CN104563145A - Rock foundation small guide pipe partial water level lowering device and implementation method thereof - Google Patents

Rock foundation small guide pipe partial water level lowering device and implementation method thereof Download PDF

Info

Publication number
CN104563145A
CN104563145A CN201510035288.0A CN201510035288A CN104563145A CN 104563145 A CN104563145 A CN 104563145A CN 201510035288 A CN201510035288 A CN 201510035288A CN 104563145 A CN104563145 A CN 104563145A
Authority
CN
China
Prior art keywords
steel
water
aqueduct
pvc
foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510035288.0A
Other languages
Chinese (zh)
Inventor
闫成标
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Yancheng No2 Constructive Group Co Ltd
Original Assignee
Jiangsu Yancheng No2 Constructive Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Yancheng No2 Constructive Group Co Ltd filed Critical Jiangsu Yancheng No2 Constructive Group Co Ltd
Priority to CN201510035288.0A priority Critical patent/CN104563145A/en
Publication of CN104563145A publication Critical patent/CN104563145A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/10Restraining of underground water by lowering level of ground water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0001Rubbers
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0006Plastics
    • E02D2300/0007PVC
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0026Metals
    • E02D2300/0029Steel; Iron

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Hydrology & Water Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The invention relates to a device and an implementation method thereof, in particular relates to a rock foundation small guide pipe partial water level lowering device and an implementation method thereof. The rock foundation small guide pipe partial water level lowering device is characterized in that a PVC (Polyvinyl Chloride) water filter pipe is connected with a PVC connection pipe, wherein the PVC connection pipe is connected with a steel guide pipe; the steel guide pipe is connected with an annular water stopping steel plate; rubber water discharging pipes are inserted into pipes for connecting the steel guide pipe, the PVC connection pipe and the PVC water filter pipe. With the adoption of the technical scheme, the rock foundation small guide pipe partial water level lowering device has the advantages and active effects that the operation is simple, the construction is convenient, the technical difficulty is low, the pertinence on water precipitation and drainage regions is strong and the arrangement is flexible; the cost is low, natural drainage is realized by sufficiently utilizing underground water, and the energy source consumption is reduced; the underground water level can be effectively reduced, a foundation keeps dry and the construction of other procedures is not influenced; a foundation working surface can be more rapidly provided and the engineering progress is effectively promoted; the construction quality is guaranteed and the engineering cost is reduced.

