CN104504199B - Multiple Time Scales active distribution network Interactive Simulation Methods of Scenic based on workflow engine - Google Patents

Multiple Time Scales active distribution network Interactive Simulation Methods of Scenic based on workflow engine Download PDF

Info

Publication number
CN104504199B
CN104504199B CN201410806004.9A CN201410806004A CN104504199B CN 104504199 B CN104504199 B CN 104504199B CN 201410806004 A CN201410806004 A CN 201410806004A CN 104504199 B CN104504199 B CN 104504199B
Authority
CN
China
Prior art keywords
distribution network
active distribution
simulation
model
workflow
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410806004.9A
Other languages
Chinese (zh)
Other versions
CN104504199A (en
Inventor
蒲天骄
李志宏
黄仁乐
陈乃仕
葛贤军
刘克文
屈富敏
赵立强
王晓辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
State Grid Beijing Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
State Grid Beijing Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, China Electric Power Research Institute Co Ltd CEPRI, State Grid Beijing Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201410806004.9A priority Critical patent/CN104504199B/en
Publication of CN104504199A publication Critical patent/CN104504199A/en
Application granted granted Critical
Publication of CN104504199B publication Critical patent/CN104504199B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention provides a kind of Multiple Time Scales active distribution network Interactive Simulation Methods of Scenic based on workflow engine, comprises the following steps:Determine the initial section of active distribution network simulation model;Determine the influence factor of active distribution network interactive simulation;The modeling of functional unit artificial service;Create simulation work flow template;It is operated stream Simulation Control;Simulation Control result is visualized.Present invention employs workflow engine technology, can solve the problem that traditional electric network swim analysis software lacks and lacks the shortcomings that interactive with trend to time series power flowcontrol, and forecast accident process, realizes operation flow stability, ease for maintenance and controller perturbation.

