CN104504484A - Coating production scheduling management system - Google Patents

Coating production scheduling management system Download PDF

Info

Publication number
CN104504484A
CN104504484A CN201410621999.1A CN201410621999A CN104504484A CN 104504484 A CN104504484 A CN 104504484A CN 201410621999 A CN201410621999 A CN 201410621999A CN 104504484 A CN104504484 A CN 104504484A
Authority
CN
China
Prior art keywords
production
module
plan
schedule
information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410621999.1A
Other languages
Chinese (zh)
Inventor
何晓东
项进解
兰乾诗
杨团
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHUHAI LONGTEC CO Ltd
Original Assignee
ZHUHAI LONGTEC CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHUHAI LONGTEC CO Ltd filed Critical ZHUHAI LONGTEC CO Ltd
Priority to CN201410621999.1A priority Critical patent/CN104504484A/en
Publication of CN104504484A publication Critical patent/CN104504484A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0633Workflow analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Marketing (AREA)
  • Educational Administration (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses and provides a coating production scheduling management system, which is used for performing intelligent scheduling management on multi-formula production and realizing flexible, dynamic and rapid reorganization and reuse of production flows and production formulas and has the advantages of meeting of efficient production, accurate operation and control and stabilization of product quality. The coating production scheduling management system comprises a production data storage server, a production plan scheduling system and a plurality of automatic production lines, wherein the production plan scheduling system is in communication connection with the production data storage server and the automatic production lines; and the production plan scheduling system comprises a right setting module, a data acquisition module, a production scheduling module, an analysis and statistic module, a result presenting module, a production verification module, a report inquiry module, a production plan updating module and a production plan view module. The coating production scheduling management system can be widely applied to the field of production and preparation of coatings.

Description

Coating material production arranges single management system
Technical field
The present invention relates to one coating material production arranges single management system.
Background technology
In recent years, although China's chemistry painting industry industry achieves the development of advancing by leaps and bounds, with increasing rapidly of China's chemistry painting industry industry, there are problems in the production model of coating industry.
In the past domestic coating in market, sale, company management's layer such as buying have employed ERP management, but still relied on manual work in Workshop Production scheduling.After assigning workshop under the production schedule, in the process of arranging production, easily there is following problem: 1), produce out of control, the manufacture order mistakes and omissions that are ranked; 2) progress of each manufacture order cannot, be understood in time; 3), the production schedule arranges inefficiency, data fault rate uncontrollable; 4), rush order is easily forgotten or is not processed in time; 5) rear data input service amount, has been produced greatly and easily make mistakes; 6), the quality of production cannot be followed the trail of; 7), interdepartmental information is obstructed and coordinating efficiency is low.Thus bring to the production management of company and efficiency to have a strong impact on.Along with the anxiety of production-scale expansion, human resources, badly influence the production and operating activities of company, the market environment of current competitive fierceness cannot have been tackled.
Summary of the invention
Technical matters to be solved by this invention overcomes the deficiencies in the prior art, a kind of production polygamy side is provided to carry out intelligent scheduling management, realize the dynamic Quick Casting of flexibility of production procedure and factory formula and multiplexing, meet High-efficient Production, accurately manipulation, stabilized product quality coating material production arranges single management system.
The technical solution adopted in the present invention is: the present invention includes production data storage server, production schedule product plan and many automatic production lines, described production schedule product plan is all connected with production data storage server and many automatic production line communications, wherein, described production schedule product plan comprises:
Priority assignation module, the people for arranging different stage can carry out the authority operated;
Data acquisition module, for obtaining the corresponding production schedule in described production data storage server, and obtains the actual production information of production scene production line, and transmits this actual production information in described production data storage server every preset period of time;
The row's of production single module, planned production information for inputting according to staff planners generates the production schedule, obtain the actual production information of production scene production line from production data storage server, and carry out production row list according to above-mentioned information and be issued to production scene production line;
Analytic statistics module, for obtaining actual production information from production data storage server, obtaining production report according to this production information of preset strategy process, storing this form to production data storage server;
Result presents module, the production report that display analysis statistical module produces.
Further, described production schedule product plan also comprises production school inspection module and report query module, wherein:
Described production school inspection module carries out school inspection to planned production information;
Described report query module comprises the inquiry of historical data and planned production forms data is inquired about, and inquires about perhaps according to conditional filtering in whole manufacture order, can pass through time, production line, product type and product batch number and filter the form needing inquiry.
Further, described production row single module comprises individual event dispose by plan module and batch plan scheduling module, and wherein, described individual event dispose by plan module receives the planned production information comprising work order number of individual event; Described batch plan scheduling module imports batch plan file and comprises the planned production information of work order number described in extracting from batch plan file from local file.
Further, described production schedule product plan also comprises production schedule update module and the production schedule checks module, wherein,
Described production schedule update module receives the new planned production information comprising new work order number, finds the corresponding production schedule and the new plan information comprising new work order number with this is replaced and searched the production schedule and form new production plan according to work order number in production schedule data center;
The described production schedule is searched module and is searched the production schedule according to look-up command in production schedule data center.
The invention has the beneficial effects as follows the ERP interface that the invention provides customization, also can conduct independentworkshop scheduling management system, meets the producer of the ERP that do not reach the standard grade or the temporary transient producer not considering to dock with ERP, meets the scheduling management in workshop.Client can by production schedule product plan carry out manufacture order foundation, priority carried out to manufacture order carry out scheduling, and monitor the real-time production status of each manufacture order in process of production at any time: real time record often plants the charging time of material and the personnel that feed intake.Allow empowerment management personnel to adjust manufacture order and the technological process of production at any time according to produced on-site situation, and record is carried out to adjustment carry out product quality tracing, improve the yield rate of product.Production schedule product plan explains production technology and relevant treatment automatically according to the rule of system definition, facilitates managerial personnel to judge whether current manufacture order exists irrational place and provide foundation fast before scheduling.Native system adopts advanced thing connection mechanics of communication and human engineering interaction technique, polygamy side is produced and carries out intelligent scheduling management, realize the dynamic Quick Casting of flexibility of production procedure and factory formula and multiplexing, meet the production object of High-efficient Production, accurately manipulation, stabilized product quality.
Accompanying drawing explanation
fig. 1it is principle frame of the present invention figure;
fig. 2it is structural representation of the present invention figure;
fig. 3for the present invention produces the signal of row's single module figure.
Embodiment
as Fig. 1, fig. 2, fig. 3shown in, the present invention includes production data storage server 1, production schedule product plan 2 and many automatic production lines 3, described production schedule product plan 2 is all connected with production data storage server 1 and the communication of many automatic production lines 3, and wherein, described production schedule product plan 2 comprises:
Priority assignation module 21, people for arranging different stage can carry out the authority operated, the personnel of different rights can carry out respectively building single, inspection is single, row is single, delete list and query manipulation, having the personnel that the production schedule searches authority is such as production foreman, line length, section chief etc.;
Data acquisition module 22, for obtaining the corresponding production schedule in described production data storage server, and obtains the actual production information of production scene production line, and transmits this actual production information in described production data storage center every preset period of time;
The row's of production single module 23, planned production information for inputting according to staff planners generates the production schedule, the actual production information of production scene production line is obtained from production data storage center, and carry out production row list according to above-mentioned information and be issued to production scene production line, such as, operating personnel are finding the corresponding production schedule by work order number, order of classes or grades at school or work order number and order of classes or grades at school as index; Then, from the production schedule, obtain the key element such as name of product, formula version, production line, production, product batch number, planned time; Finally, produce according to the production schedule;
Analytic statistics module 24, for obtaining actual production information from production data storage center, obtaining production report according to this production information of preset strategy process, storing this form to production data storage server;
Result presents module 25, the production report that display analysis statistical module produces.
Described production schedule product plan also comprises production school inspection module 26 and report query module 27, wherein
Described production school inspection module 26 pairs of planned production information carry out school inspection;
Described report query module 27 comprises the inquiry of historical data and planned production forms data is inquired about, and inquires about perhaps according to conditional filtering in whole manufacture order, can pass through time, production line, product type and product batch number and filter the form needing inquiry.
Described production row single module 23 comprises individual event dispose by plan module 231 and batch plan scheduling module 232, and wherein, described individual event dispose by plan module 231 receives the planned production information comprising work order number of individual event; Described batch plan scheduling module 232 imports batch plan file and comprises the planned production information of work order number described in extracting from batch plan file from local file, this batch plan file can be that production schedule information is first made electronics shelves by each department, then imported by the production schedule information of these electronics shelves batch, such electronics shelves can be excel shelves, word shelves etc.
Carry out production according to produced on-site situation at production schedule product plan by squad leader arrange single and confirm to be issued to field control system, field control system manually starts production according to the order of manufacture order.Produce when scene starts, on-the-spot PLC control system feeds back to production schedule product plan order status just aborning in real time, and resolves display by production schedule product plan.Operator weighs by stepping line scanning according to prompting on touch-screen, and after workman weighs, scene of pressing " confirms " button complete, from manually feeding intake toward still in after meeting range of weighing, continuing next step and producing, and satisfiedly then continues weighing.After production, field control system is uploaded production data and is preserved to production data storage server.To the manufacture order of accidental interruption, can proceed after powering on to produce.Monitor that in PLC production run, Ye Neng real-time reception technology department is to the factory formula not producing editing order at production schedule product plan.

Claims (4)

1. a coating material production arranges single management system, it is characterized in that: described coating material production is arranged single management system and comprised production data storage server, production schedule product plan and many automatic production lines, described production schedule product plan is all connected with production data storage server and many automatic production line communications, wherein, described production schedule product plan comprises:
Priority assignation module, the people for arranging different stage can carry out the authority operated;
Data acquisition module, for obtaining the corresponding production schedule in described production data storage server, and obtains the actual production information of production scene production line, and transmits this actual production information in described production data storage center every preset period of time;
The row's of production single module, planned production information for inputting according to staff planners generates the production schedule, obtain the actual production information of production scene production line from production data storage center, and carry out production row list according to above-mentioned information and be issued to production scene production line;
Analytic statistics module, for obtaining actual production information from production data storage center, obtaining production report according to this production information of preset strategy process, storing this form to production data storage server;
Result presents module, the production report that display analysis statistical module produces.
2. arrange single management system according to the coating material production described in claim 1, it is characterized in that: described production schedule product plan also comprises production school inspection module and report query module, wherein,
Described production school inspection module carries out school inspection to planned production information;
Described report query module comprises the inquiry of historical data and planned production forms data is inquired about, and inquires about perhaps according to conditional filtering in whole manufacture order, can pass through time, production line, product type and product batch number and filter the form needing inquiry.
3. arrange single management system according to the coating material production described in claim 1, it is characterized in that: described production row single module comprises individual event dispose by plan module and batch plan scheduling module, wherein, described individual event dispose by plan module receives the planned production information comprising work order number of individual event; Described batch plan scheduling module imports batch plan file and comprises the planned production information of work order number described in extracting from batch plan file from local file.
4. coating material production according to claim 1 arranges single management system, it is characterized in that: described production schedule product plan also comprises production schedule update module and the production schedule checks module, wherein,
Described production schedule update module receives the new planned production information comprising new work order number, finds the corresponding production schedule and the new plan information comprising new work order number with this is replaced and searched the production schedule and form new production plan according to work order number in production schedule data center;
The described production schedule is searched module and is searched the production schedule according to look-up command at production data storage server.
CN201410621999.1A 2014-11-07 2014-11-07 Coating production scheduling management system Pending CN104504484A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410621999.1A CN104504484A (en) 2014-11-07 2014-11-07 Coating production scheduling management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410621999.1A CN104504484A (en) 2014-11-07 2014-11-07 Coating production scheduling management system

Publications (1)

Publication Number Publication Date
CN104504484A true CN104504484A (en) 2015-04-08

Family

ID=52945879

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410621999.1A Pending CN104504484A (en) 2014-11-07 2014-11-07 Coating production scheduling management system

Country Status (1)

Country Link
CN (1) CN104504484A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107239472A (en) * 2016-03-29 2017-10-10 上海普兰金融服务有限公司 One kind row's forms data processing method and processing device
CN111768072A (en) * 2020-05-19 2020-10-13 东华大学 Printing and dyeing workshop scheduling system
CN112256758A (en) * 2020-10-22 2021-01-22 苏州苏铸成套装备制造有限公司 Intelligent data management system for static pressure modeling production
CN112785134A (en) * 2021-01-14 2021-05-11 上海发那科机器人有限公司 Production plan management system and method for butt joint robot spraying operation
CN113095610A (en) * 2019-12-23 2021-07-09 珠海格力电器股份有限公司 Planning scheduling and allocating system, method and storage medium
CN114139911A (en) * 2021-11-24 2022-03-04 上海民艳信息科技有限公司 Method for high-grade production scheduling in manufacturing industry

