CN104556766A - Construction method for building foundation bed employing recycled concrete - Google Patents

Construction method for building foundation bed employing recycled concrete Download PDF

Info

Publication number
CN104556766A
CN104556766A CN201510041969.8A CN201510041969A CN104556766A CN 104556766 A CN104556766 A CN 104556766A CN 201510041969 A CN201510041969 A CN 201510041969A CN 104556766 A CN104556766 A CN 104556766A
Authority
CN
China
Prior art keywords
concrete
aggregate
bed course
less
building foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510041969.8A
Other languages
Chinese (zh)
Inventor
赵业荣
吴晓东
刘庆昌
曹生财
丁二虎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ANHUI TONGJI CONSTRUCTION GROUP Co Ltd
Original Assignee
ANHUI TONGJI CONSTRUCTION GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ANHUI TONGJI CONSTRUCTION GROUP Co Ltd filed Critical ANHUI TONGJI CONSTRUCTION GROUP Co Ltd
Priority to CN201510041969.8A priority Critical patent/CN104556766A/en
Publication of CN104556766A publication Critical patent/CN104556766A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies
    • Y02W30/91Use of waste materials as fillers for mortars or concrete

Landscapes

  • Road Paving Structures (AREA)

Abstract

The invention discloses a construction method for a building foundation bed employing recycled concrete. The method comprises the following steps: (1) producing recycled coarse aggregates by employing waste concrete; and (2) pouring a foundation bed employing recycled materials. The construction method has the beneficial effects that the dependence of engineering on natural stones is relieved; mining of natural resources is reduced; reutilization of solid wastes is achieved; the damage to environment caused by waste concrete blocks is reduced; the environmental protection purpose of the country is reflected; research and innovation of a recycled concrete application technology are facilitated; and relatively comprehensive and specified recycled concrete using standard is gradually formed.

