CN104313955B - One has tiny fragments of stone, coal, etc. railway roadbed dehumidification and temperature adjustment equipment - Google Patents

One has tiny fragments of stone, coal, etc. railway roadbed dehumidification and temperature adjustment equipment Download PDF

Info

Publication number
CN104313955B
CN104313955B CN201410506719.2A CN201410506719A CN104313955B CN 104313955 B CN104313955 B CN 104313955B CN 201410506719 A CN201410506719 A CN 201410506719A CN 104313955 B CN104313955 B CN 104313955B
Authority
CN
China
Prior art keywords
sealing plate
track
sleeper
dolly
telescoping cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410506719.2A
Other languages
Chinese (zh)
Other versions
CN104313955A (en
Inventor
刘峰
王海荣
王伟
谢蛟
刘海东
程红威
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Railway Engineering Research Institute of CARS
Xuzhou XCMG Railway Equipment Co Ltd
Original Assignee
Railway Engineering Research Institute of CARS
Xuzhou XCMG Railway Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Railway Engineering Research Institute of CARS, Xuzhou XCMG Railway Equipment Co Ltd filed Critical Railway Engineering Research Institute of CARS
Priority to CN201410506719.2A priority Critical patent/CN104313955B/en
Publication of CN104313955A publication Critical patent/CN104313955A/en
Application granted granted Critical
Publication of CN104313955B publication Critical patent/CN104313955B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B27/00Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers
    • E01B27/12Packing sleepers, with or without concurrent work on the track; Compacting track-carrying ballast
    • E01B27/20Compacting the material of the track-carrying ballastway, e.g. by vibrating the track, by surface vibrators

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Machines For Laying And Maintaining Railways (AREA)

Abstract

The invention discloses one and have tiny fragments of stone, coal, etc. railway roadbed dehumidification and temperature adjustment equipment, be all connected with PLC control system including heater, chiller and PLC control system, heater and chiller;Heater includes that oven heat (1), heating air pump (2) and heating dolly (5), heating air pump (2) one end connect oven heat (1), and the other end connects the hot air interface (4) that heating dolly (5) top is arranged;Chiller includes cooling down air pump (6) and cooling dolly (9), cooling air pump is connected with the cold wind interface (8) being arranged on cooling car top, originally there is tiny fragments of stone, coal, etc. railway roadbed dehumidification and temperature adjustment equipment, by heating system, cooling system and the cooperating of PLC control system, the sealing device utilizing heating dolly and cooling dolly realizes the two-stage to railway roadbed and seals, realize the heating and dehumidification to railway roadbed and cool, meeting humidity, the requirement of temperature to railway ballast in solidification work progress.

