CN104481031B - Assembly connection structure and method of coupling beams of shear walls of assembly concrete frame shear structure - Google Patents

Assembly connection structure and method of coupling beams of shear walls of assembly concrete frame shear structure Download PDF

Info

Publication number
CN104481031B
CN104481031B CN201410616527.7A CN201410616527A CN104481031B CN 104481031 B CN104481031 B CN 104481031B CN 201410616527 A CN201410616527 A CN 201410616527A CN 104481031 B CN104481031 B CN 104481031B
Authority
CN
China
Prior art keywords
prefabricated
wall
coupling beam
shear
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410616527.7A
Other languages
Chinese (zh)
Other versions
CN104481031A (en
Inventor
李明
赵唯坚
王春艳
颜伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Construction Technology Co., Ltd.
Original Assignee
Shenyang Jianzhu University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Jianzhu University filed Critical Shenyang Jianzhu University
Priority to CN201410616527.7A priority Critical patent/CN104481031B/en
Publication of CN104481031A publication Critical patent/CN104481031A/en
Application granted granted Critical
Publication of CN104481031B publication Critical patent/CN104481031B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Abstract

The invention relates to the field of assembly concrete structures, in particular to an assembly connection structure and method of coupling beams of shear walls of an assembly concrete frame shear structure. Grouting seams and equivalent bars are arranged between prefabricated coupling beams and prefabricated shear walls or between the coupling beams of the shear walls with half-span coupling beams for beam-wall or beam-beam connection. Holes are reserved in the prefabricated coupling beams and the coupling beams of the prefabricated shear walls or the shear walls with half-span coupling beams, spiral stirrups are arranged surrounding the holes in advance, the equivalent bars penetrate through the preserved holes, the reserved horizontal holes and the grouting seams between the beams and walls or between the beams are filled by grouting minimum inflation mortar, therefore the prefabricated coupling beams, the prefabricated shear walls and the equivalent bars, or the coupling beams of the shear walls with half-span coupling beams and the equivalent bars can be firmly integrated, and connection of the prefabricated coupling beams and the coupling beams of the prefabricated shear walls or the shear walls with half-span coupling beams can be achieved. The assembly connection structure and method greatly reduce the project construction cost and reduce site concreting wet construction.

