CN104551611A - Ball assembly fixture - Google Patents

Ball assembly fixture Download PDF

Info

Publication number
CN104551611A
CN104551611A CN201310501012.8A CN201310501012A CN104551611A CN 104551611 A CN104551611 A CN 104551611A CN 201310501012 A CN201310501012 A CN 201310501012A CN 104551611 A CN104551611 A CN 104551611A
Authority
CN
China
Prior art keywords
mould
ball
assembly tooling
ball assembly
locating hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310501012.8A
Other languages
Chinese (zh)
Other versions
CN104551611B (en
Inventor
罗发飞
曹改娟
李涛
吴居良
陈志锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gree Electric Appliances Inc of Zhuhai
Original Assignee
Gree Electric Appliances Inc of Zhuhai
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gree Electric Appliances Inc of Zhuhai filed Critical Gree Electric Appliances Inc of Zhuhai
Priority to CN201310501012.8A priority Critical patent/CN104551611B/en
Publication of CN104551611A publication Critical patent/CN104551611A/en
Application granted granted Critical
Publication of CN104551611B publication Critical patent/CN104551611B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P19/00Machines for simply fitting together or separating metal parts or objects, or metal and non-metal parts, whether or not involving some deformation; Tools or devices therefor so far as not provided for in other classes
    • B23P19/02Machines for simply fitting together or separating metal parts or objects, or metal and non-metal parts, whether or not involving some deformation; Tools or devices therefor so far as not provided for in other classes for connecting objects by press fit or for detaching same
    • B23P19/027Machines for simply fitting together or separating metal parts or objects, or metal and non-metal parts, whether or not involving some deformation; Tools or devices therefor so far as not provided for in other classes for connecting objects by press fit or for detaching same using hydraulic or pneumatic means

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Insertion Pins And Rivets (AREA)
  • Automatic Assembly (AREA)

Abstract

The invention provides a ball assembling tool, which is used for assembling balls into a mounting hole of a support frame, and comprises: the positioning assembly is provided with a positioning hole corresponding to the mounting hole; and the assembly component comprises a press fitting bulge matched with the positioning hole so as to press the ball arranged in the positioning hole into the mounting hole. By applying the ball assembling tool, the balls arranged in the positioning holes can be assembled into the mounting holes of the support frame through the positioning assemblies and the assembling assemblies, so that the aim of improving the working efficiency can be fulfilled, and the labor intensity of workers can be further reduced.

