CN104358309A - Quickly installed high-strength house structure - Google Patents

Quickly installed high-strength house structure Download PDF

Info

Publication number
CN104358309A
CN104358309A CN201410584742.3A CN201410584742A CN104358309A CN 104358309 A CN104358309 A CN 104358309A CN 201410584742 A CN201410584742 A CN 201410584742A CN 104358309 A CN104358309 A CN 104358309A
Authority
CN
China
Prior art keywords
steel
boards
column
wallboard
vertical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410584742.3A
Other languages
Chinese (zh)
Inventor
董永强
韩志安
周元
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Steel Work Co Ltd Of Sichuan Sinorael
Original Assignee
Steel Work Co Ltd Of Sichuan Sinorael
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Steel Work Co Ltd Of Sichuan Sinorael filed Critical Steel Work Co Ltd Of Sichuan Sinorael
Priority to CN201410584742.3A priority Critical patent/CN104358309A/en
Publication of CN104358309A publication Critical patent/CN104358309A/en
Pending legal-status Critical Current

Links

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The invention discloses a quickly installed high-strength house structure and belongs to the technical field of steel structures. The quickly installed high-strength house structure comprises a bottom frame, a top frame, at least four uprights connected between the bottom frame and the top frame, and wall boards installed between the adjacent uprights; the uprights are square steel tubes, vertical C-shaped steels are arranged on at least two outer vertical surfaces of the square steel tube, a rubber strip is arranged on the edge of an opening of the C-shaped steel, the edge of the wall board is embedded into the opening of the C-shaped steel of the upright, the wall board comprises two oppositely arranged steel boards, vertical H-shaped steels are arranged on the opposite inner side surfaces of the two steel boards, the outer side surface of each steel board is covered with a polyester ethylene layer, an S-shaped steel structure net rack is arranged between the two steel boards, and concrete is filled between the two steel boards. The wall boards are directly embedded among the uprights through the C-shaped steels, so that the efficiency is improved, and the structures of the wall boards also improve the overall strength.

Description

A kind of high strength building structure quick for installation
Technical field
The present invention relates to long strands field, in particular to a kind of high strength building structure quick for installation.
Background technology
In steel building, mostly adopt the steel such as H profile steel or square steel to be welded into skeleton as column and beam, during construction, all need to utilize extra part to be mounted on skeleton by wallboard, make it embed between column, consume the more time, have impact on efficiency.
Summary of the invention
The object of the present invention is to provide a kind of high strength building structure quick for installation, mostly need to utilize extra part wallboard to be mounted to the problem lowered efficiency between column during to solve the construction of existing steel house.
For realizing the object of the invention, the technical scheme of employing is: a kind of high strength building structure quick for installation, comprises underframe, pushes up frame, is connected at least four columns between underframe and top frame, is arranged on wallboard between adjacent upright posts; Described column is square steel pipe, and at least two alien invasion of square steel pipe are provided with vertical C-type steel, and the opening edge of C-type steel is provided with rubber strip; The edge of wallboard embeds in the C-type steel opening of column; Wallboard comprises two steel plates be oppositely arranged, and the relative inner surface of two steel plates is provided with vertical H profile steel, and outer surface is all coated with polyester vinyl layer; S shape steel structure net rack is provided with between two steel plates; Concrete is filled with between two steel plates.
Further, described C-type steel is welded with square steel pipe or bolt is connected.
The invention has the beneficial effects as follows, the present invention is adopted to be provided with the square steel pipe column of C-type steel, not only ensure that the intensity of column, also can in construction and installation process, directly being installed by C-type steel by wallboard embeds between column, and do not need extra connector, more quick, simplify construction sequence, improve efficiency, and after installing, the rubber strip of the opening edge of C-type steel naturally closely can be attached to the installation connection that surfaces of wall realizes sealing, H profile steel on the S shape steel structure net rack of wallboard and two steel plates not only increases intensity and the stability of wallboard, also add the adhesive power of concrete and steel plate and inside thereof, polyester vinyl layer improves anti-flammability and the thermal insulation of wallboard.
Accompanying drawing explanation
Fig. 1 is the front view of the column of high strength building structure quick for installation provided by the invention;
Fig. 2 is the top view at the column place of high strength building structure quick for installation provided by the invention;
Fig. 3 is the sectional view of Fig. 2 deadlight side elevation.
Detailed description of the invention
Also by reference to the accompanying drawings the present invention is described in further detail below by specific embodiment.
Fig. 1 to Fig. 3 shows high strength building structure quick for installation provided by the invention, comprises underframe, pushes up frame, is connected at least four columns between underframe and top frame, is arranged on wallboard 4 between adjacent upright posts; Column is square steel pipe 1, and at least two alien invasion of square steel pipe 1 are provided with vertical C-type steel 2, and the opening edge of C-type steel 2 is provided with rubber strip 3; The edge of wallboard 4 embeds in C-type steel 2 opening of column; The relative inner surface that wallboard 4 comprises two steel plates, 41, two steel plates 41 be oppositely arranged is provided with vertical H profile steel as reinforcing prop 44, and outer surface is all coated with polyester vinyl layer 42; S shape steel structure net rack 43 is provided with between two steel plates 41; Concrete is filled with between two steel plates 41.
C-type steel 2 can be welded with square steel pipe 1, and bonding strength is high, is also conducive to the intensity of column entirety, also can be bolted, and adjusts position flexibly when being convenient to in-site installation like this.
Can in two of square steel pipe 1, three or four alien invasion relative set C-type steel 2, when the alien invasion that two at square steel pipe 1 are adjacent arranges C-type steel 2, column can be used as the column of corner junction; When the relative alien invasion of two at square steel pipe 1 or three alien invasion or four alien invasion arrange C-type steel 2, column can be used as the column of intermediate connections, be applicable to the column of diverse location situation respectively, specifically all can according to actual conditions by prefabricated for different columns, also corresponding suitable column can according to circumstances be selected at the scene, all very convenient, efficiency is high.
The foregoing is only the preferred embodiments of the present invention, be not limited to the present invention, for a person skilled in the art, the present invention can have various modifications and variations.Within the spirit and principles in the present invention all, any amendment done, equivalent replacement, improvement etc., all should be included within protection scope of the present invention.

Claims (2)

1. a high strength building structure quick for installation, is characterized in that, comprises underframe, pushes up frame, is connected at least four columns between underframe and top frame, is arranged on wallboard between adjacent upright posts; Described column is square steel pipe, and at least two alien invasion of square steel pipe are provided with vertical C-type steel, and the opening edge of C-type steel is provided with rubber strip; The edge of wallboard embeds in the C-type steel opening of column; Wallboard comprises two steel plates be oppositely arranged, and the relative inner surface of two steel plates is provided with vertical H profile steel, and outer surface is all coated with polyester vinyl layer; S shape steel structure net rack is provided with between two steel plates; Concrete is filled with between two steel plates.
2. high strength building structure quick for installation according to claim 1, is characterized in that, described C-type steel is welded with square steel pipe or bolt is connected.
CN201410584742.3A 2014-10-28 2014-10-28 Quickly installed high-strength house structure Pending CN104358309A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410584742.3A CN104358309A (en) 2014-10-28 2014-10-28 Quickly installed high-strength house structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410584742.3A CN104358309A (en) 2014-10-28 2014-10-28 Quickly installed high-strength house structure

Publications (1)

Publication Number Publication Date
CN104358309A true CN104358309A (en) 2015-02-18

Family

ID=52525606

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410584742.3A Pending CN104358309A (en) 2014-10-28 2014-10-28 Quickly installed high-strength house structure

Country Status (1)

Country Link
CN (1) CN104358309A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104712060A (en) * 2015-03-18 2015-06-17 伯恩太阳能科技有限公司 Integrated house
CN105369982A (en) * 2015-12-07 2016-03-02 文登蓝岛建筑工程有限公司 3D modular circular column for building
CN105421693A (en) * 2015-12-07 2016-03-23 文登蓝岛建筑工程有限公司 Column beam decoration plate installation structure of 3D modularization housing
CN105507522A (en) * 2015-12-07 2016-04-20 文登蓝岛建筑工程有限公司 Profile steel-wrapping material connector for 3D modularized house building
CN105544864A (en) * 2015-12-07 2016-05-04 文登蓝岛建筑工程有限公司 Box column structure for 3D modular house building
CN107288215A (en) * 2017-07-10 2017-10-24 中国十七冶集团有限公司 A kind of novel building framework
CN112267586A (en) * 2020-10-23 2021-01-26 舒城诚鑫建材有限公司 Composite fireproof insulation board based on inorganic lightweight aggregate and preparation method thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1370902A (en) * 2001-02-27 2002-09-25 喻力 Plate-type building member
JP2003193618A (en) * 2001-12-25 2003-07-09 Sumitomo Metal Steel Products Inc Structural panel, and structure of wall body and floor body
CN201050117Y (en) * 2007-06-20 2008-04-23 佘晨岗 Detachable steel frame movable room
US20080178551A1 (en) * 2007-01-31 2008-07-31 Porter William H Flexible modular building framework
CN203334425U (en) * 2013-05-14 2013-12-11 潘存勋 Steel structure unit and steel structure system
CN103470076A (en) * 2013-10-08 2013-12-25 江苏明福钢结构有限公司 Novel detachable steel-structured plant
CN104074267A (en) * 2014-07-04 2014-10-01 中国石油集团长城钻探工程有限公司工程服务公司 Dismountable skid-mounted steel structure camping house