Description

The assembled attachment structure of assembly concrete frame-shear structure Shear-wall Connecting Beam Used and method
[technical field]
The present invention relates to prefabricated concrete structure field, be specially a kind of assembly concrete frame-shear structure shearing The assembled attachment structure of wall coupling beam and assembled method of attachment, particularly by prefabricated coupling beam, dry wall or prefabricated band beam The fractionation assembly system of band coupling beam shear wall in the assembly concrete frame-shear structure that wall is constituted, component connecting structure, The works built by this assembled system and connecting structure, and assembled method of attachment.
[background technology]
Frame shear wall structure, referred to as frame-shear structure, primary structure is framework and shear wall, its middle frame by Beam column is constituted, and shear wall disposal is in part frame, and shear wall is used for increasing integrally-built anti-horizontal loading energy Power.Frame-shear structure is applicable to plane or is vertically arranged skyscraper numerous and diverse, that horizontal loading is big.Assembled coagulation The prior art of soil structure is limited to pure frame structure and shear wall structure more, assembly concrete frame-shear structure Technology is less, only patent " assembly concrete Frame-Shear Wall assembly attachment structure and assembled connection side Method ", the structure being also not directed to wherein Shear-wall Connecting Beam Used splits assembly structure and method of attachment.
Owing to the coupling beam thickness of Shear Wall in Frame-Shear Wall Structures is less, with shear wall with thick, there is no enough faces, cross section Accumulate and put sleeve, simultaneously because frame-shear structure center is set a roof beam in place, frame column and the existence of shear wall, Shear-wall Connecting Beam Used Assembly space extremely limited, be therefore applicable to sleeve connection method that frame beam column and Liang Liang connect, be applicable to The joint bar method of attachment that Vierendeel girder is connected with shear wall, it is adaptable to the sleeve that levels shear wall is connected with shear wall Methods of attachment etc. are not all suitable for this kind and connect.So far, the assembled of coupling beam in Shear Wall in Frame-Shear Wall Structures is connected Access node structure and assembled method of attachment there is no effective solution, the company of concrete Shear Wall in Frame-Shear Wall Structures Beam is mainly built by complete cast-in-place engineering method.Cast-in-place engineering method, concrete wet trade amount is big, and construction quality is difficult to Ensure, long in time limit, it is unfavorable for realizing energy-saving and emission-reduction.
[summary of the invention]
It is an object of the invention to provide the assembled of a kind of assembly concrete frame-shear structure Shear-wall Connecting Beam Used and connect knot Structure and assembled method of attachment, by using the assembled system of the most effective fractionation and means of structural connection, bigger Reduction construction costs in degree, minimizing cast-in-place concrete wet trade, raising construction quality, the reduction of erection time, Realize energy-saving and emission-reduction.
Technical scheme:
The assembled attachment structure of a kind of assembly concrete frame-shear structure Shear-wall Connecting Beam Used, is connected by precast shear wall Beam, precast shear wall or the coupling beam with the shear wall of half bridging beam constitute structure and split assembled system, wherein: Coupling beam in precast shear wall, the most prefabricated coupling beam;Precast shear wall, hereinafter referred to as dry wall;Prefabricated band There are the shear wall of half bridging beam, hereinafter referred to as prefabricated band Liang Qiang;This assembly attachment structure is following two structure shape One of formula:
(1) split at the two ends of coupling beam and shear wall link position, make respectively prefabricated coupling beam and with prefabricated coupling beam The dry wall that beam-ends connects, the dry wall being connected with coupling beam two panels altogether;In prefabricated coupling beam and dry wall component Reserving hole, hole is arranged around tie hoop, arranges equivalence reinforcing bar in hole, by prefabricated coupling beam and pre- Perfusion microdilatancy mortar in wall reserving hole processed and grouting seam, makes prefabricated coupling beam, dry wall and equivalence bar connecting For entirety;
(2) split in the span centre position of coupling beam, after fractionation, form the prefabricated shear wall with half bridging beam of two panels, I.e. prefabricated band Liang Qiang;In prefabricated band beam wall, reserving hole in coupling beam, hole is arranged around tie hoop, hole Equivalence reinforcing bar is inside set, by irrigating microdilatancy mortar in reserving hole in prefabricated band beam wall and grouting seam, makes Prefabricated band Liang Qiang is connected as entirety.
The assembled attachment structure of described assembly concrete frame-shear structure Shear-wall Connecting Beam Used, prefabricated coupling beam, prefabricated Reserving hole in the coupling beam of wall and prefabricated band Liang Qiang, the length of prefabricated coupling beam and a piece of prefabricated band beam wall Hole is big In 2 times of anchorage length of steel bar and add grouting seam length less than anchorage length of steel bar, around hole, be furnished with spiral hoop Muscle, hole is used for placing equivalence reinforcing bar, and tie hoop is for supporting hole and retraining the microdilatancy sand of internal perfusion Slurry.
The assembled attachment structure of described assembly concrete frame-shear structure Shear-wall Connecting Beam Used, equivalent end reinforced weldering When having half nut, half nut to ensure perfusion microdilatancy mortar, the reinforcing bar being connected with half nut is positioned at hole center, Half nut makes equivalence reinforcing bar preferably be anchored in prefabricated components simultaneously.