Description

Multiple Time Scales active distribution network Interactive Simulation Methods of Scenic based on workflow engine
Technical field
The invention belongs to Simulating technique in Electric Power System field, and in particular to a kind of Multiple Time Scales based on workflow engine Active distribution network Interactive Simulation Methods of Scenic.
Background technology
With the appearance of the power network new elements such as distributed power source, energy storage device, microgrid, Demand Side Response load, to distribution The operation of net proposes new requirement with scheduling, and the concept of active distribution network is arisen at the historic moment.The construction object of active distribution network is Digestion capability of the power distribution network to distributed energy is lifted, the peak-valley difference in power distribution network running and comprehensive network loss is reduced, meets User supplies high-quality the customized demand of electricity consumption, promotes terminal user to be actively engaged in ability to what electric power system optimization was run, enters One step excavates the equipment utilization potentiality of power system, and it is horizontal effectively to lift comprehensive utilization of energy.To realize this target, it is necessary to right When carrying out analogue simulation to the active distribution network containing distributed power source, because the output of distributed power source has unstability And intermittent feature, need to enter Mobile state to the trend in some specific continuous times when carrying out simulation analysis to power distribution network Analysis, it is abundant to excavate the characteristics of active distribution network network operation for containing a variety of distributed power sources and rule, while power distribution network section Numerous, the topological complexity of point, if using the whole network Load flow calculation, can not probably meet the needs calculated in real time.State of electric distribution network at present Optimal State, normal condition, the state of alert, abnormality, malfunction, recovery state, island state etc. are typically divided into, is matched somebody with somebody In the state of difference, the Business Stream of control is not quite similar power network.
So-called workflow engine refers to a part of the workflow as application system, and provided has to each application system Decisive action determines the Core Solutions such as information transmission route, content rating according to the different of role, the division of labor and condition.Work Making stream engine includes the critical functions such as the node administration of flow, flow direction management, flow sample management.Developed according to service logic The programmed logic that corresponds to actual needs simultaneously ensures its stability, ease for maintenance (modularization and structuring) and elastic (easy basis The variation in program is made in the change of actual service logic, such as the change of decision-making power, the variation of institutional framework and due to business Novel service logic etc. caused by the change in direction).Services Oriented Achitecture (service-oriented Architecture, SOA), it is a component model, the different function units (referred to as servicing) of application program are passed through these by it Good interface is defined between service and contract connects.Interface is defined by the way of neutral, and it should be only Stand on hardware platform, operating system and the programming language of the service of realization.Workflow engine causes structure in various such systems In service, can by a kind of unification and it is general in a manner of interact.
Electric power system data markup language --- E linguistic norms (hereinafter referred to as " E language ") are in the electricity of IEC 61970-301 On the basis of Force system common data model CIM (Common Information Model) object-oriented is abstract, by power train The data describing mode of traditional facing relation of uniting is combined with the CIM of object-oriented, has both remained the height of facing relation method Efficiency, its long-term achievement in research is inherited, the advantages of absorbing object-oriented method again (inheritance of such as class), there is letter It is clean, efficiently and the characteristics of suitable for power system.Cime forms, but power distribution network are supported currently for the simulation software of power transmission network Emulation does not have unified standard also, and target trend profile data when analogue system can easily export simultaneously record paper can be fine The record for solving the problems, such as the electric network swim profile data of continuous time series.
The content of the invention
Coordinate interaction for lacking during active distribution network sequential Power flow simulation, it is impossible to simulate corresponding chain reaction, together The problems such as management relative loose of each sub-application module of Shi Shiji distribution network systems, the present invention provide one kind and are based on workflow engine Multiple Time Scales active distribution network Interactive Simulation Methods of Scenic, employ workflow engine technology, can solve the problem that traditional power network tide Flow analysis software to lack to time series power flowcontrol, and the shortcomings that forecast accident process and interactive trend shortage, realize Operation flow stability, ease for maintenance and controller perturbation.
In order to realize foregoing invention purpose, the present invention adopts the following technical scheme that:
The present invention provides a kind of Multiple Time Scales active distribution network Interactive Simulation Methods of Scenic based on workflow engine, the side Method comprises the following steps:
Step 1:Determine the initial section of active distribution network simulation model;
Step 2:Determine the influence factor of active distribution network interactive simulation;
Step 3:The modeling of functional unit artificial service;
Step 4:Create simulation work flow template;
Step 5:It is operated stream Simulation Control;
Step 6:Simulation Control result is visualized.
In the step 1, active distribution network mould is determined by the service data of active distribution network model and active distribution network The service data of the initial section of type, active distribution network model and active distribution network uses expansible CIM/E text formattings.