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2004104891A1 (en) * 2003-05-19 2004-12-02 Chauhan S K Automated utility supply management system integrating data sources including geographic information systems (gis) data.
CN102231068A (en) * 2011-03-23 2011-11-02 烟台龙彩新材料有限公司 System and method for controlling three-dimensional line powder production
CN203024844U (en) * 2013-01-22 2013-06-26 湖北人福康华药用辅料有限公司 Online automatic weighing device for reaction kettle
CN103745311A (en) * 2013-12-25 2014-04-23 天通精电新科技有限公司 Production data management information system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2004104891A1 (en) * 2003-05-19 2004-12-02 Chauhan S K Automated utility supply management system integrating data sources including geographic information systems (gis) data.
CN102231068A (en) * 2011-03-23 2011-11-02 烟台龙彩新材料有限公司 System and method for controlling three-dimensional line powder production
CN203024844U (en) * 2013-01-22 2013-06-26 湖北人福康华药用辅料有限公司 Online automatic weighing device for reaction kettle
CN103745311A (en) * 2013-12-25 2014-04-23 天通精电新科技有限公司 Production data management information system

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107239472A (en) * 2016-03-29 2017-10-10 上海普兰金融服务有限公司 One kind row's forms data processing method and processing device
CN113095610A (en) * 2019-12-23 2021-07-09 珠海格力电器股份有限公司 Planning scheduling and allocating system, method and storage medium
CN111768072A (en) * 2020-05-19 2020-10-13 东华大学 Printing and dyeing workshop scheduling system
CN112256758A (en) * 2020-10-22 2021-01-22 苏州苏铸成套装备制造有限公司 Intelligent data management system for static pressure modeling production
CN112785134A (en) * 2021-01-14 2021-05-11 上海发那科机器人有限公司 Production plan management system and method for butt joint robot spraying operation
CN112785134B (en) * 2021-01-14 2023-03-24 上海发那科机器人有限公司 Production plan management system and method for butt joint robot spraying operation
CN114139911A (en) * 2021-11-24 2022-03-04 上海民艳信息科技有限公司 Method for high-grade production scheduling in manufacturing industry

Similar Documents

Publication Publication Date Title
CN104504484A (en) Coating production scheduling management system
CN104407576B (en) A kind of implementation method and control system of universal manufacturing unit
CN107516165A (en) A kind of project supervision KXG based on BIM
CN104484730A (en) Batching monitoring and tracing method and system
CN108288119A (en) A kind of intelligentized factory control method and system
CN104376408A (en) Data acquisition and management system used in paint producing process
CN111047257A (en) Production order management system based on 5G network
CN103926894A (en) Furniture making method and system and control device
CN108681878A (en) The acquisition of intelligent plant production line data and billboard management system and method
CN105931029A (en) Production management system for girder fabrication yard based on BIM
CN104240001A (en) Method for rapidly collecting geographic information data in online collaboration mode in large field area
CN105678504A (en) XML-based field layer, MES, ERP integrated information integration method
CN109657816A (en) A kind of online check method of substation equipment monitoring information table
CN108829048A (en) A kind of information analysis system and method based on liquid crystal glass base production and processing
CN105117827A (en) System and method for checking monitoring information tables of transformer station
CN111459116B (en) Efficient tube intelligent production line digital management system
CN110335102A (en) A kind of system that service platform configures order to clothes processing factory
CN104091247A (en) Production plan management system and method
CN110689214A (en) Material supply intelligent collection management control platform
CN203882161U (en) Informationized production management system for pre-machining equipment of bearing mold
CN109101001B (en) Composite probe value chain data acquisition and monitoring method
CN105867315A (en) Injection production management system and method
CN103679310A (en) Method and device for simulating production line
CN105719060A (en) Method for managing cable manufacturing
CN117829572A (en) Manufacturing execution system and method based on ceramic product

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20150408