Description

Ball assembly tooling
Technical field
The present invention relates to process equipment applications, in particular to a kind of ball assembly tooling.
Background technology
A cabinet machine of the prior art needs eight bracing frames, and a bracing frame need assemble seven balls.And generally all adopt the mode of staff's hand assembled to carry out ball installation in prior art, namely staff once can only assemble a ball, therefore adopts this kind of assembling mode operating efficiency low, and intensity of workers is large.
Summary of the invention
The present invention aims to provide a kind of ball assembly tooling, to reach the object of increasing work efficiency.
To achieve these goals, the invention provides a kind of ball assembly tooling, for assembling ball in the installing hole of bracing frame, ball assembly tooling comprises: positioning component, is provided with the locating hole corresponding with installing hole; Load module, comprise coordinate with locating hole press-fit projection, with the ball that will be placed in locating hole press-in installing hole.
Further, positioning component comprises: mould in first, and locating hole to be arranged in first on mould; Mould in second, is arranged on the top of mould in first, comprise for guide the guide portion of ball and for the resigning hole press-fiting male cooperation, in second, mould has the primary importance that guide portion is communicated with locating hole and the second place that resigning hole is communicated with locating hole.
Further, in first, mould comprises mould body in first, mould body is provided with the first sliding part in first, and in second, mould comprises mould body in second, in second, mould body is provided with the second sliding part matched with the first sliding part.
Further, in first, mould comprises mould body and the first limiting section and the second limiting section that are arranged on mould body two opposed end in first in first, and when primary importance, in second, mould abuts with the first limiting section, when the second place, in second, mould abuts with the second limiting section.
Further, in second, mould comprises mould body in second, guide portion comprises the guiding groove be arranged in second on mould body and the bullport be communicated with guiding groove, and when primary importance, bullport is communicated with that with locating hole the ball be placed in guiding groove is directed into locating hole.
Further, ball assembly tooling also comprises importing assembly, is communicated with guiding groove, to be directed in guiding groove by ball.
Further, ball assembly tooling also comprises the memory module for storing ball, and importing assembly is communicated with memory module away from one end of guiding groove.
Further, load module comprises: the first patrix, press-fits projection and is arranged at the first patrix place; Second patrix, is fixedly connected with the first patrix, to support the first patrix.
Further, positioning component also comprises bed die, is provided with the mounting groove for installing bracing frame.
Further, ball assembly tooling also comprises protection assembly, is provided with the spatial accommodation for holding positioning component and load module.
Apply ball assembly tooling of the present invention, can comparatively quickly the ball be placed in locating hole be assembled in the installing hole of bracing frame by positioning component and load module, thus the object of increasing work efficiency can be reached, can intensity of workers be reduced further.
Accompanying drawing explanation
The Figure of description forming a application's part is used to provide a further understanding of the present invention, and schematic description and description of the present invention, for explaining the present invention, does not form inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 is the decomposition texture schematic diagram of middle ball assembly tooling according to a first embodiment of the present invention;
Fig. 2 is the assembly structure schematic diagram of middle ball assembly tooling according to a first embodiment of the present invention;
Fig. 3 be according to a first embodiment of the present invention in the structural representation of mould in first;
Fig. 4 be according to a first embodiment of the present invention in the structural representation of mould in second;
Fig. 5 be according to a first embodiment of the present invention in the sectional view of mould in second;
Fig. 6 be according to a first embodiment of the present invention in the structural representation of the first patrix;
Fig. 7 is the structural representation of middle bed die according to a first embodiment of the present invention;
Fig. 8 be according to a first embodiment of the present invention in the assembling schematic diagram of funnel and support in memory module;
Fig. 9 be according to a first embodiment of the present invention in the structural representation of inclined tube in memory module;
Figure 10 is the decomposition texture schematic diagram of middle ball assembly tooling according to a second embodiment of the present invention.
