CN104480863B - The steel anchor beam installation and locating method of Cable stayed Bridge Main Tower construction - Google Patents
The steel anchor beam installation and locating method of Cable stayed Bridge Main Tower construction Download PDFInfo
- Publication number
- CN104480863B CN104480863B CN201410759994.5A CN201410759994A CN104480863B CN 104480863 B CN104480863 B CN 104480863B CN 201410759994 A CN201410759994 A CN 201410759994A CN 104480863 B CN104480863 B CN 104480863B
- Authority
- CN
- China
- Prior art keywords
- steel anchor
- anchor beam
- chain block
- bracket
- rigidity bracket
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
The present invention relates to a kind of steel anchor beam installation and locating method for Cable stayed Bridge Main Tower construction, the steel anchor beam rack system using detachable recycling installs location steel anchor beam, including rigidity bracket I and chain block II, rigidity bracket I is shelved on the most mounted n# steel anchor beam, in order to jacking n+1# steel anchor beam, treat that n+2# steel anchor beam installs, then at n+2# steel anchor beam, four chain block II are installed, sling n+1# steel anchor beam, remove steel anchor beam rigidity bracket I, then with chain block II, n+1# steel anchor beam is in place.The present invention, by rigidity bracket and the rack system of the detachable recycling of chain block composition, realizes the installation location of steel anchor beam, it is possible to resolve the problem that operation side is not enough, reduction of erection time and cost-effective, and this device is easy and simple to handle, easy to control.
Description
Technical field
Invention relates to a kind of steel anchor beam installation and locating method for Cable stayed Bridge Main Tower construction, is particularly suited for the king-tower steel anchor beam of lifting after king-tower space can not meet steel anchor beam and constructs.
Background technology
On Cable stayed Bridge Main Tower tower, suspension cable anchoring uses steel anchor beam to bear pulling force and concrete bearing compressive force structure, the i.e. structural grouping of " steel anchor beam+concrete bracket " mostly.Construction of Pylon uses segmented construction, and general single segmental comprises two steel anchor beams.When lifting after king-tower space can not meet steel anchor beam, when constructing corresponding sections, before the concrete bracket reinforcing bar of a colligation steel anchor beam topmost, it is necessary to one, bottom steel anchor beam is hung in king-tower.But the concrete bracket that now this steel anchor beam is corresponding does not the most pour concrete, it is necessary to this steel anchor beam has been poured on the steel anchor beam of sections in lower floor by dismountable rigidity bracket support.
Summary of the invention
The present invention is to solve that Cable stayed Bridge Main Tower steel anchor beam installs the technical problem of location, and the steel anchor beam installation and locating method that a kind of Cable stayed Bridge Main Tower constructs is provided.
The technical scheme is that a kind of steel anchor beam installation and locating method for Cable stayed Bridge Main Tower construction, the steel anchor beam rack system using detachable recycling installs location steel anchor beam, including rigidity bracket I and chain block II, rigidity bracket I is shelved on the most mounted n# steel anchor beam, in order to jacking n+1# steel anchor beam, treat that n+2# steel anchor beam installs, then at n+2# steel anchor beam, four chain block II are installed, sling n+1# steel anchor beam, remove steel anchor beam rigidity bracket I, then with chain block II, n+1# steel anchor beam is in place.
Rigidity bracket I includes longitudinal and transverse beam, longitudinal and transverse link rod, diagonal brace, angle brace, backing plate, backing plate upper end fixes longeron, fixed cross beam on longeron, middle part is fixing connects longitudinal and transverse link rod, it is connected to diagonal brace, angle brace between longitudinal and transverse beam, is connected by connecting plate between crossbeam, connecting plate is fixed by pull bar, and backing plate is fixed by limiting plate.
The useful achievement of the present invention is: a whole set of rack system consisted of rigidity bracket and chain block, it is achieved the installation location of steel anchor beam, it is possible to resolve the problem that operation side is not enough, the effective shortening Construction of Pylon duration on the premise of meeting safety and prescription.This device is easy and simple to handle, easy to control.
Accompanying drawing explanation
Fig. 1 is the installation working condition chart of the present invention;
Fig. 2 is the front view of rigidity bracket;
Fig. 3 is one of profile of rigidity bracket;
Fig. 4 is the two of the profile of rigidity bracket.
Detailed description of the invention
Below in conjunction with instantiation, the embodiment of of the present invention patent is expanded on further.
Such as Fig. 1, shown in 2,3,4, the steel anchor beam installation and locating method for Cable stayed Bridge Main Tower construction of the present invention, the steel anchor beam rack system of detachable recycling is used location steel anchor beam to be installed, including rigidity bracket I11, chain block II10.
Rigidity bracket I11 is shelved on the most mounted n# steel anchor beam 12, in order to jacking n+1# steel anchor beam 13, treat that n+2# steel anchor beam 14 installs, then at n+2# steel anchor beam 14, four chain block II10 are installed, sling n+1# steel anchor beam 13, remove steel anchor beam rigidity bracket I11, then with chain block II10, n+1# steel anchor beam 13 is in place.
Rigidity bracket II10 includes longitudinal and transverse beam 1,2, longitudinal and transverse link rod 3, diagonal brace 4, angle brace 5, backing plate 6, longeron 1 is fixed in backing plate 6 upper end, fixed cross beam 2 on longeron, and middle part is fixing connects longitudinal and transverse link rod 3, longitudinal and transverse beam 1, it is connected to diagonal brace 4, angle brace 5 between 2, is connected by connecting plate 7 between longitudinal and transverse link rod 3, connecting plate is fixed by pull bar 9, and backing plate 7 is fixed by limiting plate 8.
The concrete operation method of the present invention:
1) treat that previous sections concreting is complete, after putting in place by specification maintenance, the n# steel anchor beam 12 installed is placed rigidity bracket I11, n+1# steel anchor beam 13 is installed, is shelved on rigidity bracket I11.
2) when n+1# steel anchor beam 13 is installed, absolute altitude exceeds design and installation position about 15cm.
3) assembling reinforcement is continued to completing second anchoring bracket.
4), after this section concreting completes, after reaching the intensity of design code, n+2# steel anchor beam 14 is installed.
5) chain block II10 is installed on n+2# steel anchor beam 14, utilizes chain block II10 to be lifted by crane by n+1# steel anchor beam 13, hang rigidity bracket I11 certain distance.
6) screw rod of rigidity of dismantling bracket I11, disintegrates rigidity bracket I11 and hangs out king-tower.
7) chain block II10 is utilized to transfer to n+1# steel anchor beam 13, on the steel anchor beam bracket of correspondence, complete the construction of a sections.
Claims (1)
1. the steel anchor beam installation and locating method of a Cable stayed Bridge Main Tower construction, the steel anchor beam rack system using detachable recycling installs location steel anchor beam, including rigidity bracket I (11) and chain block II (10), it is characterized in that: described rigidity bracket I (11) includes indulging, crossbeam (1, 2), vertical, horizontal-associate bar (3), diagonal brace (4), angle brace (5), backing plate (6), longeron (1) is fixed in described backing plate (6) upper end, fixed cross beam (2) on longeron, middle part fixing connection indulges, horizontal-associate bar (3), vertical, crossbeam (1, 2) diagonal brace (4) it is connected between, angle brace (5), vertical, connected by connecting plate (7) between horizontal-associate bar (3), connecting plate (7) is fixed by pull bar (9), backing plate (6) is fixed by limiting plate (8);Rigidity bracket I (11) is shelved on the most mounted n# steel anchor beam (12), in order to jacking n+1# steel anchor beam (13), treat that n+2# steel anchor beam (14) installs, then at n+2# steel anchor beam (14), four chain block II (10) are installed, sling n+1# steel anchor beam (13), remove steel anchor beam rigidity bracket I (11), then with chain block II (10), n+1# steel anchor beam (13) is in place.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410759994.5A CN104480863B (en) | 2014-12-12 | 2014-12-12 | The steel anchor beam installation and locating method of Cable stayed Bridge Main Tower construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410759994.5A CN104480863B (en) | 2014-12-12 | 2014-12-12 | The steel anchor beam installation and locating method of Cable stayed Bridge Main Tower construction |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104480863A CN104480863A (en) | 2015-04-01 |
CN104480863B true CN104480863B (en) | 2016-08-24 |
Family
ID=52755461
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410759994.5A Active CN104480863B (en) | 2014-12-12 | 2014-12-12 | The steel anchor beam installation and locating method of Cable stayed Bridge Main Tower construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104480863B (en) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105970819A (en) * | 2016-05-31 | 2016-09-28 | 中铁大桥局集团第五工程有限公司 | Installation construction method for steel anchor beams |
CN106284092B (en) * | 2016-08-31 | 2018-05-15 | 中铁四局集团第二工程有限公司 | Steel anchor beam suspender and its application method |
CN108103949A (en) * | 2017-12-29 | 2018-06-01 | 南通华凯重工有限公司 | A kind of Cable stayed Bridge Main Tower composite steel anchor beam integral assembling process |
CN108316150B (en) * | 2018-01-25 | 2024-03-15 | 北京城建道桥建设集团有限公司 | Construction system and construction method for main tower and steel anchor beam of cable-stayed bridge |
CN108374350B (en) * | 2018-05-14 | 2024-05-31 | 中交二公局第二工程有限公司 | Assembly jig frame of steel anchor beam and steel corbel unit and installation method |
CN111005302B (en) * | 2019-12-30 | 2021-07-30 | 中交路桥华南工程有限公司 | Steel anchor beam mounting method |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0820910A (en) * | 1994-07-05 | 1996-01-23 | Kajima Corp | Construction method of pc cable stayed bridge |
CN101122114A (en) * | 2007-09-14 | 2008-02-13 | 中铁大桥局集团第五工程有限公司 | Back-cable-free cable-stayed bridge steel tower vertical turn construction method |
CN103243654B (en) * | 2013-05-16 | 2015-01-21 | 中交路桥华南工程有限公司 | Mounting method for steel anchor beam of cable-stayed bridge and assembly jig and cable bent tower mounting platform used in method |
CN203440753U (en) * | 2013-07-08 | 2014-02-19 | 中交第二公路工程局有限公司 | Multifunctional steel bar locating framework |
-
2014
- 2014-12-12 CN CN201410759994.5A patent/CN104480863B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN104480863A (en) | 2015-04-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104480863B (en) | The steel anchor beam installation and locating method of Cable stayed Bridge Main Tower construction | |
CN102071798B (en) | Hydraulic climbing system for wall-attached support frame | |
CN103556627B (en) | A kind of hanging cage structure for large diameter bored pile reinforcing bar cage hoisting | |
KR100820299B1 (en) | Temporary structure and precast concrete beam of pylon setting method using the bracket | |
CN102251483B (en) | Construction method for hoisting concrete-filled steel tube lattice bridge pier through self-lifting attached crane | |
CN206859068U (en) | A kind of Cable-stayed Bridge Pylon sill segmental timbering structure | |
CN102777030A (en) | Method for building up formwork construction platform of lift shaft | |
CN203855895U (en) | Mobile jib operation platform for constructing and overhauling bridges | |
CN108331336A (en) | The integrated lifting steel plateform system and its construction method of floor synchronous construction | |
CN103912137A (en) | Lifting device for lifting construction for buildings | |
CN204781927U (en) | Elevartor shaft formwork and elevartor shaft concrete placement operation platform | |
CN202830785U (en) | High pier bridge cantilever casting concrete 0 # block pier top bracket | |
CN104727545A (en) | Hydraulic sliding-mode vertical transportation system and method for large water tower barrel | |
CN107165056B (en) | Anti-overturning steel bar bracket for cantilever bent cap concrete pouring and mounting method thereof | |
CN102277836B (en) | Construction method of tilting concrete tower base | |
CN102733608A (en) | Construction method for spray head layer of granulation tower | |
CN203129025U (en) | Suspension fixing device for hanging basket | |
CN102155091B (en) | Creeping formwork platform | |
CN102372228B (en) | Translational installation method for large-span crane beam | |
CN201785702U (en) | Lifting device for steel frame of continuous box girder | |
RU2469948C2 (en) | Method for complete unloading of reinforced concrete cantilever of column against action of crane beams | |
CN103835238A (en) | High-pier cable-stayed bridge zero-number block non-bracket construction method and structure in construction process | |
CN105421246A (en) | Installation method of towing cable hanging baskets | |
CN202023149U (en) | Hanging basket used in construction | |
CN204662933U (en) | A kind of hoistway operation frame lift-type steel platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |