CN104564455B - Engine oil inlet pipe joint and machining method thereof - Google Patents

Engine oil inlet pipe joint and machining method thereof Download PDF

Info

Publication number
CN104564455B
CN104564455B CN201410698837.8A CN201410698837A CN104564455B CN 104564455 B CN104564455 B CN 104564455B CN 201410698837 A CN201410698837 A CN 201410698837A CN 104564455 B CN104564455 B CN 104564455B
Authority
CN
China
Prior art keywords
wall
sleeve pipe
type connecting
connecting tube
joint type
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410698837.8A
Other languages
Chinese (zh)
Other versions
CN104564455A (en
Inventor
董阿能
白永洁
陈荣发
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NINGBO TAIER AUTOMOBILE PARTS CO Ltd
Original Assignee
NINGBO TAIER AUTOMOBILE PARTS CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NINGBO TAIER AUTOMOBILE PARTS CO Ltd filed Critical NINGBO TAIER AUTOMOBILE PARTS CO Ltd
Priority to CN201410698837.8A priority Critical patent/CN104564455B/en
Publication of CN104564455A publication Critical patent/CN104564455A/en
Application granted granted Critical
Publication of CN104564455B publication Critical patent/CN104564455B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Quick-Acting Or Multi-Walled Pipe Joints (AREA)

Abstract

The invention discloses an engine oil inlet pipe joint and a machining method thereof. The engine oil inlet pipe joint comprises a bamboo joint type connecting pipe (3), a bushing (5), a fastening nut (4) and an external nut (2), wherein the bamboo joint type connecting pipe (3) is connected with a rubber pipe (1); the fastening nut (4) and the bamboo joint type connecting pipe (3) are integrally formed; the external nut (2) sleeves one end of the bamboo joint type connecting pipe (3); the bushing (5) sleeves the outer side of the other end of the bamboo joint type connecting pipe (3); the rubber pipe (1) is positioned between the outer wall of the bamboo joint type connecting pipe (3) and the inner wall of the bushing (5); the outer wall of the bamboo joint type connecting pipe (3) is provided with a plurality of annular bumps (6) which are embedded into the inner wall of the rubber pipe (1); the inner wall of the bushing (5) is provided with a plurality of clamping teeth (7) which are embedded into the outer wall of the rubber pipe (1). The engine oil inlet pipe joint which is low in production cost and reliable in rubber pipe connection and the engine oil inlet pipe joint machining method which is simple in machining processes and firm and reliable in rubber pipe connection are provided.