Reference numeral in figure: 10, positioning component; 11, mould in first; 12, mould in second; 13, bed die; 111, locating hole; 112, the first limiting section; 113, the second limiting section; 114, the first sliding part; 115, recess; 121, resigning hole; 122, guiding groove; 123, bullport; 124, the second sliding part; 131, mounting groove; 20, load module; 21, the first patrix; 22, the second patrix; 211, projection is press-fited; 30, assembly is imported; 31, pipe; 32, clip; 40, memory module; 41, funnel; 42, support; 43, inclined tube; 431, import; 50, assembly is protected; 90, bracing frame; 91, installing hole.
Detailed description of the invention
It should be noted that, when not conflicting, the embodiment in the application and the feature in embodiment can combine mutually.Below with reference to the accompanying drawings and describe the present invention in detail in conjunction with the embodiments.
As shown in Figures 1 to 9, first embodiment of the invention provides a kind of ball assembly tooling, for assembling ball in the installing hole 91 of bracing frame 90.Ball assembly tooling comprises positioning component 10 and load module 20.Wherein, positioning component 10 is provided with the locating hole 111 corresponding with installing hole 91.Load module 20 comprise coordinate with locating hole 111 press-fit protruding 211, with the ball that will be placed in locating hole 111 press-in installing hole 91.
Comparatively quickly the ball be placed in locating hole 111 can be assembled in the installing hole 91 of bracing frame 90 by positioning component 10 and load module 20, thus the object of increasing work efficiency can be reached, can intensity of workers be reduced further.
As depicted in figs. 1 and 2, positioning component 10 to comprise in first mould 12 in mould 11 and second.Above-mentioned locating hole 111 to be arranged in first on mould 11.In above-mentioned second, mould 12 coordinates with mould in first 11, comprise for guide the guide portion of ball and for press-fit protruding 211 resigning holes 121 coordinated, in second, mould 12 has the second place that primary importance that guide portion is communicated with locating hole 111 is communicated with locating hole 111 with resigning hole 121.
Particularly, as shown in Figure 3, in first, mould 11 comprises mould body in first, in first, mould body is provided with the first sliding part 114, in second, mould 12 comprises mould body in second, in second, mould body is provided with the second sliding part 124 matched with the first sliding part 114.
The friction that first sliding part 114 and the second sliding part 124 can reduce in mould in first 11 and second between mould 12 by above-mentioned sliding part is set, also can positions mould 12 in mould in above-mentioned first 11 and second simultaneously.The first sliding part 114 in the present embodiment is slide protrusion, and the second sliding part 124 is the chute coordinated with slide protrusion.
Preferably, in first, can arrange the first limiting section 112 and the second limiting section 113 by mould body two opposed end, when primary importance, in second, mould 12 abuts with the first limiting section 112, and when the second place, in second, mould 12 abuts with the second limiting section 113.
First limiting section 112 and the second limiting section 113 is set, can carry out spacing to mould 12 in second by above-mentioned limiting section, thus mould 12 in second can be made to arrive primary importance or the second place of setting more accurately, avoid, because of Wrong localization, operate miss occurs.The first limiting section 112 in the present embodiment and the second limiting section 113 are the positioning convex be arranged in first on mould 11.
Further, above-mentioned first limiting section 112 and the second limiting section 113 can make Split type structure, to be fixed in above-mentioned first on mould 11 by bolt or screw.
In above-mentioned first, mould 11 is also provided with the fixed part for fixing cylinder, in above-mentioned second, mould 12 can be promoted by cylinder, and can be arranged on fixation portions for promoting the cylinder that in second, mould 12 moves.
As shown in Figure 4 and Figure 5, guide portion comprises the guiding groove 122 be arranged in second on mould body and the bullport 123 be communicated with guiding groove 122.When primary importance, with locating hole 111, bullport 123 is communicated with that the ball be placed in guiding groove 122 is directed into locating hole 111, and when the second place, resigning hole 121 is communicated with locating hole 111.
Preferably, the top of above-mentioned guiding groove 122 can arrange the lid for preventing ball from deviating from, and above-mentioned lid can adopt transparent material to make, so that staff observes.
Simultaneously; shape and the arranged direction of above-mentioned guiding groove 122 all can be changed according to need of work, and every technical scheme that can ensure that each ball can be entered in corresponding locating hole 111 by corresponding bullport 123 all should within the protection domain of the application.
