described main joist includes being arranged on aluminum alloy strip Aluminium section bar on tooth connector end face and the aluminium profiles pair frame being arranged on aluminium section bar;
Lower sectional material or lower adhesive tape in described aluminium section bar must be adjacent to aluminium alloy connector with tooth end face and keep flat OK, tapping screw is used to fix;Set between described aluminium alloy connector with tooth end face and lower sectional material or lower adhesive tape It is equipped with anticorrosion pad;
Described aluminium profiles pair frame is arranged on aluminium section bar by aluminium alloy briquetting and aluminium alloy buckle closure;
Step 9: install upper strata transparent PC plate;
The smooth of main joist skeleton and cleaning is must assure that before installation;
Being arranged on main joist by transparent for upper strata PC plate during installation, the plate end of described upper strata transparent PC plate leads to Crossing rustless steel bluff piece and cushion film is connected on aluminium profiles pair frame, side seam is added reality by blend compounds;Described adjacent upper The side seam of the transparent PC plate of layer forms double glue-line after adding in fact;
The anti-ultraviolet one of described upper strata transparent PC plate faces up installation, and in a pre-installation transparent for upper strata PC 5-10cm uncovered by the protecting film of plate surrounding, keeps protecting film not clamped by rustless steel bluff piece;
Step 10: edges of boards cutting is also cleared up;
PC plate transparent to upper strata and lower floor's transparent PC plate expose edges of boards and carry out cutting and make edges of boards flush, And the edges of boards after cutting construction are cleared up.
The present invention is further arranged to: described corner brace is zinc-plated corner brace.
The present invention is further arranged to: described upper strata square tube and lower floor's square tube are 60mm × 60mm × 3mm Galvanized steel square tube.
The present invention is further arranged to: described square tube bearing is the galvanized steel square tube of 50mm × 50mm × 4mm.
The present invention is further arranged to: described lower floor square tube is equidistantly 800mm.
The present invention is further arranged to: described attaching plate elements is junction steel plate.
The present invention is further arranged to: described spacer for bolt is pad with tooth.
The present invention is further arranged to: described upper strata transparent PC plate and lower floor transparent PC plate is thickness not phase Same transparent PC plate.
The present invention is further set to: the thickness of described upper strata transparent PC plate is 12mm, described lower floor The thickness of transparent PC plate is 4mm.
Compared with prior art, the invention have the advantages that:
1, high intensity, impact resistance, tenacity are strong;
2, processability is good, plasticity is strong, can be actually needed according to building-site, bends to arch, semicircle Etc. style;
3, hollow transparent plate structure, can ultraviolet radiation resisting for a long time, effect spy is excellent in daylighting, and heat-insulating property is strong, Mass energy expense can be saved.
Foregoing is only the general introduction of technical solution of the present invention, in order to be better understood upon the technology hands of the present invention Section, the invention will be further described below in conjunction with the accompanying drawings.
Accompanying drawing explanation
Fig. 1 is the structural representation installing lower floor's transparent PC plate in the embodiment of the present invention;
Fig. 2 is the structural representation installing upper strata transparent PC plate in the embodiment of the present invention;
Fig. 3 is the structure for amplifying schematic diagram of local A in Fig. 2;
Fig. 4 is to install the structural representation of aluminium section bar used by the transparent PC plate of upper strata in the embodiment of the present invention;
Detailed description of the invention
