CN104485054A - 一种动态洪水风险图的绘制方法 - Google Patents

一种动态洪水风险图的绘制方法 Download PDF

Info

Publication number
CN104485054A
CN104485054A CN201410845422.9A CN201410845422A CN104485054A CN 104485054 A CN104485054 A CN 104485054A CN 201410845422 A CN201410845422 A CN 201410845422A CN 104485054 A CN104485054 A CN 104485054A
Authority
CN
China
Prior art keywords
flood
frequency
flood risk
risk mapping
risk map
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410845422.9A
Other languages
English (en)
Inventor
李胜
郑强
张宗旗
张�荣
李涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUIZHOU EAST CENTURY TECHNOLOGY Co Ltd
Original Assignee
GUIZHOU EAST CENTURY TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUIZHOU EAST CENTURY TECHNOLOGY Co Ltd filed Critical GUIZHOU EAST CENTURY TECHNOLOGY Co Ltd
Priority to CN201410845422.9A priority Critical patent/CN104485054A/zh
Publication of CN104485054A publication Critical patent/CN104485054A/zh
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09BEDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
    • G09B29/00Maps; Plans; Charts; Diagrams, e.g. route diagram

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Mathematical Physics (AREA)
  • Business, Economics & Management (AREA)
  • Educational Administration (AREA)
  • Educational Technology (AREA)
  • General Physics & Mathematics (AREA)
  • Image Generation (AREA)

Abstract

本发明公开了一种动态洪水风险图的绘制方法,它包括下述步骤:步骤1、绘制出目标区域内典型频率点的洪水风险图;步骤2、测量实际洪水发生时的洪水频率;步骤3、根据步骤2得到的洪水频率和步骤1生成的典型频率点的洪水风险图利用内插法得到洪水发生时的洪水频率的实际洪水风险图;本发明解决了现有技术在洪水发生后得知频率才绘制洪水风险图,存在实时性差而且耗时耗力等问题。

Description

一种动态洪水风险图的绘制方法
技术领域
    本发明属于洪水风险图绘制技术,尤其涉及一种动态洪水风险图的绘制方法。
背景技术
洪水风险图是对可能发生的超标准洪水的洪水演进路线、到达时间、淹没水深、淹没范围及流速大小等过程特征进行预测,以标示洪泛区内各处受洪水灾害的危险程度的一种重要的防洪非工程措施,现有技术的洪水风险图的绘制时根据一场实际频率的洪水发生时,花1-3天时间来绘制出该频率洪水的风险图,往往洪水风险图完成后,该频率的洪水已经结束,使得绘制好的洪水风险图失去了意义,采用这样的方法绘制的洪水风险图存在防洪意义小,效率低下,实时性差等问题。
发明内容
本发明要解决的技术问题:提供一种动态洪水风险图的绘制方法,以解决现有技术在洪水发生后得知频率才绘制洪水风险图,存在实时性差而且耗时耗力等问题。
本发明技术方案:
一种动态洪水风险图的绘制方法,它包括下述步骤:
步骤1、绘制出目标区域内典型频率点的洪水风险图;
步骤2、测量实际洪水发生时的洪水频率;
步骤3、根据步骤2得到的洪水频率和步骤1生成的典型频率点的洪水风险图利用内插法得到洪水发生时的洪水频率的洪水风险图。
步骤1所述的典型频率点为:10年一遇、20年一遇、50年一遇和100年一遇。
本发明的有益效果:
本发明通过预先绘制典型频率洪水风险图,在实际洪水发生时根据实际洪水发生时的频率,通过内插法得到实际洪水频率的洪水风险图,采用该方法绘制实际洪水频率的洪水风险图快而且所花时间少,准确可靠而且实时性强,具有很好的实用价值,本发明解决了现有技术在洪水发生后得知频率才绘制洪水风险图,存在实时性差而且耗时耗力等问题。
具体实施方式:
一种动态洪水风险图的绘制方法,它包括下述步骤:
步骤1、绘制出目标区域内典型频率点的洪水风险图;
步骤2、测量实际洪水发生时的洪水频率;
步骤3、根据步骤2得到的洪水频率和步骤1生成的典型频率点的洪水风险图利用内插法得到洪水发生时的洪水频率的实际洪水风险图。
采用本发明方法可以随时绘制不同洪水频率的洪水风险图,形成完整的动态洪水风险图,本发明能够快速计算绘制出任意洪水频率的洪水风险图,具有实时性强,可靠性高等优点。在实际抗洪抢险过程中具有重大的意义,有利于抗洪抢险。
步骤1所述的典型频率点为:10年一遇、20年一遇、50年一遇和100年一遇。

Claims (2)

1.一种动态洪水风险图的绘制方法,它包括下述步骤:
步骤1、绘制出目标区域内典型频率点的洪水风险图;
步骤2、测量实际洪水发生时的洪水频率;
步骤3、根据步骤2得到的洪水频率和步骤1生成的典型频率点的洪水风险图利用内插法得到洪水发生时的洪水频率的洪水风险图。
2.根据权利要求1所述的一种动态洪水风险图的绘制方法,其特征在于:步骤1所述的典型频率点为:10年一遇、20年一遇、50年一遇和100年一遇。
CN201410845422.9A 2014-12-31 2014-12-31 一种动态洪水风险图的绘制方法 Pending CN104485054A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410845422.9A CN104485054A (zh) 2014-12-31 2014-12-31 一种动态洪水风险图的绘制方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410845422.9A CN104485054A (zh) 2014-12-31 2014-12-31 一种动态洪水风险图的绘制方法

Publications (1)

Publication Number Publication Date
CN104485054A true CN104485054A (zh) 2015-04-01

Family

ID=52759594

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410845422.9A Pending CN104485054A (zh) 2014-12-31 2014-12-31 一种动态洪水风险图的绘制方法

Country Status (1)

Country Link
CN (1) CN104485054A (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105760476A (zh) * 2016-02-14 2016-07-13 北京艾森思科技有限公司 一种基于b/s结构的洪水风险图出图***及方法
CN106971008A (zh) * 2017-05-10 2017-07-21 中国地质大学(武汉) 一种洪涝风险专题图的自动生成***及其并行处理方法

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003168179A (ja) * 2001-12-03 2003-06-13 Foundation Of River & Basin Integrated Communications Japan リアルタイムハザードマップシステム
WO2006002687A2 (en) * 2004-06-30 2006-01-12 Swiss Reinsurance Company Method and system for automated location-dependent recognition of flood risks
JP2006099662A (ja) * 2004-09-30 2006-04-13 Non-Life Insurance Rating Organization Of Japan 確率的及び工学的な水災評価方法
KR100745646B1 (ko) * 2007-04-04 2007-08-02 인하대학교 산학협력단 지아이에스를 이용한 홍수방재정보 제공시스템 및 그 방법
CN103218522A (zh) * 2013-04-01 2013-07-24 民政部国家减灾中心 一种划分洪灾风险等级的方法及装置
US8542884B1 (en) * 2006-11-17 2013-09-24 Corelogic Solutions, Llc Systems and methods for flood area change detection
CN103366633A (zh) * 2013-04-16 2013-10-23 中国水利水电科学研究院 基于水利地图数据模型的洪水风险图绘制方法及其***
US8649567B1 (en) * 2006-11-17 2014-02-11 Corelogic Solutions, Llc Displaying a flood change map with change designators
CN103927389A (zh) * 2014-04-30 2014-07-16 北京中有联科技有限公司 一种洪涝灾害地理分析评估动态模型的构建方法
CN104156525A (zh) * 2014-08-05 2014-11-19 天津大学 一种提高风暴潮灾害风险预测精度的方法

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003168179A (ja) * 2001-12-03 2003-06-13 Foundation Of River & Basin Integrated Communications Japan リアルタイムハザードマップシステム
WO2006002687A2 (en) * 2004-06-30 2006-01-12 Swiss Reinsurance Company Method and system for automated location-dependent recognition of flood risks
JP2006099662A (ja) * 2004-09-30 2006-04-13 Non-Life Insurance Rating Organization Of Japan 確率的及び工学的な水災評価方法
US8542884B1 (en) * 2006-11-17 2013-09-24 Corelogic Solutions, Llc Systems and methods for flood area change detection
US8649567B1 (en) * 2006-11-17 2014-02-11 Corelogic Solutions, Llc Displaying a flood change map with change designators
KR100745646B1 (ko) * 2007-04-04 2007-08-02 인하대학교 산학협력단 지아이에스를 이용한 홍수방재정보 제공시스템 및 그 방법
CN103218522A (zh) * 2013-04-01 2013-07-24 民政部国家减灾中心 一种划分洪灾风险等级的方法及装置
CN103366633A (zh) * 2013-04-16 2013-10-23 中国水利水电科学研究院 基于水利地图数据模型的洪水风险图绘制方法及其***
CN103927389A (zh) * 2014-04-30 2014-07-16 北京中有联科技有限公司 一种洪涝灾害地理分析评估动态模型的构建方法
CN104156525A (zh) * 2014-08-05 2014-11-19 天津大学 一种提高风暴潮灾害风险预测精度的方法

Non-Patent Citations (11)

* Cited by examiner, † Cited by third party
Title
付成威等: "实时动态耦合模型及其在洪水风险图中的应用", 《水利水运工程学报》 *
向立云等: "洪水风险图编制规划方法探讨", 《中国防汛抗旱》 *
周毅: "浙江省洪水风险图的编制与实践", 《中国水利》 *
张情 等: "基于GIS的中小河流典型洪水淹没图编制研究", 《水利与建筑工程学报》 *
曹东等: "洪水风险图及其作用", 《东北水利水电》 *
曹永强等: "我国洪水风险图绘制方法研究", 《人民黄河》 *
李娜: "GIS技术在洪水风险图编制中的应用", 《中国水利》 *
李红亮等: "洪水风险图管理与应用***的设计与实现", 《测绘科学》 *
胡瑞鹏 等: "GIS在洪水淹没灾害评估中的应用", 《水利水文自动化》 *
许有鹏等: "GIS支持下中小流域洪水风险图***研究", 《地理科学》 *
韩松: "场次洪水灾情评估方法——以黑龙江流域2013年汛期洪涝灾害为例", 《黑龙江水利科技》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105760476A (zh) * 2016-02-14 2016-07-13 北京艾森思科技有限公司 一种基于b/s结构的洪水风险图出图***及方法
CN106971008A (zh) * 2017-05-10 2017-07-21 中国地质大学(武汉) 一种洪涝风险专题图的自动生成***及其并行处理方法
CN106971008B (zh) * 2017-05-10 2023-08-08 中国地质大学(武汉) 一种洪涝风险专题图的自动生成***及其并行处理方法

Similar Documents

Publication Publication Date Title
EP2838051A3 (en) Linear road marking detection method and linear road marking detection apparatus
CN105353620B (zh) 一种基于地表水深信息的地面灌溉控制方法
CN103198494B (zh) 一种基于建筑外轮廓线及激光点云的建筑立面提取方法
Jansen et al. Brief Communication: Newly developing rift in Larsen C Ice Shelf presents significant risk to stability
WO2014141273A3 (en) Slicing and/or texturing for three-dimensional printing
MX2017007781A (es) Sistemas y métodos para representar las características y efectos del viento dentro de una transmisión.
SG11201805938XA (en) Method and apparatus for obtaining abbreviated name of point of interest on map
MX2016014138A (es) Modelo computacional y metodos de impresion tridimensional (3d).
WO2015156873A3 (en) Methods and apparatus for determining angle of arrival (aoa) in a radar warning receiver
GB201116961D0 (en) Fast calibration for lidars
MX2013012660A (es) Metodo para medicion de forma.
MY165050A (en) Fracture determination method, fracture determination apparatus, program, and computer readable recording medium
WO2015173346A3 (de) Verfahren zur kalibrierung eines messgerätes
EP2945126A3 (en) Graphics processing method and graphics processing apparatus
CN104485054A (zh) 一种动态洪水风险图的绘制方法
WO2020052376A3 (en) Game rendering method and apparatus, and non-transitory computer-readable storage medium
EP3133504A3 (en) Method and device for knowledge base construction
EP2863187A3 (en) Flow rate measurement method and apparatus
BR112016018615A2 (pt) método de registro e sistema de registro
MX2017016009A (es) Dispositivo de presentacion de areas de alcance de vehiculo y metodo de presentacion de areas de alcance de vehiculo.
CN203981122U (zh) 一种激光测径仪
SG11201903186VA (en) Three-dimensional object formation instruction apparatus, three-dimensional object production method, and program
CN206357252U (zh) 采用四个声音接收器确定声源方位的机器人
CN104537170A (zh) 用于泵站三维流场计算的网格划分方法及装置
CN204359233U (zh) 一种可更换球形测头的千分尺

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20150401