Bullport 123 in the present embodiment is placed in the bottom of the second mould body, the i.e. oblique below of guiding groove, when primary importance, above-mentioned bullport 123 aligns with locating hole 111, ball in guiding groove 122 can roll in locating hole 111, but due to the size of bullport 123 and locating hole 111 suitable, therefore a ball can only be entered in each locating hole 111, all the other balls can only enter not to be had in the locating hole 111 of ball, thus can guarantee all to have ball in each locating hole 111.
It should be noted that, guiding groove 122 in the present embodiment and resigning hole 121 are multiple, separated by resigning hole 121 one direction between every two adjacent guiding grooves 122, namely arrange with resigning hole 121 interval setting number according to the width guiding groove 122 of mould in second.
As shown in Figure 7, above-mentioned positioning component 10 also comprises bed die 13, is provided with the mounting groove 131 for installing bracing frame 90.Arrange mounting groove 131 to limit the position of bracing frame 90, be shifted in assembling process to prevent bracing frame 90.
Certain above-mentioned mounting groove 131 also can be set to other structures, everyly can carry out spacing to bracing frame 90.
Load module 20 in the present embodiment comprises the first patrix 21 and for supporting the second patrix 22 of above-mentioned first patrix 21.Wherein, press-fit protruding 211 and be arranged at the first patrix 21 place.When assembling, ball is placed in locating hole 111, and now resigning hole 121 is aimed at locating hole 111, now presses down the first patrix 21, make to press-fit protruding 211 through being pressed in installing hole 91 by ball, to complete the assembly manipulation of ball after resigning hole 121 and locating hole 111.
It should be noted that, above-mentioned first patrix 21 can arrange the groove coordinated with guiding groove, to reduce the height press-fiting protruding 211, certainly, when the height press-fiting protruding 211 is enough, also can not arrange above-mentioned groove.
Further, above-mentionedly press-fit protruding 211 and can make the structure with the first patrix 21 split, during use, fixedly be fixed on the first patrix 21 by screw, protruding 211 will be press-fited and be arranged to Split type structure, when some or several press-fit protruding 211 damage time, do not need to change the first patrix 21 entirety.
Above-mentioned second patrix 22 adopts hard material to make, to support above-mentioned first patrix 21.Use the deformation that hard material can prevent the first patrix 21 from producing because of insufficient strength.And only need change when the first patrix 21 is damaged the first patrix 21, second patrix 22 can continue use, reduce waste.
Preferably, above-mentioned second patrix 22 can be driven by driving elements such as cylinders, thus drives above-mentioned first patrix 21 to move.
The above-mentioned quantity press-fiting projection 211, locating hole 111 and resigning hole 121 all can adjust according to need of work.
Further, ball assembly tooling also comprises protection assembly 50, is provided with the spatial accommodation for holding positioning component 10 and load module 20.Protection assembly 50 in the present embodiment is the casing of an opening, to reach the object of the safety of protection staff.Certainly, other sealing surfaces of above-mentioned casing also can make network structure.
As depicted in figs. 1 and 2, ball assembly tooling also comprise import assembly 30, through above-mentioned protection assembly 50 opening and be communicated with guiding groove 122, so that ball is directed in guiding groove 122.Wherein, the importing assembly 30 in the present embodiment comprises pipe 31 and the clip 32 for fixing tube 31, and above-mentioned pipe 31 to be fixed in first on mould 11 by clip 32.Preferably, in above-mentioned first, mould 11 is also provided with recess 115, passes through to allow pipe 31 and be communicated with guiding groove 122.
Inductive switch and retention device can also be set on above-mentioned clip 32 in the embodiment of the present invention, to be entered the quantity of ball by inductive switch induction thus to control retention device and close pipe 31, pile up to ensure that ball can not reboot in groove 122.
It should be noted that, shape and the arrangement of the pipe 31 in the present embodiment can set as required, everyly can ensure that the technical scheme of ball smooth flow all should in the protection domain of the application.
Preferably, above-mentioned ball assembly tooling also comprises the memory module 40 for storing ball, and importing assembly 30 is communicated with memory module 40 away from one end of guiding groove 122.
Memory module 40 in the present embodiment comprises funnel 41, support 42 and inclined tube 43.Above-mentioned funnel 41 is supported on protection assembly 50 by support 42.Above-mentioned inclined tube 43 is placed in the port of export of funnel 41, and its miner diameter end is communicated with pipe 31.This inclined tube 43 is provided with multiple import 431, and when above-mentioned middle mould moves up and down, inclined tube 43 moves with pipe 31, to break the balance of the ball be placed in funnel 41, thus ball can be made to roll in pipe 31.