Description

Engine oil inlet pipe joint and its processing method
Technical field
The present invention relates to engine oil inlet pipe joint technical field, be especially a kind of engine oil inlet pipe joint and its add Work method.
Background technology
Existing engine oil inlet pipe joint is a kind of connector between petroleum pipeline, in order to ensure engine just Often work, so, there is requirement very high to the reliability and sealing of inlet connector connection.Currently, engine oil inlet pipe The structure of joint, as shown in figure 1, including clamp nut 01, sebific duct 02, sleeve pipe 03 and bamboo joint type connecting tube 04, clamp nut 01 It is integrally formed with sleeve pipe 03, sleeve pipe 03 is thin-wall construction, clamp nut 01 is linked in the outer wall of bamboo joint type connecting tube 04, the end of sebific duct 01 Portion is located between the inwall of sleeve pipe 03 and the outer wall of bamboo joint type connecting tube 04.
The engine oil inlet pipe joint of the structure is thin-wall part due to sleeve pipe 03, and the structure of the inwall of sleeve pipe 03 is by machine Machine, machining completion typically is carried out to the inwall of sleeve pipe 03 by cutting tool;So, in process, one Aspect, because wall is thin, causes the cutting output of cutter big, and cutter loss is big, and production cost is high;On the other hand, because wall is thin, cutting When being near completion, if both cutter or sleeve pipe 03 have one to shift, sleeve pipe 03 is just easily caused to scrap;Additionally, glue The axial movement of pipe 02 is that anti-skidding work is played in the connection between annular protrusion and sebific duct 02 by the outer wall of bamboo joint type connecting tube 04 With that is, sebific duct 02 only has inwall to be limited to, and so, the slightly dilatancy of sebific duct 02 just can be from bamboo joint type connecting tube 04 Outer wall comes off, so as to cause leakage.
Currently, the processing method of engine oil inlet pipe joint is:First, bamboo joint type connecting tube 04 is placed on mounting bracket On, and then integrally formed clamp nut 01 and sleeve pipe 03 are arranged on the outer wall of bamboo joint type connecting tube 04;
Then, sebific duct 02 is screwed between the outer wall of bamboo joint type connecting tube 04 and sleeve pipe 03;
Finally, to being withheld at the outer wall of sleeve pipe 03, not only cause that clamp nut 01 and sleeve pipe 03 are fixed on bamboo joint type company The outer wall of adapter 04, and cause that the annular protrusion of the outer wall of bamboo joint type connecting tube 04 is embedded into the inwall of sebific duct 02.
Had the following disadvantages in above-mentioned processing method:Clamp nut 01 and sleeve pipe 03 are integrally formed, and clamp nut 01 is needed Fit to the outer wall of bamboo joint type connecting tube 04 is wanted, so, in addition it is also necessary to the endoporus to clamp nut 01 carries out machining, and then increases The allowance of clamp nut 01;Additionally, sebific duct 02 is by the annular protrusion and sleeve pipe 03 of the outer wall of bamboo joint type connecting tube 04 Inwall is fixed at engine oil inlet pipe joint, but, sebific duct 02 only has inwall to be limited to, so being easily caused connection not Firmly, i.e., sebific duct 02 easily comes off from engine oil inlet pipe joint.
The content of the invention
The technical problems to be solved by the invention are to provide a kind of low production cost, the reliable engine of sebific duct connection and enter Oil connection.
In order to solve the above technical problems, the engine oil inlet pipe joint that the present invention is provided, the bamboo joint type that it is connected with sebific duct Connecting tube, sleeve pipe, clamp nut and outer connected nut, described clamp nut are integrally formed with bamboo joint type connecting tube;Outer connected nut Bamboo joint type connecting tube one end is linked in, sleeve pipe is linked in outside the bamboo joint type connecting tube other end;Sebific duct is located at outside bamboo joint type connecting tube Between wall and internal surface of sleeve pipe, bamboo joint type connection pipe outer wall is provided with the annular protrusion of multiple embedded rubber tube inner walls, and internal surface of sleeve pipe is provided with The latch of the embedded sebific duct outer wall of multiple.
First annular groove and the second annular groove are provided with as a kind of preferred, described bamboo joint type connection pipe outer wall, are covered Pipe one end is provided with the first bulge loop of the first annular groove of insertion, and it is second convex that outer connected nut one end is provided with embedded second annular groove Ring.
After above engine oil inlet pipe joint, the present invention compared with prior art, with advantages below:By sleeve pipe It is fixedly installed on bamboo joint type and is connected pipe outer wall with the split type processing of clamp nut, clamp nut, so, it is only necessary to process in sleeve pipe Wall, the inwall without processing clamp nut, reduces the chipping allowance of internal surface of sleeve pipe, reduces production cost;Additionally, sleeve pipe with Bamboo joint type connecting tube is connected by the form that the first bulge loop is embedded into first annular groove, and internal surface of sleeve pipe passes through with sebific duct outer wall Latch insertion sebific duct outer wall, bamboo joint type connection pipe outer wall and rubber tube inner wall are connected by the form that annular protrusion is embedded in rubber tube inner wall Connect, so, reliability and fastness that sebific duct is connected with inlet connector are improve on the whole, and because the inwall of sebific duct is pasted Tight bamboo joint type connection pipe outer wall and annular protrusion, sebific duct outer wall are adjacent to internal surface of sleeve pipe and latch so that sebific duct is in the close of junction Envelope property is also significantly improved, i.e. the outer wall and inwall of sebific duct are sealed;Further, since latch and annular protrusion Both presence, play duplicate protection and act on during to sebific duct by axial tension, prevent sebific duct from departing from from inlet connector, that is, block Tooth plays anti-dropout effect to sebific duct outer wall, and annular protrusion plays anti-dropout effect to rubber tube inner wall.
Another technical problem to be solved by this invention is to provide that a kind of manufacturing procedure is simple, sebific duct firm and reliable connection Engine oil inlet pipe joint processing method.