Description

Utilize the building foundation cushion construction method of regeneration concrete
Technical field
The present invention relates to a kind of building foundation cushion construction method utilizing regeneration concrete.
Background technology
In building field, blinding layer is the middle layer of reinforced concrete foundation and foundation soil, and in order to make, surface of base is smooth to be convenient in assembling reinforcement above its Main Function, and plays the effect on protection basis.Those blinding layers need to consume certain resource, be not again very high to the requirement of concrete strength, therefore in natural resources day by day deficient today, available discarded concrete replace part course, not only can economize on resources, can be again the approach that solidification disposal of waste provides a kind of resource utilization.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of building foundation cushion construction method utilizing regeneration concrete.
The present invention is achieved through the following technical solutions.
Utilize a building foundation cushion construction method for regeneration concrete, step comprises:
(1) discarded concrete is utilized to produce regenerated coarse aggregate:
1. waste concrete stockyard: reclaim waste concrete, and by its stockyard;
2. artificial removal of impurities: first by the waste concrete block precrushing of large volume; Then alignment cutting reinforcing bar; The last impurity therefrom screening out bulk;
3. primary crushing: use jaw crusher to carry out primary crushing the waste concrete after artificial removal of impurities, obtain aggregate;
4. sieve: the waste concrete of primary crushing is sent in sieve apparatus, sifts out particle diameter and be less than differential stockyard at the bottom of the sieve of 5mm, remainingly enter next step operation;
5. secondary breaking: use cone crusher to carry out secondary breaking;
6. first time vibratory screening apparatus: by the aggregate of secondary breaking use magnetic separator carry out first time vibratory screening apparatus, sift out particle diameter and be less than differential stockyard at the bottom of the sieve of 5mm, remaining enter next operate;
7. second time vibratory screening apparatus: use magnetic separator to carry out second time vibratory screening apparatus, the aggregate being greater than 37.5mm is returned 5. secondary breaking---7. second time vibratory screening apparatus repetitive operation, is not more than 37.5mm by remaining particle diameter and the aggregate being not less than 5mm enters next operates;
8. rinse: particle diameter is not more than 37.5mm and the aggregate being not less than 5mm is washed;
9. dry: carry out drying be not more than the condition of 80 DEG C in temperature under and dry, be dried to water content and be less than 1%, obtain regenerated coarse aggregate and concentrate and preserve;
(2) twice-laid stuff is utilized to build blinding layer:
1. preparation of construction: the surface dust on cleaning foundation ditch surface, machinery is cut the earth to the above 300mm of substrate absolute altitude, then hand digging is trimmed to substrate absolute altitude;
2. building foundation bed course regeneration concrete configures:
Unit is component cube consumption kg/m 3, composition comprises: cement 260 ~ 320, water 155 ~ 165, fine aggregate 780-850, coarse aggregate 980-1040, flyash 60 ~ 90, high performance water reducing agent of polyocarboxy acid 4.0 ~ 5.0;
Wherein, cement be silicate cement, ordinary Portland cement or Portland blast furnace slag cement any one, its strength grade is not less than 32.5 grades; Fine aggregate is medium sand or coarse sand, and silt content is not more than 3%; In coarse aggregate, regenerated coarse aggregate accounts for coarse aggregate total amount and is not more than 70%, and its maximum particle diameter is not more than 2/3 of cushion thickness, and silt content is not more than 2%;
3. building foundation bed course regeneration concrete bed course build, maintenance:
Adopt fixed vehicle-mounted building foundation bed course regeneration concrete transferpump, pump truck is located at foundation ditch limit, delivery pump pipe is set up by building order when building bed course, first sprinkle water in basic unit before laying concrete cushion moistening, and brush one deck plain cement sand syrup, its water cement ratio 0.4-0.5:1, then lay from one end, can lay by piecemeal when laying area is larger, note in process of deployment leaving construction joint, before building foundation bed course regeneration concrete bed course is built, insert reinforcing bar and control stake as absolute altitude, spacing 1500mm; With spade paving, thickness, a little more than levelling heap, carries out concrete vibrating with flat-plate vibrator immediately, when thickness is more than 20cm, should adopt poker vibrator, its miles of relative movement is not more than 1.5 times of left and right radius, accomplish not leak to shake, guarantee closely knit, after concrete vibrating is closely knit, to be as the criterion inspection planeness with elevation line horizontal on wall and levelling heap, high shovel falls, recess fills, and strikes off with byatt darby, and surface is rubbed with the hands flat again with wooden float;
After building foundation bed course regeneration concrete bed course has built receipts light, be covered in concrete surface with plastic cloth, reached after 1.2Mpa until intensity, after construction completes, about 12h covers and watering maintenance, preserving period, is no less than 7d, if during winter construction operation, envrionment temperature is not less than+5 DEG C.
Beneficial effect of the present invention:
Alleviate the dependence of engineering to natural rock, decrease the exploitation to natural resources; Achieve the recycling of solid waste, decrease the destruction of waste concrete block to environment, embody the aim of national green environmental protection; Be conducive to research and the innovation of regeneration concrete utilisation technology, the regeneration concrete progressively forming specification more comprehensively uses standard.