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1370902A (en) * 2001-02-27 2002-09-25 喻力 Plate-type building member
JP2003193618A (en) * 2001-12-25 2003-07-09 Sumitomo Metal Steel Products Inc Structural panel, and structure of wall body and floor body
US20080178551A1 (en) * 2007-01-31 2008-07-31 Porter William H Flexible modular building framework
CN201050117Y (en) * 2007-06-20 2008-04-23 佘晨岗 Detachable steel frame movable room
CN203334425U (en) * 2013-05-14 2013-12-11 潘存勋 Steel structure unit and steel structure system
CN103470076A (en) * 2013-10-08 2013-12-25 江苏明福钢结构有限公司 Novel detachable steel-structured plant
CN104074267A (en) * 2014-07-04 2014-10-01 中国石油集团长城钻探工程有限公司工程服务公司 Dismountable skid-mounted steel structure camping house

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104712060A (en) * 2015-03-18 2015-06-17 伯恩太阳能科技有限公司 Integrated house
CN104712060B (en) * 2015-03-18 2017-07-07 伯恩太阳能科技有限公司 A kind of integrated house
CN105369982A (en) * 2015-12-07 2016-03-02 文登蓝岛建筑工程有限公司 3D modular circular column for building
CN105421693A (en) * 2015-12-07 2016-03-23 文登蓝岛建筑工程有限公司 Column beam decoration plate installation structure of 3D modularization housing
CN105507522A (en) * 2015-12-07 2016-04-20 文登蓝岛建筑工程有限公司 Profile steel-wrapping material connector for 3D modularized house building
CN105544864A (en) * 2015-12-07 2016-05-04 文登蓝岛建筑工程有限公司 Box column structure for 3D modular house building
CN107288215A (en) * 2017-07-10 2017-10-24 中国十七冶集团有限公司 A kind of novel building framework
CN112267586A (en) * 2020-10-23 2021-01-26 舒城诚鑫建材有限公司 Composite fireproof insulation board based on inorganic lightweight aggregate and preparation method thereof

Similar Documents

Publication Publication Date Title
CN104358309A (en) Quickly installed high-strength house structure
CN105937263B (en) A kind of assembled steel frame wall filled with masonry system and its construction method
CN104358318B (en) A kind of building using concrete steel structural upright
CN103967166A (en) Low-yield-point steel plate shear wall with two connected edges
CN104278744B (en) Combined type reinforced concrete prefabricated bay window
CN104141317A (en) Basement tower crane foundation construction method and structure adopting reverse construction method
CN204174737U (en) A kind of Steel Structure of small-sized mobile house
CN204551897U (en) With the steel framework post of joint type linkage
CN204491883U (en) A kind of assembling energy consumption steel plate shear wall
CN201187165Y (en) Composite type main transformer fireproof wall of transformer substation
CN104264794A (en) Connection of cold-formed steel housing beam and concrete-filled square steel tubular column and connecting method of connection
CN104358311A (en) High-strength building structure convenient to construct
CN203613826U (en) Mobile house
CN204112527U (en) A kind of converter station valve hall combined baffle wall of shielded flexible direct current magnetic wave
CN103967178A (en) Curtain wall corner structure with no upright posts
CN103147510B (en) Combined assembly type house device
CN203905531U (en) Rural assembled steel structure residence system
CN104358310A (en) High-strength house unit with H-shaped steel structure frame
CN104358312A (en) Steel framework of small-size mobile house
CN106088398A (en) A kind of combined wall board
CN102561731A (en) Module constructed one-layer villa and construction method thereof
CN104358462A (en) Flame-retardant composite house structure with polyester ethylene wall slabs
CN104358354A (en) Steel structure upright post convenient for construction and mounting of wallboard
CN104481081A (en) Concrete-steel structure stand column
CN212053705U (en) Corner external corner connecting piece of horizontal truss

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20150218