In order to solve the above technical problems, the present invention is comprised the following steps:
A, go out sleeve pipe blank by cold moudling, then internal surface of sleeve pipe finish by numerically controlled lathe to obtain latch;
B, sleeve pipe is nested into bamboo joint type connecting tube one end outer wall, external nut is inserted in the bamboo joint type connecting tube other end Outward;Second bulge loop outer wall of external connected nut is withheld so that the second bulge loop is embedded into the second annular groove;To sleeve pipe First bulge loop outer wall is withheld so that the first bulge loop is embedded into first annular groove;
C, sebific duct is inserted into the space that internal surface of sleeve pipe is connected pipe outer wall with bamboo joint type;
D, sleeve outer wall is withheld so that the latch of internal surface of sleeve pipe is embedded into sebific duct outer wall, and bamboo joint type connecting tube The annular protrusion of outer wall is embedded into rubber tube inner wall;
E, taking-up engine oil inlet pipe joint finished product.
As one kind preferably, the intermediate layer of sebific duct is wound with ground floor steel wire and second layer steel wire in described step c, the Layer of steel wire and second layer steel wire are in circular helix, and ground floor steel wire is left-hand screw line, and second layer steel wire is right-hand helix.
After above engine oil inlet pipe joint processing method, the present invention compared with prior art, with advantages below: Due to only needing to cut internal surface of sleeve pipe, so can just reduce the wall thickness of sleeve pipe during cold moudling, and then reduce number Chipping allowance of the lathe tool to internal surface of sleeve pipe during control lathe;In addition, being embedded into first annular groove, the second bulge loop by the first bulge loop It is embedded into being rigidly connected for the second annular groove so that sleeve pipe and outer connected nut are difficult to be come off from bamboo joint type connecting tube, and button During gland pipe outer wall so that latch is embedded into sebific duct outer wall, and then improves the sealing of sebific duct outer wall and internal surface of sleeve pipe Property, the inner and outer wall of such sebific duct receives constraint and seals.
Brief description of the drawings
Fig. 1 is the part drawing of engine oil inlet pipe joint in the prior art.
Fig. 2 is the part drawing of inventive engine inlet connector.
Wherein:
Prior art:01st, clamp nut, 02, sebific duct, 03, sleeve pipe, 04, bamboo joint type connecting tube;
The present invention:1st, sebific duct, 2, outer connected nut, 3, bamboo joint type connecting tube, 4, clamp nut, 5, sleeve pipe, 6, annular protrusion, 7th, latch, 8, first annular groove, the 9, second annular groove, the 10, first bulge loop, the 11, second bulge loop.
Specific embodiment
The present invention is described in more detail with reference to specific embodiment.
Specific embodiment:
A kind of engine oil inlet pipe joint, bamboo joint type connecting tube 3 that it is connected with sebific duct 1, sleeve pipe 5, clamp nut 2 and outer Connected nut, described clamp nut 4 is integrally formed with bamboo joint type connecting tube 3;Outer connected nut 2 is linked in bamboo joint type connecting tube 3 one End, sleeve pipe 5 is linked in outside the other end of bamboo joint type connecting tube 3;Sebific duct 1 be located at the outer wall of bamboo joint type connecting tube 3 and the inwall of sleeve pipe 5 it Between, the outer wall of bamboo joint type connecting tube 3 is provided with the annular protrusion 6 of multiple embedded inwalls of sebific duct 1, and the inwall of sleeve pipe 5 is provided with multiple embedded glue The latch 7 of the outer wall of pipe 1.
The described outer wall of bamboo joint type connecting tube 3 is provided with the annular groove 9 of first annular groove 8 and second, and the one end of sleeve pipe 5 is provided with First bulge loop 10 of the first annular groove 8 of insertion, one end of outer connected nut 2 is provided with the second bulge loop 11 of embedded second annular groove 9.
A kind of processing method of engine oil inlet pipe joint, it is comprised the following steps:
A, go out sleeve pipe blank by cold moudling, then the inwall of sleeve pipe 5 finish obtaining latch by numerically controlled lathe 7;
B, sleeve pipe 5 is nested into one end outer wall of bamboo joint type connecting tube 3, it is another that outer connected nut 2 is inserted in into bamboo joint type connecting tube 3 End is outer;The outer wall of second bulge loop 11 of external connected nut 2 is withheld so that the second bulge loop 11 is embedded into the second annular groove 9; The outer wall of the first bulge loop 10 to sleeve pipe 5 is withheld so that the first bulge loop 10 is embedded into first annular groove 8;
C, the space that sebific duct 1 is inserted into the inwall of sleeve pipe 5 and the outer wall of bamboo joint type connecting tube 3;
D, the outer wall of sleeve pipe 5 is withheld so that the latch 7 of the inwall of sleeve pipe 5 is embedded into the outer wall of sebific duct 1, and bamboo joint type connects The annular protrusion 6 of the outer wall of adapter 3 is embedded into the inwall of sebific duct 1;Described withholding refers to by pressurizing unit so that the periphery of sleeve pipe 5 Wall is subject to uniform radial forces, and then so that sleeve pipe 5 is received in the position by active force, diameter reduces, so as to drive The overall internal diameter of sleeve pipe 5 reduces;
E, taking-up engine oil inlet pipe joint finished product.
The intermediate layer of sebific duct 1 is wound with ground floor steel wire and second layer steel wire, ground floor steel wire and in described step c Two layers of steel wire are in circular helix, and ground floor steel wire is left-hand screw line, and second layer steel wire is right-hand helix.Conventional sebific duct is Intermediate layer be made of by fiber, so bearing capacity and security performance can not all obtain enough guarantees, so, by first The setting of layer steel wire and second layer steel wire can improve the bearing capacity of the entirety of sebific duct 1, i.e. sebific duct 1 can transmit some high pressures Oil;The security that sebific duct 1 transmits fluid can also be improved, i.e. sebific duct 1 is difficult explosion.
In said structure and method, the concept of bamboo joint type connecting tube 3 is exactly that the outer wall of an annulus is provided with some rings Shape projection and annular groove, these annular protrusions and annular groove seem similar to the junction of bamboo, so referred to as bamboo Section formula connecting tube.