The assembled attachment structure of described assembly concrete frame-shear structure Shear-wall Connecting Beam Used, end reinforced half spiral shell of equivalence The diameter of cap is less than the diameter of hole, and to ensure that equivalence reinforcing bar moves freely in hole, wherein half nut is Whole nut diametrically cuts, and is symmetrically welded in the end of equivalence reinforcing bar, during perfusion microdilatancy mortar, micro- Expansive mortar flows through half nut, is full of whole holes.
The assembled attachment structure of described assembly concrete frame-shear structure Shear-wall Connecting Beam Used, in described prefabricated coupling beam Laterally fractionation is set at beam-ends and dry wall, and by equivalence reinforcing bar, the two is attached in this place, by Perfusion microdilatancy mortar in grouting seam and prefabricated coupling beam and dry wall reserving hole, makes prefabricated coupling beam and dry wall even Connect as entirety.
The assembled attachment structure of described assembly concrete frame-shear structure Shear-wall Connecting Beam Used, at described prefabricated band beam Laterally fractionation is set at the coupling beam of wall, and by equivalence reinforcing bar, the two is attached in this place, by grouting In the coupling beam hole of seam and prefabricated band Liang Qiang, perfusion microdilatancy mortar, makes two panels prefabricated band Liang Qiang be connected as entirety.
The assembled attachment structure of described assembly concrete frame-shear structure Shear-wall Connecting Beam Used, the Kong Zhi of reserving hole Footpath is more than equivalence bar diameter, to ensure to irrigate enough microdilatancy mortars in hole so that it is the most bonding Equivalence reinforcing bar and aperture wall.
The frame of the assembled attachment structure of the assembly concrete frame-shear structure Shear-wall Connecting Beam Used that use any one is above-mentioned Frame-shear wall structure thing.
The assembled method of attachment of a kind of assembly concrete frame-shear structure Shear-wall Connecting Beam Used, comprises the steps:
The first step, selects the overall diameter pore-forming steel pipe more than equivalence bar diameter, at pore-forming steel pipe walls winding screw Stirrup, is then embedded in prefabricated coupling beam, dry wall or prefabricated band Liang Qiang in advance even by the pore-forming steel pipe being tied with tie hoop The precalculated position of beam;
Second step, pours prefabricated coupling beam, dry wall or prefabricated band Liang Qiang, after concrete just solidifies, extracts Pore-forming steel pipe, forms prefabricated coupling beam, dry wall or the prefabricated band leaving tie hoop around band hole and hole Liang Qiang;
3rd step, prefabricated coupling beam and the splicing of dry wall, put into the hole of prefabricated coupling beam by equivalence reinforcing bar, will be pre- The hole para-position of coupling beam processed and dry wall, leaves grouting seam between prefabricated coupling beam beam-ends and dry wall, after para-position completes, Equivalence reinforcing bar is extracted, and stretches in corresponding dry wall in reserving hole, then layout U around grouting seam Section mould plate, by glass cement around U-shaped template, seals with prefabricated coupling beam and dry wall;
The joining method of prefabricated band beam wall coupling beam and prefabricated band beam wall coupling beam and prefabricated coupling beam and the splicing side of dry wall Method is identical;
4th step, simultaneously from prefabricated coupling beam and dry wall, or in the Grouting Pipe of prefabricated band Liang Qiang both sides, perfusion is micro-swollen Buckle is starched, until microdilatancy mortar is full of reserving hole and the U-shaped template of grouting seam of prefabricated components;
5th step, after microdilatancy mortar solidifies, removes U-shaped template, completes prefabricated coupling beam and dry wall or pre- Band Liang Qiang processed and the splicing of prefabricated band Liang Qiang;
Repeat above-mentioned five steps, complete the assembled connection of assembly concrete Shear Wall in Frame-Shear Wall Structures coupling beam.
The assembled method of attachment of described assembly concrete frame-shear structure Shear-wall Connecting Beam Used, is carrying out prefabricated coupling beam During the splicing of splicing with dry wall or prefabricated band Liang Qiang and prefabricated band Liang Qiang, first will in the three to four described step Equivalence reinforcing bar put into prefabricated coupling beam or prefabricated band Liang Qiang hole, and reserve the termination not less than 2cm at nose end, Then by the hole para-position of prefabricated coupling beam and dry wall, grouting seam between prefabricated coupling beam beam-ends and dry wall, is left, right After position completes, equivalence reinforcing bar is extracted, and stretches in the dry wall of correspondence or the reserving hole of prefabricated band Liang Qiang, Then around arrange U-shaped template at grouting seam, around U-shaped template, pass through glass cement, with prefabricated coupling beam and prefabricated The coupling beam of wall or prefabricated band Liang Qiang seals, and finally irrigates microdilatancy mortar in hole and U-shaped template.
Advantages of the present invention and providing the benefit that:
The present invention is constituted in assembly concrete frame-shear structure by prefabricated coupling beam, dry wall or prefabricated band Liang Qiang, band The fractionation assembly system of coupling beam structure in coupling beam shear wall.In prefabricated coupling beam, dry wall or prefabricated band beam wall with Hole, is disposed with tie hoop around hole.When the coupling beam of assembly concrete Shear Wall in Frame-Shear Wall Structures is longer Time, split at the two ends of coupling beam and shear wall link position, make respectively prefabricated coupling beam and with prefabricated coupling beam beam-ends The dry wall (two panels) connected, component method of attachment is: insert equivalence reinforcing bar in the reserving hole of prefabricated coupling beam, And reserve the termination not less than 2cm at nose end, by the hole para-position of prefabricated coupling beam and dry wall, prefabricated coupling beam beam Leave grouting seam between end and dry wall, equivalence reinforcing bar is extracted, and in the reserving hole of the dry wall stretching into correspondence, Then the U-shaped template of layout around grouting seam, by glass cement around U-shaped template, with prefabricated coupling beam and in advance Wall processed seals, and finally irrigates microdilatancy mortar in hole and U-shaped template, after expansive mortar consolidates, removes U-shaped template, makes prefabricated coupling beam and dry wall be connected as entirety.When assembly concrete Shear Wall in Frame-Shear Wall Structures Coupling beam shorter time, the span centre position of coupling beam split, after fractionation formed two panels prefabricated band Liang Qiang, its connection side Method is ibid.
Fractionation splicing structure and component method of attachment that the present invention proposes have the following characteristics that
It is reasonable that the most each component splits position, it is simple to structure manufacture and transport;2. component is symmetrical or close symmetrical, weight Amount is rationally, it is simple to lifting is installed;3. equivalence reinforcing bar can be in advance as prefabricated coupling beam or the preformed hole of prefabricated band Liang Qiang In hole, decrease assembly space to greatest extent;The most equivalent end reinforced half-nut that is welded with, around reserving hole Being furnished with tie hoop, the two gap and grouting seam use microdilatancy mortar, it is ensured that connection reliable;5. it is in the milk Can operate on floor, easy to operate, joint efficiency is high;6. will coupling beam be concentrated by calculating configuration reinforcement area It is arranged on coupling beam center line for single diameter steel bar, i.e. meets specification detailing requiments, reduce again splice, It is easy to construction;7. prefabricated components arrange tie hoop rather than sleeve around reserving hole, drop to a great extent Low assembly cost;8. the grouting seam between prefabricated components is the least, and situ wet operation is few, and assembly rate is high.
[accompanying drawing explanation]
The first of Figure 1A-Fig. 1 F: assembly concrete Shear Wall in Frame-Shear Wall Structures coupling beam of the present invention splits assembly Connect (splitting assembly to connect at coupling beam two ends) structural map.Wherein, Figure 1A is the facade main view split; Figure 1B is assembled facade main view;Fig. 1 C is dry wall isometric graphics;Fig. 1 D is in Figure 1A I-I Profile;Fig. 1 E is prefabricated coupling beam isometric graphics;Fig. 1 F is II-II profile in Figure 1A.
Fig. 2 A-Fig. 2 F: assembly concrete Shear Wall in Frame-Shear Wall Structures coupling beam the second of the present invention splits assembly even Connect (splitting assembly at coupling beam span centre to connect) structural map.Wherein, Fig. 2 A is the facade main view split;Figure 2B is assembled facade main view;Fig. 2 C is prefabricated band beam wall I isometric graphics;Fig. 2 D is Fig. 2 A In I-I profile;Fig. 2 E is prefabricated band beam wall II isometric graphics;Fig. 2 F is II-II to cut open in Fig. 2 A Face figure.
Equivalent reinforcing bar graphics axonometric chart in Fig. 3 (a)-(b): Figure 1A and Fig. 2 A.Wherein, (a) figure It it is half nut;B () figure is equivalence reinforcing bar and the combination of half nut.
Fig. 4 (a)-(c): the steel pipe being used for pore-forming in construction and the tie hoop 3 dimensional drawing being wound on steel pipe. Wherein, (a) figure is that pore-forming steel pipe combines with tie hoop;B () figure is pore-forming steel pipe;C () figure is spiral hoop Muscle.
Fig. 5: for pouring the U-shaped template 3 dimensional drawing of grouting seam.
In figure:
1. precast shear wall (abbreviation dry wall) in frame-shear structure;2. the company in precast shear wall in frame-shear structure Beam (is called for short prefabricated coupling beam);3. be in the milk seam;Shear wall I (the letter of the band half bridging beam 4. split at coupling beam span centre Claim prefabricated band beam wall I);The shear wall II of the band half bridging beam 5. split at coupling beam span centre (is called for short prefabricated band beam Wall II);The most U-shaped template.
1 tie hoop;2 Grouting Pipe;Reserving hole in 3 dry walls;Reserving hole in 4 prefabricated coupling beams;5 etc. Effect reinforcing bar;6 half nuts;7 microdilatancy mortars;Reserving hole in 8 prefabricated band beam walls I;9 prefabricated band beam walls II Middle reserving hole;10 pore-forming steel pipes.
[detailed description of the invention]