Below in conjunction with Fig. 1, Fig. 2, Fig. 3 and Fig. 4 of Figure of description, the present invention is further illustrated.
The abnormal curved surface hollow transparent plank house plane system construction method that the present invention provides, comprises the following steps:
Step 1: surveying setting-out;
The scope of operation submitted to according to steel construction, will need to build the Roof system of abnormal curved surface structure on steel construction Junction point correspondence position ejects location line;
Step 2: install zinc-plated corner brace 1;
Steel construction girder 10 is equidistantly installed the paired zinc-plated angle for the lower floor's square tube 11 that is fixedly clamped Code 1, described zinc-plated corner brace 1 is welded to connect with steel construction girder 10, brushing antirust paint after having welded;
Step 3: install lower floor's square tube 11, square tube bearing 12 and upper strata square tube 13 successively;
According to the paired zinc-plated corner brace 1 of equidistantly distribution, lower floor's square tube 11 is fallen into paired zinc-plated corner brace Between 1 and be clamped, rear use bolt 14 to penetrate paired zinc-plated corner brace 1 to realize fixed installation;Described Lower floor's square tube 11 also forms equidistantly distribution, can be equidistantly 800mm;
Described upper strata square tube 13 is paralleled with lower floor square tube 11, and is obtained by square tube bearing 12 and be connected;
The end face of described lower floor square tube 11 and the bottom surface of upper strata square tube 13 are provided with square tube core print seat respectively;
The square tube core print seat of lower floor's square tube 11 and upper strata square tube 13 is inserted at the two ends of described square tube bearing 12 respectively, Rear employing bolt 14 fixedly mounts;
Described upper strata square tube 13 and lower floor's square tube 11 are the galvanized steel square tube of 60mm × 60mm × 3mm; Described square tube bearing 12 is the galvanized steel square tube of 50mm × 50mm × 4mm;
Step 4: install aluminium alloy bearing 2;
Aluminium alloy bearing 2 for Fan Diao lower floor transparent PC plate 3 is installed in the bottom surface of described lower floor square tube 11, Described aluminium alloy bearing 2 uses tapping screw 21 to fix;
Step 5: install attaching plate elements 4;
End face at described upper strata square tube 13 welds the attaching plate elements for installing aluminium alloy connector with tooth 5 4, described attaching plate elements 4 is vertically arranged, preferably junction steel plate;
Step 6: install lower floor's transparent PC plate 3 that thickness is 4mm;
Hang counter for transparent for lower floor PC plate 3 in lower floor's square tube 11, the plate end edge of described lower floor transparent PC plate 3 Curved groove press-fits upper aluminium alloy gland 22 after snapping in aluminium alloy bearing 2, then installs external decoration buckle closure 23;
The anti-ultraviolet one of described lower floor transparent PC plate 3 faces up installation, and in a pre-installation that lower floor is transparent 5-10cm uncovered by the protecting film of PC plate 3 surrounding, keeps protecting film not clamped by aluminium alloy bearing 2;But also Can not uncover too many, in order to avoid damage transparent PC plate face because of operation;
Step 7: install aluminium alloy connector with tooth 5;
Bolt 51 and spacer for bolt 52 is used to be connected in attaching plate elements 4 connector 5 with tooth for aluminium alloy; Described spacer for bolt 52 is preferably pad with tooth;
Step 8: install the main joist of upper strata transparent PC plate 6;
Elongated installation main joist on aluminium alloy connector with tooth 5, described main joist includes being arranged on aluminium alloy Aluminium section bar 7 on connector 5 end face with tooth and the aluminium profiles pair frame 8 being arranged on aluminium section bar 7;
Lower sectional material or lower adhesive tape in described aluminium section bar 7 must be adjacent to aluminium alloy connector with tooth 5 end face and keep Parallel, use tapping screw to fix;Described aluminium alloy connector with tooth 5 end face and lower sectional material or lower adhesive tape it Between be provided with anticorrosion pad 53;