Claims (4)

1. a kind of engine oil inlet pipe joint, it includes the bamboo joint type connecting tube (3) be connected with sebific duct (1), sleeve pipe (5), fastens Nut (2) and outer connected nut (2), it is characterised in that:The clamp nut (4) is integrally formed with bamboo joint type connecting tube (3);It is external Nut (2) is linked in bamboo joint type connecting tube (3) one end, and sleeve pipe (5) is linked in outside bamboo joint type connecting tube (3) other end;Sebific duct (1) Between bamboo joint type connecting tube (3) outer wall and sleeve pipe (5) inwall, bamboo joint type connecting tube (3) outer wall is provided with multiple embedded sebific ducts (1) annular protrusion (6) of inwall, sleeve pipe (5) inwall is provided with the latch (7) of multiple embedded sebific duct (1) outer walls.
2. engine oil inlet pipe joint according to claim 1, it is characterised in that:Bamboo joint type connecting tube (3) outer wall sets There are first annular groove (8) and the second annular groove (9), it is first convex that sleeve pipe (5) one end is provided with the first annular groove (8) of insertion Ring (10), outer connected nut (2) one end is provided with second bulge loop (11) of embedded second annular groove (9).
3. a kind of processing method of engine oil inlet pipe joint, it is characterised in that:It is comprised the following steps:
A, go out sleeve pipe blank by cold moudling, then sleeve pipe (5) inwall finish obtaining latch by numerically controlled lathe (7);
B, sleeve pipe (5) is nested into bamboo joint type connecting tube (3) one end outer wall, outer connected nut (2) is inserted in bamboo joint type connecting tube (3) Outside the other end;The second bulge loop (11) outer wall of external connected nut (2) is withheld so that the second bulge loop (11) is embedded into the second ring In connected in star (9);The first bulge loop (10) outer wall to sleeve pipe (5) is withheld so that the first bulge loop (10) is embedded into the first ring In connected in star (8);
C, the space that sebific duct (1) is inserted into sleeve pipe (5) inwall and bamboo joint type connecting tube (3) outer wall;
D, sleeve pipe (5) outer wall is withheld so that the latch (7) of sleeve pipe (5) inwall is embedded into sebific duct (1) outer wall, and ring The annular protrusion (6) of formula connecting tube (3) outer wall is embedded into sebific duct (1) inwall;
E, taking-up engine oil inlet pipe joint finished product.
4. engine oil inlet pipe joint processing method according to claim 3, it is characterised in that:Sebific duct (1) in the step c Intermediate layer be wound with ground floor steel wire and second layer steel wire, ground floor steel wire and second layer steel wire are in circular helix, the Layer of steel wire is left-hand screw line, and second layer steel wire is right-hand helix.
CN201410698837.8A 2014-11-27 2014-11-27 Engine oil inlet pipe joint and machining method thereof Expired - Fee Related CN104564455B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410698837.8A CN104564455B (en) 2014-11-27 2014-11-27 Engine oil inlet pipe joint and machining method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410698837.8A CN104564455B (en) 2014-11-27 2014-11-27 Engine oil inlet pipe joint and machining method thereof