The assembled attachment structure of coupling beam and assembled connection side in assembly concrete Shear Wall in Frame-Shear Wall Structures of the present invention Method, is that (assembly concrete Frame-Shear Wall splits splicing structure and assembled connection side to Chinese invention patent application Method, publication number CN 102900168A) supplement.(it is applicable to even between prefabricated coupling beam and precast shear wall Beam is longer, splits assembled operating mode in beam end) or coupling beam with the shear wall of half bridging beam between (be suitable for Shorter in coupling beam, split assembled operating mode at coupling beam span centre) grouting seam is set, equivalence reinforcing bar carries out Liang Qiang or beam Beam connects.Prefabricated coupling beam, precast shear wall or the coupling beam reserving hole of the shear wall with half bridging beam, hole Around arranging tie hoop in advance, equivalence reinforcing bar, through above-mentioned reserving hole, (is protected by perfusion microdilatancy mortar It is in close contact between card equivalence reinforcing bar and reserving hole) fill up between above-mentioned reserved horizontal hole and Liang Qiang or beam beam Grouting seam, make prefabricated coupling beam, precast shear wall and equivalence reinforcing bar or with half bridging beam Shear-wall Connecting Beam Used and Equivalence reinforcing bar consolidation is integrated, it is achieved prefabricated coupling beam and precast shear wall or the Shear-wall Connecting Beam Used with half bridging beam Connection.Use tie hoop rather than sleeve around reserving hole of the present invention, reduce engineering to a great extent Cost, the present invention reduces cast-in-place concrete wet trade the most to a great extent simultaneously, improves construction quality, Reduction of erection time, it is achieved energy-saving and emission-reduction.
As shown in Figures 1 to 5, assembly concrete frame-shear structure Shear-wall Connecting Beam Used of the present invention splits assembly connection Structure and assembled method of attachment, including two kinds of detailed description of the invention, specific as follows:
(1) when the coupling beam of assembly concrete Shear Wall in Frame-Shear Wall Structures is longer, (link length is more than equivalent steel 2 times of muscle anchorage length) time, split with shear wall link position at the two ends of coupling beam, formed prefabricated by two panels Shear wall (hereinafter referred to as dry wall is 1.) and precast shear wall coupling beam (the most prefabricated coupling beam is a 2.) structure The structure become splits assembled system.In order to realize dry wall 1. with the connection 2. of prefabricated coupling beam, dry wall 1. and Prefabricated coupling beam 2. in be provided with reserving hole, be first placed in prefabricated coupling beam 2. hole equivalence reinforcing bar 5, equivalence reinforcing bar Prefabricated coupling beam 2. (Figure 1A) is exposed in 5 terminations, dry wall 1. with the 2. para-position of prefabricated coupling beam after, by prefabricated coupling beam 2. In equivalent reinforcing bar 5 extract insertion dry wall 1. in, by prefabricated coupling beam 2. with dry wall 1. reserving hole and Grouting seam 3. perfusion microdilatancy mortar 7, make prefabricated coupling beam 2., dry wall 1. and equivalence reinforcing bar 5 be connected as entirety (Figure 1B).
Wherein,
(1) prefabricated coupling beam 2. with dry wall forming hole method 1.: can be selected for overall diameter straight more than equivalence reinforcing bar 5 The pore-forming steel pipe 10 in footpath, at pore-forming steel pipe 10 wall winding screw stirrup 1, then will be tied with the one-tenth of tie hoop 1 Hole steel pipe 10 be embedded in advance prefabricated coupling beam 2. with dry wall precalculated position 1., pour prefabricated coupling beam 2., dry wall 1., after concrete setting, extract pore-forming steel pipe 10, formed and leave tie hoop around band hole and hole The prefabricated coupling beam of 1 2. with dry wall 1. (Fig. 4).
(2) prefabricated coupling beam 2. with dry wall splicing 1., equivalence reinforcing bar 5 is put into prefabricated coupling beam hole 2., And stay the termination not less than 2cm at nose end, by prefabricated coupling beam 2. with dry wall hole para-position 1., prefabricated coupling beam 2. beam-ends and dry wall 1. between leave grouting seam 3., after para-position completes, equivalence reinforcing bar 5 is extracted, and stretch into right Answer dry wall reserving hole 1..Then around grouting seam the U-shaped template of layout 6., U-shaped template is 6. around By glass cement, 2. 1. seal with dry wall with prefabricated coupling beam.Simultaneously from prefabricated coupling beam 2. with dry wall filling 1. Grouting Pipe 2 irrigates microdilatancy mortar 7, until microdilatancy mortar 7 is full of in the hole dry wall of prefabricated components in advance In hole 3, the prefabricated coupling beam of boxing out, reserving hole 4 and grouting seam U-shaped template 3. are 6..Treat that microdilatancy mortar 7 coagulates After Gu, remove U-shaped template 6., complete prefabricated coupling beam 2. with dry wall splicing (Fig. 5) 1..
(2) when the coupling beam of assembly concrete Shear Wall in Frame-Shear Wall Structures is shorter, (link length is less than or equal to 2 times of equivalence anchorage length of steel bar) time, split in the span centre position of coupling beam, form two panels after fractionation and respectively carry one The shear wall (being called for short prefabricated band Liang Qiang) of half coupling beam.In order to realize the connection of prefabricated band Liang Qiang and prefabricated band Liang Qiang, At prefabricated band beam reserving hole within the walls (Fig. 2 A).Time assembled, first put into equivalence reinforcing bar within the walls at prefabricated band beam 5, equivalence reinforcing bar 5 termination is exposed prefabricated band Liang Qiang and is not less than 2cm, after prefabricated band Liang Qiang and prefabricated band beam wall para-position, Equivalence reinforcing bar 5 is extracted insertion another sheet prefabricated band Liang Qiang, by two panels prefabricated band Liang Qiang reserving hole and Grouting seam perfusion microdilatancy mortar 7, makes two panels prefabricated band Liang Qiang and equivalence reinforcing bar 5 be connected as entirety (Fig. 2 B).
Wherein, the joining method of prefabricated band Liang Qiang and prefabricated band Liang Qiang is with prefabricated coupling beam 2. and dry wall splicing 1. Method.
Figure 1A-Fig. 1 F is to split assembled prefabrication system at coupling beam two ends.The concrete frame shear structure of which is cut The structure of power wall specifically include that dry wall 1., prefabricated coupling beam 2., grouting seam 3., tie hoop 1, Grouting Pipe 2, dry wall 1. middle reserving hole 3, prefabricated coupling beam 2. middle reserving hole 4, equivalence reinforcing bar 5, equivalence reinforcing bar end Half nut 6, microdilatancy mortar 7 etc., concrete structure is as follows:
1. 2. prefabricated coupling beam be connected with two panels dry wall at beam two ends, and 3. connecting through is in the milk stitches, equivalence reinforcing bar 5 With microdilatancy mortar 7.At dry wall 1. middle reserving hole 3, at prefabricated coupling beam 2. middle reserving hole 4, dry wall Middle reserving hole 3 and prefabricated coupling beam 2. middle reserving hole 4 inwall is provided with tie hoop 1, and Grouting Pipe 2 is respectively It is connected, in equivalence reinforcing bar 5 termination with dry wall 1. middle reserving hole 3 and prefabricated coupling beam 2. middle reserving hole 4 There is half nut 6 (Fig. 3).
Described dry wall 1. middle reserving hole 3 and prefabricated coupling beam 2. middle reserving hole 4 is connected by equivalence reinforcing bar 5, Dry wall 1. and prefabricated coupling beam 2. between for grouting seam 3., dry wall 1. in reserving hole 3, prefabricated coupling beam 2. in Gap between reserving hole 4 and equivalence reinforcing bar 5 is microdilatancy mortar 7.
It is applicable to the longer operating mode of coupling beam (link length is more than 2 times of equivalence anchorage length of steel bar).Above-mentioned spelling The force-transmission mechanism of assembling structure is: be not less than the equivalent reinforcing bar 5 of coupling beam Reinforcement area with two areas, Replace the Reinforcement of coupling beam, it is achieved coupling beam moment of flexure is to the transmission of shear wall;With the 3. middle microdilatancy of grouting seam Mortar 7 realizes the transmission to shear wall of the coupling beam shearing;It is inoculated with microdilatancy mortar between reserving hole and equivalence reinforcing bar 5 7, it is achieved the transmission of pulling force between equivalence reinforcing bar 5 and reserving hole surrounding concrete.Use the purpose of equivalence reinforcing bar 5 It is for reducing the number of steel bars needing to connect, making splicing simple and feasible in construction.
Fig. 2 A-Fig. 2 F is to split erection method at coupling beam span centre.Band coupling beam in the concrete frame shear structure of which The structure of shear wall specifically include that grouting seam 3., prefabricated band beam wall I 4., prefabricated band beam wall II 5., spiral hoop Muscle 1, Grouting Pipe 2, equivalence reinforcing bar 5, equivalence steel bar end half nut 6, microdilatancy mortar 7, prefabricated band beam Wall I 4. middle reserving hole 8, prefabricated band beam wall II 5. middle reserving hole 9 etc., concrete structure is as follows:
5. 4. prefabricated band beam wall I connect with prefabricated band beam wall II, and 3. connecting through is in the milk stitches, equivalence reinforcing bar 5 and Microdilatancy mortar 7.4. leave reserving hole 8 at prefabricated band beam wall I, 5. leave reserved at prefabricated band beam wall II Hole 9, prefabricated band beam wall I 4. middle reserving hole 8 and prefabricated band beam wall II 5. middle reserving hole 9 inwall is provided with Tie hoop 1, Grouting Pipe 2 respectively with prefabricated band beam wall I 4. in reserving hole 8 and prefabricated band beam wall II 5. in Reserving hole 9 is connected, and there is half nut 6 (Fig. 3) equivalence reinforcing bar 5 termination.
Described prefabricated band beam wall I 4. middle reserving hole 8 and prefabricated band beam wall II 5. middle reserving hole 9 is by equivalence Reinforcing bar 5 connects, prefabricated band beam wall I 4. and prefabricated band beam wall II 5. between for grouting seam 3., prefabricated band Liang Qiang I 4. in reserving hole 8, prefabricated band beam wall II 5. in reserving hole 9 and equivalence reinforcing bar 5 between gap be micro- Expansive mortar 7.
It is applicable to the shorter operating mode of coupling beam (link length is less than or equal to 2 times of equivalence anchorage length of steel bar). The force-transmission mechanism of above-mentioned splicing structure is: be not less than the equivalent steel of coupling beam Reinforcement area with two areas Muscle 5, replaces the Reinforcement of coupling beam, it is achieved the transmission of moment of flexure between assembling part coupling beam;In stitching 3. with grouting Microdilatancy mortar 7 realizes the transmission of shearing between assembling part coupling beam;It is inoculated with micro-swollen between reserving hole and equivalence reinforcing bar 5 Buckle slurry 7, it is achieved the transmission of pulling force between equivalence reinforcing bar 5 and reserving hole surrounding concrete.Use equivalence reinforcing bar 5 Purpose be for reduce need connect reinforcing bar radical, make splicing simple and feasible in construction.
Result shows, the present invention, by the shear wall of band coupling beam in concrete frame shear structure, splits into dry wall, pre- Coupling beam processed or two panels prefabricated band beam wall assembly attachment structure and the assembled method of attachment of proposition: in mechanical property, Can well realize splicing prefabricated components moment of flexure and the transmission of shearing, it is ensured that connection reliable;Construction is easy to Structure manufacture, transport and lift installation, decreasing assembly space demand to greatest extent when assembling and reinforcing bar connects Head quantity, easy to operate, joint efficiency is high;Economically, prefabricated components are arranged spiral around reserving hole Stirrup rather than sleeve, reduce assembly cost to a great extent;Between prefabricated components, grouting seam width is little, on-the-spot Wet trade is few, and assembly rate is high, improves assemblingization degree, it is achieved energy-saving and emission-reduction, raises labour productivity, and improves Construction quality, the reduction of erection time.