Accompanying drawing explanation
Fig. 1 is that the present invention utilizes discarded concrete to produce the schematic flow sheet of regenerated coarse aggregate;
Fig. 2 is that the present invention utilizes twice-laid stuff to build the schematic flow sheet of blinding layer.
Embodiment
According to drawings and embodiments the present invention is described in further detail below.
Fig. 1 is that the present invention utilizes discarded concrete to produce the schematic flow sheet of regenerated coarse aggregate, Fig. 2 is that the present invention utilizes twice-laid stuff to build the schematic flow sheet of blinding layer, with reference to Fig. 1, Fig. 2, and the present invention, the building foundation cushion construction method of utilization regeneration concrete, step comprises:
(1) discarded concrete is utilized to produce regenerated coarse aggregate:
1. waste concrete stockyard: reclaim waste concrete, and by its stockyard;
2. artificial removal of impurities: first by the waste concrete block precrushing of large volume; Then alignment cutting reinforcing bar; The last impurity therefrom screening out bulk;
3. primary crushing: use jaw crusher to carry out primary crushing the waste concrete after artificial removal of impurities, obtain aggregate;
4. sieve: the waste concrete of primary crushing is sent in sieve apparatus, sifts out particle diameter and be less than differential stockyard at the bottom of the sieve of 5mm, remainingly enter next step operation;
5. secondary breaking: use cone crusher to carry out secondary breaking;
6. first time vibratory screening apparatus: by the aggregate of secondary breaking use magnetic separator carry out first time vibratory screening apparatus, sift out particle diameter and be less than differential stockyard at the bottom of the sieve of 5mm, remaining enter next operate;
7. second time vibratory screening apparatus: use magnetic separator to carry out second time vibratory screening apparatus, the aggregate being greater than 37.5mm is returned 5. secondary breaking---7. second time vibratory screening apparatus repetitive operation, is not more than 37.5mm by remaining particle diameter and the aggregate being not less than 5mm enters next operates;
8. rinse: particle diameter is not more than 37.5mm and the aggregate being not less than 5mm is washed;
9. dry: carry out drying be not more than the condition of 80 DEG C in temperature under and dry, be dried to water content and be less than 1%, obtain regenerated coarse aggregate and concentrate and preserve;
(2) twice-laid stuff is utilized to build blinding layer:
1. preparation of construction: the surface dust on cleaning foundation ditch surface, machinery is cut the earth to the above 300mm of substrate absolute altitude, then hand digging is trimmed to substrate absolute altitude;
2. building foundation bed course regeneration concrete configures:
Unit is component cube consumption kg/m 3, composition comprises: cement 260 ~ 320, water 155 ~ 165, fine aggregate 780-850, coarse aggregate 980-1040, flyash 60 ~ 90, high performance water reducing agent of polyocarboxy acid 4.0 ~ 5.0;
Wherein, cement be silicate cement, ordinary Portland cement or Portland blast furnace slag cement any one, its strength grade is not less than 32.5 grades; Fine aggregate is medium sand or coarse sand, and silt content is not more than 3%; In coarse aggregate, regenerated coarse aggregate accounts for coarse aggregate total amount and is not more than 70%, and its maximum particle diameter is not more than 2/3 of cushion thickness, and silt content is not more than 2%;
3. building foundation bed course regeneration concrete bed course build, maintenance:
Adopt fixed vehicle-mounted building foundation bed course regeneration concrete transferpump, pump truck is located at foundation ditch limit, delivery pump pipe is set up by building order when building bed course, first sprinkle water in basic unit before laying concrete cushion moistening, and brush one deck plain cement sand syrup, its water cement ratio 0.4-0.5:1, then lay from one end, can lay by piecemeal when laying area is larger, note in process of deployment leaving construction joint, before building foundation bed course regeneration concrete bed course is built, insert reinforcing bar and control stake as absolute altitude, spacing 1500mm; With spade paving, thickness, a little more than levelling heap, carries out concrete vibrating with flat-plate vibrator immediately, when thickness is more than 20cm, should adopt poker vibrator, its miles of relative movement is not more than 1.5 times of left and right radius, accomplish not leak to shake, guarantee closely knit, after concrete vibrating is closely knit, to be as the criterion inspection planeness with elevation line horizontal on wall and levelling heap, high shovel falls, recess fills, and strikes off with byatt darby, and surface is rubbed with the hands flat again with wooden float;
After building foundation bed course regeneration concrete bed course has built receipts light, be covered in concrete surface with plastic cloth, reached after 1.2Mpa until intensity, after construction completes, about 12h covers and watering maintenance, preserving period, is no less than 7d, if during winter construction operation, envrionment temperature is not less than+5 DEG C.
Above-described embodiment, only for technical conceive of the present invention and feature are described, its object is to allow the personage being familiar with this art can understand content of the present invention and be implemented, can not limit the scope of the invention with this.All equivalences done according to spirit of the present invention change or modify, and all should be encompassed in protection scope of the present invention.

