Prior art keywords
water
dead zone
pressure
old
old dead
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410454295.XA
Other languages
Chinese (zh)
Other versions
CN104358558A (en
Inventor
许进鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201410454295.XA priority Critical patent/CN104358558B/en
Publication of CN104358558A publication Critical patent/CN104358558A/en
Application granted granted Critical
Publication of CN104358558B publication Critical patent/CN104358558B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/06Measuring temperature or pressure
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F16/00Drainage

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Physics & Mathematics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • Geophysics (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention discloses an old dead zone detection method based on the fracturing principle and belongs to the technical field of mine old dead zone water prevention and control. The old dead zone detection method comprises the following steps: (1) constructing drill holes; (2) sealing the orifice ends of the drill holes; (3) performing high-pressure water injection on the drill holes; (4) observing water flow and pressure changes; (5) judging whether an old dead zone exists; (6) drawing off water in the old dead zone. According to the invention, a high-pressure water pump is utilized to fill high-pressure water flow in the drill holes, and the water permeates into a coal bead; when the old dead zone exists in the coal bed, and as the pressure of the old dead zone water is far lower than that of high-pressure water, the high-pressure water penetrates through a coal pillar and abundantly flows into the old dead zone to cause the fact that a flow expression number on a water injection pipe is increased suddenly, and the pressure expression number is reduced rapidly; conversely, if the flow expression number does not change greatly during the water injection process, and the pressure expression number is kept unchanged, the old dead zone does not exist. When the old dead zone detection method is adopted for detecting the old dead zone, omission can be avoided, the detection process is fast and effective, the old dead zone water can be timely and effectively drawn off, and the safety of underground field operation can be practically ensured.