Claims (8)

1. an assembled attachment structure for assembly concrete frame-shear structure Shear-wall Connecting Beam Used, is characterized in that: by advance In shear wall processed, coupling beam, precast shear wall or the coupling beam with the shear wall of half bridging beam constitute structure fractionation assembly System, wherein: coupling beam in precast shear wall, the most prefabricated coupling beam;Precast shear wall, the most in advance Wall processed;The prefabricated shear wall with half bridging beam, hereinafter referred to as prefabricated band Liang Qiang;This assembly attachment structure be with One of lower two kinds of versions:
(1) split at the two ends of coupling beam and shear wall link position, make respectively prefabricated coupling beam and with prefabricated coupling beam The dry wall that beam-ends connects, the dry wall being connected with coupling beam two panels altogether;In prefabricated coupling beam and dry wall component Reserving hole, hole is arranged around tie hoop, arranges equivalence reinforcing bar in hole, by prefabricated coupling beam and pre- Perfusion microdilatancy mortar in wall reserving hole processed and grouting seam, makes prefabricated coupling beam, dry wall and equivalence bar connecting For entirety;
(2) split in the span centre position of coupling beam, after fractionation, form the prefabricated shear wall with half bridging beam of two panels, I.e. prefabricated band Liang Qiang;In prefabricated band beam wall, reserving hole in coupling beam, hole is arranged around tie hoop, hole Equivalence reinforcing bar is inside set, by irrigating microdilatancy mortar in reserving hole in prefabricated band beam wall and grouting seam, makes Prefabricated band Liang Qiang is connected as entirety;
End reinforced half nut that is welded with of equivalence, when half nut ensures perfusion microdilatancy mortar, is connected with half nut Reinforcing bar is positioned at hole center, and half nut makes equivalence reinforcing bar preferably be anchored in prefabricated components simultaneously;
The diameter of end reinforced half nut of equivalence is less than the diameter of hole, with ensure equivalence reinforcing bar in hole from By moving, wherein half nut is that whole nut diametrically cuts, and is symmetrically welded in the end of equivalence reinforcing bar, During perfusion microdilatancy mortar, microdilatancy mortar flows through half nut, is full of whole holes.
2. connect knot according to the assembled of the assembly concrete frame-shear structure Shear-wall Connecting Beam Used described in claim 1 Structure, is characterized in that, reserving hole in the coupling beam of prefabricated coupling beam, dry wall and prefabricated band Liang Qiang, prefabricated coupling beam and The length of a piece of prefabricated band beam wall Hole is more than 2 times of anchorage length of steel bar and adds filling less than anchorage length of steel bar Slurry seam length, is furnished with tie hoop around hole, hole is used for placing equivalence reinforcing bar, and tie hoop is used for supporting Hole also retrains the internal microdilatancy mortar irrigated.
3. connect knot according to the assembled of the assembly concrete frame-shear structure Shear-wall Connecting Beam Used described in claim 1 Structure, is characterized in that, arranges laterally fractionation, and pass through in this place at described prefabricated coupling beam beam-ends and dry wall The two is attached by effect reinforcing bar, micro-swollen by irrigating in grouting seam and prefabricated coupling beam and dry wall reserving hole Buckle is starched, and makes prefabricated coupling beam and dry wall be connected as entirety.
4. connect knot according to the assembled of the assembly concrete frame-shear structure Shear-wall Connecting Beam Used described in claim 1 Structure, is characterized in that, arranges laterally fractionation, and pass through equivalent steel in this place at the coupling beam of described prefabricated band Liang Qiang The two is attached by muscle, by irrigating microdilatancy mortar in the coupling beam hole of grouting seam and prefabricated band Liang Qiang, Two panels prefabricated band Liang Qiang is made to be connected as entirety.
5. according to the assembled connection of the assembly concrete frame-shear structure Shear-wall Connecting Beam Used described in claim 1 or 2 Structure, is characterized in that, the bore dia of reserving hole is more than equivalence bar diameter, to ensure perfusion foot in hole Enough microdilatancy mortars so that it is effective bonding equivalence reinforcing bar and aperture wall.
6. use the assembly concrete frame-shear structure Shear-wall Connecting Beam Used in any of the one of claim 1 to 5 The frame shear wall structure thing of assembled attachment structure.
7. an assembled method of attachment for assembly concrete frame-shear structure Shear-wall Connecting Beam Used, is characterized in that, including Following steps:
The first step, selects the overall diameter pore-forming steel pipe more than equivalence bar diameter, at pore-forming steel pipe walls winding screw Stirrup, is then embedded in prefabricated coupling beam, dry wall or prefabricated band Liang Qiang in advance even by the pore-forming steel pipe being tied with tie hoop The precalculated position of beam;
Second step, pours prefabricated coupling beam, dry wall or prefabricated band Liang Qiang, after concrete just solidifies, extracts Pore-forming steel pipe, forms prefabricated coupling beam, dry wall or the prefabricated band leaving tie hoop around band hole and hole Liang Qiang;
3rd step, prefabricated coupling beam and the splicing of dry wall, put into the hole of prefabricated coupling beam by equivalence reinforcing bar, will be pre- The hole para-position of coupling beam processed and dry wall, leaves grouting seam between prefabricated coupling beam beam-ends and dry wall, after para-position completes, Equivalence reinforcing bar is extracted, and stretches in corresponding dry wall in reserving hole, then layout U around grouting seam Section mould plate, by glass cement around U-shaped template, seals with prefabricated coupling beam and dry wall;
The joining method of prefabricated band beam wall coupling beam and prefabricated band beam wall coupling beam and prefabricated coupling beam and the splicing side of dry wall Method is identical;
4th step, simultaneously from prefabricated coupling beam and dry wall, or in the Grouting Pipe of prefabricated band Liang Qiang both sides, perfusion is micro-swollen Buckle is starched, until microdilatancy mortar is full of reserving hole and the U-shaped template of grouting seam of prefabricated components;
5th step, after microdilatancy mortar solidifies, removes U-shaped template, completes prefabricated coupling beam and dry wall or pre- Band Liang Qiang processed and the splicing of prefabricated band Liang Qiang;
Repeat above-mentioned five steps, complete the assembled connection of assembly concrete Shear Wall in Frame-Shear Wall Structures coupling beam.
8. according to the assembled connection side of the assembly concrete frame-shear structure Shear-wall Connecting Beam Used described in claim 7 Method, is characterized in that, is carrying out the splicing of prefabricated coupling beam and dry wall or prefabricated band Liang Qiang and the spelling of prefabricated band Liang Qiang When connecing, the three to four described step first equivalence reinforcing bar is put into prefabricated coupling beam or prefabricated band Liang Qiang hole, And reserve the termination not less than 2cm at nose end, then by the hole para-position of prefabricated coupling beam and dry wall, prefabricated company Leave grouting seam between beam beam-ends and dry wall, after para-position completes, equivalence reinforcing bar is extracted, and stretch into the pre-of correspondence In the reserving hole of wall processed or prefabricated band Liang Qiang, then arrange around grouting seam U-shaped template, U-shaped template week Enclose by glass cement, seal, finally at hole and U with the coupling beam of prefabricated coupling beam and dry wall or prefabricated band Liang Qiang Perfusion microdilatancy mortar in section mould plate.
CN201410616527.7A 2014-11-05 2014-11-05 Assembly connection structure and method of coupling beams of shear walls of assembly concrete frame shear structure Active CN104481031B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410616527.7A CN104481031B (en) 2014-11-05 2014-11-05 Assembly connection structure and method of coupling beams of shear walls of assembly concrete frame shear structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410616527.7A CN104481031B (en) 2014-11-05 2014-11-05 Assembly connection structure and method of coupling beams of shear walls of assembly concrete frame shear structure

Publications (2)

Publication Number Publication Date
CN104481031A CN104481031A (en) 2015-04-01
CN104481031B true CN104481031B (en) 2017-01-11

Family

ID=52755627

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410616527.7A Active CN104481031B (en) 2014-11-05 2014-11-05 Assembly connection structure and method of coupling beams of shear walls of assembly concrete frame shear structure

Country Status (1)

Country Link
CN (1) CN104481031B (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104929320A (en) * 2015-06-23 2015-09-23 上海建工二建集团有限公司 Rebar connecting structure and construction method thereof
CN106555447B (en) * 2016-09-30 2022-02-11 中国建筑股份有限公司 T-shaped flexible joint coupled wall with embedded joint beam sections and construction method thereof
CN107503446A (en) * 2017-09-30 2017-12-22 沈阳建筑大学 A kind of U-shaped steel bar connector connection Shear-wall Connecting Beam Used structure and assembly method
CN107663903B (en) * 2017-11-13 2023-05-23 中国地震局工程力学研究所 Connecting structure of assembled concrete shear wall and connecting beam and prefabricating and assembling method
CN108331209B (en) * 2018-01-24 2020-06-16 江苏南通三建建筑装饰有限公司 Assembled light partition wall
CN108360688A (en) * 2018-02-05 2018-08-03 南通联泷建筑材料有限公司 A kind of structure that wallboard is connect with coupling beam
CN108589963A (en) * 2018-05-09 2018-09-28 安徽富煌钢构股份有限公司 Prefabricated building precast reinforced concrete internal thermal insulation wall and inside and outside wall board connect reinforcing bar
CN109797971B (en) * 2019-03-12 2020-05-19 中国矿业大学 Disassembling and assembling method for cast-in-place reinforced concrete frame structure building component
CN211572006U (en) * 2019-03-21 2020-09-25 巴马丹拿建築及工程师有限公司 Connecting structure between prefabricated reinforced concrete structures and spiral steel bar assembly

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5459967A (en) * 1994-02-10 1995-10-24 Bodtker; Carl E. Adjustable support structure
BE1013347A3 (en) * 2000-03-09 2001-12-04 Prefab Profile Bv Met Beperkte Formwork for the deposit of a concrete beam.
CN2797476Y (en) * 2005-04-22 2006-07-19 北京工业大学 Mixed jointing node of assembled concrete frame structure beam column
CN101608480B (en) * 2008-06-18 2013-12-11 黑龙江宇辉新型建筑材料有限公司 Manufacturing method of precast concrete short-limb shear wall provided with door windows
CN102900168B (en) * 2012-10-08 2014-08-20 沈阳建筑大学 Splitting and assembling structure and assembling connecting method of assembled type concrete frame-shear wall
CN204225283U (en) * 2014-11-05 2015-03-25 沈阳建筑大学 The assembled syndeton of assembly concrete frame structure Shear-wall Connecting Beam Used

Also Published As

Publication number Publication date
CN104481031A (en) 2015-04-01

Similar Documents

Publication Publication Date Title
CN104481031B (en) Assembly connection structure and method of coupling beams of shear walls of assembly concrete frame shear structure
CN105863111B (en) The steel frame construction of embedded precast concrete shear wall bending resistance simultaneously
CN204225283U (en) The assembled syndeton of assembly concrete frame structure Shear-wall Connecting Beam Used
CN104631659B (en) Prefabricated assembled band steel plate concealed bracings overlaid plate type concrete coupled shear wall
CN102561553B (en) Prefabricated concrete-filled steel tube frame-shear wall and construction method thereof
CN106869315B (en) Concrete-filled steel tubular frame and its construction method with presstressed reinforcing steel
CN209227833U (en) The vertical insertion type horizontal connection structure of shear wall
CN103114669A (en) Ribbed steel bar truss concrete superimposed sheet and construction method thereof
CN206428853U (en) Energy-dissipation and shock-absorption oblique prestressed shear wall structure system suitable for prefabricated assembly
CN105113660B (en) A kind of construction method for the constructional column constructed simultaneously with frame structure filling wall
CN207660136U (en) A kind of assembly concrete frame-shear wall keyway connection structure
CN106284655A (en) Precast concrete beam stud connects node and method of attachment in succession
CN107524234A (en) Steel plate concrete Shear-wall Connecting Beam Used splits structure and preparation method
CN203452228U (en) Frame-shear wall architectural structure
CN206174195U (en) Assembled concrete shear force wall split, assemble connection structure
CN107642179A (en) Assembled frame-shear structure steel plate keyway attachment structure and assembling method
CN106760036A (en) A kind of prefabricated steel combined concrete shear wall
CN207660110U (en) A kind of steel plate concrete Shear-wall Connecting Beam Used structure
CN101503887B (en) Interlayer connection node between inner shear wall, plate and shear walls
CN207260378U (en) A kind of assembled frame-shear structure curved scissors type combines keyway connection structure
CN107246109A (en) Framework and its construction method that real compound concrete filled steel tube coupled column combination beam is constituted
CN207176718U (en) A kind of assembled heel join node
CN105649259B (en) A kind of wallboard structural system of the dark framework of band of precast concrete wall panel and its structure
CN107503446A (en) A kind of U-shaped steel bar connector connection Shear-wall Connecting Beam Used structure and assembly method
CN111691601A (en) Overlapped column with corner vertical holes in centralized arrangement and directly connected with stressed longitudinal bars and construction process

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190829

Address after: 322100 Hulian East Street 1189, Changsonggang Functional Zone, Dongyang Economic Development Zone, Jinhua City, Zhejiang Province

Patentee after: Zhejiang Construction Technology Co., Ltd.

Address before: 110168 Liaoning province Shenyang Hunnan Hunnan Road No. 9

Patentee before: Shenyang Building Univ.