The active distribution network simulation model includes substation model, power distribution station model, feeder line model, bus model, distribution Transformer model, feeder line segment model, generator model, load model, switch models and disconnecting link model;
The service data of active distribution network includes the active and reactive of power equipment, electric current, voltage, and switch and disconnecting link Division state.
In the step 2, influence factor include super short period load fluctuation data section, Short Term Generation Schedules data section, Mid-term power failure planning data section, Mid-long Term Load typical case's day curve data section, influence and wind of the illumination to photovoltaic generation Influence of the power to wind-power electricity generation.
In the step 3, by the internal logic criterion of custom feature component, write programmed algorithm and realize logic, it is real The artificial service modeling of existing functional unit;Functional unit includes backup auto-activating device, low all low-voltage load sheding devices, automatic voltage is idle Controller and micro-capacitance sensor controller.
In the step 4, workflow template is created by work process flow design tool, and pass through workflow template management Tool management workflow template;Work process flow design tool passes through the XML file in read work stream engine, parsing XML texts Corresponding process action node is generated after part, and corresponding process action nodal community is set, and is illustrated in work process flow and sets In meter instrument.
Workflow template includes normal condition workflow template, state of alert workflow template, abnormality workflow mould Plate, malfunction workflow template, island state workflow template and emulation Custom Workflow template;
Workflow template management tool is inquired about and managed to workflow template, including issue flow, stopping have been issued Flow, hang up the flow that is currently running and recover the flow being suspended.
In the step 5, analogue system services to obtain current active distribution network according to workflow template using state estimation Real-time status, real-time status includes normal condition, the state of alert, abnormality, malfunction and island state, and workflow is drawn Automatic calling state estimation service and state estimation strategy are held up, work flow controlling control is completed, obtains Simulation Control result.
In the step 6, the analysis to active distribution network network operation characteristic, and utilize tidal current chart, efficiency map, curve Figure, pie chart or rod figure visualize to Simulation Control result.
Compared with prior art, the beneficial effects of the present invention are:
1. the initial section of active distribution network simulation modeling uses expansible CIM/E text formattings, emulation ensure that Normative and good autgmentability;
2. the influence factor that active distribution network emulation prepares has taken into full account Multiple Time Scales, pass through customized power train System functional unit realizes that artificial service models, and ensure that the authenticity and accuracy of emulation;
3. the flow of active distribution network Simulation Control employs workflow engine technology, workflow template ensure that emulation system The availability of system, mitigate system maintenance cost, can solve the problem that traditional electric network swim analysis software lacks to time series trend Control and simulation process and trend lack the shortcomings that interactive, ensure that the stability, easily of active distribution network artificial service flow Maintainability and controller perturbation.
Brief description of the drawings
Fig. 1 is the Multiple Time Scales active distribution network Interactive Simulation Methods of Scenic stream based on workflow engine in the embodiment of the present invention Cheng Tu;
Fig. 2 is work flow engine management flow chart in the embodiment of the present invention.
Embodiment
The present invention is described in further detail below in conjunction with the accompanying drawings.
Coordinate interaction for lacking during active distribution network sequential Power flow simulation, it is impossible to simulate corresponding chain reaction, together The problem of management relative loose of each sub-application module of Shi Shiji distribution network systems, to standby inlet wire automatic throw-in equipment (referred to as Prepared auto restart), low all low-voltage load sheding devices, the automatic safety device of anti-isolated island protection device etc carry out functional unit service logic Modeling, by simulation process, for dispatcher by setting simulated events, simulated events mainly include normal switch operation, exception Failure is set, and realizes the closed-loop simulation of active distribution network automatically, is finally called Load flow calculation to determine the weak link of power network, is passed through Workflow engine is introduced to realize to the flexible customization of Business Stream under different scenes (such as to advanced applied analysis component such as risk assessment Analysis, protecting electroanalysis, Load flow calculation etc, the component of analysis classes and service carry out changeable assembling in real time), according to power distribution network not There is the carry out strategy processing being directed to state, when power distribution network simulation result is write, and finally given in visualization man-machine interface Go out the expression directly perceived of power distribution network simulation result, emulate teaching notes preparation extend it is a kind of be used for power distribution network CIM/E file formats, it is imitative True process considers the influence of short-term repair schedule and generation schedule, also true using ultra-short term digital simulation user The fluctuation of real load, more real decision references can be provided for dispatcher, improve the disposal ability of reply power grid accident, it is final real Simulated effect now more true to nature.
Such as Fig. 1, the present invention provides a kind of Multiple Time Scales active distribution network Interactive Simulation Methods of Scenic based on workflow engine, It the described method comprises the following steps:
