CN104314005B - 一种竖向多束预应力钢绞线的预埋定位施工方法 - Google Patents

一种竖向多束预应力钢绞线的预埋定位施工方法 Download PDF

Info

Publication number
CN104314005B
CN104314005B CN201410478637.1A CN201410478637A CN104314005B CN 104314005 B CN104314005 B CN 104314005B CN 201410478637 A CN201410478637 A CN 201410478637A CN 104314005 B CN104314005 B CN 104314005B
Authority
CN
China
Prior art keywords
bearing plate
instrument
location
plate location
multi beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410478637.1A
Other languages
English (en)
Other versions
CN104314005A (zh
Inventor
李定有
丁得志
方字荐
黄文国
黄宗光
周海峰
李辉
杨维双
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fifth Engineering Co Ltd of CTCE Group
Original Assignee
Fifth Engineering Co Ltd of CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fifth Engineering Co Ltd of CTCE Group filed Critical Fifth Engineering Co Ltd of CTCE Group
Priority to CN201410478637.1A priority Critical patent/CN104314005B/zh
Publication of CN104314005A publication Critical patent/CN104314005A/zh
Application granted granted Critical
Publication of CN104314005B publication Critical patent/CN104314005B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

一种竖向多束预应力钢绞线的预埋定位施工方法,包括步骤,制作立模工具,按照上部结构承压板的设计形状及尺寸,用竹胶板及方木制作成1:1比例承压板定位工具,再将承压板定位工具切割成7个小块;安装承压板定位工具,以下部结构已立模板和下部已穿钢绞线为基础,在模板顶端按已确定控制点位逐个安装承压板定位工具,利用承压板定位工具上的方木加工成榫卯来控制承压板定位工具的整体精度,然后与下部结构已立模板加固在一起即可进行下一步工序的施工。解决了施工中竖向多束预应力钢绞线定位困难且精度控制无法得到保证的问题,具有施工速度快、定位精准、安装简单方便的特点,且节省了定位的整体工作周期,有良好的稳定性,有效的保证了预埋件的预埋质量,定位工具可以重复使用。

Description

一种竖向多束预应力钢绞线的预埋定位施工方法
所属技术领域
本发明涉及一种竖向多束预应力钢绞线的预埋定位施工方法。
背景技术
随着中国桥梁事业的快速发展及建设,高、新、尖工程项目随着设计结构及美观要求不断涌现,设计的不断新颖,施工中对工程的精度控制越来越高,施工期间,尤其是预埋件定位的准确性很难保证,竖向多束预应力钢绞线的预埋定位,其定位的准确性直接影响上部结构的安装定位。目前施工过程中大部分都是采用井字形钢筋固定,此种固定不仅缺少定位牢固的可靠性,而且在井字形钢筋焊接固定过程中可能会造成波纹管的损坏。
发明内容
本发明其目的就在于提供一种竖向多束预应力钢绞线的预埋定位施工方法,解决了施工中竖向多束预应力钢绞线定位困难且精度控制无法得到保证的问题,具有施工速度快、定位精准、安装简单方便的特点,且节省了定位的整体工作周期,有良好的稳定性,有效的保证了预埋件的预埋质量,定位工具可以重复使用。
实现上述目的而采取的技术方案,包括步骤,
1)制作立模工具
按照上部结构承压板的设计形状及尺寸,用竹胶板及方木制作成1:1比例承压板定位工具,再将承压板定位工具切割成7个小块;
2)安装承压板定位工具
以下部结构已立模板和下部已穿钢绞线为基础,在模板顶端按已确定控制点位逐个安装承压板定位工具,利用承压板定位工具上的方木加工成榫卯来控制承压板定位工具的整体精度,然后承压板定位工具与下部结构已立模板加固在一起即可进行下一步工序的施工。
有益效果
与现有技术相比本发明具有以下优点。
1、本发明利用制作的定位工具,按照拟定的使用方法施工有效的避免了施工中竖向多束预应力钢绞线定位困难且精度控制无法得到保证的问题,同时节省了定位的整体工作周期,有良好的稳定性,并且有效的保证了预埋件的预埋质量,定位工具可以重复使用,周转安装都很简单方便,有明显的经济效益及技术保证;
2、本发明设计简单,定位工具制作所需材料及加工工具均为现场经常使用的,加工简单,施工速度快,有利于施工中精度的控制要求。
附图说明
下面结合附图对本发明作进一步详述。
图1为本发明中承压板定位工具正面示意图;
图2为本发明中承压板定位工具反面示意图。
具体实施方式
包括步骤,
1)制作立模工具
按照上部结构承压板的设计形状及尺寸,用竹胶板及方木制作成1:1比例承压板定位工具,再将承压板定位工具切割成7个小块,如图1所示;
2)安装承压板定位工具
以下部结构已立模板和下部已穿钢绞线为基础,在模板顶端按已确定控制点位逐个安装承压板定位工具,利用承压板定位工具上的方木来控制承压板定位工具的整体精度,然后承压板定位工具与下部结构已立模板加固在一起即可进行下一步工序的施工。
所述承压板定位工具上的预留孔直径小于承压板上的孔位直径1厘米;所述承压板定位工具下部混凝土结构竖向预应力波纹管直径小于承压板上的孔位直径2厘米。
竖向多束预应力定位工具,是结合混凝土节段预埋钢绞线的设计尺寸和上端钢结构承压板的预留孔位的相对位置,利用竹胶板按上部钢结构承压板形状尺寸以1:1的比列制作承压板定位工具,用此承压板定位工具来有效控制混凝土节段预埋钢绞线的定位精度,使其在混凝土浇筑完成后可以使上部钢结构可以顺利的实现精确安装。
① 、制作承压板定位工具
按照上部结构承压板的设计形状及尺寸,利用竹胶板及方木制作成1:1比例承压板定位工具,在承压板定位工具上按已设计预留孔位大小的基础上减小1厘米制作预留孔洞,这样既可以保证竖向多束预应力钢绞线的定位精度,也有效防止了由于人为操作误差大的因素,再将承压板定位工具切割成7个小块,便于定位工具的倒运及安装,如图1所示;
②、安装承压板定位工具
以下部结构已立模板和下部已穿钢绞线为基础,在模板顶按已确定控制点位逐个安装承压板定位工具,利用承压板定位工具上的方木加工成榫卯来控制定位工具的整体精度,所述方木设置在承压板定位工具反面,1个小块承压板定位工具反面的方木与另1个小块承压板定位工具反面的方木之间的连接加工成榫卯,如图2所示,然后与下部结构已立模板加固在一起即可进行下一步工序的施工。
施工安装过程中务必严格控制定位点,7小块拼装过程中,块与块之间做好闭合标示,便于拼装到位,减小拼装误差带来的影响。

