CN104372791A CN201410533075.6A CN201410533075A CN104372791A CN 104372791 A CN104372791 A CN 104372791A CN 201410533075 A CN201410533075 A CN 201410533075A CN 104372791 A CN104372791 A CN 104372791A
Authority
CN
China
Prior art keywords
cast
anchor plate
pile
pouch
situ bored
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410533075.6A
Other languages
English (en)
Other versions
CN104372791B (zh
Inventor
文国栋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang wilderness Construction Co., Ltd.
Original Assignee
Chengdu Juzhi Industrial Design Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Juzhi Industrial Design Co Ltd filed Critical Chengdu Juzhi Industrial Design Co Ltd
Priority to CN201410533075.6A priority Critical patent/CN104372791B/zh
Publication of CN104372791A publication Critical patent/CN104372791A/zh
Application granted granted Critical
Publication of CN104372791B publication Critical patent/CN104372791B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/58Prestressed concrete piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0046Production methods using prestressing techniques
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder
    • E02D2300/002Concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

本发明公开了一种灌注桩结构,包括锚固板,锚固板两侧设有环形板,环形板采用两块板体拼接而成,环形板与锚固板之间通过销轴连接,环形板上设有钻孔灌注桩,钻孔灌注桩为两个,且钻孔灌注桩竖向设置在锚固板上,钻孔灌注桩顶端延伸在锚固板上表面外侧,其底部穿过一预应力锚索延伸在预应力锚索下表面外侧,两钻孔灌注桩之间设有主筋,主筋两端固定在钻孔灌注桩上,还包括囊袋,囊袋顶部位于锚固板下表面,其底部位于环形板内底面上,囊袋及主筋连接处设有加强板。本灌注桩结构单桩承载能力强,抗拔强度高,可使灌注桩在埋设时尽量保持在桩孔中心处,不会导致移杆数据过大,施工简单,打桩方便,坚固耐用,能有效达到加固效果。

Description

灌注桩结构
技术领域
本发明涉及一种建筑设施,特别涉及一种灌注桩结构。
背景技术
我国地域辽阔,地质条件复杂多样,众多地区分布着岩溶地区。在岩溶地区进行桩基施工非常困难,事故多,进度慢,成本高,特别是在遇到溶洞的地层,易出现漏浆、断桩、溶洞垮塌等问题。近年来,随着机械钻孔灌注桩与自反力平衡荷载箱的广泛应用,大量的机械钻孔灌注桩施工完时,底部都会出现由工程机械钻头造成的锥度,然而,荷载箱与钢筋灌注桩在放置过程中,最下端钢筋灌注桩***锥度孔中,造成整根桩体的钢筋与荷载箱倾斜,从而有可能引起不必要的事故发生,且影响施工进度。
发明内容
本发明要解决的技术问题是:克服上述问题,提供一种单桩承载能力强,抗拔强度高,可使灌注桩在埋设时尽量保持在桩孔中心处,不会导致移杆数据过大的灌注桩结构。
为了实现上述目的,本发明采用的技术方案是这样的:本发明的灌注桩结构,包括锚固板,锚固板两侧设有环形板,环形板采用两块板体拼接而成,环形板与锚固板之间通过销轴连接,环形板上设有钻孔灌注桩,钻孔灌注桩为两个,且钻孔灌注桩竖向设置在锚固板上,钻孔灌注桩顶端延伸在锚固板上表面外侧,其底部穿过一预应力锚索延伸在预应力锚索下表面外侧,两钻孔灌注桩之间设有主筋,主筋两端固定在钻孔灌注桩上,还包括囊袋,囊袋顶部位于锚固板下表面,其底部位于环形板内底面上,囊袋及主筋连接处设有加强板,加强板呈三角形结构,加强板固定在囊袋及主筋之间。
进一步的,作为一种具体的结构形式,本发明所述预应力锚索上开有与钻孔灌注桩匹配的通孔。
进一步的,作为一种具体的结构形式,本发明所述预应力锚索采用韧性钢材料制成。
进一步的,作为一种具体的结构形式,本发明所述囊袋横截面积呈圆形结构。
进一步的,作为一种具体的结构形式,本发明所述主筋与加强板之间连接有导向筋。
进一步的,作为一种具体的结构形式,本发明所述囊袋上开有充气口。
与现有技术相比,本发明的优点在于:本灌注桩结构单桩承载能力强,抗拔强度高,可使灌注桩在埋设时尽量保持在桩孔中心处,不会导致移杆数据过大,施工简单,打桩方便,坚固耐用,能有效达到加固效果。
附图说明
下面结合附图和实施例对本发明进一步说明。
图1为本发明的结构示意图;
图中:1.锚固板;2.钻孔灌注桩;3.囊袋;4.环形板;5.主筋;6.加强板;7.预应力锚索。
具体实施方式
现在结合附图对本发明作进一步详细的说明。这些附图均为简化的示意图,仅以示意方式说明本发明的基本结构,因此其仅显示与本发明有关的构成。
如图1所示的本发明灌注桩结构的优选实施例,包括锚固板1,锚固板1两侧设有环形板4,环形板4采用两块板体拼接而成,环形板4与锚固板1之间通过销轴连接,环形板4上设有钻孔灌注桩2,钻孔灌注桩2为两个,且钻孔灌注桩2竖向设置在锚固板1上,钻孔灌注桩2顶端延伸在锚固板1上表面外侧,其底部穿过一预应力锚索7延伸在预应力锚索7下表面外侧,两钻孔灌注桩2之间设有主筋5,主筋5两端固定在钻孔灌注桩2上,还包括囊袋3,囊袋3顶部位于锚固板1下表面,其底部位于环形板4内底面上,囊袋3及主筋5连接处设有加强板6,加强板6呈三角形结构,加强板6固定在囊袋3及主筋5之间,所述预应力锚索7上开有与钻孔灌注桩2匹配的通孔,所述预应力锚索7采用韧性钢材料制成,所述囊袋3横截面积呈圆形结构,所述主筋5与加强板6之间连接有导向筋,所述囊袋3上开有充气口。
本发明的灌注桩结构单桩承载能力强,抗拔强度高,可使灌注桩在埋设时尽量保持在桩孔中心处,不会导致移杆数据过大,施工简单,打桩方便,坚固耐用,能有效达到加固效果。所述预应力锚索7上开有与钻孔灌注桩2匹配的通孔,便于预应力锚索7与钻孔灌注桩2之间的连接;所述预应力锚索7采用韧性钢材料制成,具有良好的柔韧性能;所述囊袋3横截面积呈圆形结构,设计合理;所述主筋5与加强板6之间连接有导向筋,可起到导向作用;所述囊袋3上开有充气口,便于对囊袋3进行充气。
以上述依据本发明的理想实施例为启示,通过上述的说明内容,相关工作人员完全可以在不偏离本项发明技术思想的范围内,进行多样的变更以及修改。本项发明的技术性范围并不局限于说明书上的内容,必须要根据权利要求范围来确定其技术性范围。

