Access way and its method for operation of the energy storage device in 0.4KV distribution net sides
Technical field
The present invention relates to energy storage device and the access way and its method for operation of power network, particularly energy storage device is in 0.4KV
The access way and its method for operation of distribution net side.
Background technology
With the development of energy storage technology, energy-storage battery, current transformer and corollary equipment it is highly integrated so that hundred multikilowatts
Energy storage device realizes densification and may move to be possibly realized, and causes energy storage device quickly square by vehicle integral type Integrated design
Just move, such energy storage device may be implemented in many-sided application of distribution net side.
Because the development of energy storage device is at home and abroad still in the starting stage, energy storage device is at present at home and abroad still in showing
Model operation phase, not yet large-scale promotion, energy storage device are even more and be less and few, and application function is single, is generally used for smoothing
New energy, and realize that the guarantor of high reliability powers and seaonal load application not yet has one to compare peace simultaneously for energy storage device
The ripe scheme of full stabilization.
The content of the invention
It is an object of the invention to provide energy storage device in the access way and its method for operation of 0.4KV power distribution networks, mesh is filled up
Application blank of the preceding energy storage device in power distribution network end.
Energy storage device 0.4KV distribution net sides access way, including provide energy storage device and 0.4KV power distribution networks, it is described
The major loop of energy storage device includes a two way convertor, it is characterised in that:The access way also includes providing the first breaker, the
Two breakers and switch;One binding post of first relay connects power load;Described the another of first relay connects
Line terminals connect the output of the two way convertor of the energy storage device;One binding post of second relay connects 0.4KV distribution
Net side;Another binding post of second relay connects another binding post of first relay;The one of the switch
Binding post connects a binding post of second relay;Another binding post of the switch connects first relay
Another binding post.
In an embodiment of the present invention, in an embodiment of the present invention, the switch is a solid-state switch.
In an alternative embodiment of the invention, the switch is a contactor.
The method of operation of the energy storage device in 0.4KV distribution net sides, it is characterised in that:If the energy storage device is applied to season
Property load, the energy storage device is grid-connected with the 0.4KV power distribution networks, first breaker and it is described switch off, described
Two breaker closings;If the energy storage device is applied to Emergency electricity, second relay disconnects, first relay
And the switch closure.
To be applied to Emergency electricity further comprising the steps of for the energy storage device in an embodiment of the present invention:When civil power just
Chang Shi, civil power is through contactor and the first breaker to customer power supply, when civil power breaks down to have a power failure, the change of the energy storage device
Stream device in the disconnection switch of after judging civil power decompression, energy-accumulating power station side decompression, issuing orders, from the energy storage device to
Family powers, and the Mobile energy storage power station is in off-grid operation pattern;When civil power recovers normal power transmission by repairing, the change
Stream device is by after judgement, close command being assigned to the switch, and the energy storage device is again grid-connected with power network.
The technical solution adopted by the present invention has the advantage that compared with prior art:Now the access way of energy storage device exists
When different application place is applied, without additional or transformation, only power supply and customer charge need to be accessed existing grid entry point, made
With simple and convenient, Automatic Control mode, the application in seaonal load side and Emergency electricity is met.
Brief description of the drawings
Fig. 1 is energy storage device access point design figure.
Fig. 2 is the wiring diagram of access point method of operation when energy storage device is incorporated into the power networks.
Fig. 3 applies the wiring diagram of the access point method of operation in Emergency electricity for energy storage device.
Fig. 4 is the wiring diagram of access point method of operation when energy storage device operates in off-network pattern.
Specific embodiment
The present invention will be further described with reference to the accompanying drawings and detailed description.
Access point scheme of the present invention, as shown in Figure 1:Binding post 1 is electrically accessed for city;Binding post 2 is used for emergent guarantor
Power supply customer charge is protected during power supply to offer to access;Binding post 3 is accessed for energy storage device.Breaker 1 is control customer charge
Point and it is disconnected;Solid-state switch/contactor, is controlled by the current transformer of energy storage device, is capable of achieving and off-grid rapid translating;Breaker
2 is the manual function added to ensure customer charge continued power, switch during normal operation when contactor occurs abnormal
It is off.
Connected mode of the invention is:One binding post of relay 1 connects power load;Another terminals of relay 1
Son connects the output of the two way convertor of the energy storage device;One binding post of relay 2 connects 0.4KV distribution net sides;Relay 2
Another binding post contact relay 1 another binding post;One terminals of one binding post contact relay 2 of solid-state switch
Son;Another binding post of another binding post contact relay 1 of solid-state switch.The on off state of solid-state switch is by energy storage device
Current transformer control.
Fig. 2 is the wiring diagram of access point method of operation when energy storage device is incorporated into the power networks.Now breaker 1 is without input, place
In idle condition;Breaker 2 is in closure state, and solid-state switch is in and cut-offs state, the now charge and discharge in Mobile energy storage power station
Electric control order is assigned by current transformer completely, is capable of achieving seaonal load application, is improved the function of power supply capacity, and can be in the external world
Civil power breaks down when having a power failure, current transformer can after checkout voltage autostop, stopping falls power transmission to external power grid.
The operation control when present invention may be equally applicable to Emergency electricity.Now the mode of connection is as shown in figure 3, be applied to
3 binding posts of operation control come into operation during anxious guarantor's power supply, and breaker 2 is in and cut-offs state, at breaker 1 and contactor
In closure state, come into operation.
When civil power is normal, civil power is through contactor and breaker 1 directly to customer power supply;
When civil power breaks down to have a power failure, current transformer is issued orders after judging civil power decompression, energy-accumulating power station side decompression
Contactor 2 is disconnected, now customer charge is powered by energy-accumulating power station battery, power station re-establishes voltage, recovered to customer charge
Normal power supply, the judgement time needed for whole process is in 600ms or so.This when of Mobile energy storage power station is in off-grid operation mould
Formula, the specific mode of connection is shown in Fig. 4.
When civil power recovers normal power transmission by repairing, current transformer by after judgement, close command being assigned to contactor,
Customer charge is restored to mains-supplied, and detailed process is shown in Fig. 3.
Energy storage device can be applied to 0.4kV distribution net sides by the mode of connection provided using the present invention, and is provided simultaneously with
Seaonal load application and Emergency Electricity Functional.And the mode of connection need to only bear power supply and user without additional or transformation
Lotus accesses existing grid entry point, easy to use, Automatic Control mode.
The solid-state switch can also be substituted with contactor in other embodiments of the invention.
Presently preferred embodiments of the present invention is the foregoing is only, it is all to ask the impartial change that the scope of the claims is done and repair according to the present invention
Decorations, should all belong to covering scope of the invention.