Claims (2)

1.一种竖向多束预应力钢绞线的预埋定位施工方法,其特征在于,包括步骤,
1)制作立模工具
按照上部结构承压板的设计形状及尺寸,用竹胶板及方木制作成1:1比例承压板定位工具,再将承压板定位工具切割成7个小块;
2)安装承压板定位工具
以下部结构已立模板和下部已穿钢绞线为基础,在模板顶端按已确定控制点位逐个安装承压板定位工具,利用承压板定位工具上的方木加工成榫卯来控制承压板定位工具的整体精度,然后承压板定位工具与下部结构已立模板加固在一起即可进行下一步工序的施工。
2.根据权利要求1所述的一种竖向多束预应力钢绞线的预埋定位施工方法,其特征在于,所述承压板定位工具上的预留孔直径小于承压板上的孔位直径1厘米;所述承压板定位工具下部混凝土结构竖向预应力波纹管直径小于承压板上的孔位直径2厘米。
CN201410478637.1A 2014-09-19 2014-09-19 一种竖向多束预应力钢绞线的预埋定位施工方法 Active CN104314005B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410478637.1A CN104314005B (zh) 2014-09-19 2014-09-19 一种竖向多束预应力钢绞线的预埋定位施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410478637.1A CN104314005B (zh) 2014-09-19 2014-09-19 一种竖向多束预应力钢绞线的预埋定位施工方法

Publications (2)

Publication Number Publication Date
CN104314005A CN104314005A (zh) 2015-01-28
CN104314005B true CN104314005B (zh) 2016-11-30

Family

ID=52369306

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410478637.1A Active CN104314005B (zh) 2014-09-19 2014-09-19 一种竖向多束预应力钢绞线的预埋定位施工方法

Country Status (1)

Country Link
CN (1) CN104314005B (zh)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106758838B (zh) * 2016-12-26 2018-07-20 河南省交通规划设计研究院股份有限公司 一种预压用钢绞线安全控制装置

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101736701A (zh) * 2009-12-15 2010-06-16 中交路桥华北工程有限公司 桥梁钢混结合段施工方法
KR101001905B1 (ko) * 2009-07-01 2010-12-17 (주)하경엔지니어링 강재 플레이트 거더의 단부 고정화에 의한 강재 플레이트 거더교 시공방법
CN202298463U (zh) * 2011-10-26 2012-07-04 柳州欧维姆机械股份有限公司 一种竖向预应力锚固体系
KR101223699B1 (ko) * 2012-05-10 2013-01-28 주식회사 젬콘 프리텐셔닝 강판을 이용한 프리스트레스트 강재거더와 이의 제작방법 및 교량 시공방법
CN103924520A (zh) * 2014-04-10 2014-07-16 中交一公局第一工程有限公司 悬索桥主缆锚固预应力管道的施工方法及装置
CN103924676A (zh) * 2014-04-14 2014-07-16 北京工业大学 预应力连接混凝土梁圆钢管混凝土柱节点
CN103924679A (zh) * 2014-04-14 2014-07-16 北京工业大学 预应力与普通钢筋连接混凝土梁圆钢管混凝土柱组合节点

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101001905B1 (ko) * 2009-07-01 2010-12-17 (주)하경엔지니어링 강재 플레이트 거더의 단부 고정화에 의한 강재 플레이트 거더교 시공방법
CN101736701A (zh) * 2009-12-15 2010-06-16 中交路桥华北工程有限公司 桥梁钢混结合段施工方法
CN202298463U (zh) * 2011-10-26 2012-07-04 柳州欧维姆机械股份有限公司 一种竖向预应力锚固体系
KR101223699B1 (ko) * 2012-05-10 2013-01-28 주식회사 젬콘 프리텐셔닝 강판을 이용한 프리스트레스트 강재거더와 이의 제작방법 및 교량 시공방법
CN103924520A (zh) * 2014-04-10 2014-07-16 中交一公局第一工程有限公司 悬索桥主缆锚固预应力管道的施工方法及装置
CN103924676A (zh) * 2014-04-14 2014-07-16 北京工业大学 预应力连接混凝土梁圆钢管混凝土柱节点
CN103924679A (zh) * 2014-04-14 2014-07-16 北京工业大学 预应力与普通钢筋连接混凝土梁圆钢管混凝土柱组合节点

Also Published As

Publication number Publication date
CN104314005A (zh) 2015-01-28

Similar Documents

Publication Publication Date Title
CN103255853A (zh) 装配式剪力墙上下层内墙板齿槽式连接结构
CN104763082B (zh) 装配式剪力墙上下层连接结构
CN105113786A (zh) 固定可调节现浇楼梯模板支设用垫块支撑***
CN103726589A (zh) 工形钢与钢管架构界面鼓凸设斜钢筋装配剪力墙及作法
CN201268921Y (zh) 钢筋马凳
CN204876199U (zh) 一种预制剪力墙竖向钢筋集中约束搭接构造
CN115749250A (zh) 一种直墙圆拱现浇结构模板及其安装方法
CN109208825A (zh) 一种便于对接和灌浆的装配式建筑结构
CN104314005B (zh) 一种竖向多束预应力钢绞线的预埋定位施工方法
CN103737718B (zh) 预制钢筋混凝土空心柱模板及其制作方法
CN104929279A (zh) 预制剪力墙竖向钢筋集中约束搭接连接构造
CN202380401U (zh) 钢桁梁柔性拱正交异性桥面板板块的拼装胎架
CN204960309U (zh) 一种固定可调节现浇楼梯模板支设用垫块支撑***
CN205617419U (zh) 一种新型组合式加筋土挡墙结构
CN209114733U (zh) 一种便于对接和灌浆的装配式建筑结构
CN204626988U (zh) 一种混凝土振捣装置
CN208184230U (zh) 自稳型组合三角架单侧支模体系
CN204001741U (zh) 清水混凝土连墙柱模板
CN202510132U (zh) 高速铁路隧道仰拱模板
CN203383822U (zh) 防渗井壁
CN205742259U (zh) 一种长距离地下通道侧墙装配式模板
CN105298118B (zh) 一种现浇混凝土楼梯踏步的模板
CN104453271B (zh) 悬挑板结构弯曲型裂缝的加固方法
CN106522483A (zh) 一种控制小坡度斜屋面平整度的支托工具
CN204738430U (zh) 混凝土预制板地梁胎膜支撑及定位工具

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Li Dingyou

Inventor after: Ding Dezhi

Inventor after: Fang Zijian

Inventor after: Huang Wenguo

Inventor after: Huang Zongguang

Inventor after: Zhou Haifeng

Inventor after: Li Hui

Inventor after: Yang Weishuang

Inventor before: Ding Dezhi

Inventor before: The inventor has waived the right to be mentioned

Inventor before: Li Dingyou

Inventor before: Zhou Haifeng

Inventor before: Yang Weishuang

COR Change of bibliographic data
C14 Grant of patent or utility model
GR01 Patent grant