Description

A kind of old Exhausted area prospecting method based on pressure break principle
Technical field
The present invention relates to a kind of old Exhausted area prospecting method based on pressure break principle, belong to mine anti-punish-old sky water technology neck Domain.
Background technology
In the old lane of digging and cavity, often there are a large amount of hydrops, referred to as empty water always.Empty water is to threaten mine safety at present always Most important water damage form.Empty water gushing water has that the instantaneous water yield is big, breaks with tremendous force, easily causes the spies such as personnel casualty accidentses always Point.In recent years, the personnel casualty accidentses caused by empty water happen occasionally always, and Shanxi Anhe coalfield occurs water damage thing within such as 2009 Therefore, cause 38 people dead it is simply that being caused by old sky water.
Empty water harm is serious always, but empty water is detected very difficult always, main reason is that, the distribution of old dead zone is different from and contains Water layer, tomography etc. are it may be said that be to have no regularity can say.The cundy that particularly older with large area dead zone is connected, bag Include small coal pit excavation Shi Tan lane, often become the fish that has escape the net in detecting, and these visit lane, because of dead zone old with large area even Logical, once connecting this spy lane in mining process, catastrophic failure can be caused.
At present old sky water is detected, mainly visited as main method in pick with the tunneling process of down-hole.In " colliery preventing and treating Water specifies " in, the drilling requirements of empty water are detected always in specified in more detail tunnel in advance:Investigative range requires as side away from 30m, holes close Spend vertical upper pitch-row and be not more than 2m, transversely pitch-row is not more than 3m.So high density, in actual mechanical process substantially Cannot complete.But do not press this density construction drill, there is a possibility that to omit old dead zone (little Tan lane) again.
Therefore, both can guarantee that to be not in omission in the urgent need to one kind at present, and can empty water detection side always effective and rapidly Method, ensures underground construction job safety conscientiously.
Content of the invention
The problem existing for above-mentioned prior art, the present invention provides a kind of old Exhausted area prospecting side based on pressure break principle Method, the detection exhaustive to the old dead zone in down-hole, detect convenient and swift, effectively prevent always the harm of empty water it is ensured that mine operation is pacified Entirely.
To achieve these goals, the present invention adopt a kind of old Exhausted area prospecting method based on pressure break principle, including with Lower step,
(1) construction drill:Meet head on by tunnel, to construct one in the direction tunneled in tunnel and hole, drilling depth is not less than 100m, dip angle of hole is parallel with coal seam;
(2) drilling orifice end seal hole:Reserve a water injection pipe in the boring constructed, water filling length of tube is not less than 50m, Then in rear end 25-35m position sealing of hole at boring opening;
(3) to boring inner high voltage water filling:Water injection pipe is connected valve, flow meter and pressure gauge, then connects water injection equipment, Open water injection equipment to water filling in boring, concrete pressure value determines according to the intensity in coal seam and the size of crustal stress;
(4) observation discharge, pressure change:Observe flow meter and the change of manometric registration in the injecting process, draw phase The curve chart answered;
(5) determine whether there is old dead zone:If flow meter registration increases suddenly, pressure gauge registration reduces suddenly simultaneously, table There is old dead zone in bright front, stop water filling, is discharged water by boring, flows out if there are old sky water, is further characterized by old dead zone Presence;If the change of flow meter registration is less in the injecting process, pressure gauge registration keeps constant, shows that front is entity coal, There is not old dead zone;
(6) old dead zone discharges water:When detecting presence empty water always, shed water injection equipment, using water injection pipe as adjutage, beat Valve opening door, the always empty water in boring is discharged.
Further, rear end 30m position sealing of hole at step (2) middle-range boring opening.
Further, in step (2) sealing of hole using chemical grout, cement mortar add water glass or adopt physical method sealing of hole.
Further, in step (3), water injection pressure is not less than 5MPa.
Further, in step (3), water injection equipment is high-pressure hydraulic pump.
Further, in step (4), flow meter and pressure gauge will be observed simultaneously.
The pressure break principle of the present invention is:Inject High-Pressure Water using water injection equipment into boring, water under high pressure penetrates into coal seam In, when there is old dead zone in coal seam, because the pressure of empty water always is far below water under high pressure, high pressure water breakthrough coal column, a large amount of flow into In old dead zone, flow meter registration on water injection pipe is led to increase suddenly, pressure gauge registration reduces rapidly;When coal seam Zhong Wulao dead zone is deposited When, water under high pressure can only slowly permeate in entity coal, now in the injecting process the change of flow meter registration less, pressure gauge registration Keep constant.
Using the method for the present invention, in mine, Detecting Old dead zone will not produce omission, it is to avoid underground construction operation has peace Full hidden danger, detection process is effective and rapid, timely and effectively can discharge empty water always, conscientiously ensure the safety of underground construction operation.
Brief description
Fig. 1 is the process chart of the present invention.
Specific embodiment
Below in conjunction with the accompanying drawings and embodiment the invention will be further described.
Embodiment one
According to the technological process shown in Fig. 1, when Shanxi Xiangyuan Jin Ping colliery carries out digging operation, using the side of the present invention Method carries out old Exhausted area prospecting operation, specifically includes following step:
(1) Jin Ping colliery 715 return aircourse meet head on by tunnel will tunnel direction (185 ° of azimuth), construction one brill Hole, drilling depth is 120m, and dip angle of hole is parallel with coal seam, and angle is 5 °;
(2) reserve a water injection pipe after the completion of holing in hole, water filling length of tube is 70m, then after at boring opening End about 30m position cement-silicate injection hole sealing, makes water pipe be fixed in boring it is ensured that when injecting water under high pressure into boring, Seepage, the judgement to old dead zone for the impact will not occur at boring opening;