Description

A kind of rock foundation ductule local dewatering device and implementation method thereof
Technical field
The present invention relates to a kind of device and implementation method thereof, particularly a kind of rock foundation ductule local dewatering device and implementation method thereof.
Background technology
At present, due to the impermeability of rock foundation, in rock foundation the infiltration of water be according to crack of stone move towards distribution, the spacing underground water that crack of stone is separated by few all cannot be discharged.Adopt light well point (multi-stage light well point), precipitation depth is between 3 ~ 6m, limits to some extent, and cannot realize for rock foundation for deep foundation ditch.Adopt Deep Pumped Wells, although to be displacement large, precipitation depth large, precipitation scope is large for advantage, for rock foundation, drilling cost is high, long in time limit.Adopt gutter drainage, excavated volume is large, and should there be enough spaces job site, but can not get rid of the underground water of rock foundation completely.
Summary of the invention
Technical problem to be solved by this invention is: provide a kind of rock foundation ductule local dewatering device and implementation method thereof, is the impermeability for rock foundation and a kind of local dewatering method adopted.In rock foundation the infiltration of water be according to crack of stone move towards distribution, when the spacing underground water that crack of stone is separated by few all cannot be discharged, and by the present invention, underground water is discharged foundation ditch, and underground water is down to outside below sole plate 500CM, be conducive to basic engineering construction.
The technical solution adopted for the present invention to solve the technical problems is: fluid-tight rock foundation crack is communicated with to import guiding gutter by the present invention, upset the crack of stone of rock foundation, plash is imported by guiding gutter, this device is imbedded in sump, water conservancy diversion pump line is inserted in the steel conduit of this device, water be down to the following 500mm in basis by guide pump and discharge foundation ditch.The present invention is made up of PVC filter pipe, PVC tube connector, steel conduit, ring seal steel plate and rubber drain, it is characterized in that: PVC filter pipe is connected with PVC tube connector, PVC tube connector is connected with steel conduit, steel conduit is connected with ring seal steel plate, in the pipe that steel conduit, PVC tube connector and PVC filter pipe are connected, insert rubber drain.
Owing to adopting technique scheme, the advantage that the present invention has and good effect are: simple to operate, easy construction, and technical difficulty is low, with strong points to Yield rainfall relation region, flexible arrangement; Cost is low, makes full use of ground water pressure and naturally dredges, and reduces energy consumption; Can effective dewatering, retentively backbone is dry does not affect the construction of other operation; The element task face of providing is very fast, effectively promotes programming; Engineering cost is reduced while guarantee construction quality.Adopt rock foundation ductule local dewatering device and using method thereof can save the duration 40% compared with Deep Pumped Wells, cost savings 60%.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the present invention is further described.
Figure of description is structural representation of the present invention.
1.PVC filter pipe in figure, 2.PVC tube connector, 3. steel conduit, 4. ring seal steel plate, 5. rubber drain.
Detailed description of the invention
In Figure of description, PVC filter pipe (1) is connected with PVC tube connector (2), PVC tube connector (2) is connected with steel conduit (3), steel conduit (3) is connected with ring seal steel plate (4), in the pipe that steel conduit (3), PVC tube connector (2) and PVC filter pipe (1) are connected, insert rubber drain (5).
Implementation method is:
(1), implementing process flow process
Excavation of foundation pit terminates → observes that seepage part → selection guiding gutter moves towards → select plash position → excavation plash → excavation guiding gutter → making aqueduct → bury underground aqueduct → plash, guiding gutter backfill 20 ~ 40mm rubble drainage layer → ductule precipitation → arrange separation layer → cushion construction → basic waterproof construction → base concrete is built → removed precipitation facility → closed steel conduit → steel catheter tip and builds waterproof concrete;
(2), implementation and operation main points
The first, after rock foundation Blasting Excavation first bottom foundation ditch surrounding open drain+sumping is set, foundation ditch top surrounding also arranges identical drainage system; Be excavated to substrate absolute altitude, with cleaning after stone breaker finishing, to the field observation of basement rock surface layer infiltration situation; Pick cutter there being the place of infiltration to deep-cut, the some leak stopping king shutoff that water percolating capacity is large, the final tiny seepage point forming certain area among a small circle, determines plash according to the rock foundation infiltration flow direction, arranges guiding gutter position; Every sheet seepage point passes to french drain by picking channel(l)ing groove, forms the drainage network under bed course;
The second, sump, guiding gutter will possess enough capacity to ensure control precipitation 500mm below sole plate absolute altitude;
Three, aqueduct will adopt steel, determines depending on the water yield, and diameter can be selected to be the steel pipe of 50mm or 80mm and to weld annular steel plate for sealing water, and the length of aqueduct is determined depending on base thickness;
Four, arrange filter pipe in aqueduct bottom, filter pipe adopts PVC to be convenient to perforating permeable (filter pipe internal diameter is equal to steel aqueduct external diameter, so that be arranged on the bottom of steel aqueduct), and punching aperture 8mm, spacing 50mm, distribute in plum blossom-shaped;
Five, bury PVC filter pipe and steel conduit underground and backfilling material particle diameter should not be less than 20mm, be advisable with 20 ~ 40mm rubble, in case permeable smooth, block up filter pipe;
Six, guiding gutter, sump top, waterproof material laying separation layer below bed course, guarantees not upwards channeling water;
Seven, in the foundation ditch of infiltration, a ponding well is respectively established, 1.5 × 1.5 × 1.5 meters, ponding well, all 20 ~ 40 rubble drainages are filled, the foundation ditch diameter 80mm steel pipe manufacturing aqueduct seeping water serious, the steel pipe manufacturing aqueduct of the foundation ditch diameter 50mm seeping water not serious in ponding well; Permeable use is done in the whole perforating of steel pipe 800mm below bed course, and 550mm place weldering one 5mm on bed course is thick for steel pipe ring seal steel plate, be embedded in the interior guide pump of foundation ditch and draw water, when building raft plate, the 100mm of staying suitable for reading for plate is built for bis-times;
Eight, diversion conduit surrounding will be done taper concrete and fix root, facilitates construction of waterproof layer;
Nine, according to field observation and calculating discharge, select the airtight waterproof submersible pump of appropriate power, that substantially adopt is flow 60 ~ 80m 3the water pump of/h, inserts gutter in aqueduct, carries out draining;
Ten, waterproof coiled material is accomplished the place's shutoff of ring seal steel plate position, after concrete raft plate is built, dewatering well conduit is closely knit with the water-tight concrete shutoff of the high strongest grade being mixed with expansion agent, aqueduct draining round the clock to raft plate build complete;
11, after base concrete raft plate is built, steel conduit top can with plug or Plate Welding, after end blocking or welding terminate, check whether it has water to overflow, as do not found to overflow water, namely availablely than Base isolation system high one-level microdilatancy water-tight concrete, dark for 100mm reserved for its raft foundation top pitting to be built, build rear reinforcement maintenance.