Claims (6)

1.一种灌注桩结构,包括锚固板,其特征在于:锚固板两侧设有环形板,环形板采用两块板体拼接而成,环形板与锚固板之间通过销轴连接,环形板上设有钻孔灌注桩,钻孔灌注桩为两个,且钻孔灌注桩竖向设置在锚固板上,钻孔灌注桩顶端延伸在锚固板上表面外侧,其底部穿过一预应力锚索延伸在预应力锚索下表面外侧,两钻孔灌注桩之间设有主筋,主筋两端固定在钻孔灌注桩上,还包括囊袋,囊袋顶部位于锚固板下表面,其底部位于环形板内底面上,囊袋及主筋连接处设有加强板,加强板呈三角形结构,加强板固定在囊袋及主筋之间。
2.根据权利要求1所述的灌注桩结构,其特征在于:所述预应力锚索上开有与钻孔灌注桩匹配的通孔。
3.根据权利要求1所述的灌注桩结构,其特征在于:所述预应力锚索采用韧性钢材料制成。
4.根据权利要求1所述的灌注桩结构,其特征在于:所述囊袋横截面积呈圆形结构。
5.根据权利要求1所述的灌注桩结构,其特征在于:所述主筋与加强板之间连接有导向筋。
6.根据权利要求1所述的灌注桩结构,其特征在于:所述囊袋上开有充气口。
CN201410533075.6A 2014-10-11 2014-10-11 灌注桩结构 Active CN104372791B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410533075.6A CN104372791B (zh) 2014-10-11 2014-10-11 灌注桩结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410533075.6A CN104372791B (zh) 2014-10-11 2014-10-11 灌注桩结构

Publications (2)

Publication Number Publication Date
CN104372791A true CN104372791A (zh) 2015-02-25
CN104372791B CN104372791B (zh) 2016-03-16

Family

ID=52551961

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410533075.6A Active CN104372791B (zh) 2014-10-11 2014-10-11 灌注桩结构

Country Status (1)

Country Link
CN (1) CN104372791B (zh)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011196022A (ja) * 2010-03-17 2011-10-06 Asahi Kasei Construction Materials Co Ltd 杭施工方法および杭施工装置
KR20120068200A (ko) * 2010-12-17 2012-06-27 (주)하경엔지니어링 현장타설파일부와 매입파일부의 연결방법
CN102587358A (zh) * 2012-03-27 2012-07-18 河海大学 一种高聚物材料后注浆挤扩灌注桩技术
CN103526770A (zh) * 2013-10-16 2014-01-22 鸿鑫建设集团有限公司 一种高防渗抗浮桩筏结构及施工方法
CN103835284A (zh) * 2014-02-21 2014-06-04 安徽省公路桥梁工程有限公司 一种岩溶地区钻孔灌注桩结构及施工方法
CN203741820U (zh) * 2014-02-21 2014-07-30 安徽省公路桥梁工程有限公司 一种岩溶地区钻孔灌注桩结构
CN204238210U (zh) * 2014-10-11 2015-04-01 隆嘉建设集团有限公司 灌注桩结构

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011196022A (ja) * 2010-03-17 2011-10-06 Asahi Kasei Construction Materials Co Ltd 杭施工方法および杭施工装置
KR20120068200A (ko) * 2010-12-17 2012-06-27 (주)하경엔지니어링 현장타설파일부와 매입파일부의 연결방법
CN102587358A (zh) * 2012-03-27 2012-07-18 河海大学 一种高聚物材料后注浆挤扩灌注桩技术
CN103526770A (zh) * 2013-10-16 2014-01-22 鸿鑫建设集团有限公司 一种高防渗抗浮桩筏结构及施工方法
CN103835284A (zh) * 2014-02-21 2014-06-04 安徽省公路桥梁工程有限公司 一种岩溶地区钻孔灌注桩结构及施工方法
CN203741820U (zh) * 2014-02-21 2014-07-30 安徽省公路桥梁工程有限公司 一种岩溶地区钻孔灌注桩结构
CN204238210U (zh) * 2014-10-11 2015-04-01 隆嘉建设集团有限公司 灌注桩结构

Also Published As

Publication number Publication date
CN104372791B (zh) 2016-03-16

Similar Documents

Publication Publication Date Title
CN103835284A (zh) 一种岩溶地区钻孔灌注桩结构及施工方法
CN103046543B (zh) 不等间距布设的外等腰梯形空心横截面抗滑桩的施工方法
CN104131556A (zh) 一种软硬夹层交互地基排水预应力管桩及施工方法
CN105625425A (zh) 一种基于浮动行走平台进行沉桩的施工方法
CN102628269A (zh) 一种减小沉管灌注桩负摩阻力的技术装置及其使用方法
CN110409525B (zh) 软弱土及不良地质复合地基加固方法
CN205576896U (zh) 一种能有效减少工程造价的带钢筋笼施工孔桩
CN204151798U (zh) 一种钢骨混凝土抗滑桩结构
CN204238210U (zh) 灌注桩结构
CN208251077U (zh) 一种建网测量控制桩的定位施工装置
CN104372791B (zh) 灌注桩结构
CN207878441U (zh) 一种软土地基的加固结构
CN106759391B (zh) 一种联排空心截面组合结构的抗滑桩群及其施工方法
CN109706955A (zh) 一种适用于钻孔灌注桩ⅲ类桩与承台连接方式
CN206346189U (zh) 一种防止混凝土灌注桩钢筋笼上浮的锚固叉
CN205420939U (zh) 双向螺旋挤土灌注桩桩网的路基结构
CN205999887U (zh) 钻孔钢筋笼箍注浆碎石桩
CN209555962U (zh) 一种适用于钻孔灌注桩ⅲ类桩与承台连接结构
CN104805876B (zh) 一种倾斜独立排架柱竖向顶推校正的方法
CN210031852U (zh) 一种用于高陡坡路堤地段的支挡结构
CN106149709B (zh) 预制灌注桩的成桩方法
CN206646517U (zh) 一种基坑支撑结构
CN204530693U (zh) 灌注桩的桩尖防卡沉管
CN104372797B (zh) 基坑结构
CN205591213U (zh) 一种施工树枝桩的简易装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Pan Taimiao

Inventor after: Lin Enyi

Inventor after: Zhuo Lebin

Inventor before: Wen Guodong

COR Change of bibliographic data
TA01 Transfer of patent application right

Effective date of registration: 20160218

Address after: 325100 Zhejiang Oubei town of Yongjia County, Rome City, building 13, room 307

Applicant after: Yongjia Yuanye Garden Engineering Co., Ltd.

Address before: Jinjiang District Jinhua Road Chengdu City, Sichuan province 610000 section of No. 8 Building 1 11 unit 23 floor No. 2301

Applicant before: CHENGDU JUZHI INDUSTRIAL DESIGN CO., LTD.

C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address

Address after: 325000 Zhejiang province Wenzhou Yongjia County Sanjiang Street 104 National Road south side field farm

Patentee after: Zhejiang wilderness Construction Co., Ltd.

Address before: 325100 Room 307, 13 Rome Town, Oubei Town, Yongjia County, Zhejiang Province

Patentee before: Yongjia Yuanye Garden Engineering Co., Ltd.

CP03 Change of name, title or address
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Cast in place pile structure

Effective date of registration: 20220119

Granted publication date: 20160316

Pledgee: Wenzhou Financing Guarantee Co.,Ltd.

Pledgor: Zhejiang Yuanye Construction Co.,Ltd.

Registration number: Y2022990000033