(3) water injection pipe is connected valve, flow meter and pressure gauge, then connect high-pressure hydraulic pump, open water pump into boring Water filling, according to the size of the intensity in coal seam and crustal stress in 715 return aircourses, final choice water injection pressure is 8MPa, in boring There is pressure differential, if water penetration, to old dead zone, due to the presence of differential water pressures, makes in now boring in coal seam between current and always empty water Crack is produced, in boring, current pour in old dead zone in coal seam, by flow meter, the change of manometric registration on water injection pipe, Accurately and effectively judge the presence of old dead zone;
(4) in the injecting process observe flow meter and manometric registration change, draw corresponding when m- flow, when m- pressure Massa Medicata Fermentata line chart, flow meter and pressure gauge will be observed simultaneously, only quickly increase when flow meter, pressure gauge registration quickly reduces, (when flow meter, pressure gauge registration are stablized, curve near tangent slope is no to show as tangent slope generation significant change on curve chart Change), just showing to hole nearby has old dead zone, and result of detection is more accurate, effective guarantee underground work safety;
(5), during digging construction operation, Shanxi Ping Kuang 715 return aircourse has successively carried out 4 bore detectings, front 3 brills In the injecting process of hole, less, pressure gauge registration keeps constant to the change of flow meter registration, shows that boring is nearby entity coal, does not exist Old dead zone, can be normally carried out digging operation, not affect the duration, and during the 4th pouring water into borehole, flow meter registration increases suddenly, with When pressure gauge registration reduce suddenly, show front there is old dead zone;
(6) because the 4th bore detecting has old dead zone, then take counter-measure, shed the water under high pressure on water injection pipe Pump, using water injection pipe as adjutage, opens valve, the always empty water in boring is discharged, in subsequent construction, is really found that old sky , due to taking effective draining preventive measure in advance, there is not casualties in area, do not delay digging operation yet.
Embodiment two
Using the detection method of the present invention, carry out detecting operation, construction procedure in Xiangyuan Jin Ping colliery 625 return aircourse For,
(1) Jin Ping colliery 625 return aircourse meet head on by tunnel will tunnel direction (185 ° of azimuth), construction one brill Hole, drilling depth is 100m, and dip angle of hole is parallel with coal seam, and angle is 5 °;
(2) reserve a water injection pipe after the completion of holing in hole, water filling length of tube is 50m, then after at boring opening End 25m position chemical grout injection hole sealing, makes water pipe be fixed in boring it is ensured that when injecting water under high pressure into boring, will not There is seepage, the judgement to old dead zone for the impact at boring opening;
(3) water injection pipe is connected valve, flow meter and pressure gauge, then connect high-pressure hydraulic pump, open water pump into boring Water filling, according to the intensity in coal seam in 625 return aircourses in colliery and the size of crustal stress, final choice water injection pressure is 5MPa;
(4) this step is consistent with operating in embodiment one;
(5), during digging construction operation, Shanxi Ping Kuang 625 return aircourse successively carried out 3 bore detectings, the 1st, 3 Pouring water into borehole flow in process represents number change less, and pressure gauge registration keeps constant, shows that boring front is entity coal, does not deposit In old dead zone, therefore it is normally carried out digging operation, does not affect the duration, during the 2nd pouring water into borehole, flow meter registration increases suddenly, Pressure gauge registration reduces suddenly simultaneously, shows that front has old dead zone;
(6) because the 2nd bore detecting has old dead zone, then take urgent counter-measure, shed the height on water injection pipe Water pump, using water injection pipe as adjutage, opens valve, by the always empty water exclusion in boring, when follow-up digging is constructed to this section, Really it is found that discarded always empty tunnel, due to taking effective draining preventive measure in advance, empty water gushing water does not occur always The casualties leading to, does not delay digging operation yet.
Embodiment three
Carry out detecting construction operation in Xiangyuan Jin Ping colliery 502 return aircourse, construction procedure is,
(1) 502 return aircourses meet head on by tunnel will tunnel direction (185 ° of azimuth), construction one boring, boring Depth is 150m, and dip angle of hole is parallel with coal seam, and angle is 5 °;
(2) reserve a water injection pipe after the completion of holing in hole, water filling length of tube is 90m, then after at boring opening End 35m position physical method injection hole sealing, makes water pipe be fixed in boring it is ensured that when injecting water under high pressure into boring, will not There is seepage, the judgement to old dead zone for the impact at boring opening;
(3) water injection pipe is connected valve, flow meter and pressure gauge, then connect high-pressure hydraulic pump, open water pump into boring Water filling, according to the intensity in coal seam in 502 return aircourses in colliery and the size of crustal stress, water injection pressure in this tunnel of final choice For 10MPa;
(4) this step is consistent with operating in embodiment one;
(5), during digging construction, because 502 return aircourse surface relief structures are complicated, in order to ensure construction safety, successively carry out 5 bore detectings, the 1st, 2,4 pouring water into borehole flow in process represent number change less, and pressure gauge registration keeps constant, shows Front is entity coal, there is not old dead zone, therefore can be normally carried out digging operation near this boring, not because Detecting Old Dead zone affects the digging duration, does not also leave potential safety hazard, during the 3rd, 5 pouring water into boreholes, flow meter registration increases suddenly, simultaneously Pressure gauge registration reduces suddenly, and showing to hole nearby has old dead zone;
(6) nearby there is old dead zone for the 3rd, 5 borings finding in construction, engineering staff takes urgent counter-measure, Shed the high-pressure hydraulic pump on water injection pipe, using water injection pipe as adjutage, open valve, the always empty water in boring is discharged, subsequently When digging is constructed to this section, really it is found that discarded coal mine gob, tunnel respectively, due to taking effective draining in advance , there is not casualties in preventive measure, do not delay digging operation yet.

Claims (5)

1. a kind of old Exhausted area prospecting method based on pressure break principle is it is characterised in that comprise the following steps,
(1) construction drill:Meet head on by tunnel, to construct one in the direction tunneled in tunnel and hole, drilling depth is not less than 100m, Dip angle of hole is parallel with coal seam;
(2) drilling orifice end seal hole:Reserve a water injection pipe in the boring constructed, water filling length of tube is not less than 50m, then In rear end 25-35m position sealing of hole at boring opening;
(3) to boring inner high voltage water filling:Water injection pipe is connected valve, flow meter and pressure gauge, then connects water injection equipment, open Water injection equipment determines to water filling in boring, concrete pressure value according to the intensity in coal seam and the size of crustal stress;
(4) observation discharge, pressure change:Observe flow meter and the change of manometric registration in the injecting process, draw corresponding Curve chart;
(5) determine whether there is old dead zone:If flow meter registration increases suddenly, pressure gauge registration reduces suddenly simultaneously, before showing There is old dead zone in side, stop water filling, is discharged water by boring, flows out if there are old sky water, is further characterized by depositing of old dead zone ?;If the change of flow meter registration is less in the injecting process, pressure gauge registration keeps constant, shows that front is entity coal, does not deposit In old dead zone;
(6) old dead zone discharges water:When detecting presence empty water always, shed water injection equipment, using water injection pipe as adjutage, open valve Door, the always empty water in boring is discharged.
2. a kind of old Exhausted area prospecting method based on pressure break principle according to claim 1 it is characterised in that:Described step (2) rear end 30m position sealing of hole at middle-range boring opening.
3. a kind of old Exhausted area prospecting method based on pressure break principle according to claim 1 it is characterised in that:Described step (3) in, water injection pressure is not less than 5MPa.
4. a kind of old Exhausted area prospecting method based on pressure break principle according to claim 1 it is characterised in that:Described step (3) in, water injection equipment is high-pressure hydraulic pump.
5. a kind of old Exhausted area prospecting method based on pressure break principle according to claim 1 it is characterised in that:Described step (4) in, flow meter and pressure gauge will be observed simultaneously.
CN201410454295.XA 2014-09-05 2014-09-05 Old dead zone detection method based on fracturing principle Expired - Fee Related CN104358558B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410454295.XA CN104358558B (en) 2014-09-05 2014-09-05 Old dead zone detection method based on fracturing principle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410454295.XA CN104358558B (en) 2014-09-05 2014-09-05 Old dead zone detection method based on fracturing principle

Publications (2)

Publication Number Publication Date
CN104358558A CN104358558A (en) 2015-02-18
CN104358558B true CN104358558B (en) 2017-02-08

Family

ID=52525855

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410454295.XA Expired - Fee Related CN104358558B (en) 2014-09-05 2014-09-05 Old dead zone detection method based on fracturing principle

Country Status (1)

Country Link
CN (1) CN104358558B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108625897B (en) * 2018-03-14 2020-04-24 山东大学 Artificial drainage pressure relief method for water-rich area outside tunnel
CN108468566B (en) * 2018-03-26 2019-11-26 中煤科工集团西安研究院有限公司 Empty crystal really visits and puts method mine based on underground pencil directional drilling always
CN114000827B (en) * 2021-11-05 2023-07-14 中国矿业大学 Collapse column exploration method based on pressure seepage principle and electromagnetic response characteristics

Also Published As

Publication number Publication date
CN104358558A (en) 2015-02-18

Similar Documents

Publication Publication Date Title
CN110939442B (en) Method for treating rock burst by pressure relief source in ground fracturing area
CN103334770B (en) One is grown up reverse-slope tunnel ultra high water pressure rich water zone of fracture construction method
CN107060834B (en) drainage slow-seepage grouting control process under tunnel roof water-rich crushing condition
CN102619552B (en) Directional hydraulic pressing penetration, permeability increase and outburst elimination method of guide groove
CN101832142B (en) Tunnel information tracing accurate grouting method
CN105239984B (en) A kind of coal mine underground fracturing crack extends control method
CN104790951B (en) Weaken the method and device away from the high-order tight roofs of 100 ~ 350m of coal seam
CN103835651B (en) A kind of single hole directional drilling local slip casting mine shaft rising boring technique
CN109209472A (en) The coal seam pressure relief anti-burst method that a kind of punching, explosion, water filling intercouple
CN111456723B (en) One-hole dual-purpose method for overburden three-zone detection and rock stratum movement monitoring
CN101761346A (en) Method for constructing metamorphic rock confined water tunnel
CN103195468A (en) System process for conducting efficient strengthened extraction in surrounding rock
CN111520184A (en) Comprehensive control system and method for coal mine rock burst and harmful gas
CN103742127B (en) A kind of overlying strata caving zone and height of water flowing fractured zone Drill-hole television detection determination method
CN107083967A (en) The method and system of extremely hard rock are tunneled using hydraulic fracturing technology liaison tunnel development machine
CN110107284B (en) Drilling and testing system and method for detecting height of water flowing fractured zone through water pressure
CN112502663B (en) Curtain grouting method based on directional hydraulic mechanical splitting technology
CN103850678A (en) Hydraulic fracturing ground stress testing system for panoramic drill hole inspection instrument
CN104358558B (en) Old dead zone detection method based on fracturing principle
CN103498680A (en) Method for increasing top-coal recovery rate in primary mining period of fully-mechanized caving face
CN108180035A (en) Gas extraction method for combined operation of drilling and permeability increasing of high-gas low-permeability coal seam
CN110792450A (en) Method for determining advanced support of grouting anchor cable
CN106499384A (en) Coal bed gas directional well injection/pressure fall-off test test device and its method
CN207406345U (en) Rich water sand-pebble layer shield tunnel end horizontal grouting ruggedized construction
CN106988738A (en) A kind of detection method of definitely stress distribution feature

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170208

CF01 Termination of patent right due to non-payment of annual fee