Claims (1)

1. utilize the building foundation cushion construction method with regeneration concrete, it is characterized in that, step comprises:
(1) discarded concrete is utilized to produce regenerated coarse aggregate:
1. waste concrete stockyard: reclaim waste concrete, and by its stockyard;
2. artificial removal of impurities: first by the waste concrete block precrushing of large volume; Then alignment cutting reinforcing bar; The last impurity therefrom screening out bulk;
3. primary crushing: use jaw crusher to carry out primary crushing the waste concrete after artificial removal of impurities, obtain aggregate;
4. sieve: the waste concrete of primary crushing is sent in sieve apparatus, sifts out particle diameter and be less than differential stockyard at the bottom of the sieve of 5mm, remainingly enter next step operation;
5. secondary breaking: use cone crusher to carry out secondary breaking;
6. first time vibratory screening apparatus: by the aggregate of secondary breaking use magnetic separator carry out first time vibratory screening apparatus, sift out particle diameter and be less than differential stockyard at the bottom of the sieve of 5mm, remaining enter next operate;
7. second time vibratory screening apparatus: use magnetic separator to carry out second time vibratory screening apparatus, the aggregate being greater than 37.5mm is returned 5. secondary breaking---7. second time vibratory screening apparatus repetitive operation, is not more than 37.5mm by remaining particle diameter and the aggregate being not less than 5mm enters next operates;
8. rinse: particle diameter is not more than 37.5mm and the aggregate being not less than 5mm is washed;
9. dry: carry out drying be not more than the condition of 80 DEG C in temperature under and dry, be dried to water content and be less than 1%, obtain regenerated coarse aggregate and concentrate and preserve;
(2) twice-laid stuff is utilized to build blinding layer:
1. preparation of construction: the surface dust on cleaning foundation ditch surface, machinery is cut the earth to the above 300mm of substrate absolute altitude, then hand digging is trimmed to substrate absolute altitude;
2. building foundation bed course regeneration concrete configures:
Unit is component cube consumption kg/m 3, composition comprises: cement 260 ~ 320, water 155 ~ 165, fine aggregate 780-850, coarse aggregate 980-1040, flyash 60 ~ 90, high performance water reducing agent of polyocarboxy acid 4.0 ~ 5.0;
Wherein, cement be silicate cement, ordinary Portland cement or Portland blast furnace slag cement any one, its strength grade is not less than 32.5 grades; Fine aggregate is medium sand or coarse sand, and silt content is not more than 3%; In coarse aggregate, regenerated coarse aggregate accounts for coarse aggregate total amount and is not more than 70%, and its maximum particle diameter is not more than 2/3 of cushion thickness, and silt content is not more than 2%;
3. building foundation bed course regeneration concrete bed course build, maintenance:
Adopt fixed vehicle-mounted building foundation bed course regeneration concrete transferpump, pump truck is located at foundation ditch limit, delivery pump pipe is set up by building order when building bed course, first sprinkle water in basic unit before laying concrete cushion moistening, and brush one deck plain cement sand syrup, its water cement ratio 0.4-0.5:1, then lay from one end, can lay by piecemeal when laying area is larger, note in process of deployment leaving construction joint, before building foundation bed course regeneration concrete bed course is built, insert reinforcing bar and control stake as absolute altitude, spacing 1500mm; With spade paving, thickness, a little more than levelling heap, carries out concrete vibrating with flat-plate vibrator immediately, when thickness is more than 20cm, should adopt poker vibrator, its miles of relative movement is not more than 1.5 times of left and right radius, accomplish not leak to shake, guarantee closely knit, after concrete vibrating is closely knit, to be as the criterion inspection planeness with elevation line horizontal on wall and levelling heap, high shovel falls, recess fills, and strikes off with byatt darby, and surface is rubbed with the hands flat again with wooden float;
After building foundation bed course regeneration concrete bed course has built receipts light, be covered in concrete surface with plastic cloth, reached after 1.2Mpa until intensity, after construction completes, about 12h covers and watering maintenance, preserving period, is no less than 7d, if during winter construction operation, envrionment temperature is not less than+5 DEG C.
CN201510041969.8A 2015-01-27 2015-01-27 Construction method for building foundation bed employing recycled concrete Pending CN104556766A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510041969.8A CN104556766A (en) 2015-01-27 2015-01-27 Construction method for building foundation bed employing recycled concrete

