CN104500057A - Testing method of liquid producing profile of horizontal well - Google Patents

Testing method of liquid producing profile of horizontal well Download PDF

Info

Publication number
CN104500057A
CN104500057A CN201410722644.1A CN201410722644A CN104500057A CN 104500057 A CN104500057 A CN 104500057A CN 201410722644 A CN201410722644 A CN 201410722644A CN 104500057 A CN104500057 A CN 104500057A
Authority
CN
China
Prior art keywords
tubing string
sliding bush
horizontal well
testing
well
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410722644.1A
Other languages
Chinese (zh)
Inventor
罗懿
李克智
符伟兵
卢瑜林
邓学峰
屈玉凤
梅洁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Engineering Technology Research Institute Of North China Branch china Petroleum & Chemical Corp
China Petroleum and Chemical Corp
Original Assignee
Engineering Technology Research Institute Of North China Branch china Petroleum & Chemical Corp
China Petroleum and Chemical Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Engineering Technology Research Institute Of North China Branch china Petroleum & Chemical Corp, China Petroleum and Chemical Corp filed Critical Engineering Technology Research Institute Of North China Branch china Petroleum & Chemical Corp
Priority to CN201410722644.1A priority Critical patent/CN104500057A/en
Publication of CN104500057A publication Critical patent/CN104500057A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B49/00Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
    • E21B49/08Obtaining fluid samples or testing fluids, in boreholes or wells

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Sampling And Sample Adjustment (AREA)

Abstract

The invention discloses a testing method of a liquid producing profile of a horizontal well. The testing method sequentially comprises the following steps: placing a horizontal well of tubular column well completion staged fracturing production to remove a driving sliding sleeve inner ball seat through drilling milling of the horizontal well, releasing a sampling tubular column, swabbing, dragging, re-swabbing to take a liquid produced by each to-be-tested stage in a to-be-tested layer of the horizontal well, metering according to a liquid producing amount of the produced liquid, accurately testing a water content, analyzing a liquid producing characteristic of the to-be-tested section corresponding to the output so as to realize staged swabbing of the to-be-tested layer and improve the swabbing pressure of single-time swabbing as well as achieve the testing of the liquid producing profile of the horizontal pumping well with low yield. Meanwhile, in the whole swabbing process, the to-be-tested sections corresponding to all sections of driving sliding sleeve device are swabbed through the sampling tubular column; the sampling tubular column is simple in structure and convenient to use, therefore, the cost of testing the whole liquid producing profile is reduced, and a technical support is provided for testing and governing of the liquid producing profile of the high-water-content horizontal well in an oil field.

