CN104472309A - Manufacturing and embedding method of high-density hedge frame row end steel pipe support - Google Patents

Manufacturing and embedding method of high-density hedge frame row end steel pipe support Download PDF

Info

Publication number
CN104472309A
CN104472309A CN201410688706.1A CN201410688706A CN104472309A CN 104472309 A CN104472309 A CN 104472309A CN 201410688706 A CN201410688706 A CN 201410688706A CN 104472309 A CN104472309 A CN 104472309A
Authority
CN
China
Prior art keywords
steel pipe
sleeve
hedge frame
column
density
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410688706.1A
Other languages
Chinese (zh)
Inventor
张建光
许建锋
张玉星
李英丽
王五成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Heibei Agricultural University
Original Assignee
Heibei Agricultural University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Heibei Agricultural University filed Critical Heibei Agricultural University
Priority to CN201410688706.1A priority Critical patent/CN104472309A/en
Publication of CN104472309A publication Critical patent/CN104472309A/en
Pending legal-status Critical Current

Links

Classifications

    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G17/00Cultivation of hops, vines, fruit trees, or like trees
    • A01G17/04Supports for hops, vines, or trees
    • A01G17/14Props; Stays

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Botany (AREA)
  • Environmental Sciences (AREA)
  • Supports For Plants (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

A method for making and burying the steel tube pillar at the row end of the hedge frame of high-density pear garden includes such steps as welding steel bar cross arm and sleeve to the vertical column, fixing the base by sand-stone concrete, inserting top column in the sleeve, and burying the steel tube pillar in the hedge frame. The row end upright post manufactured by the method is firm, attractive, practical and easy to erect, and can be applied to a high-density cultivation pear garden.

Description

The making of the capable end tubular steel post of a kind of highly dense theatre hedge frame and method for embedding
Technical field
The present invention relates to making and the method for embedding of the capable end tubular steel post of a kind of highly dense theatre hedge frame.
Background technology
In the past on China's pears are produced, because seeding row spacing of planting is comparatively large, after being shaped, pear tree tree crown was large, and result is more late, generally all adopts and cultivates without support.Although there is employing pergola system coastal area, main purpose is in order to typhoon protection.
In recent years, some areas of China start to carry out the highly dense cultivation of pears, due to pear tree result early, output is high, when building garden, just must set up hedge frame, to support treelet, ensures the dry vertical growth in center and large result in earlier stage.
We are setting up in highly dense cultivation Demonstration Garden process, in order to spanning tree body and erection bird prevention net function are combined, have employed coating steel pipe as hedge post setting.In the hedge wall bracket of highly dense theatre, row end pillar plays most important supporting role, must be firmly solid, and stretching resistance is strong, adapts to theatre mechanical work.The making of the capable end tubular steel post of hedge frame that the present invention creates and method for embedding, both artistic and practical, be convenient to erection, suitable highly dense cultivation theatre adopts.
Summary of the invention
The present invention establishes making and the method for embedding of the capable end tubular steel post of a kind of highly dense theatre hedge frame.
The technical solution adopted for the present invention to solve the technical problems is: the coating steel pipe selecting appropriate gauge, at the steel pipe base portion appropriate location welded reinforcement cross-arm as row end column, at appropriate location, middle part welded sleeve, the rubber stopper jam-pack of steel pipe top suitable size.Then, column is embedded in Shu Hang one end, theatre, bottom sand-stone concrete is fixed.Pillar is inserted in sleeve pipe, firmly pushes up firm column.On column, draw plastic silk on request again, finally pear tree is fixed on hedge ledge face.
Particular content of the present invention, namely the making of highly dense theatre hedge frame capable end tubular steel post and method for embedding as follows:
(1) 1 inch (DN25) and 6 points of (DN20) coating steel pipes are selected in the selection of steel pipe.1 inch of steel pipe length is 400cm, and 6 points of steel pipe length are 310cm;
(2) reinforcing bar cross-arm is produced on 12cm place, 1 inch of steel pipe lower end welding ф 6 reinforcing bar, and length is 12cm;
(3) make sleeve and get 1 inch of steel pipe that length is 8.5cm, at one end 2cm place oblique offside top cutting, be then welded on steel pipe 210cm height, sleeve and column angle remain on 36 °;
(4) pipe top closing: the rubber stopper shutoff of steel pipe top diameter at butt end 2.5cm, top diameter 2cm, height 2.5cm, pre-rainwater-proof enters;
(5) column is embedded in and determines that the long and wide heatable adobe sleeping platform being 40cm, dark 50cm is dug in the place of pile anchoring.Then, the steel pipe post made is put into hole central, below 40cm sand-stone concrete tamp, earth's surface place 10cm bankets;
(6) fore-set is set up: 6 points of steel pipes as fore-set are inserted in the sleeve on column, and the fore-set other end digs the dark heatable adobe sleeping platform of 20cm, and firm with brick top.
The beneficial effect of patent of the present invention is: the row end pillar and the method for embedding that adopt this structure, and pillar is firmly stable, and easily, pull resistance is strong, both artistic and practical in erection, can meet the needs of highly dense theatre spanning tree body vertical growth in early stage and erection bird prevention net.
Accompanying drawing explanation
Fig. 1 is that hedge frame capable end tubular steel post in theatre makes and method for embedding figure.
Column base portion 50cm imbeds underground, and acrial part is 350cm.Under ground portion column, at base portion 12cm place welded reinforcement cross-arm, is fixed with sand-stone concrete.160cm place soldering sleeve on the ground, inserts fore-set.Fore-set is arranged in tree row, builds road, so that mechanical work outside column.Column top rubber stopper jam-pack, enters (design parameter is separately shown in Figure of description) with rainwater-proof.
Embodiment
2014, in pears Engineering Technical Research Centre Labor-saving high-efficiency theatre, Hebei province is built, buy 1 inch (DN25) and 6 points of coating steel pipes (DN20) from market.1 inch of steel pipe is as row end column, and 6 points of steel pipes are as fore-set.Column lower weld reinforcing bar cross-arm, then fixes with sand-stone concrete.Column steel pipe top rubber stopper jam-pack, pre-water-inlet-proof.In addition, utilize the feature that 6 points of outer diameter of steel pipes are identical with 1 inch of pipe diameter, with 1 inch of internal diameter steel pipe manufacturing sleeve pipe, be welded on predetermined altitude on column, then 6 points of steel pipe fore-sets are inserted in sleeve.This making and bury the method for row end column underground, firmly solid, pull resistance is strong, elegant in appearance, and easily, suitable highly dense cultivation theatre adopts in erection.

Claims (1)

1. the making of the capable end steel pipe post of highly dense theatre hedge frame and a method for embedding, is characterized in that comprising following step:
(1) make sleeve and get 1 inch of steel pipe (DN25) that length is 8.5cm, at one end 2cm place oblique offside top cutting, then cut surface is welded on steel pipe 210cm height, sleeve and column angle remain on 36 °;
(2) pipe top closing: the rubber stopper shutoff of steel pipe top diameter at butt end 2.5cm, top diameter 2cm, height 2.5cm;
(3) set up fore-set: the 6 points of steel pipes (DN20) being 310cm length are inserted in the sleeve that column welds, and the other end digs the dark heatable adobe sleeping platform of 20cm, and with brick top jail pillar.
CN201410688706.1A 2014-11-26 2014-11-26 Manufacturing and embedding method of high-density hedge frame row end steel pipe support Pending CN104472309A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410688706.1A CN104472309A (en) 2014-11-26 2014-11-26 Manufacturing and embedding method of high-density hedge frame row end steel pipe support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410688706.1A CN104472309A (en) 2014-11-26 2014-11-26 Manufacturing and embedding method of high-density hedge frame row end steel pipe support

Publications (1)

Publication Number Publication Date
CN104472309A true CN104472309A (en) 2015-04-01

Family

ID=52747036

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410688706.1A Pending CN104472309A (en) 2014-11-26 2014-11-26 Manufacturing and embedding method of high-density hedge frame row end steel pipe support

Country Status (1)

Country Link
CN (1) CN104472309A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2775493A1 (en) * 1998-03-02 1999-09-03 Francis Girou Supporting post especially for grape vine training wires
CN202503980U (en) * 2012-02-28 2012-10-31 天津市林业果树研究所 Y-shaped support special for viticulture
CN203015543U (en) * 2012-12-31 2013-06-26 厦门农丰园大棚开发有限公司 Arc-shaped bracket connecting device of agricultural greenhouse
CN203723183U (en) * 2014-03-14 2014-07-23 嘉兴职业技术学院 Tree transplanting fixing bracket for use in green construction

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2775493A1 (en) * 1998-03-02 1999-09-03 Francis Girou Supporting post especially for grape vine training wires
CN202503980U (en) * 2012-02-28 2012-10-31 天津市林业果树研究所 Y-shaped support special for viticulture
CN203015543U (en) * 2012-12-31 2013-06-26 厦门农丰园大棚开发有限公司 Arc-shaped bracket connecting device of agricultural greenhouse
CN203723183U (en) * 2014-03-14 2014-07-23 嘉兴职业技术学院 Tree transplanting fixing bracket for use in green construction

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
严大义等编著: "《晚红(红地球)葡萄栽培》", 31 October 1999 *
王忠跃主编: "《提高葡萄商品性栽培技术问答》", 28 February 2010 *

Similar Documents

Publication Publication Date Title
CN203768919U (en) Porous planting and green restoring system for high and steep slope
CN204466402U (en) A kind of novel dragon fruit cultivation support
CN204466322U (en) Steep high rock slope hang type greening structure
CN104472309A (en) Manufacturing and embedding method of high-density hedge frame row end steel pipe support
JP2004298145A (en) Plant support pipe
CN203801415U (en) Specific suspension type lycium drop irrigation apparatus
WO2016041152A1 (en) Modular tree foundation construction assisting device
CN204608803U (en) A kind of bolt support high gradient slope is with planting raw groove structure
JP2006180796A (en) Wooden underground mine-timbering for transplanted wood and timbering method
CN104221826A (en) Irrigating device for underground roots of single plantlet in drought region
CN107896814B (en) Method for supporting big tree by cultivating new tree root wrapping steel pipe on big tree trunk
CN210959714U (en) Gardens are vwatched branch and are prevent wind and consolidate support
CN209964808U (en) Reliable type fastening strutting arrangement
CN107509596A (en) A kind of tree-like frame of pear tree " Y " word and its construction method
KR101015636B1 (en) Laying type device for supporting tree
CN102047804B (en) Long-lasting columnar and wall-shaped planting quick method for woody plants
CN203846516U (en) Building structure for green plants planting on rock mountain
CN210445041U (en) Vegetable greenhouse plants frame and uses stability supporting mechanism
CN204132086U (en) A kind of dismountable viticulture frame type
CN205830553U (en) A kind of application frame
CN209983220U (en) Tree cultivation frame for landscaping engineering
CN104322350B (en) A kind of mechanically-basedization prunes the Fructus Vitis viniferae hedge frame of posture
CN103650840A (en) Technology for planting green Chinese onions supported by air bags
CN201758611U (en) Plant rod device for road slope vegetation
CN214430455U (en) Pole setting formula climbing plant growth device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20150401