CN104420584A - 变电站屋顶浇筑混凝土的方法 - Google Patents

变电站屋顶浇筑混凝土的方法 Download PDF

Info

Publication number
CN104420584A
CN104420584A CN201310392084.3A CN201310392084A CN104420584A CN 104420584 A CN104420584 A CN 104420584A CN 201310392084 A CN201310392084 A CN 201310392084A CN 104420584 A CN104420584 A CN 104420584A
Authority
CN
China
Prior art keywords
concreting
build
time
foam
base layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310392084.3A
Other languages
English (en)
Inventor
李鹏
窦长亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Tianjin Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Tianjin Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Tianjin Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201310392084.3A priority Critical patent/CN104420584A/zh
Publication of CN104420584A publication Critical patent/CN104420584A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

本发明公开了一种变电站屋顶浇筑混凝土的方法,包括下述步骤:1)配制泡沫浆体;2)拌制水泥浆,按选用的泡沫混凝土型号,先投入水泥、粉煤灰和水搅拌;3)基层处理,清扫基层钢筋混凝土板面,然后对该基层钢筋混凝土板面基层应浇水润湿;4)浇筑泡沫混凝土,浇筑时分多次浇筑,一次浇筑厚度小于150mm,砼浇筑后,初凝前按标高用长刮杆刮平;5)浇筑后处理,浇筑后观察浆体下沉速度及高度,并及时采取促凝措施,如果出现塌陷情况,应及时补充浇筑。本发明既能满足当前缩短工期的要求,又能具备良好的保温性及防水性,从而满足电力设备安全运行的要求。

Description

变电站屋顶浇筑混凝土的方法
技术领域
本发明涉及一种施工方法,特别是一种变电站屋顶浇筑混凝土的方法。
背景技术
随着社会的飞速发展,电力设施的完善是保证社会建设顺利进行的基本条件,因此电力行业的基建工程经常出现抢工期的现象,经常会因为抢工期造成屋顶的保温层和防水层出现失误,甚至会导致变电站会渗水、漏水,对电力设备的安全运行造成了极大的隐患。
由于变电站具有行业的特殊性,尤其超高压变电站工程涉及的专业较多,如消防专业、变电专业、通风专业等均需要在主建筑物的屋顶装设较多的设备,造成屋顶的孔洞较多,因此经常会导致变电站屋顶的保温性能及防水性能受损。
目前,电力行业很多专业仍旧使用十分传统的施工方法,相对需求的资金较多。
发明内容
本发明所要解决的技术问题是提供一种工期短,成本低的变电站屋顶浇筑混凝土的方法。
为了解决上述技术问题,本发明采用的技术方案是:
一种变电站屋顶浇筑混凝土的方法,包括下述步骤:
1)配制泡沫浆体;
2)拌制水泥浆,按选用的泡沫混凝土型号,先投入水泥、粉煤灰和水搅拌;
3)基层处理,清扫基层钢筋混凝土板面,然后对该基层钢筋混凝土板面基层应浇水润湿;
4)浇筑泡沫混凝土,浇筑时分多次浇筑,一次浇筑厚度小于150mm,砼浇筑后,初凝前按标高用长刮杆刮平;
5)浇筑后处理,浇筑后观察浆体下沉速度及高度,并及时采取促凝措施,如果出现塌陷情况,应及时补充浇筑。
本发明的有益效果是:
1、在工期短、任务重的前提下,按期保证工程完工。
2、节约了资金。
3、变电站屋顶的保温性能及防水性能得到很大改善,确保了电力设备的安全运行。
附图说明
图1为本发明提供的变电站屋顶浇筑混凝土的方法的流程图。
具体实施方式
下面结合附图和具体实施方式对本发明作进一步详细说明:
从图1所示的本发明实施方式可知:
变电站屋顶浇筑混凝土的方法,包括下述步骤:
1)配制泡沫浆体;
2)拌制水泥浆,按选用的泡沫混凝土型号,先投入水泥、粉煤灰和水搅拌;
3)基层处理,清扫基层钢筋混凝土板面,然后对该基层钢筋混凝土板面基层应浇水润湿;
4)浇筑泡沫混凝土,浇筑时分多次浇筑,一次浇筑厚度小于150mm,砼浇筑后,初凝前按标高用长刮杆刮平;
5)浇筑后处理,浇筑后观察浆体下沉速度及高度,并及时采取促凝措施,如果出现塌陷情况,应及时补充浇筑。
施工的环境温度宜在5℃~40℃之间。
浇筑前经常注意天气变化,如有大雨缓时开盘并及时通知各相关单位。如正在施工中天气突然变化,原则是小雨不停,大雨采取防护措施。其措施是:已浇筑完毕的混凝土面用塑料薄膜覆盖,正在浇筑的部位采用搭设防水棚。
浇筑时要有专门的铺灰人员指挥浇筑,切忌“天女散花”,分配好清理人员和抹面人员。
记好混凝土浇筑记录。每次开盘前必须做好开盘鉴定,经相关人员确认后方开盘,并且随机抽查混凝土配合比情况。
浇筑混凝土应连续进行。如必须间歇,其间歇时间不应超过初凝时间。
综上所述,本发明的内容并不局限在上述实施例中,本领域的技术人员可以根据本发明的指导思想轻易提出其它实施方式,这些实施方式都包括在本发明的范围之内。

Claims (1)

1.一种变电站屋顶浇筑混凝土的方法,其特征在于,该法包括下述步骤:
1)配制泡沫浆体;
2)拌制水泥浆,按选用的泡沫混凝土型号,先投入水泥、粉煤灰和水搅拌;
3)基层处理,清扫基层钢筋混凝土板面,然后对该基层钢筋混凝土板面基层应浇水润湿;
4)浇筑泡沫混凝土,浇筑时分多次浇筑,一次浇筑厚度小于150mm,砼浇筑后,初凝前按标高用长刮杆刮平;
5)浇筑后处理,浇筑后观察浆体下沉速度及高度,并及时采取促凝措施,如果出现塌陷情况,应及时补充浇筑。
CN201310392084.3A 2013-09-02 2013-09-02 变电站屋顶浇筑混凝土的方法 Pending CN104420584A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310392084.3A CN104420584A (zh) 2013-09-02 2013-09-02 变电站屋顶浇筑混凝土的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310392084.3A CN104420584A (zh) 2013-09-02 2013-09-02 变电站屋顶浇筑混凝土的方法

Publications (1)

Publication Number Publication Date
CN104420584A true CN104420584A (zh) 2015-03-18

Family

ID=52970639

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310392084.3A Pending CN104420584A (zh) 2013-09-02 2013-09-02 变电站屋顶浇筑混凝土的方法

Country Status (1)

Country Link
CN (1) CN104420584A (zh)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10131310A (ja) * 1996-10-30 1998-05-19 Dyflex Corp 防水工法
CN1525028A (zh) * 2003-09-17 2004-09-01 李军掴 一种钢筋混凝土屋顶浇筑技术及专用真空管
CN201144486Y (zh) * 2007-12-28 2008-11-05 常州易能科技有限公司 轻质防水保温隔热屋面
CN102116078A (zh) * 2011-01-26 2011-07-06 沈阳金铠建筑节能科技有限公司 一种保温防水一体化建筑屋面及其施工方法
CN102701648A (zh) * 2012-05-14 2012-10-03 山西省第二建筑工程公司 掺轻质材料的泡沫混凝土及其制作方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10131310A (ja) * 1996-10-30 1998-05-19 Dyflex Corp 防水工法
CN1525028A (zh) * 2003-09-17 2004-09-01 李军掴 一种钢筋混凝土屋顶浇筑技术及专用真空管
CN201144486Y (zh) * 2007-12-28 2008-11-05 常州易能科技有限公司 轻质防水保温隔热屋面
CN102116078A (zh) * 2011-01-26 2011-07-06 沈阳金铠建筑节能科技有限公司 一种保温防水一体化建筑屋面及其施工方法
CN102701648A (zh) * 2012-05-14 2012-10-03 山西省第二建筑工程公司 掺轻质材料的泡沫混凝土及其制作方法

Similar Documents

Publication Publication Date Title
CN103693900B (zh) 建筑用轻质材料及其制备方法
CN106381921A (zh) 360度地下防水结构体系及其施工方法
CN103174224B (zh) 一种外墙外保温***
CN103790290A (zh) 屋面泡沫混凝土找坡层施工工法
CN108612233B (zh) 一种现浇饰面清水混凝土墙体施工方法
CN105201101A (zh) 轻集料混凝土小型空心砌块建筑体砌筑施工方法
CN103615076A (zh) 一种大坡度斜屋面混凝土施工方法
CN109811969A (zh) 一种建筑体坡顶结构防水保温屋面面层防裂施工工艺
CN104420584A (zh) 变电站屋顶浇筑混凝土的方法
CN204578041U (zh) 一种盖板可侧翻式隧道电缆沟
CN106318048B (zh) 一种免砸砖隐形修复液
CN105133855A (zh) 一种即有屋面的节能环保式防水保温施工方法
CN204266404U (zh) 一种外墙抗裂防渗漏结构
CN203603495U (zh) 轻骨料专用预湿***
Xiaojun et al. Analysis of application of external wall thermal insulating technology in affordable housing in tonglu county
CN103296591A (zh) 一种组合箱式变电站基础
Hu et al. Construction method of foam glass thermal insulation material in sloping roof
CN203213325U (zh) 一种外墙外保温***
Li et al. Crack control technology for concrete of super-large section precast immersed tube
CN205713187U (zh) 一种水平洞口防护构造
CN106154446A (zh) 一种光缆防冻桶结构
CN105421805B (zh) 变电站变压器油池扩建方法
CN104312700A (zh) 一种用于轨道螺栓的长效防锈油脂及其制备方法
CN104725772B (zh) 保温隔热用脲醛泡沫塑料的制备方法
CN202689037U (zh) 一种底板层结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20150318

WD01 Invention patent application deemed withdrawn after publication