Description

A kind of method of testing of horizontal well production profile
Technical field
The invention belongs to oilfield exploitation technical field, particularly relate to a kind of method of testing of horizontal well production profile.
Background technology
In recent years, along with the development of horizontal well technology, horizontal well development has become the important channel of improving well yield, suggestions for improvement and raising recovery ratio, and especially the staged fracturing renovation technique of horizontal well makes unconventional fine and close oil gas economic development become a reality.At present, it is 5 1/2 that compact oil reservoir develops main completion mode " casing cementing completion and bore hole preset tubing string completion (preset 4 1/2 " sleeve pipe, open hole packer and pitching fracturing sliding bush), casing cementing completion adopts pumping bridging plug staged fracturing technique and coiled tubing band underseal to drag staged fracturing technique; Preset tubing string then adopts pitching staged fracturing technique.After adopting staged fracturing of horizontal well to go into operation, improve compact oil reservoir well yield greatly, but there is large quantities of horizontal well causing output to reduce fast because of moisture rising in manufacturing process, and due to cannot water exit position be judged after water outlet, water blockoff measure targetedly cannot be carried out, cause whole development weak effect.
For the water exit position of determined level well, existing method the most accurately and effectively implements producing profile testing, according to test interpretation result determination water exit position to horizontal well production section.For horizontal well produced fluid cross section, large quantifier elimination and experiment work are done both at home and abroad.But due to the exceptional well body structure of horizontal well and particular/special requirement when surveying production profile, cause the lifting when conveying of produced fluid cross section tester and test to remain a difficult problem for horizontal well produced fluid cross section, the method for testing of the production profile of dissimilar horizontal well is as follows:
1) water spraying horizontal well mainly carries out the conveying of tester by crawl device or coiled tubing, and the test of production profile is carried out on blowing production limit, limit;
2) cannot blowing, but the horizontal well that Liquid output is large, mainly by gaslift lifting, crawl device or coiled tubing carry out the conveying of tester, and the test of production profile is carried out on gaslift production limit, limit;
3) Liquid output is little, large sleeve pipe (9 5/8 " and more than) or large sleeve pipe (9 5/8 " and more than) is adopted to hang the horizontal well of small casing (5 1/2 " or 7 ") completion, dual string can be utilized to carry out the test of horizontal well production profile, pumping pipe string carries out lifting, and crawl device or coiled tubing connecting test instrument are transported to horizontal well test section by test string;
4) to 7, " jacketing machine draws water the test of horizontal well production profile, and be utilize simulation oil pumper liquid production section test device to carry out lifting, crawl device is taken instrument to be tested and is delivered to test section through this device, the test of carrying out horizontal well production profile when simulation oil pumping is produced.
In a word, existing horizontal well produced fluid cross section method is more easily implemented in large sleeve pipe or the high horizontal well of output, and for employing 5 1/2 " casing cementing completion or bore hole preset tubing string completion and the horizontal well of the not high compact oil reservoir exploitation of output; need setting-up eccentricity well head when utilizing annulus logging technology to judge water exit position; means of delivery enters under being difficult in annular space, cannot successful implementation; As utilized Gas lift test technology, then require that oilwell produced fluid amount is high; As utilized pump measuring technology, by the restriction of string size, crawl device cannot pass through oil well pump, and therefore, the horizontal well of existing compact oil reservoir exploitation exists the problem of producing profile testing difficulty, affects normally carrying out with the oilfield exploitation of horizontal well development.
Summary of the invention
The object of this invention is to provide a kind of method of testing of horizontal well production profile, be intended to solve the problem of the horizontal well water exploration difficulty of the compact oil reservoir exploitation that horizontal well produced fluid cross section method restricted application in prior art causes.
In order to realize above object, in the present invention, the technical scheme of the method for testing of horizontal well production profile is as follows:
The method of testing of horizontal well production profile, comprises the following steps:
Step one, stops taking out, pressure release, tears well head open, trip out flow string in well;
Step 2, is milled the ball seat in pitching sliding bush apparatus each in the horizontal segment of preset tubing string by brill and removes;
Step 3, sampling tubing string is dropped in the horizontal segment of preset tubing string, sampling tubing string is made to be in the outer tube of a joint sliding bush apparatus, sampling tubing string comprises setting within the outer tube along well depth direction successively interval, rear packer and before being fixed on, feed tube between rear packer, before, distance between rear packer is not more than the length of the outer tube of sliding bush apparatus, the rear end of rear packer is provided with the plugging structure for sealing up its rear end opening, the front end of front packer is connected to the below of the oil well pump of the vertical section input of preset tubing string by oil pipe, the tube wall of feed tube offers inside and outside inlet,
Step 4, by the fluid in oil well pump outside pumping sampling tubing string, must sample the liquid of to be measured section of output corresponding to the sliding bush apparatus that saves residing for tubing string from wellhead;
Step 5, the forward and backward packing tubing string of deblocking, drags sampling tubing string to corresponding to be measured section of another joint sliding bush apparatus along well depth direction or along well depth rightabout, and by forward and backward packer setting;
Step 6, repeats step 4, the liquid of the to be measured section of output that sliding bush apparatus is corresponding residing for pumping sampling tubing string.
Pitching sliding bush apparatus has more than three joints, after step 6, repeats step 4, five, six, until the product fluid of to be measured section corresponding to each pitching sliding bush apparatus is all by pumping.
Pressure reduction sliding sleeve section occurrence characteristics utilizes the total production feature of former horizontal well all production section and whole pitching sliding sleeve sectionalization test occurrence characteristics to contrast and draws.
After step 2, sampling tubing string is dragged successively backward or is dragged successively forward from most deutomerite pitching sliding bush apparatus from the most prosthomere pitching sliding bush apparatus of the horizontal segment of preset tubing string.
Front packer connects oil well pump by releasing device.
Forward and backward packer is hydraulic buckling packer.
The horizontal well that in the present invention, preset tubing string completion staged fracturing is gone into operation mills except ball seat in pitching sliding sleeve-inputs samples the pumping of tubing string-pumping-dragging-again to the liquid of each to be measured section of output in the layer to be tested taking out horizontal well through boring successively, according to the liquid producing amount measure of product fluid, the accurate chemical examination of moisture, rate root, analyze the Fluid Producing Property of corresponding to be measured section of output, thus realize treating test layer segmentation pumping, improve the swabbing pressure of single pumping, the producing profile testing of the horizontal well that especially draws water for the machine that output is not high; Simultaneously, in whole pumping process, by sampling tubing string, pumping is carried out to corresponding to be measured section of each joint sliding bush apparatus, the structure of sampling tubing string is simple, easy to use, thus reduce the expense of whole producing profile testing, for oil field High water cut horizontal well produced fluid cross section and improvement provide technical guarantee.
Accompanying drawing explanation
Fig. 1 is the structural representation of a kind of embodiment of the present invention;
Fig. 2 is the structural representation sampling tubing string in Fig. 1.
1-oil pumper, 2-production wellhead, 3-external diameter 177.8mm sleeve pipe, 4-external diameter 73mm N80 external upset tubing, pump barrel and pump plunger in 5-sucker rod, insert pump, the outer pump barrel of 6-insert pump, 7-hanging packer, 8-open hole packer, 9-bores the pitching sliding sleeve after milling, 10-pressure reduction sliding sleeve, 11-external diameter 114.3mm sleeve pipe, 12-samples tubing string, 13-safety joint, 14-hydraulic releasing tool, 15-circulating sub, 16-seating and sealing unit, swell packers before 17-, 18- 1/ 4" stainless steel controls pipeline, 19-feed tube, swell packers after 20-, 21-blind plugging, 22-external diameter 60.3mm N80 additional thicker strip chamfering oil pipe.
Detailed description of the invention
The embodiment of the method for testing of horizontal well production profile in the present invention: as shown in Figure 1 and Figure 2, the method is a kind of horizontal well production profile sectionalization test method, comprises the following steps:
1, pit shaft prepares: stop taking out, pressure release, dismounting horizontal well to be tested well head, trip out former well flow string;
2, bore milling ball seat: enter drill bit under in preset tubing string, bored to mill by the ball seat in each pitching sliding bush apparatus from outer tube and remove;
3, throw in sampling tubing string: to preset tubing string, throw in sampling tubing string from well head, and make to sample tubing string and be devoted in the outer tube of most deutomerite pitching sliding bush apparatus, described sampling tubing string comprises the blind plugging be connected in series successively from back to front, rear packer, sampling screen casing, front packer, seating and sealing unit, circulating sub, releasing device, safety joint, front packer and rear packer are hydraulic buckling packer and bridge joint has the stainless steel being in sampling screen casing periphery to control pipeline between, sampling screen casing is the feed tube of whole sampling tubing string, sieve aperture on the tube wall of sampling screen casing is the inlet of feed tube, there is the sampling oil pipe be connected with oil well pump safety joint front end, sampling oil pipe is 60.3mm additional thicker strip chamfering oil pipe,
4, sampling tubing string sets: well head connects pump truck, 28MPa is suppressed in test oil pipe, make to sample the front packer of tubing string and rear packer inflation and the most inner chamber of deutomerite pitching sliding bush apparatus and the inner chamber of other joint sliding bush apparatus are separated, separate by be measured section of layer to be tested and other production sections, and continue to be forced into 2 ~ 3t in sampling tubing string, to make the descent of piston in seating and sealing unit, highly pressurised liquid trap is completed in mandrel and packing element annular space and sets;
5, pumping: enter the pumping instrument combined by pump barrel in sucker rod, insert pump and pump plunger under in 73mm N80 external upset tubing, and product is asked in pumping of starting shooting after extension is taken out, moisture, the rate root of sample analysis production fluid every day, metering output liquid measure, analyzes this to be measured section of occurrence characteristics;
6, drag deblocking sampling tubing string: stop taking out after production fluid sampling is qualified, terminate this test of to be measured section, trip out sucker rod, pump plunger and interior pump barrel, on carry and the deblocking sampling front packer of tubing string and rear packer, and drag adjacent to be measured section of the supreme joint of sampling tubing string;
7, repeat step 4 ~ 6 until complete the test jobs of all to be measured section of layer to be tested.
The object of boring milling ball seat in the present embodiment be in order to sampling tubing string smooth under enter to provide passage.The outer pump barrel of insert pump and be produce tubing string with upper part, the function of flow string is before entering sucker rod, insert pump plunger and interior pump barrel under realizing, can suppress and realize straddle packer and effectively set, enter sucker rod, insert pump plunger and interior pump barrel under after setting and produce.The function of sample analysis is the product fluid being obtained test zone by wellhead, and carries out the accurate-metering of output, the accurate chemical examination of moisture, rate root, analyzes occurrence characteristics.
In the above-described embodiments, the existing ball-throwing type sliding bush apparatus of sliding bush apparatus, there is again differential sliding bush apparatus, wherein differential sliding bush apparatus only has one, and ball-throwing type sliding bush apparatus has four, in other embodiments, sliding bush apparatus is also necessary for one or more ball-throwing type sliding bush apparatus and a differential sliding bush apparatus combination, and wherein the sliding bush apparatus at horizontal well B target spot first fracturing section place is necessary for differential sliding bush apparatus.
In the above-described embodiments, sliding bush apparatus is five joints, and in other embodiments, sliding bush apparatus also can be more than 2 ~ 5 joints or 5 save.
Based on other embodiments above, when sliding bush apparatus is two, in the present embodiment, the method for testing of horizontal well production profile is by following steps embodiment:
Step one, pit shaft prepares: stop taking out, pressure release, dismounting horizontal well to be tested well head, trip out former well flow string;
Step 2, bores milling ball seat: enter drill bit under in preset tubing string, bored to mill by the ball seat in each pitching sliding bush apparatus and remove from outer tube;
Step 3, sampling tubing string is dropped in the horizontal segment of preset tubing string, sampling tubing string is made to be in the outer tube of a joint pitching sliding bush apparatus, sampling tubing string comprises setting within the outer tube along well depth direction successively interval, rear packer and before being fixed on, feed tube between rear packer, before, distance between rear packer is not more than the length of the outer tube of sliding bush apparatus, the rear end of rear packer is provided with the plugging structure for sealing up its rear end opening, the front end of front packer is connected to the below of the oil well pump of the vertical section input of preset tubing string by oil pipe, the tube wall of feed tube offers inside and outside inlet,
Step 4, by the fluid in oil well pump outside pumping sampling tubing string, must sample the liquid of to be measured section of output corresponding to the pitching sliding bush apparatus that saves residing for tubing string from wellhead; Contrast total production fluid situation analysis pressure reduction sliding sleeve place output section feature.

Claims (5)

1. the method for testing of horizontal well production profile, is characterized in that, comprises the following steps:
Step one, stops taking out, pressure release, tears well head open, trip out flow string in well;
Step 2, is milled the ball seat in pitching sliding bush apparatus each in the horizontal segment of preset tubing string by brill and removes;
Step 3, sampling tubing string is dropped in the horizontal segment of preset tubing string, sampling tubing string is made to be in the outer tube of a joint sliding bush apparatus, sampling tubing string comprises setting within the outer tube along well depth direction successively interval, rear packer and before being fixed on, feed tube between rear packer, before, distance between rear packer is not more than the length of the outer tube of sliding bush apparatus, the rear end of rear packer is provided with the plugging structure for sealing up its rear end opening, the front end of front packer is connected to the below of the oil well pump of the vertical section input of preset tubing string by oil pipe, the tube wall of feed tube offers inside and outside inlet,
Step 4, by the fluid in oil well pump outside pumping sampling tubing string, must sample the liquid of to be measured section of output corresponding to the sliding bush apparatus that saves residing for tubing string from wellhead;
Step 5, the forward and backward packing tubing string of deblocking, drags sampling tubing string to corresponding to be measured section of another joint sliding bush apparatus along well depth direction or along well depth rightabout, and by forward and backward packer setting;
Step 6, repeats step 4, the liquid of the to be measured section of output that sliding bush apparatus is corresponding residing for pumping sampling tubing string.
2. the method for testing of horizontal well production profile according to claim 1, is characterized in that, sliding bush apparatus has more than three joints, after step 6, repeats step 4, five, six, until the product fluid of to be measured section corresponding to each pitching sliding bush apparatus is all by pumping.
3. the method for testing of horizontal well production profile according to claim 2, it is characterized in that, after step 2, sampling tubing string is dragged successively backward or is dragged successively forward from most deutomerite pitching sliding bush apparatus from the most prosthomere pitching sliding bush apparatus of the horizontal segment of preset tubing string.
4. the method for testing of horizontal well production profile as claimed in any of claims 1 to 3, is characterized in that, front packer connects oil well pump by releasing device.
5. the method for testing of horizontal well production profile as claimed in any of claims 1 to 3, is characterized in that, forward and backward packer is hydraulic buckling packer.
CN201410722644.1A 2014-12-03 2014-12-03 Testing method of liquid producing profile of horizontal well Pending CN104500057A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410722644.1A CN104500057A (en) 2014-12-03 2014-12-03 Testing method of liquid producing profile of horizontal well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410722644.1A CN104500057A (en) 2014-12-03 2014-12-03 Testing method of liquid producing profile of horizontal well

Publications (1)

Publication Number Publication Date
CN104500057A true CN104500057A (en) 2015-04-08

Family

ID=52941496

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410722644.1A Pending CN104500057A (en) 2014-12-03 2014-12-03 Testing method of liquid producing profile of horizontal well

Country Status (1)

Country Link
CN (1) CN104500057A (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105134182A (en) * 2015-09-08 2015-12-09 中国石油天然气股份有限公司 Production fluid profile testing pipe column dragged by submersible linear motor and method
CN105569635A (en) * 2015-12-31 2016-05-11 中国石油天然气股份有限公司 Horizontal well liquid production section testing technology process pipe column and testing method
CN106593422A (en) * 2016-12-01 2017-04-26 中国石油天然气股份有限公司 Storage type testing method in oil pipe of horizontal well and pipe column
WO2019113679A1 (en) * 2017-12-13 2019-06-20 Source Rock Energy Partners Inc. Inflow testing systems and methods for oil and/or gas wells
CN110017138A (en) * 2019-05-08 2019-07-16 中国科学院武汉岩土力学研究所 Air water multilayer sampling method and device in a kind of drilling
CN110017133A (en) * 2019-05-23 2019-07-16 广州海洋地质调查局 A kind of test of horizontal well production profile and shutoff method and device
CN110206531A (en) * 2019-05-23 2019-09-06 广州海洋地质调查局 A kind of oil pipe of horizontal well production profile test method and device
CN110206540A (en) * 2019-05-23 2019-09-06 广州海洋地质调查局 A kind of horizontal well annular space production profile test method and device
CN110242275A (en) * 2019-05-23 2019-09-17 广州海洋地质调查局 A kind of oil pipe of horizontal well wears cable production and cuts open test method and device
CN110608033A (en) * 2019-10-29 2019-12-24 中国石油化工股份有限公司 Shale gas horizontal well single-section testing mechanism and horizontal well single-section testing method
CN110617054A (en) * 2019-09-17 2019-12-27 中国石油天然气股份有限公司 Oil field horizontal well sectional testing pipe column and method
CN111852428A (en) * 2020-08-03 2020-10-30 中国石油天然气股份有限公司 Method for fracturing outer packing and coiled tubing in combined operation
CN113027430A (en) * 2021-04-29 2021-06-25 佘国强 Horizontal well fluid production section testing pipe column and process based on tracer marking

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2009082689A1 (en) * 2007-12-20 2009-07-02 Schlumberger Canada Limited System and method for optimizing production in a well
CN201546710U (en) * 2009-11-04 2010-08-11 中国石油天然气股份有限公司 Segmented water exploration test pipe column for casing completion horizontal well
CN201671623U (en) * 2010-05-18 2010-12-15 中国石油天然气股份有限公司 Pipe column for leakage finding and separate mining of horizontal well
WO2011150048A2 (en) * 2010-05-26 2011-12-01 Schlumberger Canada Limited Intelligent completion system for extended reach drilling wells
CN202596684U (en) * 2012-06-08 2012-12-12 中国石油天然气股份有限公司 Multi-stage segmented yield-seeking and water-finding testing process pipe column for casing well completion horizontal well
WO2012174663A1 (en) * 2011-06-21 2012-12-27 Packers Plus Energy Services Inc. Fracturing port locator and isolation tool
CN203321480U (en) * 2013-06-05 2013-12-04 中国石油天然气股份有限公司 Casing completion multi-section fracturing horizontal well selective exploitation pipe string
CN103711469A (en) * 2013-12-27 2014-04-09 阜新驰宇石油机械有限公司 Horizontal well switchable type well cementation staged fracturing oil production technology

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2009082689A1 (en) * 2007-12-20 2009-07-02 Schlumberger Canada Limited System and method for optimizing production in a well
CN201546710U (en) * 2009-11-04 2010-08-11 中国石油天然气股份有限公司 Segmented water exploration test pipe column for casing completion horizontal well
CN201671623U (en) * 2010-05-18 2010-12-15 中国石油天然气股份有限公司 Pipe column for leakage finding and separate mining of horizontal well
WO2011150048A2 (en) * 2010-05-26 2011-12-01 Schlumberger Canada Limited Intelligent completion system for extended reach drilling wells
WO2012174663A1 (en) * 2011-06-21 2012-12-27 Packers Plus Energy Services Inc. Fracturing port locator and isolation tool
CN202596684U (en) * 2012-06-08 2012-12-12 中国石油天然气股份有限公司 Multi-stage segmented yield-seeking and water-finding testing process pipe column for casing well completion horizontal well
CN203321480U (en) * 2013-06-05 2013-12-04 中国石油天然气股份有限公司 Casing completion multi-section fracturing horizontal well selective exploitation pipe string
CN103711469A (en) * 2013-12-27 2014-04-09 阜新驰宇石油机械有限公司 Horizontal well switchable type well cementation staged fracturing oil production technology

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105134182A (en) * 2015-09-08 2015-12-09 中国石油天然气股份有限公司 Production fluid profile testing pipe column dragged by submersible linear motor and method
CN105569635A (en) * 2015-12-31 2016-05-11 中国石油天然气股份有限公司 Horizontal well liquid production section testing technology process pipe column and testing method
CN106593422A (en) * 2016-12-01 2017-04-26 中国石油天然气股份有限公司 Storage type testing method in oil pipe of horizontal well and pipe column
WO2019113679A1 (en) * 2017-12-13 2019-06-20 Source Rock Energy Partners Inc. Inflow testing systems and methods for oil and/or gas wells
US11174729B2 (en) 2017-12-13 2021-11-16 Source Rock Energy Partners Inc. Inflow testing systems and methods for oil and/or gas wells
CN110017138A (en) * 2019-05-08 2019-07-16 中国科学院武汉岩土力学研究所 Air water multilayer sampling method and device in a kind of drilling
CN110242275A (en) * 2019-05-23 2019-09-17 广州海洋地质调查局 A kind of oil pipe of horizontal well wears cable production and cuts open test method and device
CN110206540A (en) * 2019-05-23 2019-09-06 广州海洋地质调查局 A kind of horizontal well annular space production profile test method and device
CN110206531A (en) * 2019-05-23 2019-09-06 广州海洋地质调查局 A kind of oil pipe of horizontal well production profile test method and device
CN110017133A (en) * 2019-05-23 2019-07-16 广州海洋地质调查局 A kind of test of horizontal well production profile and shutoff method and device
CN110206540B (en) * 2019-05-23 2024-04-02 广州海洋地质调查局 Method and device for testing annular output profile of horizontal well
CN110206531B (en) * 2019-05-23 2024-04-09 广州海洋地质调查局 Method and device for testing output profile of horizontal well oil pipe
CN110242275B (en) * 2019-05-23 2024-04-19 广州海洋地质调查局 Horizontal well oil pipe cable penetrating production profile test method and device
CN110017133B (en) * 2019-05-23 2024-05-10 广州海洋地质调查局 Method and device for testing output profile of horizontal well and plugging water
CN110617054A (en) * 2019-09-17 2019-12-27 中国石油天然气股份有限公司 Oil field horizontal well sectional testing pipe column and method
CN110617054B (en) * 2019-09-17 2022-08-30 中国石油天然气股份有限公司 Oil field horizontal well sectional testing pipe column and method
CN110608033A (en) * 2019-10-29 2019-12-24 中国石油化工股份有限公司 Shale gas horizontal well single-section testing mechanism and horizontal well single-section testing method
CN111852428A (en) * 2020-08-03 2020-10-30 中国石油天然气股份有限公司 Method for fracturing outer packing and coiled tubing in combined operation
CN113027430A (en) * 2021-04-29 2021-06-25 佘国强 Horizontal well fluid production section testing pipe column and process based on tracer marking

Similar Documents

Publication Publication Date Title
CN104500057A (en) Testing method of liquid producing profile of horizontal well
US11142988B2 (en) Stress testing with inflatable packer assembly
CN111119826B (en) Coiled tubing staged fracturing string and string fracturing method
CN105888653B (en) A kind of multistage pressure break horizontal well tracer groundwater prospecting method
CN104929603A (en) Infinite stage type sectional cracking method for sleeve
CN110485986B (en) Segmented acid fracturing water control yield increasing method for deep open hole horizontal well of fractured-vuggy carbonate reservoir
CN105937393A (en) Horizontal well dragging type liquid production profile testing pipe column and testing method thereof
CN204371316U (en) Horizontal well water exploration pipe column for industrial machine swabbing and draining
CN111577257B (en) Horizontal well subsection setting type flow metering water exploration pipe column and water exploration method thereof
CN110439524A (en) The refracturing remodeling method of oil/gas well
CN203856456U (en) Well testing pipe column
RU2449114C1 (en) Method of dual completion of several productive horizons and device for its implementation
CN112267876B (en) Formation pressure measurement while drilling tool with double packer structures and testing method
CN212898468U (en) Tracer bridge plug assembly
CN105134184A (en) Horizontal well continuous channeling checking process pipe column and method
CN104632195B (en) Gas lift flow aiding horizontal well water exploration pipe column and method
US2187486A (en) Formation testing method and apparatus
RU2601882C1 (en) Guide device for entering side shaft
CN107339096A (en) Rapid water exploration method for horizontal well
CN207177888U (en) Logging pipe column
CN215860141U (en) Horizontal well liquid production section testing pipe column based on tracer marking
CN104196512A (en) Oil well horizontal well oil jacket simultaneous injection type double-sealing single-clamping volume fracturing tubular column and fracturing method thereof
WO2021249499A1 (en) Wellbore segmented operation method and rubber plug for said method
CN203296759U (en) Pipe column device for perforating and testing of HTHP ultra-deep well
CN113027430A (en) Horizontal well fluid production section testing pipe column and process based on tracer marking

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20150408

RJ01 Rejection of invention patent application after publication