Claims (2)

1. a rock foundation ductule local dewatering device and implementation method thereof, be made up of PVC filter pipe, PVC tube connector, steel conduit, ring seal steel plate and rubber drain, it is characterized in that: PVC filter pipe (1) is connected with PVC tube connector (2), PVC tube connector (2) is connected with steel conduit (3), steel conduit (3) is connected with ring seal steel plate (4), in the pipe that steel conduit (3), PVC tube connector (2) and PVC filter pipe (1) are connected, insert rubber drain (5).
2. a kind of rock foundation ductule local dewatering device according to claim 1 and implementation method thereof, is characterized in that: implementation method is:
(1), implementing process flow process
Excavation of foundation pit terminates → observes that seepage part → selection guiding gutter moves towards → select plash position → excavation plash → excavation guiding gutter → making aqueduct → bury underground aqueduct → plash, guiding gutter backfill 20 ~ 40mm rubble drainage layer → ductule precipitation → arrange separation layer → cushion construction → basic waterproof construction → base concrete is built → removed precipitation facility → closed steel conduit → steel catheter tip and builds waterproof concrete;
(2), implementation and operation main points
The first, after rock foundation Blasting Excavation first bottom foundation ditch surrounding open drain+sumping is set, foundation ditch top surrounding also arranges identical drainage system; Be excavated to substrate absolute altitude, with cleaning after stone breaker finishing, to the field observation of basement rock surface layer infiltration situation; Pick cutter there being the place of infiltration to deep-cut, the some leak stopping king shutoff that water percolating capacity is large, the final tiny seepage point forming certain area among a small circle, determines plash according to the rock foundation infiltration flow direction, arranges guiding gutter position; Every sheet seepage point passes to french drain by picking channel(l)ing groove, forms the drainage network under bed course;
The second, sump, guiding gutter will possess enough capacity to ensure control precipitation 500mm below sole plate absolute altitude;
Three, aqueduct will adopt steel, determines depending on the water yield, and diameter can be selected to be the steel pipe of 50mm or 80mm and to weld annular steel plate for sealing water, and the length of aqueduct is determined depending on base thickness;
Four, arrange filter pipe in aqueduct bottom, filter pipe adopts PVC to be convenient to perforating permeable (filter pipe internal diameter is equal to steel aqueduct external diameter, so that be arranged on the bottom of steel aqueduct), and punching aperture 8mm, spacing 50mm, distribute in plum blossom-shaped;
Five, bury PVC filter pipe and steel conduit underground and backfilling material particle diameter should not be less than 20mm, be advisable with 20 ~ 40mm rubble, in case permeable smooth, block up filter pipe;
Six, guiding gutter, sump top, waterproof material laying separation layer below bed course, guarantees not upwards channeling water;
Seven, in the foundation ditch of infiltration, a ponding well is respectively established, 1.5 × 1.5 × 1.5 meters, ponding well, all 20 ~ 40 rubble drainages are filled, the foundation ditch diameter 80mm steel pipe manufacturing aqueduct seeping water serious, the steel pipe manufacturing aqueduct of the foundation ditch diameter 50mm seeping water not serious in ponding well; Permeable use is done in the whole perforating of steel pipe 800mm below bed course, and 550mm place weldering one 5mm on bed course is thick for steel pipe ring seal steel plate, be embedded in the interior guide pump of foundation ditch and draw water, when building raft plate, the 100mm of staying suitable for reading for plate is built for bis-times;
Eight, diversion conduit surrounding will be done taper concrete and fix root, facilitates construction of waterproof layer;
Nine, according to field observation and calculating discharge, select the airtight waterproof submersible pump of appropriate power, that substantially adopt is flow 60 ~ 80m 3the water pump of/h, inserts gutter in aqueduct, carries out draining;
Ten, waterproof coiled material is accomplished the place's shutoff of ring seal steel plate position, after concrete raft plate is built, dewatering well conduit is closely knit with the water-tight concrete shutoff of the high strongest grade being mixed with expansion agent, aqueduct draining round the clock to raft plate build complete;
11, after base concrete raft plate is built, steel conduit top can with plug or Plate Welding, after end blocking or welding terminate, check whether it has water to overflow, as do not found to overflow water, namely availablely than Base isolation system high one-level microdilatancy water-tight concrete, dark for 100mm reserved for its raft foundation top pitting to be built, build rear reinforcement maintenance.
CN201510035288.0A 2015-01-21 2015-01-21 Rock foundation small guide pipe partial water level lowering device and implementation method thereof Pending CN104563145A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510035288.0A CN104563145A (en) 2015-01-21 2015-01-21 Rock foundation small guide pipe partial water level lowering device and implementation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510035288.0A CN104563145A (en) 2015-01-21 2015-01-21 Rock foundation small guide pipe partial water level lowering device and implementation method thereof

