CN104563996A - 带压拖动压裂管柱及其压裂方法 - Google Patents

带压拖动压裂管柱及其压裂方法 Download PDF

Info

Publication number
CN104563996A
CN104563996A CN201310520275.3A CN201310520275A CN104563996A CN 104563996 A CN104563996 A CN 104563996A CN 201310520275 A CN201310520275 A CN 201310520275A CN 104563996 A CN104563996 A CN 104563996A
Authority
CN
China
Prior art keywords
fracturing
construction
tubing string
perforating
perforation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310520275.3A
Other languages
English (en)
Inventor
刘明
刘江波
任勇
赵振峰
王在强
胡相君
张安康
李旭梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Natural Gas Co Ltd
Original Assignee
China Petroleum and Natural Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Natural Gas Co Ltd filed Critical China Petroleum and Natural Gas Co Ltd
Priority to CN201310520275.3A priority Critical patent/CN104563996A/zh
Publication of CN104563996A publication Critical patent/CN104563996A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Earth Drilling (AREA)

Abstract

本发明公开了一种带压拖动压裂管柱及其压裂方法,是为提高工具施工效率及降低施工成本而设计的。本压裂管柱由通过油管连接的液压可控开关阀和射孔压裂管柱组成。进行射孔压裂施工前,将射孔压裂管柱下入井中,将液压可控开关阀位置安装在造斜点以上的位置,然后进行正常的射孔压裂施工;在施工结束后,投球关闭液压可控开关阀,带压拖动射孔压裂管柱至下一段储层位置,进行下一段的射孔压裂施工;待全部射孔段压裂施工完毕一次放喷,通洗井。本方法可避免在每段射孔压裂施工后进行放喷,能节省施工时间,避免放喷液污染环境;能降低射孔压裂后地层返出液体而伤害射管柱,提高施工效率;能降低工人劳动强度,免除放喷对扩大井场的需要,减少施工成本。

Description

带压拖动压裂管柱及其压裂方法
技术领域
本发明涉及一种带压拖动压裂管柱及其压裂方法,属于油气田压裂改造技术领域。
背景技术
目前,油田主要采用水力喷射压裂工艺进行水平井分段压裂及老井改造,该工艺以其独有的射孔压裂一体化操作、高施工效率及低风险等特点得到了广泛地应用。但是,油井改造后要用放喷调整钻具,以进行下一段改造施工。放喷施工要扩建井场,准备存放喷液的泥浆池,配套各类相关物料和设施。防喷时间最长达20个小时,施工周期加长,成本高,制约了水平井分段压裂改造技术向高效率和低成本方向的发展。
发明内容
本发明的目的在于提供一种带压拖动压裂管柱及其压裂方法,以减少放喷工序及返排液污染,提高工具施工效率,降低成本。
本发明的带压拖动压裂管柱由通过油管连接的液压可控开关阀和上端设有喷射器的射孔压裂管柱组成。进行射孔压裂施工前,将射孔压裂管柱下入井中,将液压可控开关阀位置安装在造斜点以上的位置,然后进行正常的射孔压裂施工;在施工结束后,投球关闭液压可控开关阀,带压拖动射孔压裂管柱至下一段储层位置,进行下一段的射孔压裂施工;待全部射孔段压裂施工完毕一次放喷,通洗井。
本方法可避免在每段射孔压裂施工后进行放喷,能节省施工时间,避免放喷液污染环境;能降低射孔压裂施工后地层返出液体伤害射孔压裂工具管柱,提高工具施工效率,缩短完井周期;能降低工人劳动强度,免除放喷对扩大井场的需要,不用挖泥浆坑,减少物料损耗或其他设施所产生的施工及费用。
附图说明
图1为带压拖动压裂管柱示意图。
具体实施方式
实施例:
参照图1对本发明的实施例进一步说明:
本带压拖动压裂管柱由通过油管1连接的液压可控开关阀2和上端设有喷射器4的射孔压裂管柱3组成。
本带压拖动压裂管柱的压裂方法如下:
1、首先,将射孔压裂管柱3正常下入井中;
2、按照工程设计,将液压可控开关阀2安装在造斜点O以上五根油管处的位置,以确保管柱活动时不会下入造斜点,然后,将油管1接至防喷井口;
3、在连接好地面管线并进行第一段储层的射孔压裂施工后,拆下油管1,注入管线,安装防喷管,投入钢球;
4、重新连接油1,注入管线,打压,使钢球与液压可控开关阀2内的球座配合,关闭通道,封闭油管1;
5、泄压后,拆卸井口,操作防喷器组,封堵油套环空,带压拖动射孔压裂管柱3至下一段储层位置,继续施工。
6、完毕全井储层施工后,一次性放喷,起出射孔压裂管柱3。