Step 1:Determine the initial section of active distribution network simulation model;
Step 2:Determine the influence factor of active distribution network interactive simulation;
Step 3:The modeling of functional unit artificial service;
Step 4:Create simulation work flow template;
Step 5:It is operated stream Simulation Control;
Step 6:Simulation Control result is visualized.
In the step 1, active distribution network mould is determined by the service data of active distribution network model and active distribution network The service data of the initial section of type, active distribution network model and active distribution network uses expansible CIM/E text formattings.
The active distribution network simulation model includes substation model, power distribution station model, feeder line model, bus model, distribution Transformer model, feeder line segment model, generator model, load model, switch models and disconnecting link model;
The service data of active distribution network includes the active and reactive of power equipment, electric current, voltage, and switch and disconnecting link Division state.
In the step 2, influence factor include super short period load fluctuation data section, Short Term Generation Schedules data section, Mid-term power failure planning data section, Mid-long Term Load typical case's day curve data section, influence and wind of the illumination to photovoltaic generation Influence of the power to wind-power electricity generation.
Step 2 specifically includes following steps:
Step 2-1:The data message section of generation schedule is set.The active reactive of the generator of continuous time section is set Power data, the generating change during analog simulation.
Step 2-2:Have a power failure plan and sequential load data are set, the active reactive work(of the load of continuous time section is set Rate data, the load fluctuation during analog simulation.Load data a few days ago is generated using ultra-short term software auxiliary, Generation Mid-long Term Load data are aided in using Mid-long term load forecasting software, meet sequential load data under different time scales Need.
Step 2-3:Environmental characteristic information is set.Environmental classes scene information is set, such as geography information, wind-force and the gas of illumination Image information.
Step 2-4:Dispatching running way event is set.The division action message of target switch and disconnecting link when band is set, if Target fault message when putting single band.Event information includes event generation time, incident duration, event occurrence of equipment, thing Part type, the logic association information between event.
In the step 3, by the internal logic criterion of custom feature component, write programmed algorithm and realize logic, it is real The artificial service modeling of existing functional unit;Functional unit includes backup auto-activating device, low all low-voltage load sheding devices, automatic voltage is idle Controller and micro-capacitance sensor controller.
In the step 4, workflow template is created by work process flow design tool, and pass through workflow template management Tool management workflow template;Work process flow design tool passes through the XML file in read work stream engine, parsing XML texts Corresponding process action node is generated after part, and corresponding process action nodal community is set, and is illustrated in work process flow and sets In meter instrument.
Workflow template includes normal condition workflow template, state of alert workflow template, abnormality workflow mould Plate, malfunction workflow template, island state workflow template and emulation Custom Workflow template;
Normal condition workflow template, calls Load flow calculation service, can call Analysis for Closed Loop service during Loop Closing Operation.
State of alert workflow template, call Load flow calculation service, network reconfiguration service, comprehensive warning service, AVC.
Abnormality workflow template, call Load flow calculation service, risk assessment service, comprehensive warning service, AVC.
Malfunction workflow template, network reconfiguration service, power failure range Analysis Service are called, electroanalysis service is protected, closes Key load protects electricity service, scheme performs service, comprehensive warning service, AVC.
Island state workflow template, call critical load protect electricity service, scheme perform service, comprehensive warning service, AVC, microgrid control subsystem.
Custom Workflow template is emulated, emulation teacher is in visual work process flow designer according to actual emulation The needs of scene service, by pulling establishment and modification process, by flow edit tool, realize the self-defined of simulation work stream Deployment, flow edit tool include the assignment strategy of task, artificial service workflow management strategy, and the two strategies are final real The assignment of current task and the process control of flow.
Such as Fig. 2, workflow template management tool is inquired about and managed to workflow template, including issue flow, stopping The flow and recover the flow being suspended that announced flow, hang-up are currently running.
In the step 5, analogue system services to obtain current active distribution network according to workflow template using state estimation Real-time status, real-time status includes normal condition, the state of alert, abnormality, malfunction and island state, and workflow is drawn Automatic calling state estimation service and state estimation strategy are held up, work flow controlling control is completed, obtains Simulation Control result.
In the step 6, the analysis to active distribution network network operation characteristic, and utilize tidal current chart, efficiency map, curve Figure, pie chart or rod figure visualize to Simulation Control result.
Finally it should be noted that:The above embodiments are merely illustrative of the technical scheme of the present invention and are not intended to be limiting thereof, institute The those of ordinary skill in category field with reference to above-described embodiment still can to the present invention embodiment modify or Equivalent substitution, these are applying for this pending hair without departing from any modification of spirit and scope of the invention or equivalent substitution Within bright claims.

Claims (1)

1. the Multiple Time Scales active distribution network Interactive Simulation Methods of Scenic based on workflow engine, it is characterised in that:Methods described bag Include following steps:
Step 1:Determine the initial section of active distribution network simulation model;
Step 2:Determine the influence factor of active distribution network interactive simulation;
Step 3:The modeling of functional unit artificial service;
Step 4:Create simulation work flow template;
Step 5:It is operated stream Simulation Control;
Step 6:Simulation Control result is visualized;
In the step 1, active distribution network model is determined by the service data of active distribution network model and active distribution network The service data of initial section, active distribution network model and active distribution network uses expansible CIM/E text formattings;
The active distribution network simulation model includes substation model, power distribution station model, feeder line model, bus model, distribution transformer Device model, feeder line segment model, generator model, load model, switch models and disconnecting link model;
The service data of active distribution network includes the active and reactive of power equipment, electric current, voltage, and point of switch and disconnecting link Conjunction state;
In the step 2, influence factor includes super short period load fluctuation data section, Short Term Generation Schedules data section, mid-term Power failure planning data section, Mid-long Term Load typical case's day curve data section, influence and wind-force pair of the illumination to photovoltaic generation The influence of wind-power electricity generation;
In the step 3, by the internal logic criterion of custom feature component, write programmed algorithm and realize logic, realize work( The artificial service modeling of energy component;Functional unit includes backup auto-activating device, low all low-voltage load sheding devices, auto voltage control Device and micro-capacitance sensor controller;
In the step 4, workflow template is created by work process flow design tool, and pass through workflow template management tool Management work flow template;Work process flow design tool is by the XML file in read work stream engine, after parsing XML file Corresponding process action node is generated, and corresponding process action nodal community is set, and is illustrated in work process flow design work In tool;
Workflow template includes normal condition workflow template, state of alert workflow template, abnormality workflow template, event Hinder operation flow template, island state workflow template and emulation Custom Workflow template;
Workflow template management tool is inquired about and managed to workflow template, including issue flow, the announced stream of stopping The flow and recover the flow being suspended that journey, hang-up are currently running;
In the step 5, analogue system services to obtain the reality of current active distribution network according to workflow template using state estimation When state, real-time status includes normal condition, the state of alert, abnormality, malfunction and island state, workflow engine from It is dynamic to call state estimation service and state estimation strategy, work flow controlling control is completed, obtains Simulation Control result;
In the step 6, the analysis to active distribution network network operation characteristic, and using tidal current chart, efficiency map, curve map, Pie chart or rod figure visualize to Simulation Control result.
CN201410806004.9A 2014-12-22 2014-12-22 Multiple Time Scales active distribution network Interactive Simulation Methods of Scenic based on workflow engine Active CN104504199B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410806004.9A CN104504199B (en) 2014-12-22 2014-12-22 Multiple Time Scales active distribution network Interactive Simulation Methods of Scenic based on workflow engine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410806004.9A CN104504199B (en) 2014-12-22 2014-12-22 Multiple Time Scales active distribution network Interactive Simulation Methods of Scenic based on workflow engine

Publications (2)

Publication Number Publication Date
CN104504199A CN104504199A (en) 2015-04-08
CN104504199B true CN104504199B (en) 2017-11-21

Family

ID=52945596

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410806004.9A Active CN104504199B (en) 2014-12-22 2014-12-22 Multiple Time Scales active distribution network Interactive Simulation Methods of Scenic based on workflow engine

Country Status (1)