The upper end of above-mentioned inclined tube 43 can suitably lengthen and make cylinder, the lower end cone transition of inclined tube 43, and the end internal diameter of cone, slightly larger than ball diameter, can be opened more import 431 like this, more ball can be allowed to roll on inclined tube 43.
When ball assembly tooling in the application embodiment of the present invention works: the mounting groove 131 first 8 bracing frames 90 being placed on bed die 13 correspondence, and ball is added in funnel 41.Starting switch, makes mould 11 in first drive mould 12 in second, clip 32, inclined tube 43 to move down together with pipe 31.
Treat that in first, mould 11 moves to desired location, in second, mould 12 starts reach, until withstand the first limiting section 112, now the groove of mould 12 aims at the outlet of pipe 31 lower end in second.
Further, when pipe 31 moves downward, ball enters pipe 31 along inclined tube 43, under along pipe 31, when during outlet is with second, the entrance of mould 12 guiding groove 122 aligns, ball rolls in groove, and the lower end of guiding groove 122 has bullport 123, ball is rolled in locating hole 111 along bullport 123, then enters in the installing hole 91 of bracing frame 90 along locating hole 111.
When in second, the guiding groove 122 of mould 12 is full of ball, all must have ball in 7 bullports 123 in guiding groove 122, namely all there is ball at 7 installing hole 91 places of bracing frame 90.
Now, mould in second 12 is retreated, make mould 12 in second push up the second limiting section 113 of mould 11 rear end in first, to make resigning hole 121 and locating hole 111 to it, and just directly over the installing hole 91 of bracing frame 90, in each locating hole 111, all have 1 ball.
Press down the first patrix 21 and the second patrix 22, ball is pressed in installing hole 91 through after resigning hole 121 and locating hole 111 by the projection 211 that press-fits on the first patrix 21.
Finally, retract position by the first patrix 21 and the second patrix 22, and take out the bracing frame 90 having assembled ball.As shown in Figure 10, second embodiment of the invention additionally provides a kind of ball assembly tooling, comprise the memory module 40 offering multiple through hole and the importing assembly 30 being provided with locating ring or positioning convex point, wherein, above-mentioned importing assembly 30 passes the through hole of setting on the first patrix 21 and the second patrix 22 and abuts with mould in second 12, thinks that in second, mould 12 provides ball.In above-mentioned second, mould 12 is provided with sliding tray, misplaces to prevent above-mentioned importing assembly 30.
It should be noted that, the second embodiment is except above-mentioned feature, and other are all identical with the first embodiment, and the operation principle of the second embodiment is identical with the operation principle of the first embodiment.
When applying the ball assembly tooling work in above-mentioned second embodiment: first 8 bracing frames 90 are placed in the draw-in groove of bed die 13 correspondence, ball are added memory module 40; Now pipe 31 passes mould 12 in second, pushes up the upper surface of mould 11 in first.
Secondly, starting switch, in first, mould 11 drives that mould 12 in second moves down, pipe 31 moves down under self gravitation effect.Now, ball is rolled into by memory module 40 in the pipe 31 moved down, and to pipe 31 bottom, is parked in the upper surface of the resigning hole of mould in second.
When in first, mould 11 presses down and puts in place, the locating ring of pipe 31 withstands the upper surface of mould 12 in second, now the weight of pipe 31 is born by locating ring, on the upper surface of pipe low side mould 12 in second, but with second in the distance of upper surface of mould 12 be less than the diameter of half ball, deviate from from pipe 31 to prevent ball.
In second, mould 12 promotes reach by cylinder, withstands the locating piece of mould 11 leading portion in first.First patrix 21 and the second patrix 22 press down, and are pressed into by ball in the installing hole of bracing frame 90.
Finally, each mould return, and the bracing frame 90 assembled is taken out, installation operation can be completed.As can be seen from the above description, the above embodiments of the present invention achieve following technique effect: by rear plate and side plate being wholely set the installation step can saving split type rear plate and side plate, thus reach the object of the efficiency of assembling improving air-conditioner.
The foregoing is only the preferred embodiments of the present invention, be not limited to the present invention, for a person skilled in the art, the present invention can have various modifications and variations.Within the spirit and principles in the present invention all, any amendment done, equivalent replacement, improvement etc., all should be included within protection scope of the present invention.

Claims (10)

1. a ball assembly tooling, for assembling ball in the installing hole (91) of bracing frame (90), it is characterized in that, described ball assembly tooling comprises:
Positioning component (10), is provided with the locating hole (111) corresponding with described installing hole (91);
Load module (20), comprise coordinate with described locating hole (111) press-fit projection (211), so that the ball be placed in described locating hole (111) is pressed into described installing hole (91).
2. ball assembly tooling according to claim 1, is characterized in that, described positioning component (10) comprising:
Mould (11) in first, described locating hole (111) to be arranged in described first on mould (11);
Mould (12) in second, be arranged on the top of mould (11) in described first, comprise for guide the guide portion of described ball and for the described resigning hole (121) press-fiting projection (211) and coordinate, in described second, mould (12) has primary importance and the second place that described resigning hole (121) is communicated with described locating hole (111) that described guide portion is communicated with described locating hole (111).
3. ball assembly tooling according to claim 2, it is characterized in that, in described first, mould (11) comprises mould body in first, mould body is provided with the first sliding part (114) in described first, in described second, mould (12) comprises mould body in second, in described second, mould body is provided with the second sliding part (124) matched with described first sliding part (114).
4. ball assembly tooling according to claim 2, it is characterized in that, in described first, mould (11) comprises mould body and the first limiting section (112) and the second limiting section (113) that are arranged on mould body two opposed end in described first in first, when described primary importance, in described second, mould (12) abuts with described first limiting section (112), when the described second place, in described second, mould (12) abuts with described second limiting section (113).
5. ball assembly tooling according to claim 2, it is characterized in that, in described second, mould (12) comprises mould body in second, described guide portion comprises the guiding groove (122) be arranged in described second on mould body and the bullport (123) be communicated with described guiding groove (122), when described primary importance, with described locating hole (111), described bullport (123) is communicated with that the ball be placed in described guiding groove (122) is directed into described locating hole (111).
6. ball assembly tooling according to claim 5, is characterized in that, described ball assembly tooling also comprises importing assembly (30), is communicated with, to be directed in described guiding groove (122) by described ball with described guiding groove (122).
7. ball assembly tooling according to claim 6, it is characterized in that, described ball assembly tooling also comprises the memory module (40) for storing described ball, and described importing assembly (30) is communicated with described memory module (40) away from one end of described guiding groove (122).
8. ball assembly tooling according to claim 1, is characterized in that, described load module (20) comprising:
First patrix (21), described in press-fit projection (211) and be arranged at described first patrix (21) place;
Second patrix (22), is fixedly connected with described first patrix (21), to support described first patrix (21).
9. ball assembly tooling according to claim 1, is characterized in that, described positioning component (10) also comprises bed die (13), is provided with the mounting groove (131) for installing support frame as described above (90).
10. ball assembly tooling according to claim 1, is characterized in that, described ball assembly tooling also comprises protection assembly (50), is provided with the spatial accommodation for holding described positioning component (10) and described load module (20).
CN201310501012.8A 2013-10-22 2013-10-22 Ball assembly fixture Expired - Fee Related CN104551611B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310501012.8A CN104551611B (en) 2013-10-22 2013-10-22 Ball assembly fixture