Publications (1)

Publication Number Publication Date
CN104563145A true CN104563145A (en) 2015-04-29

Family

ID=53080157

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510035288.0A Pending CN104563145A (en) 2015-01-21 2015-01-21 Rock foundation small guide pipe partial water level lowering device and implementation method thereof

Country Status (1)

Country Link
CN (1) CN104563145A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105782534A (en) * 2016-05-17 2016-07-20 山东省水利科学研究院 Rubber and plastic folding water stop strip type one-way automatic drain valve
CN106088123A (en) * 2016-08-16 2016-11-09 中国建筑第七工程局有限公司 A kind of sand geology steel tube well fall water level device and construction method thereof
CN108487276A (en) * 2018-04-27 2018-09-04 陕西建工机械施工集团有限公司 A kind of embed-type shallow-layer combined water drain pipe and construction method
CN109577352A (en) * 2019-01-24 2019-04-05 中国建筑第五工程局有限公司 A kind of shotcrete basal plane infiltration drainage device and construction method
CN111395995A (en) * 2020-03-19 2020-07-10 丰电阳光(北京)清洁能源技术有限公司 Secondary well completion method for aquifer energy storage well
CN112982461A (en) * 2019-12-14 2021-06-18 浙江建腾建设有限公司 Pipe well precipitation combined reducing steel sleeve plugging construction method
CN113089701A (en) * 2021-04-15 2021-07-09 北京天润建设有限公司 Rock foundation low-point precipitation construction process and construction device
CN116497868A (en) * 2023-06-28 2023-07-28 中国建筑第四工程局有限公司 Novel gravity type retaining wall structure

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006226061A (en) * 2005-02-21 2006-08-31 Shimizu Corp Underground drainage construction method
CN202450537U (en) * 2012-03-06 2012-09-26 新蒲建设集团有限公司 Composite dewatering device of vacuum tube well
CN203569576U (en) * 2013-09-18 2014-04-30 上海岩土工程勘察设计研究院有限公司 Plastic-row anti-sliding type light well point pipe
CN203583504U (en) * 2013-10-23 2014-05-07 深圳市建业建筑工程有限公司 Water pumping structure for concrete layer pouring
CN203855977U (en) * 2014-05-28 2014-10-01 武汉一冶建筑安装工程有限责任公司 Underground piping flow-diversion and pressure-reduction treatment device
CN204551507U (en) * 2015-01-21 2015-08-12 江苏盐城二建集团有限公司 A kind of rock foundation ductule local dewatering device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006226061A (en) * 2005-02-21 2006-08-31 Shimizu Corp Underground drainage construction method
CN202450537U (en) * 2012-03-06 2012-09-26 新蒲建设集团有限公司 Composite dewatering device of vacuum tube well
CN203569576U (en) * 2013-09-18 2014-04-30 上海岩土工程勘察设计研究院有限公司 Plastic-row anti-sliding type light well point pipe
CN203583504U (en) * 2013-10-23 2014-05-07 深圳市建业建筑工程有限公司 Water pumping structure for concrete layer pouring
CN203855977U (en) * 2014-05-28 2014-10-01 武汉一冶建筑安装工程有限责任公司 Underground piping flow-diversion and pressure-reduction treatment device
CN204551507U (en) * 2015-01-21 2015-08-12 江苏盐城二建集团有限公司 A kind of rock foundation ductule local dewatering device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
闫成标等: "浅谈岩石地基小导管局部降水施工技术", 《中国高新技术企业》 *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105782534A (en) * 2016-05-17 2016-07-20 山东省水利科学研究院 Rubber and plastic folding water stop strip type one-way automatic drain valve
CN105782534B (en) * 2016-05-17 2018-07-13 山东省水利科学研究院 Rubber and plastic folds the unidirectional automatic drain valve of sealing chip
CN106088123A (en) * 2016-08-16 2016-11-09 中国建筑第七工程局有限公司 A kind of sand geology steel tube well fall water level device and construction method thereof
CN106088123B (en) * 2016-08-16 2018-06-29 中国建筑第七工程局有限公司 A kind of sand geology steel tube well drop water level device and its construction method
CN108487276A (en) * 2018-04-27 2018-09-04 陕西建工机械施工集团有限公司 A kind of embed-type shallow-layer combined water drain pipe and construction method
CN109577352A (en) * 2019-01-24 2019-04-05 中国建筑第五工程局有限公司 A kind of shotcrete basal plane infiltration drainage device and construction method
CN112982461A (en) * 2019-12-14 2021-06-18 浙江建腾建设有限公司 Pipe well precipitation combined reducing steel sleeve plugging construction method
CN111395995A (en) * 2020-03-19 2020-07-10 丰电阳光(北京)清洁能源技术有限公司 Secondary well completion method for aquifer energy storage well
CN111395995B (en) * 2020-03-19 2021-10-29 丰电阳光(北京)清洁能源技术有限公司 Secondary well completion method for aquifer energy storage well
CN113089701A (en) * 2021-04-15 2021-07-09 北京天润建设有限公司 Rock foundation low-point precipitation construction process and construction device
CN116497868A (en) * 2023-06-28 2023-07-28 中国建筑第四工程局有限公司 Novel gravity type retaining wall structure

Similar Documents

Publication Publication Date Title
CN104563145A (en) Rock foundation small guide pipe partial water level lowering device and implementation method thereof
CN203947484U (en) A kind of drainage of foundation pit and circulating water utilization system
CN103046565B (en) Draining method for ultra-deep batholith deep foundation pit
CN102535488B (en) Waterproof construction method for bottom plate of high-water-level basement
CN203530996U (en) Multi-well-point combined type precipitation facility
CN104314090A (en) Deep foundation pit bedrock drainage culvert and drainage system and drainage construction method thereof
CN113279421B (en) Vacuum dewatering process for deep foundation pit
CN102051885A (en) Process for absorbing and discharging water under deep foundation concrete
CN110984200B (en) Method for draining water of foundation pit of binary geological structure layer
CN204551507U (en) A kind of rock foundation ductule local dewatering device
CN102787606B (en) Guard method to surrounding environment in a kind of excavation of foundation pit Precipitation Process
CN204551510U (en) A kind of filled-up ground catchments pressure reduction well drop and drainage structure
CN1063518C (en) Drainage cut-off (deep ditch high-building method) drainage and supplying optimization combination for preventing and harnessing groud water
CN114575359B (en) Weak-permeability soil layer side slope underground flood control method
CN110185051A (en) Deep narrow excavation water discharge method
CN211312564U (en) Strong permeable stratum deep foundation pit underground water control structure based on depressurization and permeability reduction
CN211898587U (en) Rear-mounted thin-wall steel pipe water draining device for large bottom plate anti-floating
CN203296817U (en) Inclined drift system
CN112854189A (en) Drainage well with inner soil discharge field sunken pit bottom and drainage method thereof
CN208815550U (en) A kind of rich water powder land floor precipitation and recharge construction system
CN211621638U (en) Foundation pit dewatering and drainage system suitable for binary geological structure layer
CN111042212A (en) Rear-mounted thin-wall steel pipe water draining device and method for large bottom plate anti-floating
CN102776891A (en) Method for processing underground supporting structure leakage of foundation with rock block layer in soft soil
CN211498899U (en) Foundation pit dewatering arrangement structure
CN214401734U (en) Dredging well at bottom of sunken hole in inner soil discharge field

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20150429