CN104502726A - Method for measuring the power-frequency grounding resistance of tower and cement pole - Google Patents

Method for measuring the power-frequency grounding resistance of tower and cement pole Download PDF

Info

Publication number
CN104502726A
CN104502726A CN201410720659.4A CN201410720659A CN104502726A CN 104502726 A CN104502726 A CN 104502726A CN 201410720659 A CN201410720659 A CN 201410720659A CN 104502726 A CN104502726 A CN 104502726A
Authority
CN
China
Prior art keywords
tower
grounding
resistance
earthing pole
earthing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410720659.4A
Other languages
Chinese (zh)
Other versions
CN104502726B (en
Inventor
唐志
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Liaoning Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Liaoning Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Liaoning Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201410720659.4A priority Critical patent/CN104502726B/en
Publication of CN104502726A publication Critical patent/CN104502726A/en
Application granted granted Critical
Publication of CN104502726B publication Critical patent/CN104502726B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Measurement Of Resistance Or Impedance (AREA)

Abstract

Provided is a method for measuring the power-frequency grounding resistance of a tower and a cement pole, which can greatly improve the test efficiency and test accuracy, detect poor grounding in a timely manner and improve the lightning withstand level of equipment. The method comprises the following steps: (a) checking the grounding electrodes of a tower and a cement pole; (b) measuring the grounding resistance of each grounding electrode by a meter clamping method under the condition of not dismounting the grounding electrodes, executing the step (c) if a grounding electrode with the grounding resistance less than l ohm is found in measurement, and executing the steps (d) and (e) and checking whether the situation of unqualified grounding electrodes or poor contact of a lightning conductor above the tower exists if a grounding electrode of which the grounding resistance is increased obviously or exceeds the corresponding requirement or the regulation on the value of the grounding resistance is found in measurement through comparison with the values of grounding resistance of other grounding electrodes around and the previous values of the grounding electrode; (c) measuring the overall grounding resistance of the tower by a meter clamping method under the condition of retaining one grounding wire; (d) measuring the overall grounding resistance of the tower by a three-electrode method; and (e) measuring the grounding resistance of each grounding electrode of the tower by a three-electrode method.

Description

The measuring method of steel tower and cement pole power frequency earthing resistance
Technical field
the present invention relates to onethe measuring method of steel tower and cement pole power frequency earthing resistance.
Background technology
The classic method of tower grounding test is earthing megohm meter method of testing, and workload is large, efficiency is low, and it is more that test result is subject to on-the-spot influence factor.For a fairly large number of area of shaft tower, adopt three electrode method test to be difficult to, actual motion is difficult to the accuracy and the promptness that ensure test in safeguarding.Pincerlike meter tests test method is simple, but due to the incorrect of method and to service condition grasp indefinite, do not popularize at power department always.
Summary of the invention
The technical problem to be solved in the present invention is to provide the accuracy greatly improving testing efficiency and test, Timeliness coverage imperfect earth, improves the steel tower of equipment lightning withstand level and the measuring method of cement pole power frequency earthing resistance.
Technical solution of the present invention is:
The measuring method of steel tower and cement pole power frequency earthing resistance, its step is as follows:
A () steel tower and cement pole earthing pole check
First check whether test line steel tower and cement pole meet earthing device characterisitic parameter and measure directive/guide DL/T 475-2006, record lightning conducter model, shaft tower height, earthing pole pattern, shaft tower numbering, earthing pole numbering, soil regime and work as ground temperature, checking the electrical connection situation of tested tower grounding line, then performing record and process in time as found that there is the abnormal conditions such as ground wire destroys or bolt is stolen;
B () uses the stake resistance of the every root earthing pole of pincers meter method for measuring in earthing pole situation not tearing open
Do not tear earthing pole open, use pincerlike earth resistance tester to measure the stake resistance of every root earthing pole respectively; Open pincerlike earth resistance tester jaw during measurement, use tester to vise each ground wire by root, make ground wire placed in the middle, as far as possible perpendicular to tester jaw place plane, and keep jaw contacts good, make tester work, read and record stable reading;
If find that there is earthing pole stake resistance during measurement to be less than l ohm, then may exist in ground between each earthing pole or the situation that in basis, metal connects, now perform step (c), whole shaft tower is used pincers meter method for measuring as a whole;
If find in measurement with other earthing poles of surrounding and this earthing pole in the past numeric ratio comparatively have earthing pole stake resistance obviously to increase, or exceed the regulation to grounding resistance in corresponding standard or code, then check whether this earthing pole coupling bolt loosens or loose contact, still increase if remeasured after eliminating or exceed standard, three electrode method is then adopted to perform step (d) and step (e), check whether that to there is earthing pole defective, or the situation such as lightning conducter loose contact above steel tower, to judge its reason and corresponding rectification;
C () uses the stake resistance of pincers meter method for measuring steel tower entirety in reservation ground wire situation
Only retain a ground wire to be connected with shaft tower tower body, all the other ground wires all should disconnect with shaft tower tower body and can not with shaft tower tower body Metal Contact, and with having the wire of insulation rubber by parallel with the ground wire be retained for other ground wires disconnected, and contact is good, is measured as a whole by tower grounding device; Pincerlike earth resistance tester jaw is opened during measurement, tester is used to vise that root ground wire be retained, pincerlike earth resistance tester should be positioned at the top of all parallel connections, make the ground wire that is retained placed in the middle, as far as possible perpendicular to tester jaw place plane, and keep jaw contacts good, make tester work, read and record stable reading;
D () three electrode method measures the stake resistance of tower entirety
By all ground wires with disconnects with shaft tower tower body, but can not with shaft tower tower body Metal Contact, and in parallel with all ground wires having the wire of insulation rubber to disconnect, tower grounding device is measured by employing three electrode method as a whole;
E () three electrode method measures the stake resistance of the every root earthing pole of steel tower
Remove the parallel connections between ground wire, use three electrode method to measure the stake resistance of the every root earthing pole of steel tower respectively.
The invention has the beneficial effects as follows: first use pincerlike method to measure the stake resistance of earthing pole, three electrode method is adopted to measure again when the stake resistance of earthing pole is abnormal, two kinds of methods are organically combined, greatly improve the accuracy of testing efficiency and test, so that Timeliness coverage imperfect earth, improve steel tower and the cement pole power frequency earthing resistance of equipment lightning withstand level.
Accompanying drawing explanation
Fig. 1 is the schematic diagram of the power frequency earthing resistance not tearing the every root earthing pole of earthing pole pincers meter method for measuring open;
Fig. 2 is the schematic diagram of the power frequency earthing resistance of reservation earthing pole pincers meter method for measuring steel tower and cement pole entirety;
Fig. 3 is the schematic diagram that three electrode method measures the power frequency earthing resistance of steel tower and cement pole entirety;
Fig. 4 is the schematic diagram that three electrode method measures the power frequency earthing resistance of steel tower and the every root earthing pole of cement pole;
In figure: P-voltage pole, C-electric current pole.
Embodiment
As shown in the figure, the measuring method of steel tower and cement pole power frequency earthing resistance, its step is as follows:
A () steel tower and cement pole earthing pole check
First check whether test line steel tower and cement pole meet earthing device characterisitic parameter and measure directive/guide DL/T 475-2006, record lightning conducter model, shaft tower height, earthing pole pattern, shaft tower numbering, earthing pole numbering, soil regime and work as ground temperature, checking the electrical connection situation of tested tower grounding line, record should be performed and process in time as found that there is the abnormal conditions such as ground wire destroys or bolt is stolen;
B () uses the stake resistance of the every root earthing pole of pincers meter method for measuring in earthing pole situation not tearing open
Do not tear earthing pole open, use pincerlike earth resistance tester to measure the stake resistance of every root earthing pole A, B, C, D respectively, as shown in Figure 1; Open pincerlike earth resistance tester jaw during measurement, use tester to vise each ground wire by root, make ground wire placed in the middle, as far as possible perpendicular to tester jaw place plane, and keep jaw contacts good, make tester work, read and record stable reading;
If find that there is earthing pole stake resistance during measurement to be less than l ohm, then may exist in ground between each earthing pole or the situation that in basis, metal connects, now perform step (c), whole shaft tower is used pincers meter method for measuring as a whole;
If find in measurement with other earthing poles of surrounding and this earthing pole in the past numeric ratio comparatively have earthing pole stake resistance obviously to increase, or exceed the regulation to grounding resistance in corresponding standard or code, then check whether this earthing pole coupling bolt loosens or loose contact, still increase if remeasured after eliminating or exceed standard, then perform step (d) and step (e), check whether that to there is earthing pole defective, or the situation such as lightning conducter loose contact above steel tower, to judge its reason and corresponding rectification.
C () uses the stake resistance of pincers meter method for measuring steel tower entirety in reservation ground wire situation
Only retain a ground wire A to be connected with shaft tower tower body, all the other ground wires B, C, D and tower body disconnect and can not with shaft tower tower body Metal Contact, and with there being the wire of insulation rubber that ground wire B, C, D of disconnection is in parallel with the ground wire A be retained, and contact is good, tower grounding device is measured, as a whole as Fig. 2; Pincerlike earth resistance tester jaw is opened during measurement, tester is used to vise that root ground wire be retained, pincerlike earth resistance tester should be positioned at the top of all parallel connections, make the ground wire that is retained placed in the middle, as far as possible perpendicular to tester jaw place plane, and keep jaw contacts good, make tester work, read and record stable reading;
D () three electrode method measures the stake resistance of tower entirety
All ground wire A, B, C, D and shaft tower tower body are disconnected, but can not with shaft tower tower body Metal Contact, and with having the wire of insulation rubber by parallel for all ground wires disconnected, adopt three electrode method earth resistance tester to measure, tower grounding device as Fig. 3 as a whole;
E () three electrode method measures the stake resistance of the every root earthing pole of steel tower
Remove the parallel connections between ground wire, use three electrode method to be measured the stake resistance of the every root earthing pole of steel tower respectively by earth resistance tester, as Fig. 4.

Claims (1)

1. the measuring method of steel tower and cement pole power frequency earthing resistance, is characterized in that step is as follows:
A () steel tower and cement pole earthing pole check
First check whether test line steel tower and cement pole meet earthing device characterisitic parameter and measure directive/guide DL/T 475-2006, record lightning conducter model, shaft tower height, earthing pole pattern, shaft tower numbering, earthing pole numbering, soil regime and work as ground temperature, checking the electrical connection situation of tested tower grounding line, then performing record and process in time as found that there is the abnormal conditions such as ground wire destroys or bolt is stolen;
B () uses the stake resistance of the every root earthing pole of pincers meter method for measuring in earthing pole situation not tearing open
Do not tear earthing pole open, use pincerlike earth resistance tester to measure the stake resistance of every root earthing pole respectively; Open pincerlike earth resistance tester jaw during measurement, use tester to vise each ground wire by root, make ground wire placed in the middle, as far as possible perpendicular to tester jaw place plane, and keep jaw contacts good, make tester work, read and record stable reading;
If find that there is earthing pole stake resistance during measurement to be less than l ohm, then may exist in ground between each earthing pole or the situation that in basis, metal connects, now perform step (c), whole shaft tower is used pincers meter method for measuring as a whole;
If find in measurement with other earthing poles of surrounding and this earthing pole in the past numeric ratio comparatively have earthing pole stake resistance obviously to increase, or exceed the regulation to grounding resistance in corresponding standard or code, then check whether this earthing pole coupling bolt loosens or loose contact, still increase if remeasured after eliminating or exceed standard, then perform step (d) and step (e), check whether that to there is earthing pole defective, or the situation such as lightning conducter loose contact above steel tower, to judge its reason and corresponding rectification;
C () uses the stake resistance of pincers meter method for measuring steel tower entirety in reservation ground wire situation
Only retain a ground wire to be connected with shaft tower tower body, all the other ground wires all should disconnect with shaft tower tower body and can not with shaft tower tower body Metal Contact, and with having the wire of insulation rubber by parallel with the ground wire be retained for other ground wires disconnected, and contact is good, is measured as a whole by tower grounding device; Pincerlike earth resistance tester jaw is opened during measurement, tester is used to vise that root ground wire be retained, pincerlike earth resistance tester should be positioned at the top of all parallel connections, make the ground wire that is retained placed in the middle, as far as possible perpendicular to tester jaw place plane, and keep jaw contacts good, make tester work, read and record stable reading;
D () three electrode method measures the stake resistance of tower entirety
By all ground wires with disconnects with shaft tower tower body, but can not with shaft tower tower body Metal Contact, and in parallel with all ground wires having the wire of insulation rubber to disconnect, tower grounding device is measured by employing three electrode method as a whole;
E () three electrode method measures the stake resistance of the every root earthing pole of steel tower
Remove the parallel connections between ground wire, use three electrode method to measure the stake resistance of the every root earthing pole of steel tower respectively.
CN201410720659.4A 2014-12-01 2014-12-01 The measuring method of steel tower and cement pole power frequency earthing resistance Active CN104502726B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410720659.4A CN104502726B (en) 2014-12-01 2014-12-01 The measuring method of steel tower and cement pole power frequency earthing resistance

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410720659.4A CN104502726B (en) 2014-12-01 2014-12-01 The measuring method of steel tower and cement pole power frequency earthing resistance

Publications (2)

Publication Number Publication Date
CN104502726A true CN104502726A (en) 2015-04-08
CN104502726B CN104502726B (en) 2017-12-15

Family

ID=52944137

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410720659.4A Active CN104502726B (en) 2014-12-01 2014-12-01 The measuring method of steel tower and cement pole power frequency earthing resistance

Country Status (1)

Country Link
CN (1) CN104502726B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107490725A (en) * 2017-08-04 2017-12-19 上海建科检验有限公司 The pole method of testing of special industry place grounding resistance three

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1158425A (en) * 1996-11-26 1997-09-03 山西省忻州地区电业局 Release-free electric cable tower ground resistance testing method and device
CN1828313A (en) * 2006-02-21 2006-09-06 武汉高压研究所 Pole tower earthing resistance quick testing method without unfastening wire and device
KR20070046645A (en) * 2005-10-31 2007-05-03 한국전력공사 Measurement method of grounding resistance of transmission towers in an energized transmission line system
JP4028167B2 (en) * 2000-10-25 2007-12-26 東日本電信電話株式会社 Method and apparatus for measuring ground resistance
CN101216515A (en) * 2007-12-27 2008-07-09 武汉华瑞防雷科技股份有限公司 Powerline pole tower ground resistance measurement method and its tester
EP2189799A1 (en) * 2008-11-21 2010-05-26 Korea Electric Power Corporation Apparatus and method for three-pole type measuring of specific soil resistance for distribution grounding
CN201583596U (en) * 2009-12-07 2010-09-15 江苏省电力公司盱眙县供电公司 Device for testing ground resistance of transmission line tower
CN102680798A (en) * 2012-02-28 2012-09-19 山东建筑大学 Online measurement method and device for grounding resistor of rod tower

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1158425A (en) * 1996-11-26 1997-09-03 山西省忻州地区电业局 Release-free electric cable tower ground resistance testing method and device
JP4028167B2 (en) * 2000-10-25 2007-12-26 東日本電信電話株式会社 Method and apparatus for measuring ground resistance
KR20070046645A (en) * 2005-10-31 2007-05-03 한국전력공사 Measurement method of grounding resistance of transmission towers in an energized transmission line system
CN1828313A (en) * 2006-02-21 2006-09-06 武汉高压研究所 Pole tower earthing resistance quick testing method without unfastening wire and device
CN101216515A (en) * 2007-12-27 2008-07-09 武汉华瑞防雷科技股份有限公司 Powerline pole tower ground resistance measurement method and its tester
EP2189799A1 (en) * 2008-11-21 2010-05-26 Korea Electric Power Corporation Apparatus and method for three-pole type measuring of specific soil resistance for distribution grounding
CN201583596U (en) * 2009-12-07 2010-09-15 江苏省电力公司盱眙县供电公司 Device for testing ground resistance of transmission line tower
CN102680798A (en) * 2012-02-28 2012-09-19 山东建筑大学 Online measurement method and device for grounding resistor of rod tower

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
李德超等: "两种杆塔接地电阻测量方法的比较", 《电瓷避雷器》 *
李汉明等: "钳表法测量线路杆塔接地电阻的误差分析", 《高电压技术》 *
杜洋等: "线路杆塔工频接地电阻测量方法的探讨", 《四川电力技术》 *
楚广虹等: "500KV线路工频接地电阻测量方法的分析探讨", 《科技情报开发与经济》 *
王火庚: "杆塔接地电阻的测量方法", 《铜业工程》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107490725A (en) * 2017-08-04 2017-12-19 上海建科检验有限公司 The pole method of testing of special industry place grounding resistance three

Also Published As

Publication number Publication date
CN104502726B (en) 2017-12-15

Similar Documents

Publication Publication Date Title
CN111781426A (en) High-voltage cable cross interconnection loop resistance live detection system and method
CN204422659U (en) A kind of grounding net of transformer substation Transient grounding resistance and the automatic test diagnosis equipment of response
CN108562860A (en) Electric energy meter two-way accessory power supply power consumption Auto-Test System and test method
CN104049161A (en) Testing connecting structure and testing method for substation field lightning arrester without demounting primary high-voltage lead
KR102206379B1 (en) Photovoltaic ground resistance measuring system
CN107797023B (en) Three-phase voltage unbalance source positioning method, device and system
CN204679563U (en) A kind of grounding net of transformer substation corrosion detection system based on surface potential
CN105182173B (en) Novel composite mutual inductor polarity tester
CN202815027U (en) Relay test fixture
CN102879657B (en) Method for checking phase sequences of lines
CN104502726A (en) Method for measuring the power-frequency grounding resistance of tower and cement pole
CN105717364B (en) The measurement method of single lightning conducter iron pipe tower power frequency earthing resistance
CN103454536A (en) Power transformer test method
CN109142873A (en) A kind of orbit traffic direct current power supply system full loop D.C. resistance test method
CN105717365A (en) Method for measuring power frequency grounding resistance of iron pipe tower with double ground wires
CN204681043U (en) A kind of cable pipeline being convenient to examination and detection failure
CN209280758U (en) A kind of testing jig for battery measurement
CN101634671B (en) Eight-terminal voltammetry measuring method of direct current resistance
CN203941248U (en) The test syndeton that the on-the-spot lightning arrester of a kind of electric substation is not torn a high-voltage connection open
CN108152659B (en) Method for judging turn-to-turn insulation short circuit of electromagnetic voltage transformer
CN102590603B (en) Through flow sampling method of check protection device
CN203069674U (en) Automatic detection tool for loop resistance
CN207636718U (en) A kind of circuit-breaker testing repairing auxiliary device
CN106526412B (en) A kind of method and apparatus suitable for photovoltaic field direct current cables Earth design
CN116973680B (en) Low-current grounding line selection device, system and fault line investigation method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Wang Aihua

Inventor after: Cui Jisheng

Inventor after: Chen Chuan

Inventor after: Li Yan

Inventor after: Tang Zhi

Inventor before: Tang Zhi

CB03 Change of inventor or designer information
GR01 Patent grant
GR01 Patent grant