Claims (3)

1.一种带压拖动压裂管柱,其特征在于:
本带压拖动压裂管柱由通过油管(1)连接的液压可控开关阀(2)和上端设有喷射器(4)的射孔压裂管柱(3)组成。
2.一种带压拖动压裂管柱的压裂方法,其特征在于本方法在进行射孔压裂施工前,将射孔压裂管柱(3)下入井中,将液压可控开关阀位置安装在造斜点以上的位置,然后进行正常的射孔压裂施工;在施工结束后,投球关闭液压可控开关阀(2),带压拖动射孔压裂管柱(3)至下一段储层位置,进行下一段的射孔压裂施工;待全部射孔段压裂施工完毕一次放喷,通洗井。
3.根据权利要求2所述的带压拖动压裂管柱的压裂方法,其特征在于其具体操作步骤如下:
1)首先,将射孔压裂管柱(3)正常下入井中;
2)按照工程设计,将液压可控开关阀(2)安装在造斜点O以上五根油管处的位置,以确保管柱活动时不会下入造斜点,然后,将油管1接至防喷井口;
3)在连接好地面管线并进行第一段储层的射孔压裂施工后,拆下油管(1),注入管线,安装防喷管,投入钢球;
4)重新连接油(1),注入管线,打压,使钢球与液压可控开关阀2内的球座配合,关闭通道,封闭油管(1);
5)泄压后,拆卸井口,操作防喷器组,封堵油套环空,带压拖动射孔压裂管柱(3)至下一段储层位置,继续施工。
6)完毕全井储层施工后,一次性放喷,起出射孔压裂管柱(3)。
CN201310520275.3A 2013-10-29 2013-10-29 带压拖动压裂管柱及其压裂方法 Pending CN104563996A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310520275.3A CN104563996A (zh) 2013-10-29 2013-10-29 带压拖动压裂管柱及其压裂方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310520275.3A CN104563996A (zh) 2013-10-29 2013-10-29 带压拖动压裂管柱及其压裂方法

Publications (1)

Publication Number Publication Date
CN104563996A true CN104563996A (zh) 2015-04-29

Family

ID=53080981

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310520275.3A Pending CN104563996A (zh) 2013-10-29 2013-10-29 带压拖动压裂管柱及其压裂方法

Country Status (1)

Country Link
CN (1) CN104563996A (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113530512A (zh) * 2020-04-22 2021-10-22 中国石油天然气股份有限公司 压裂管柱及压裂方法

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2415637A1 (en) * 2000-07-11 2002-01-17 Halliburton Energy Services, Inc. Well management system
CN200993001Y (zh) * 2006-12-29 2007-12-19 大港油田集团有限责任公司 无堵塞分层压裂管柱及其无堵塞分层压裂装置
US20090008088A1 (en) * 2007-07-06 2009-01-08 Schultz Roger L Oscillating Fluid Flow in a Wellbore
CN201372806Y (zh) * 2009-01-23 2009-12-30 毛万里 一种环空液压控制多次开关阀
CN102691495A (zh) * 2012-05-18 2012-09-26 中国石油天然气股份有限公司 用于套管固井完井高破压地层水平井的分段压裂方法
CN102777156A (zh) * 2012-07-20 2012-11-14 中国石油化工股份有限公司 一种多层段油气井的压裂方法
CN103132969A (zh) * 2011-12-05 2013-06-05 中国石油化工股份有限公司 油井用分段压裂滑套及其装置和使用方法

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2415637A1 (en) * 2000-07-11 2002-01-17 Halliburton Energy Services, Inc. Well management system
CN200993001Y (zh) * 2006-12-29 2007-12-19 大港油田集团有限责任公司 无堵塞分层压裂管柱及其无堵塞分层压裂装置
US20090008088A1 (en) * 2007-07-06 2009-01-08 Schultz Roger L Oscillating Fluid Flow in a Wellbore
CN201372806Y (zh) * 2009-01-23 2009-12-30 毛万里 一种环空液压控制多次开关阀
CN103132969A (zh) * 2011-12-05 2013-06-05 中国石油化工股份有限公司 油井用分段压裂滑套及其装置和使用方法
CN102691495A (zh) * 2012-05-18 2012-09-26 中国石油天然气股份有限公司 用于套管固井完井高破压地层水平井的分段压裂方法
CN102777156A (zh) * 2012-07-20 2012-11-14 中国石油化工股份有限公司 一种多层段油气井的压裂方法

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
姜德铭 等: "水力喷射拖动分压工艺在水平井的应用", 《油气井测试》 *
王元基主编: "《水平井油田开发技术文集》", 31 May 2010 *
谢涛等: "工艺危害分析在带压拖动压裂工艺中的应用", 《科技和产业》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113530512A (zh) * 2020-04-22 2021-10-22 中国石油天然气股份有限公司 压裂管柱及压裂方法

Similar Documents

Publication Publication Date Title
CN109630060B (zh) 一种可重复不压井完井投产管柱及施工方法
CN105804680B (zh) 一种油气田带压修井作业装置及方法
CN103470239B (zh) 一种带压拖动连续压裂工艺方法
CN104695927A (zh) 一种连续油管与生产油管组合管串压裂与完井一体化方法
CN203081417U (zh) 多功能一体化气举工艺管柱
CN203321476U (zh) 老井重复改造用连续油管可控封隔器工艺管柱
CN106930746A (zh) 钻孔丙酮侵袭与水力压裂相结合的交替式煤层增透方法
CN104563997A (zh) 水力喷射与桥塞联作工艺管柱及其工作方法
CN203626820U (zh) 一种气举助流水平井找水管柱
CN104563996A (zh) 带压拖动压裂管柱及其压裂方法
CN102691492B (zh) 注蒸汽稠油井筛管完井跨越油层固井工艺
RU2533470C2 (ru) Способ ликвидации негерметичности эксплуатационных колонн
CN204041042U (zh) 一种连续油管拖动压裂管柱
CN202866733U (zh) 油田新型修井密封装置
CN204386577U (zh) 滑套压裂孔的防护套以及滑套
CN203394469U (zh) 一种煤层气水平井pe筛管完井装置
CN204457616U (zh) 水平井用的组合式泄油装置以及管柱
CN203347747U (zh) 防污染热洗管柱
CN206205870U (zh) 一种防冲蚀石油管道管短节组件
CN109252824B (zh) 一种油水井井下砂埋管柱的打捞装置及方法
CN115992672A (zh) 一种低压溢流井抽油杆在线清洗工艺技术及装备
CN109236261A (zh) 一种油气井大排量水力喷射分层压裂管柱及压裂方法
CN205036340U (zh) 一种抽油杆下井防污防喷装置
CN202745707U (zh) 连续油管作业操作窗
CN204252995U (zh) 一种提高井下高压磨料射流割缝效率及安全环保的设备

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20150429

RJ01 Rejection of invention patent application after publication