Described aluminium profiles pair frame 8 is arranged on aluminium section bar 7 by aluminium alloy briquetting 81 and aluminium alloy buckle closure 82;
Step 9: install the upper strata transparent PC plate 6 that thickness is 12mm;
The smooth of main joist skeleton and cleaning is must assure that before installation;
During installation, transparent for upper strata PC plate 6 is arranged on main joist, the plate of described upper strata transparent PC plate 6 End is connected on aluminium profiles pair frame 8 by rustless steel bluff piece 61 and cushion film 62, and side seam is added reality by blend compounds; The side seam of described adjacent upper strata transparent PC plate 6 forms double glue-line 63 after adding in fact;
The anti-ultraviolet one of described upper strata transparent PC plate 6 faces up installation, and in a pre-installation that upper strata is transparent 5-10cm uncovered by the protecting film of PC plate 6 surrounding, keeps protecting film not clamped by rustless steel bluff piece 61;But Also can not uncover too many, in order to avoid damage transparent PC plate face because of operation;
Step 10: edges of boards cutting is also cleared up;
The edges of boards that expose of PC plate 6 transparent to upper strata and lower floor's transparent PC plate 3 carry out cutting and make edges of boards neat Flat, and the edges of boards after cutting construction are cleared up.
The abnormal curved surface hollow transparent plank house plane system construction method that the present invention provides, by two layers of thickness not phase Same transparent PC plate composition Roof system, uses aluminium alloy joist to support between two-layer transparent PC plate;Under Layer transparent PC plate installation is counter hangs in lower floor's square tube, and plate end edge curved groove snaps in aluminium alloy bearing;The transparent PC in upper strata Plate is arranged on main joist, the elongated installation of main joist, and the plate end of upper strata transparent PC plate 6 is adopted with aluminium profiles pair frame Connect with rustless steel bluff piece is fixing.The construction method of the present invention includes surveying setting-out, installs corner brace, side successively Logical, aluminium alloy bearing, attaching plate elements, lower floor's transparent PC plate, aluminium alloy connector with tooth, main joist, Upper strata transparent PC plate, and edges of boards cutting the construction procedure cleared up, make full use of aluminium alloy joist excellent Mechanical performance and utilize transparent PC plate to have good performance of moulding to make roof boarding, can assemble Special-shaped curved moulding the most attractive in appearance, processability is good, plasticity is strong, can be actually needed according to building-site, curved The styles such as song overarches, semicircle;And it is respectively mounted transparent PC plate in aluminium alloy joist levels, formed Hollow transparent plate structure, thus there is heat-insulating property and the anti-ultraviolet property of excellence simultaneously, high intensity, resistance to Shock, tenacity are strong, and effect spy is excellent in daylighting, can save mass energy expense;It is particularly well-suited to big sport In the large-scale public utility Roof system work progress such as venue, station, exhibition center, museum.
The ultimate principle of the present invention, principal character and advantage have more than been shown and described.The technology people of the industry Member it should be appreciated that the present invention is not restricted to the described embodiments, described in above-described embodiment and description only Being the principle that the present invention is described, without departing from the spirit and scope of the present invention, the present invention also has respectively Planting changes and improvements, these changes and improvements both fall within scope of the claimed invention.Application claims Protection domain is defined by appending claims and equivalent thereof.

Claims (9)

1. an abnormal curved surface hollow transparent plank house plane system construction method, it is characterised in that include following Step:
Step 1: surveying setting-out;
The scope of operation submitted to according to steel construction, will need to build the Roof system of abnormal curved surface structure on steel construction Junction point correspondence position ejects location line;
Step 2: install corner brace;
Steel construction girder is equidistantly installed the paired corner brace for the lower floor's square tube that is fixedly clamped, described angle Code is connected with steel construction Main Girder Welding, brushing antirust paint after having welded;
Step 3: install lower floor's square tube, square tube bearing and upper strata square tube successively;
According to the paired corner brace of equidistantly distribution, lower floor's square tube fallen between paired corner brace and pressed from both sides Tightly, the rear corner brace using bolt-through the most paired realizes fixed installation;Described lower floor square tube is also formed equidistantly Distribution;
Described upper strata square tube is paralleled with lower floor square tube, and is obtained by square tube bearing and be connected;
The end face of described lower floor square tube and the bottom surface of upper strata square tube are provided with square tube core print seat respectively;
The square tube core print seat of lower floor's square tube and upper strata square tube is inserted at the two ends of described square tube bearing respectively, uses spiral shell afterwards Bolt fixedly mounts;
Step 4: install aluminium alloy bearing;
Aluminium alloy bearing for Fan Diao lower floor transparent PC plate is installed in the bottom surface of described lower floor square tube, described Aluminium alloy bearing uses tapping screw to fix;
Step 5: install attaching plate elements;
End face at described upper strata square tube welds the attaching plate elements for installing aluminium alloy connector with tooth, described Attaching plate elements is vertically arranged;
Step 6: install lower floor's transparent PC plate;
Hang counter for transparent for lower floor PC plate in lower floor's square tube, the plate end edge curved groove card of described lower floor transparent PC plate Press-fit upper aluminium alloy gland after entering aluminium alloy bearing, then external decoration buckle closure is installed;
The anti-ultraviolet one of described lower floor transparent PC plate faces up installation, and in a pre-installation transparent for lower floor PC 5-10cm uncovered by the protecting film of plate surrounding, keeps protecting film not clamped by aluminium alloy bearing;
Step 7: install aluminium alloy connector with tooth;
Bolt and spacer for bolt is used to be connected in attaching plate elements connector with tooth for aluminium alloy;
Step 8: install the main joist of upper strata transparent PC plate;
Elongated installation main joist on aluminium alloy connector with tooth, described main joist includes being arranged on aluminum alloy strip Aluminium section bar on tooth connector end face and the aluminium profiles pair frame being arranged on aluminium section bar;
Lower sectional material or lower adhesive tape in described aluminium section bar must be adjacent to aluminium alloy connector with tooth end face and keep flat OK, tapping screw is used to fix;Set between described aluminium alloy connector with tooth end face and lower sectional material or lower adhesive tape It is equipped with anticorrosion pad;
Described aluminium profiles pair frame is arranged on aluminium section bar by aluminium alloy briquetting and aluminium alloy buckle closure;
Step 9: install upper strata transparent PC plate;
The smooth of main joist skeleton and cleaning is must assure that before installation;
Being arranged on main joist by transparent for upper strata PC plate during installation, the plate end of described upper strata transparent PC plate leads to Crossing rustless steel bluff piece and cushion film is connected on aluminium profiles pair frame, side seam is added reality by blend compounds;Described adjacent upper The side seam of the transparent PC plate of layer forms double glue-line after adding in fact;
The anti-ultraviolet one of described upper strata transparent PC plate faces up installation, and in a pre-installation transparent for upper strata PC 5-10cm uncovered by the protecting film of plate surrounding, keeps protecting film not clamped by rustless steel bluff piece;
Step 10: edges of boards cutting is also cleared up;
PC plate transparent to upper strata and lower floor's transparent PC plate expose edges of boards and carry out cutting and make edges of boards flush, And the edges of boards after cutting construction are cleared up.
Abnormal curved surface hollow transparent plank house plane system construction method the most according to claim 1, it is special Levy and be: described corner brace is zinc-plated corner brace.
Abnormal curved surface hollow transparent plank house plane system construction method the most according to claim 1, it is special Levy and be: described upper strata square tube and lower floor's square tube are the galvanized steel square tube of 60mm × 60mm × 3mm.
Abnormal curved surface hollow transparent plank house plane system construction method the most according to claim 1, it is special Levy and be: described square tube bearing is the galvanized steel square tube of 50mm × 50mm × 4mm.
Abnormal curved surface hollow transparent plank house plane system construction method the most according to claim 1, it is special Levy and be: described lower floor square tube is equidistantly 800mm.
Abnormal curved surface hollow transparent plank house plane system construction method the most according to claim 1, it is special Levy and be: described attaching plate elements is junction steel plate.
Abnormal curved surface hollow transparent plank house plane system construction method the most according to claim 1, it is special Levy and be: described spacer for bolt is pad with tooth.
Abnormal curved surface hollow transparent plank house plane system construction method the most according to claim 1, it is special Levy and be: described upper strata transparent PC plate and lower floor transparent PC plate is the transparent PC plate that thickness differs.
Abnormal curved surface hollow transparent plank house plane system construction method the most according to claim 8, it is special Levying and be: the thickness of described upper strata transparent PC plate is 12mm, the thickness of described lower floor transparent PC plate is 4 mm。
CN201410743619.1A 2014-12-08 2014-12-08 Abnormal curved surface hollow transparent plank house plane system construction method Active CN104594568B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410743619.1A CN104594568B (en) 2014-12-08 2014-12-08 Abnormal curved surface hollow transparent plank house plane system construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410743619.1A CN104594568B (en) 2014-12-08 2014-12-08 Abnormal curved surface hollow transparent plank house plane system construction method