Publications (2)

Publication Number Publication Date
CN104564455A CN104564455A (en) 2015-04-29
CN104564455B true CN104564455B (en) 2017-05-24

Family

ID=53081338

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410698837.8A Expired - Fee Related CN104564455B (en) 2014-11-27 2014-11-27 Engine oil inlet pipe joint and machining method thereof

Country Status (1)

Country Link
CN (1) CN104564455B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105834701B (en) * 2016-06-15 2017-11-21 芜湖金源机械制造有限公司 The processing method of engine water branch connecting pipe
CN106764143B (en) * 2016-12-05 2019-08-20 新黎明科技股份有限公司 Anti-explosion movable joint and its attaching nut's installation method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09229265A (en) * 1996-02-20 1997-09-05 Kyokuto Gomme Kk Pipe coupling provided with rubber flexible pipe
JP2002323187A (en) * 2001-04-23 2002-11-08 Kurashiki Kako Co Ltd Flexible joint and method of manufacturing the flexible joint
CN203614947U (en) * 2013-12-25 2014-05-28 宁波泰尔汽车部件有限公司 Engine joint component
CN203614970U (en) * 2013-12-25 2014-05-28 宁波泰尔汽车部件有限公司 Portable type fastening connection pipe component
CN204239939U (en) * 2014-11-27 2015-04-01 宁波泰尔汽车部件有限公司 Engine oil inlet pipe joint

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09229265A (en) * 1996-02-20 1997-09-05 Kyokuto Gomme Kk Pipe coupling provided with rubber flexible pipe
JP2002323187A (en) * 2001-04-23 2002-11-08 Kurashiki Kako Co Ltd Flexible joint and method of manufacturing the flexible joint
CN203614947U (en) * 2013-12-25 2014-05-28 宁波泰尔汽车部件有限公司 Engine joint component
CN203614970U (en) * 2013-12-25 2014-05-28 宁波泰尔汽车部件有限公司 Portable type fastening connection pipe component
CN204239939U (en) * 2014-11-27 2015-04-01 宁波泰尔汽车部件有限公司 Engine oil inlet pipe joint

Also Published As

Publication number Publication date
CN104564455A (en) 2015-04-29

Similar Documents

Publication Publication Date Title
CA3050060C (en) Pinned composite pipe end-fitting
CN104160197B (en) Flanged joint linkage structure
CN104564455B (en) Engine oil inlet pipe joint and machining method thereof
US9638362B2 (en) Threaded connections with an adjustable secondary shoulder
JP2012518770A (en) Improved end connector for high pressure reinforced rubber hose
JP2016513216A (en) Tubular joint center shoulder seal
CN205261090U (en) Pressure hose, connection spare part that uses rather than cooperation and composite set of two
CN204239939U (en) Engine oil inlet pipe joint
CN102031936A (en) Threaded connection structure of steel tubes
US9470061B2 (en) High strength connection for sleeve and mandrel and related methods
CN101319744A (en) Tube connector
CN202493819U (en) Plug-in type pipe joint
CN102812278A (en) Device for coupling fluid-circulation tubes and related method
CN207088519U (en) A kind of production mould of the glass reinforced plastic pipe of prefabricated cushion rubber
EP2096347B1 (en) Method for joining together steel pipes for conveying fluids under pressure
CN103066800B (en) Cold shrinkage-compensating and positioning superconducting motor
US20210048125A1 (en) Hydraulic pipe coupling structure that is formed integrally and has enhanced strength
KR101979737B1 (en) Spline shaft and spline manufacturing method
KR200474252Y1 (en) Fixing hydraulic coupling apparatus
JP2013040652A (en) Synchronous clutch gear for double-cone synchronization
CN204226898U (en) Engine oil tube assembly
CN205655026U (en) Interior locking -type glue connection
CN208935609U (en) Rabbet annular groove interface waterproof flange head
CN201925321U (en) Improved spline pair
CN208935189U (en) A kind of expansion set bindiny mechanism

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170524

Termination date: 20211127

CF01 Termination of patent right due to non-payment of annual fee