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310501012.8A CN104551611B (en) 2013-10-22 2013-10-22 Ball assembly fixture

Publications (2)

Publication Number Publication Date
CN104551611A true CN104551611A (en) 2015-04-29
CN104551611B CN104551611B (en) 2017-01-18

Family

ID=53069243

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310501012.8A Expired - Fee Related CN104551611B (en) 2013-10-22 2013-10-22 Ball assembly fixture

Country Status (1)

Country Link
CN (1) CN104551611B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105014340A (en) * 2015-06-17 2015-11-04 河海大学常州校区 Ball assembling device
CN105149919A (en) * 2015-07-02 2015-12-16 雄华机械(苏州)有限公司 Ball embedding equipment

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3533151A (en) * 1967-11-02 1970-10-13 Cons Foods Corp Apparatus for inserting balls in a ball bearing retainer
US7222413B2 (en) * 2000-05-15 2007-05-29 Matsushita Electric Industrial Co., Ltd Board transferring apparatus including identifying devices, and component mounting apparatus including the board transferring apparatus
CN202192407U (en) * 2011-07-27 2012-04-18 东莞市石龙万通实业有限公司 Double-fold hidden slide rail bead loading machine
CN202219391U (en) * 2011-07-27 2012-05-16 东莞市石龙万通实业有限公司 Double-layered ball mounting machine for damping sliding rails
CN202219392U (en) * 2011-07-27 2012-05-16 东莞市石龙万通实业有限公司 Ball mounting machine for triple-folding hidden sliding rails
CN102941463A (en) * 2012-10-31 2013-02-27 昆山高晟精密机电有限公司 Roller loading mechanism for assembly production line of gearbox of electric drill
CN203526917U (en) * 2013-10-22 2014-04-09 珠海格力电器股份有限公司 Ball assembly fixture

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3533151A (en) * 1967-11-02 1970-10-13 Cons Foods Corp Apparatus for inserting balls in a ball bearing retainer
US7222413B2 (en) * 2000-05-15 2007-05-29 Matsushita Electric Industrial Co., Ltd Board transferring apparatus including identifying devices, and component mounting apparatus including the board transferring apparatus
CN202192407U (en) * 2011-07-27 2012-04-18 东莞市石龙万通实业有限公司 Double-fold hidden slide rail bead loading machine
CN202219391U (en) * 2011-07-27 2012-05-16 东莞市石龙万通实业有限公司 Double-layered ball mounting machine for damping sliding rails
CN202219392U (en) * 2011-07-27 2012-05-16 东莞市石龙万通实业有限公司 Ball mounting machine for triple-folding hidden sliding rails
CN102941463A (en) * 2012-10-31 2013-02-27 昆山高晟精密机电有限公司 Roller loading mechanism for assembly production line of gearbox of electric drill
CN203526917U (en) * 2013-10-22 2014-04-09 珠海格力电器股份有限公司 Ball assembly fixture

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105014340A (en) * 2015-06-17 2015-11-04 河海大学常州校区 Ball assembling device
CN105149919A (en) * 2015-07-02 2015-12-16 雄华机械(苏州)有限公司 Ball embedding equipment

Also Published As

Publication number Publication date
CN104551611B (en) 2017-01-18

Similar Documents

Publication Publication Date Title
CN103447607A (en) Automatic feeding and cutting assembly line
CN205363188U (en) Magnet set task work adorns fixture device that impresses
CN103203409A (en) Pipe fitting production line
CN104551611A (en) Ball assembly fixture
CN203526917U (en) Ball assembly fixture
CN103121051B (en) Metal sheet bending machine
CN103737280B (en) A kind of automatic sheathing device of magnet ring insulation sleeve
CN205852276U (en) A kind of numerically controlled lathe pedestal being easy to movement
CN103272965B (en) Iron nail repairing device
CN205147135U (en) Expander roll locking device
CN205587922U (en) Fire hydrant valve gap equipment
CN204925194U (en) Terminal box structure for electric energy meter
CN205650712U (en) Mould centering device and stamping equipment
CN206544220U (en) A kind of sound film die cutting device
CN206598232U (en) The assembled fixture of external antenna sheath
CN103707111B (en) Hinge empiecement machine pay-off
CN205660402U (en) Prevent iron fillings numerical control machine tool working table
CN203959148U (en) The regular conveying mechanism of empty van
CN204316408U (en) A kind of mounting guide rail of photovoltaic module and support
CN204868721U (en) Punching press assembly devices
CN102720767A (en) Mounting structure of roller bearing
CN202780082U (en) Multifunctional clamping claw
CN202363727U (en) Tooling for assembling contact finger socket
CN209223966U (en) The device of fuel metering valve spring retainer is dialled in a kind of quick drawing
CN104038001A (en) Traction motor end cover bearing press-fitting tool

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170118

CF01 Termination of patent right due to non-payment of annual fee