Publications (2)

Publication Number Publication Date
CN104594568A CN104594568A (en) 2015-05-06
CN104594568B true CN104594568B (en) 2016-08-24

Family

ID=53120585

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410743619.1A Active CN104594568B (en) 2014-12-08 2014-12-08 Abnormal curved surface hollow transparent plank house plane system construction method

Country Status (1)

Country Link
CN (1) CN104594568B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110158759B (en) * 2019-05-24 2024-01-16 中建八局装饰工程有限公司 Steel structure trapezoid combined channel and construction method thereof
CN110206212A (en) * 2019-05-27 2019-09-06 中国十七冶集团有限公司 A kind of curved metal roof construction method based on BIM technology

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5823704A (en) * 1995-01-03 1998-10-20 Koch Konstruktive Membranen Gmbh & Co., K.G. Holding device for the anchorage of single- or multilayer webs to a stationary structural member
CN1811098A (en) * 2006-02-24 2006-08-02 武汉日新科技有限公司 Solar electricity-generating and light-emitting tile
CN101082237A (en) * 2006-06-02 2007-12-05 上海市向明中学 Glass heat-proof curtain wall structure
CN101215915A (en) * 2008-01-08 2008-07-09 沈阳远大铝业工程有限公司 Thin film curtain wall structure
CN203188431U (en) * 2013-05-07 2013-09-11 黑龙江大学 Hemispherical curve surface roof
CN103726618A (en) * 2013-11-29 2014-04-16 钱国珍 Roof solar photovoltaic device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5823704A (en) * 1995-01-03 1998-10-20 Koch Konstruktive Membranen Gmbh & Co., K.G. Holding device for the anchorage of single- or multilayer webs to a stationary structural member
CN1811098A (en) * 2006-02-24 2006-08-02 武汉日新科技有限公司 Solar electricity-generating and light-emitting tile
CN101082237A (en) * 2006-06-02 2007-12-05 上海市向明中学 Glass heat-proof curtain wall structure
CN101215915A (en) * 2008-01-08 2008-07-09 沈阳远大铝业工程有限公司 Thin film curtain wall structure
CN203188431U (en) * 2013-05-07 2013-09-11 黑龙江大学 Hemispherical curve surface roof
CN103726618A (en) * 2013-11-29 2014-04-16 钱国珍 Roof solar photovoltaic device

Also Published As

Publication number Publication date
CN104594568A (en) 2015-05-06

Similar Documents

Publication Publication Date Title
CN203347544U (en) Combined architectural structure
CN203782939U (en) Novel stainless steel fireproof curtain wall
CN205475694U (en) Assembled steel construction house
CN103806580B (en) Building integrated solar cell module curtain wall and roofing
CN201649374U (en) Framework type curtain wall with decorative strip keels
CN203821644U (en) Building integrated solar cell module curtain wall and roof
CN104594568B (en) Abnormal curved surface hollow transparent plank house plane system construction method
CN104158130A (en) Suspension type fireproof bridge stand
CN102535698A (en) Heat insulation curtain wall
CN205875404U (en) Log cabin group that dismantles log cabin of storing and have it is built in easy installation
CN203755506U (en) Ribbon curtain wall structure
CN210887704U (en) Aluminum veneer curtain wall structure with glass window based on steel truss
CN204691016U (en) A kind of economical curtain wall with large scale aluminium sheet ornamental strip
CN209293361U (en) Curtain wall decorative strip connection structure
CN202466917U (en) Clerestory frame
CN201843239U (en) Fish scale unitized curtain wall system
CN104631614A (en) Installation structure of U-shaped glass building
CN215670391U (en) Daylighting top edge portion binding off structure
CN202298928U (en) Sealing and repairing structure of glue-line-free aluminum sheet
CN205369617U (en) Broken line curtain point type bearing structure
CN210529988U (en) Heat-insulation sound-insulation composite board
CN204225285U (en) A kind of sectional material connection structure for glass sunlight house
CN204012521U (en) With the fireproof bridge frame of discharge structure
CN204662835U (en) A kind of environmental protection finishing aluminium sheet
CN204001451U (en) A kind of decoration roofing

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant