CN104459515A - Mainboard production testing method - Google Patents
Mainboard production testing method Download PDFInfo
- Publication number
- CN104459515A CN104459515A CN201410647700.XA CN201410647700A CN104459515A CN 104459515 A CN104459515 A CN 104459515A CN 201410647700 A CN201410647700 A CN 201410647700A CN 104459515 A CN104459515 A CN 104459515A
- Authority
- CN
- China
- Prior art keywords
- mobile storage
- tested
- equipment
- test
- mainboard production
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Test And Diagnosis Of Digital Computers (AREA)
Abstract
The invention relates to a mainboard production testing method. The method comprises the steps that a mobile storage is connected with equipment to be tested; the equipment to be tested is power on, and a testing system in the mobile storage is started to test the equipment to be tested; external mobile storage equipment is utilized for storing the testing system, the mobile storage equipment is connected with the equipment to be tested, and the testing system is started to carry out relevant testing on the equipment. The mainboard production testing method is easy to use and saves time.
Description
Technical field
The present invention relates to electronic applications, particularly relate to a kind of mainboard production test method.
Background technology
For equipment mainboard, production test mainly comprises: the peripherals tests such as port signal function, WIFI/Bluetooth/Keypad, in the middle of traditional manual test, first need system to start shooting completely, then go separately to go to test to each function individual event.And conventional automated test, then need the first pre-a set of automatic test software of burning, after having tested, upgrading returns back out goods software again, relates to and repeatedly starts shooting and upgrade, consuming time more.
In this manual test scheme, on the one hand: need after android system is opened completely, could start to carry out proper testing, and Android start-up time nearly 20s consuming time, sheerly wait for consuming time; On the other hand, owing to being test under Android environment, the CPU for entry level performance will produce that more operation bidirectional is consuming time, system exception process probability, cause the whole test duration to extend.And after testing, still need by the system upgrade of shipment in equipment, step is comparatively loaded down with trivial details, in time, is consumed too much.
Therefore in prior art for the test aspect still Shortcomings that dispatches from the factory of equipment, need inventor badly and this made improvements.
Summary of the invention
In view of above-mentioned the deficiencies in the prior art part, the object of the present invention is to provide a kind of mainboard production test method, shorten device fabrication time hardware testing time.
In order to achieve the above object, this invention takes following technical scheme:
A kind of mainboard production test method, is arranged on detection system in mobile storage, comprises step:
Mobile storage and equipment connection to be tested;
Device power to be tested, starts the test macro in mobile storage, treats testing apparatus and test.
In described mainboard production test method, before mobile storage and equipment connection to be tested, the boot of equipment to be tested is set as preferentially starting from external disk.
In described mainboard production test method, described test macro, after test terminates, will detect data and store.
In described mainboard production test method, described detection data are PC readable documents.
Described mainboard production test method, described test comprises: port signal functional test, WIFI/Bluetooth/Keypad apparatus function test.
In described mainboard production test method, described mobile storage comprises USB flash disk and SD card.
In described mainboard production test method, between described mobile storage with equipment to be tested, connected mode comprises that USB is connected, draw-in groove connects.
Compared to prior art, a kind of mainboard production test method provided by the invention, utilizes external mobile storage equipment memory test system, by movable storage device and equipment connection to be tested, device start test macro carries out dependence test to equipment, uses simple, saves time.
Accompanying drawing explanation
The process flow diagram of the mainboard production test method that Fig. 1 provides for the application.
Embodiment
The invention provides a kind of mainboard production test method, for making object of the present invention, technical scheme and effect clearly, clearly, developing simultaneously referring to accompanying drawing, the present invention is described in more detail for embodiment.Should be appreciated that specific embodiment described herein only in order to explain the present invention, be not intended to limit the present invention.
Refer to Fig. 1, the process flow diagram of its mainboard production test method provided for the application, detection system be arranged in mobile storage, as shown in Figure 1, described method comprises:
Mobile storage and equipment connection to be tested;
Device power to be tested, starts the test macro in mobile storage, treats testing apparatus and test.
Concrete, described equipment to be tested comprises computer, intelligent television, PSP(PlayStation Portable) etc., equipment described in the present embodiment is intelligent television, before intelligent television assembling is dispatched from the factory and is sold client, prior art is in intelligent television, first load one based on the test macro of Android system, carrying out corresponding module testing, after test passes, saying that described test macro upgrades to host computer system, testing apparatus will be treated like this and carry out twice system loading, complex steps.
In the method for testing that the application provides, test macro is loaded in mobile storage, in described equipment to be tested, whether there is the operation that host computer system all can not affect described test macro.
Further, the equipment of considering needs whether there is system in priority scan mobile storage, and before mobile storage and equipment connection to be tested, the boot of equipment to be tested is set as preferentially starting from external disk.
Further, consider the protectiveness detecting data, described test macro, after test terminates, will detect data and store.
Further, for the detection data of equipment need one online under can check intuitively, and need not open the test macro in mobile storage, described detection data are PC readable documents.
Further, in described mainboard production test method, wherein said test comprises: port signal functional test, WIFI/Bluetooth/Keypad apparatus function test.Certainly, this method also carries out dependence test to other mainboard subsets, is the function that test macro has.
Further, the carriage requirement of described test macro is not high, and general movable storage device all can meet, and described mobile storage comprises USB flash disk and SD card.
Further, the convenience be connected between described mobile storage with equipment to be tested, connected mode comprises USB connection, draw-in groove connects.
The mainboard production test method that this province please provide, compared with prior art, it has following technique effect:
The different client of same scheme all uses same version testing software, no longer by the impact that the volume production version of client postpones.Production line test operation steps and gimmick complete unity, facilitate personnel to be familiar with, improved efficiency simultaneously;
Adopt external minimum system, need not start whole too fat to move android system, veneer start process just can save about the 17s time;
Because the basis of test is being based upon on scaled-down version linux system, operations time delay is little, and stable.Estimate that single-board testing process can save about the 30s time;
Any amendment of this test macro does not affect main system and runs, and can import production at any time, without the need to putting client on record after having problem real time modifying.
Be understandable that, for those of ordinary skills, can be equal to according to technical scheme of the present invention and inventive concept thereof and replace or change, and all these change or replace the protection domain that all should belong to the claim appended by the present invention.
Claims (6)
1. a mainboard production test method, is characterized in that, detection system is loaded in mobile storage, comprises step:
Mobile storage and equipment connection to be tested;
Device power to be tested, starts the test macro in mobile storage, treats testing apparatus and test.
2. mainboard production test method according to claim 1, is characterized in that, before mobile storage and equipment connection to be tested, the boot of equipment to be tested is set as preferentially starting from external disk.
3. mainboard production test method according to claim 1, is characterized in that, described test macro, after test terminates, will detect data and store.
4. mainboard production test method according to claim 3, is characterized in that, described detection data are PC readable documents.
5. mainboard production test method according to claim 1, is characterized in that, described mobile storage comprises USB flash disk and SD card.
6. mainboard production test method according to claim 5, is characterized in that, between described mobile storage with equipment to be tested, connected mode comprises that USB is connected, draw-in groove connects.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410647700.XA CN104459515A (en) | 2014-11-14 | 2014-11-14 | Mainboard production testing method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410647700.XA CN104459515A (en) | 2014-11-14 | 2014-11-14 | Mainboard production testing method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104459515A true CN104459515A (en) | 2015-03-25 |
Family
ID=52905874
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410647700.XA Pending CN104459515A (en) | 2014-11-14 | 2014-11-14 | Mainboard production testing method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104459515A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106649006A (en) * | 2016-09-30 | 2017-05-10 | 广州视源电子科技股份有限公司 | Method and system for automatic test of board start |
CN108718408A (en) * | 2018-05-21 | 2018-10-30 | 深圳市金锐显数码科技有限公司 | A kind of detection method and system for audio/video decoding board |
CN111722880A (en) * | 2020-05-11 | 2020-09-29 | 深圳市共进电子股份有限公司 | Equipment production method, device, terminal equipment and medium |
CN115372803A (en) * | 2022-10-25 | 2022-11-22 | 深圳华北工控股份有限公司 | Mainboard test system, method, device and storage medium |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20060085158A1 (en) * | 2004-09-27 | 2006-04-20 | Sony Corporation | Mobile apparatus for testing personal computers |
CN102665092A (en) * | 2012-03-06 | 2012-09-12 | 四川金网通电子科技有限公司 | Test method for hardware of set top box |
CN103399809A (en) * | 2013-07-23 | 2013-11-20 | 珠海全志科技股份有限公司 | Board test method and device |
-
2014
- 2014-11-14 CN CN201410647700.XA patent/CN104459515A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20060085158A1 (en) * | 2004-09-27 | 2006-04-20 | Sony Corporation | Mobile apparatus for testing personal computers |
CN102665092A (en) * | 2012-03-06 | 2012-09-12 | 四川金网通电子科技有限公司 | Test method for hardware of set top box |
CN103399809A (en) * | 2013-07-23 | 2013-11-20 | 珠海全志科技股份有限公司 | Board test method and device |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106649006A (en) * | 2016-09-30 | 2017-05-10 | 广州视源电子科技股份有限公司 | Method and system for automatic test of board start |
CN108718408A (en) * | 2018-05-21 | 2018-10-30 | 深圳市金锐显数码科技有限公司 | A kind of detection method and system for audio/video decoding board |
CN111722880A (en) * | 2020-05-11 | 2020-09-29 | 深圳市共进电子股份有限公司 | Equipment production method, device, terminal equipment and medium |
CN111722880B (en) * | 2020-05-11 | 2024-02-09 | 深圳市共进电子股份有限公司 | Equipment production method and device, terminal equipment and medium |
CN115372803A (en) * | 2022-10-25 | 2022-11-22 | 深圳华北工控股份有限公司 | Mainboard test system, method, device and storage medium |
CN115372803B (en) * | 2022-10-25 | 2023-09-15 | 深圳华北工控股份有限公司 | Motherboard test system, method, device and storage medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7743292B2 (en) | Apparatus and method for memory card testing | |
CN102662701A (en) | Online CPLD (Complex Programmable Logic Devices) upgrading method, device and business veneer | |
CN110750396B (en) | Server operating system compatibility testing method and device and storage medium | |
US20110179260A1 (en) | Method for integrating operating system into bios chip and method for booting operating system from server | |
CN103593281B (en) | Test macro and method of testing | |
CN102708050A (en) | Method and system for testing mobile application | |
CN103150188B (en) | The compatible video card fast initializing method of the x86 of non-x 86 instruction set computer | |
CN104459515A (en) | Mainboard production testing method | |
CN103064812B (en) | Method and device for quickly connecting mobile equipment and computer | |
CN103677885A (en) | ARM FLASH simple program programming method | |
CN101930372A (en) | System and method for updating programs | |
CN111143150A (en) | Method and system for testing PCBA (printed circuit board assembly), testing equipment and micro-control unit | |
CN103677915A (en) | Automatic burning method of flash mirror image based on TF starting card | |
CN105718346A (en) | Computer mainboard PCIe slot function test method based on UEFI | |
US8078859B2 (en) | Method of configuring computers with expansion cards | |
CN103777978A (en) | Automatic user-mode 3G-USB network interface card detecting method based on Linux kernel | |
CN104572143A (en) | Startup detection system and method for computer | |
CN102043634B (en) | Embedded system and embedded software upgrading method | |
CN102880479B (en) | A kind of method of remotely modifying BIOS property parameters and device | |
CN104866397A (en) | Computer System And Control Method | |
CN105573877A (en) | Information processing method and electronic equipment | |
CN105630523A (en) | Computer BIOS data recovery system and method | |
WO2012027886A1 (en) | Platform specific application test | |
CN102014214A (en) | Hand-held terminal powered-on/powered-off method and identification method of memory card of hand-held terminal | |
US9619355B2 (en) | Booting verification method of computer and electronic device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150325 |