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510041969.8A CN104556766A (en) 2015-01-27 2015-01-27 Construction method for building foundation bed employing recycled concrete

Publications (1)

Publication Number Publication Date
CN104556766A true CN104556766A (en) 2015-04-29

Family

ID=53073955

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510041969.8A Pending CN104556766A (en) 2015-01-27 2015-01-27 Construction method for building foundation bed employing recycled concrete

Country Status (1)

Country Link
CN (1) CN104556766A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106285135A (en) * 2016-08-09 2017-01-04 中化(舟山)兴海建设有限公司 A kind of method that Machine-made Sand is used for petrochemical industry storage tank cushion cap sand bedding course
CN108188150A (en) * 2017-12-29 2018-06-22 连城县丰海竹木业有限公司 A kind of bamboo and wood processing industry organic solid castoff sorting disposing system
CN108532833A (en) * 2018-05-15 2018-09-14 长江大学 A kind of regeneration concrete coupled column and preparation method thereof
CN109534758A (en) * 2018-12-29 2019-03-29 浙江春天建设有限公司 A kind of cement concrete reproduction construction method
CN110206139A (en) * 2019-06-05 2019-09-06 贵州百胜工程建设咨询有限公司 A kind of mass concrete construction method
CN110563420A (en) * 2019-09-19 2019-12-13 中地国际工程有限公司 construction method of pool
CN111423173A (en) * 2020-01-13 2020-07-17 武汉长江航道救助打捞局 D-shaped soft raft of recycled concrete unit blocks and manufacturing method thereof
CN112776126A (en) * 2020-12-31 2021-05-11 广州市市政工程试验检测有限公司 Static load test pile-load concrete test block manufacturing method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201073653Y (en) * 2007-01-22 2008-06-18 上海德滨机械设备科技有限公司 Recovery system of building recycled aggregate for construction site
CN201381285Y (en) * 2009-04-24 2010-01-13 西安墙体材料研究设计院 Manufacturing equipment for building rubbish recycled aggregate
CN102390963A (en) * 2011-08-19 2012-03-28 云南华威废弃物资源化有限公司 Recycled aggregate medium-dry hard concrete prepared by using building waste and preparation method of recycled aggregate medium-dry hard concrete
CN103332881A (en) * 2013-06-03 2013-10-02 广西大学 Preparation method for high-quality recycled concrete aggregates

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201073653Y (en) * 2007-01-22 2008-06-18 上海德滨机械设备科技有限公司 Recovery system of building recycled aggregate for construction site
CN201381285Y (en) * 2009-04-24 2010-01-13 西安墙体材料研究设计院 Manufacturing equipment for building rubbish recycled aggregate
CN102390963A (en) * 2011-08-19 2012-03-28 云南华威废弃物资源化有限公司 Recycled aggregate medium-dry hard concrete prepared by using building waste and preparation method of recycled aggregate medium-dry hard concrete
CN103332881A (en) * 2013-06-03 2013-10-02 广西大学 Preparation method for high-quality recycled concrete aggregates

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
王华生等: "《混凝土工程便携手册》", 31 October 2005, 机械工业出版社 *
肖开涛: "再生混凝土的性能及其改性研究", 《中国优秀硕士学位论文全文数据库工程科技II辑》 *
袁军锋: "混凝土垫层施工工艺分析", 《科技致富向导》 *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106285135A (en) * 2016-08-09 2017-01-04 中化(舟山)兴海建设有限公司 A kind of method that Machine-made Sand is used for petrochemical industry storage tank cushion cap sand bedding course
CN108188150A (en) * 2017-12-29 2018-06-22 连城县丰海竹木业有限公司 A kind of bamboo and wood processing industry organic solid castoff sorting disposing system
CN108532833A (en) * 2018-05-15 2018-09-14 长江大学 A kind of regeneration concrete coupled column and preparation method thereof
CN108532833B (en) * 2018-05-15 2020-04-07 长江大学 Recycled concrete combined column and preparation method thereof
CN109534758A (en) * 2018-12-29 2019-03-29 浙江春天建设有限公司 A kind of cement concrete reproduction construction method
CN110206139A (en) * 2019-06-05 2019-09-06 贵州百胜工程建设咨询有限公司 A kind of mass concrete construction method
CN110563420A (en) * 2019-09-19 2019-12-13 中地国际工程有限公司 construction method of pool
CN110563420B (en) * 2019-09-19 2021-10-29 中地国际工程有限公司 Construction method of pool
CN111423173A (en) * 2020-01-13 2020-07-17 武汉长江航道救助打捞局 D-shaped soft raft of recycled concrete unit blocks and manufacturing method thereof
CN111423173B (en) * 2020-01-13 2021-11-26 武汉长江航道救助打捞局 Method for manufacturing D-shaped soft raft of recycled concrete unit block
CN112776126A (en) * 2020-12-31 2021-05-11 广州市市政工程试验检测有限公司 Static load test pile-load concrete test block manufacturing method

Similar Documents

Publication Publication Date Title
CN104556766A (en) Construction method for building foundation bed employing recycled concrete
CN110130278B (en) Construction method of cemented dam
CN101691732B (en) Technique for crushing and water washing of aggregates on asphalt pavement of high-speed highway
CN105198257A (en) Construction waste crushing and screening line method
CN1990129A (en) A method for comprehensive treatment of construction refuse
CN104711974B (en) A kind of steel tube regeneration concrete complex carrier stake and preparation method thereof
Baikerikar A review on green concrete
CN107445652A (en) A kind of foamed ceramics waste material pervious concrete and preparation method thereof
CN102964093A (en) Recycled concrete brick and preparation method thereof
CN104511472A (en) On-site recycle method of construction waste
CN105110669A (en) Method for comprehensive utilization of stone wastes
CN205934638U (en) Supercrust structure with building garbage recovery aggregate
CN108395128B (en) Full-circulation recycling method for urban construction waste, machine-made sand, concrete and building blocks thereof prepared by full-circulation recycling method
CN108505409B (en) Solidified muddy soil and construction waste regenerated aggregate composite inorganic material and forming method thereof
CN110078452B (en) Inorganic binder manufactured by classifying and treating building solid waste regenerated aggregate and preparation method thereof
CN205576857U (en) Be suitable for hydraulic and hydroelectric engineering's super high enrockment dam structure
CN107640939A (en) A kind of spray anchor concrete prepared using building waste
CN107344820A (en) Construction refuse resource utilizes disposal system
CN104529322A (en) Iron tailings roller compacted concrete for pavement
CN115613595A (en) Application of waste concrete as backfill material and backfill construction method thereof
CN209456828U (en) A kind of decontamination building waste permeable pavement structure
CN110886274A (en) Self-compacting rock-fill concrete gravity dam body structure and construction method thereof
CN102731029A (en) Regenerated and utilizable subgrade engineering material and preparation method thereof
CN206255993U (en) The harmless treatment of drilling well rock and recycling equipment
CN211587914U (en) Shield debris recycling system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20150429

RJ01 Rejection of invention patent application after publication