Country Link
CN (1) CN104504199B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106529306B (en) * 2016-11-16 2019-02-19 中国电子产品可靠性与环境试验研究所 Security of system appraisal procedure and device
CN112100544B (en) * 2020-09-07 2023-03-28 贵州电网有限责任公司 Spare power automatic switching installation device and spare power automatic switching action logic monitoring technology visualization method
CN112287504B (en) * 2020-12-25 2021-04-20 中国电力科学研究院有限公司 Offline/online integrated simulation system and method for power distribution network

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102081867A (en) * 2010-05-24 2011-06-01 北京科东电力控制***有限责任公司 All-digital high-voltage direct current transmission training stimulation system
CN102903063A (en) * 2012-09-19 2013-01-30 中国电力科学研究院 Integral electricity market operation system
CN102957204A (en) * 2012-02-08 2013-03-06 深圳市金宏威技术股份有限公司 Intelligent simulation method and system of power distribution network terminal
CN104091014A (en) * 2014-07-02 2014-10-08 国家电网公司 Power flow simulation control method based on time series

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040153303A1 (en) * 2002-12-30 2004-08-05 Le Tang Efficient process for time dependent network model in an energy market simulation system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102081867A (en) * 2010-05-24 2011-06-01 北京科东电力控制***有限责任公司 All-digital high-voltage direct current transmission training stimulation system
CN102957204A (en) * 2012-02-08 2013-03-06 深圳市金宏威技术股份有限公司 Intelligent simulation method and system of power distribution network terminal
CN102903063A (en) * 2012-09-19 2013-01-30 中国电力科学研究院 Integral electricity market operation system
CN104091014A (en) * 2014-07-02 2014-10-08 国家电网公司 Power flow simulation control method based on time series

Also Published As

Publication number Publication date
CN104504199A (en) 2015-04-08

Similar Documents

Publication Publication Date Title
CN103617760B (en) A kind of power distribution network DTS analogue system and emulation mode thereof
CN102663912B (en) Computer simulation systems for integrated dispatching and monitoring of regional power network
CN104678960B (en) It is a kind of based on scene it is anti-error and intend ticket training off-line type Dispatching system and method
CN103020385B (en) Based on RTDS electrical network 500kV major network modeling and simulating system
CN104091014B (en) A kind of electric network swim simulation control method based on time series
CN104537428B (en) One kind meter and the probabilistic economical operation appraisal procedure of wind power integration
CN101794410A (en) Power grid intelligent dispatching operation sheet generating system based on drawing environment
CN105718686B (en) One kind being based on event driven power distribution network analogue system and its emulation mode
CN104463696A (en) Power grid operating risk recognition and prevention method and system
CN103823952B (en) The dataflow design method of bulk power grid regulation and control integration whole process simulation training system
CN108345739A (en) Recognize the method that CIME and SVG model file information realizations protection definite value on-line testing function obtains model
CN103199521A (en) Power network planning construction method based on network reconstruction and optimized load-flow simulating calculation
CN104504199B (en) Multiple Time Scales active distribution network Interactive Simulation Methods of Scenic based on workflow engine
CN107767122A (en) A kind of electric operation ticket method of calibration
Flueck et al. Integrating renewable and distributed resources-IIT perfect power smart grid prototype
CN105186686A (en) Full network topology-based power grid dispatching intelligent anti-error strategy system
CN107623335A (en) Regenerative resource digestion capability analysis calculation method based on priority scheduling
CN107016490A (en) Power networks risk takes precautions against pre-control practical application method, apparatus and system
CN104463430A (en) Load dispatch control system
CN109842121A (en) Multistage multi-region domain association control load shedding in-circuit emulation modeling method and system
Brose et al. Real-Time Dispatcher Training Simulation System for Future Requirements of Grid Operation
CN204679830U (en) A kind of anti-error and intend the off-line type scheduling operation bill system of ticket training based on scene
CN109785702A (en) Power grid simulation training system based on monitoring signal simulation
Gao et al. The Research and Development of Integrated Operation-Maintenance Simulation Training System [J]
CN107276073A (en) A kind of bus load Forecasting Methodology based on the honourable equivalent load of load

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant