CN104376766B CN201410667481.1A CN201410667481A CN104376766B CN 104376766 B CN104376766 B CN 104376766B CN 201410667481 A CN201410667481 A CN 201410667481A CN 104376766 B CN104376766 B CN 104376766B
Authority
CN
China
Prior art keywords
bus duct
training device
actual training
mounting technique
practical training
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410667481.1A
Other languages
Chinese (zh)
Other versions
CN104376766A (en
Inventor
杨斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sina aituo equipment (Jiangsu) Co., Ltd
Original Assignee
Zhejiang College of Construction
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang College of Construction filed Critical Zhejiang College of Construction
Priority to CN201410667481.1A priority Critical patent/CN104376766B/en
Publication of CN104376766A publication Critical patent/CN104376766A/en
Application granted granted Critical
Publication of CN104376766B publication Critical patent/CN104376766B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09BEDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
    • G09B23/00Models for scientific, medical, or mathematical purposes, e.g. full-sized devices for demonstration purposes
    • G09B23/06Models for scientific, medical, or mathematical purposes, e.g. full-sized devices for demonstration purposes for physics
    • G09B23/18Models for scientific, medical, or mathematical purposes, e.g. full-sized devices for demonstration purposes for physics for electricity or magnetism

Landscapes

  • Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Mathematical Physics (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Algebra (AREA)
  • Pure & Applied Mathematics (AREA)
  • Educational Administration (AREA)
  • Computational Mathematics (AREA)
  • Business, Economics & Management (AREA)
  • Educational Technology (AREA)
  • Theoretical Computer Science (AREA)
  • Installation Of Bus-Bars (AREA)

Abstract

The invention relates to a bus duct installation technology practical training device which comprises an all-open type bus duct formed by connecting a terminal end socket, a straight line section, a tee joint, a horizontal bend, a perpendicular bend and a starting end connector. The bus duct is connected with a power distribution cabinet through the starting end connector. A jack box is connected to the bus duct for electricity obtaining. The bus duct installation technology practical training device has the advantages that the engineering practice is reflected, and engineering practice is facilitated. By means of the bus duct installation technology practical training device, multiple practical training items comprising the bus duct connection and installation technology, the technology of connection and installation between the bus duct and the power distribution cabinet, the technology of connection between the bus duct and a bridge support, and the vertical shaft connection technology can be carried out, and the defect of bus duct installation technology practical training in architecture electric professional group teaching is overcome.

Description

A kind of bus duct mounting technique actual training device
Technical field
The present invention relates to a kind of Practical teaching device, especially a kind of bus duct mounting technique actual training device.
Background technology
With emerging in large numbers of modernization project facility and equipment, the fast increasing of power consumption of all trades and professions, especially numerous high level Building and large-sized workshop workshop appearance, as transmission pressure traditional cable in high current induction system can not meet will Ask, the used in parallel of multiway cable brings inconvenience to in-site installation construction connection.Plug type bus duct is as a kind of new Type distribution wire arises at the historic moment, and bus duct, compared with traditional cable, fully demonstrates its superiority when high current conveys, Simultaneously because employing new technology, new technology, the bus duct both ends junction substantially reducing and the contact of branching port splicing position Resistance and temperature rise, and employ high-quality insulating materials in bus duct, thus improve the security reliability of bus duct, make Whole system is more perfect.It is a basis and important content in architectural electricity specialty group that bus duct is installed, and to bus duct Mounting technique real training never has good actual training device, and more being mainly goes to learn to job site, and scene is many Mounting technique is all concealed work, is hardly visible, and has danger.
Content of the invention
The invention solves the problems that the shortcoming of above-mentioned prior art, a kind of reflection engineering practice is provided, promotes practical teaching Bus duct mounting technique actual training device.
The present invention solves the technical scheme of its technical problem employing: this bus duct mounting technique actual training device, including complete Open by terminal end socket, straightway, threeway, horizontal curved, bus duct that vertically curved, top joint is formed by connecting, described mother Wire casing is connected with power distribution cabinet by top joint, bus duct is connected with jack box for power taking.
Preferably, described bus duct passes through the fireproof blocking setting of wall, bus duct passes through the spring support of floor.
Preferably, bus duct is provided with fixed support along wall cabling.
Preferably, the air switch of described power distribution cabinet is connected with top joint by cable, junction is located at top In case.
Preferably, described jack box, by power taking at the spliced eye on bus duct, is provided with air switch in jack box.
Preferably, each section of bus duct metal shell adopts copper litz wire to connect and protective grounding.
Preferably, the connection of each section of bus duct: show the Joining Technology between each section of bus duct Three-phase five-wire copper bar.
Invention has the advantages that: the present invention is a set of bus duct mounting technique actual training device reflecting engineering reality, Promote practical teaching.By this set actual training device, can carry out bus duct connect mounting process is connected with power distribution cabinet install and Multiple practical training projects such as crane span structure Joining Technology, vertical shaft mounting process, have filled up architectural electricity specialty group teaching median generatrix groove and have installed The deficiency of technology real training.
Brief description
Fig. 1 is the structural representation of the present invention;
Description of reference numerals: terminal end socket 1, threeway 2, horizontal curved 3, vertically curved 4, top joint 5, top case 6, power distribution cabinet 7, jack box 8, spring support 9, fireproof blocking setting 10, fixed support 11, straightway 12.
Specific embodiment
The invention will be further described below in conjunction with the accompanying drawings:
Embodiment:
Actual training device design can show the actual technology of engineering site and component, rationally takies training field again Institute, so this device adopts capacity less 200a air-type bus duct mounting process training skill device, takes up an area 2 squares of left sides Right.
As described in Figure 1, bus duct system and each connecting link major design: bus duct mounting technique actual training device, including Full open model by terminal end socket 1, straightway 12, threeway 2, horizontal curved 3, vertically curved 4, the bus that is formed by connecting of top joint 5 Groove, described bus duct one end is top joint 5, and top joint 5 is connected with power distribution cabinet 7.Jack box 8 is connected with bus duct.Institute Stating bus duct passes through fireproof blocking to arrange 10, spring support 9 installation settings through floor of bus duct.Bus duct is along wall cabling It is provided with fixed support 11.
This actual training device comprises to show the actual bus duct system of engineering and each connecting link and following mounting process:
Bus duct is connected with power distribution cabinet 7: the air switch including power distribution cabinet 7 passes through cable and bus duct top joint 5 Joining Technology, junction is located in top case 6, and top case 6 can open convenient its attachment structure of observation.
The mounting process of bus duct vertical shaft: spring support 9 mounting process of bus duct through-flooring, spring support 9 plays slow Punching acts on, and prevents to settle and leads to the bus duct between each floor to rupture;Bus duct passes through the fireproof blocking of wall to set Put 10 installation plugging technology, buffer action is played in fireproof blocking setting 10, prevent that floor is on fire to be spread along bus duct.
Busway inserting case 8 power taking technique: described jack box 8 at the spliced eye on bus duct jack box 8 be responsible for from Take in bus duct a little, in jack box 8, be provided with air switch, jack box 8 one is inserted in bus duct simultaneously, a connection is electricity Cable.
Bus duct is grounded: the Joining Technology of the copper litz wire of each section of bus duct shell.
The connection of each link of bus duct: show the Joining Technology between each link bus duct Three-phase five-wire copper bar.
In addition to the implementation, the present invention can also have other embodiment.All employing equivalents or equivalent transformation shape The technical scheme becoming, all falls within the protection domain of application claims.

Claims (6)

1. a kind of bus duct mounting technique actual training device, is characterized in that: include full open model by terminal end socket (1), straightway (12), threeway (2), horizontal curved (3), bus duct that vertically curved (4), top joint (5) is formed by connecting, described bus duct passes through to begin End connector (5) is connected with power distribution cabinet (7), bus duct is connected with jack box (8) for power taking.
2. bus duct mounting technique actual training device according to claim 1, is characterized in that: described bus duct passes through wall Fireproof blocking arranges (10), and bus duct passes through the spring support (9) of floor.
3. bus duct mounting technique actual training device according to claim 1 and 2, is characterized in that: bus duct sets along wall cabling There is fixed support (11).
4. bus duct mounting technique actual training device according to claim 1 and 2, is characterized in that: the sky of described power distribution cabinet (7) Air cock is connected with top joint (5) by cable, and junction is located in top case (6).
5. bus duct mounting technique actual training device according to claim 1 and 2, is characterized in that: described jack box (8) is passed through Power taking at spliced eye on bus duct, jack box is provided with air switch in (8).
6. bus duct mounting technique actual training device according to claim 1 and 2, is characterized in that: outside each section of bus duct metal Shell adopts copper litz wire to connect and protective grounding.
CN201410667481.1A 2014-11-20 2014-11-20 Bus duct installation technology practical training device Active CN104376766B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410667481.1A CN104376766B (en) 2014-11-20 2014-11-20 Bus duct installation technology practical training device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410667481.1A CN104376766B (en) 2014-11-20 2014-11-20 Bus duct installation technology practical training device

Publications (2)

Publication Number Publication Date
CN104376766A CN104376766A (en) 2015-02-25
CN104376766B true CN104376766B (en) 2017-01-25

Family

ID=52555649

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410667481.1A Active CN104376766B (en) 2014-11-20 2014-11-20 Bus duct installation technology practical training device

Country Status (1)

Country Link
CN (1) CN104376766B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110544407B (en) * 2019-09-16 2021-04-16 驻马店职业技术学院 Training device for vocational skill training

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2248410Y (en) * 1994-09-21 1997-02-26 钱霆 Fireproof busbar casing
CN101354852A (en) * 2008-09-05 2009-01-28 吴方国 Emulation experiment platform of buildings integrative wire laying system and emulation method thereof
CN201311737Y (en) * 2008-11-13 2009-09-16 浙江天煌科技实业有限公司 Intelligent district practical training module
CN103680239A (en) * 2013-12-04 2014-03-26 国家电网公司 Three-dimensional simulation system of 500kV transformer substation
CN204215634U (en) * 2014-11-20 2015-03-18 浙江建设职业技术学院 Bus duct field engineering actual training device

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2879964B2 (en) * 1990-10-29 1999-04-05 積水ハウス株式会社 Kitchen design assistant

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2248410Y (en) * 1994-09-21 1997-02-26 钱霆 Fireproof busbar casing
CN101354852A (en) * 2008-09-05 2009-01-28 吴方国 Emulation experiment platform of buildings integrative wire laying system and emulation method thereof
CN201311737Y (en) * 2008-11-13 2009-09-16 浙江天煌科技实业有限公司 Intelligent district practical training module
CN103680239A (en) * 2013-12-04 2014-03-26 国家电网公司 Three-dimensional simulation system of 500kV transformer substation
CN204215634U (en) * 2014-11-20 2015-03-18 浙江建设职业技术学院 Bus duct field engineering actual training device

Also Published As

Publication number Publication date
CN104376766A (en) 2015-02-25

Similar Documents

Publication Publication Date Title
US9716357B2 (en) Electric power connecting
CN104242191A (en) Benzene hydrogenation engineering instrument pipeline laying method
CN104376766B (en) Bus duct installation technology practical training device
CN203352080U (en) Cable splitter
CN202333180U (en) Operating rod for grounding wire
CN204215634U (en) Bus duct field engineering actual training device
CN202084665U (en) Portable universal short circuit grounding wire
CN204205494U (en) A kind of high pressure closes common box bus
CN108923298A (en) A kind of fast-wiring case and its application method for power supply vehicle of meet an emergency
CN102409790A (en) Seamless suspended ceiling device and installation method thereof
CN204167694U (en) Switch cubicle secondary line routing device
CN203707717U (en) Electric wire protecting pipe
CN204030505U (en) Bus duct
CN109921339A (en) A kind of flexible metal pipeline wiring construction
CN202997463U (en) Intensive bus ducts
CN103647164A (en) Multifunctional ground rod wire end wire clamp
CN205335810U (en) Cable distribution box
CN203932355U (en) Multifunctional grounded excellent line scan pickup coil side wire clamp
CN201112570Y (en) Fast safe joint for electric wire
CN106207530A (en) The complete thread guide devices in a kind of 10KV transformer platform area
CN202254415U (en) Indoor electric connection structure of solar water heater
CN205404641U (en) Connector of threephase kilowatthour meter
CN104701789A (en) Steering connection box
CN104078875A (en) Bus duct installing method
CN205791327U (en) Electrical cable mounting structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20191212

Address after: 225600 Baqiao Industrial Park, XIAJIA Town, Gaoyou City, Yangzhou City, Jiangsu Province

Patentee after: Sina aituo equipment (Jiangsu) Co., Ltd

Address before: 311231 Xiaoshan higher education zone, Hangzhou, Zhejiang

Patentee before: Zhejiang College of Construction