Description

One has tiny fragments of stone, coal, etc. railway roadbed dehumidification and temperature adjustment equipment
Technical field
The present invention relates to a kind of dehumidification and temperature adjustment equipment, specifically one and have tiny fragments of stone, coal, etc. railway roadbed dehumidification and temperature adjustment equipment, belong to railway and set Standby technical field.
Background technology
Railway ballast typically refers to the railway ballast layer laid below sleeper, above roadbed, and it is the basis of track-frame, mainly Effect is supporting sleeper, and the vehicular load that rail and sleeper are transmitted is evenly distributed to subgrade bed surface, reduces subgrade deformation, Ensure traffic safety.Having tiny fragments of stone, coal, etc. railway ballast versatility good, range is extensive.
Railway ballast curing technology is for having tiny fragments of stone, coal, etc. railway construction, either in construction cost control or actual answering All have great advantage with the effect aspect conventional art of comparing over, for guaranteeing construction quality, wet to railway ballast in work progress Degree, temperature requirement are more strict, and wanting to reach construction requirement have to carry out pretreatment to railway roadbed.
The most common polyurethane foam auxiliary device, including dehydrating unit and register, this equipment is by railway roadbed Carry out the dehumidification and temperature adjustment effect that wind injection can reach certain, but owing to there is no special sealing system to ensure the reality that wind is injected Utilization rate, therefore existing equipment exists that efficiency is low, consume energy big defect, it is impossible to preferably meets railway roadbed and solidifies humidity and temperature Requirement.
Summary of the invention
It is an object of the invention to provide one and have tiny fragments of stone, coal, etc. railway roadbed dehumidification and temperature adjustment equipment, it is possible to efficiently to there being tiny fragments of stone, coal, etc. railway roadbed to remove Wet, homoiothermic, reaches the construction requirement having tiny fragments of stone, coal, etc. railway roadbed curing technology.
For reaching above-mentioned purpose, originally there is tiny fragments of stone, coal, etc. railway roadbed dehumidification and temperature adjustment equipment, control including heater, chiller and PLC System, heater and chiller are all connected with PLC control system;
Described heater includes oven heat, heating air pump and heating dolly, and described heating air pump one end connects heat Baking oven, the other end connects the hot air interface that heating car top is arranged;
Described chiller includes cooling down air pump and cooling dolly, and described cooling air pump cools down little roof with being arranged on The cold wind interface in portion connects;
Described heating dolly is consistent with cooling dolly on structure composition, all includes frame system and frame and seal assembly System;
Described frame system and frame includes lead, telescoping cylinderAnd vehicle frame, leadAnd telescoping cylinderIt is installed in vehicle frame On;
Described seal assembly system includes sleeper sealing device, track seal device and railway ballast sealing device, these three Divide and connected by a main framing, by upper sealing plate and telescoping cylinderConnect, telescoping cylinderWith leadConnect;
Described sleeper sealing device include sleeper seal cotton, sleeper sealing plate, lead, upper sealing plate and telescoping cylinder , sleeper seal cotton be arranged on sleeper sealing plate lower end, and can fit with the side of tie, sleeper sealing plate upper end is provided with guiding Groove, lower end is provided with gathering sill, gathering sill, described gathering sill, gathering sillBetween gap and track in structure Adapt with in size;Telescoping cylinderOne end connects seal assembly main framing, and the other end connects sleeper sealing plate, drives sleeper close Shrouding is along the lead being fixed on upper sealing plateMove forward and backward, telescoping cylinderDrive sleeper sealing plate along leadUpper bottom Move;
Described track seal device is divided into symmetrical two parts, gathering sill with track for axleFor both sides common component, Left part includes telescoping cylinder, track seal cotton, gathering sillWith track sealing plate, described track sealing platePass through Gathering sillAnd gathering sillConnect with sleeper sealing plate;Track seals cottonIt is fixed on track sealing plateOn, its shape and size Match with on the left of track;Telescoping cylinderBack cylinder cover end connects with sleeper sealing plate, front end housing end and track sealing plateConnect; Right part includes telescoping cylinder, track seal cotton, gathering sillWith track sealing plate, the connection of its same parts is closed It is same left part, simply telescoping cylinderThe direction of motion and telescoping cylinderOn the contrary, track seals cottonShape and size with Match on the right side of track;
Described railway ballast sealing device includes that railway ballast sealing plate support, balancing weight and railway ballast seal cotton, and described railway ballast is close Shrouding support is the ingredient of main framing, and it is evenly distributed in the upper surface balancing weight, and lower surface laminating railway ballast seals cotton.
Preferably, oven heat uses liquefied gas burning to provide heat, and is provided with temperature sensor realization to combustion switch Control.
Further, sleeper sealing plate seals the cotton edge having face to contact with tie by track and is equipped with sealing strip.
Further, it is provided with warm-air pipe between heating air pump and hot air interface.
Further, it is provided with cool air hose between cooling air pump and cold wind interface.
Preferably, telescoping cylinder is cylinder.
Further, the road wheel of heating dolly and cooling dolly is provided with brake positioning device.
Originally there is tiny fragments of stone, coal, etc. railway roadbed dehumidification and temperature adjustment equipment, by heating system, cooling system and the cooperating of PLC control system, Heating dolly and the cooling tie sealing device of dolly, track seal device and railway ballast sealing device three part are by a main framing Connecting, form two-stage and seal, stepped in planform, wherein, railway ballast sealing device is to seal at low ladder, and track is close Seal apparatus is placed in inside tie sealing device, for sealing at high ladder, it is achieved to the heating and dehumidification of railway roadbed with cool, and meets Humidity, the requirement of temperature to railway ballast in curing technology work progress;PLC is used to control the work of whole sealing system, from Dynamicization degree is high, it is ensured that the accuracy of equipment operation and reliability.
Accompanying drawing explanation
Fig. 1 is the system synthesis figure of this invention;
Fig. 2 is the assembly figure of cart system;
Fig. 3 is that the A-A of Fig. 2 is to sectional view;
Fig. 4 is sleeper sealing device structure figure;
Fig. 5 is track seal device structure chart;
Fig. 6 is track seal device structure chart when being in sealing state;
Fig. 7 is the left view enlarged drawing of Fig. 5;
Fig. 8 is railway ballast sealing device structure figure.
In figure: 1, oven heat, 2, heating air pump, 3, warm-air pipe, 4, hot air interface, 5, heating dolly, 6, cooling air pump, 7, Cool air hose, 8, cold wind interface, 9, cooling dolly, 10, sleeper sealing device, 11, lead, 12, telescoping cylinder, 13, vehicle frame, 14, track seal device, 15, railway ballast sealing device, 16, sleeper seal cotton, 17, sleeper sealing plate, 18, lead, 19, on Shrouding, 20, sleeper, 21, telescoping cylinder, 22, telescoping cylinder, 23, track seal cotton, 24, track, 25, gathering sill, 26, stretch Contracting cylinder, 27, gathering sill, 28, track sealing plate, 29, track seal cotton, 30, gathering sill, 31, track sealing plate , 32, railway ballast sealing plate support, 33, balancing weight, 34, railway ballast seal cotton.
Detailed description of the invention
The present invention is further described below in conjunction with the accompanying drawings.
As it is shown in figure 1, originally there is tiny fragments of stone, coal, etc. railway roadbed dehumidification and temperature adjustment equipment, including heater, chiller and PLC control system, Heater and chiller are all connected with PLC control system;
Described heater includes oven heat 1, heating air pump 2 and heating dolly 5, and described heating air pump 2 one end is even Connecing oven heat 1, the other end connects the hot air interface 4 that heating dolly 5 top is arranged;
Described chiller includes cooling down air pump 6 and cooling dolly 9, and described cooling air pump 6 is with to be arranged on cooling little The cold wind interface 8 at car 9 top connects;
It is different as differentiation that described heating dolly 5 simply connects wind regime with cooling dolly 9, and the two is on structure forms Consistent, all include frame system and frame and seal assembly system;
As in figure 2 it is shown, described frame system and frame includes lead11, telescoping cylinder12 and vehicle frame 13, lead11 and stretch Contracting cylinder12 are installed on vehicle frame 13;
As it is shown on figure 3, described seal assembly system is by upper sealing plate 19 and telescoping cylinder12 connect, telescoping cylinder12 with lead Xiang Zhu11 connect;
Described seal assembly system includes sleeper sealing device 10, track seal device 14 and railway ballast sealing device 15, This three part is connected by a main framing, forms two-stage and seals, and stepped in planform, railway ballast sealing device 15 is low Sealing at ladder, it is internal that track seal device 14 is placed in tie sealing device 10, for sealing at high ladder;
As shown in Figures 2 to 4, described sleeper sealing device 10 includes that sleeper seals cotton 16, sleeper sealing plate 17, guides Post18, upper sealing plate 19 and telescoping cylinder21, sleeper seals cotton 16 lower ends being arranged on sleeper sealing plate 17, and can be with tie 20 Side laminating, sleeper sealing plate 17 upper end is provided with gathering sill25, lower end is provided with gathering sill27, gathering sill30, described Gathering sill27, gathering sillGap between 30 adapts in structure and size with track 24;Telescoping cylinder21 one end Connecting seal assembly main framing, the other end connects sleeper sealing plate 17, drives sleeper sealing plate 17 along being fixed on upper sealing plate 19 Lead18 move forward and backward, telescoping cylinder12 drive sleeper sealing plate 17 along lead11 upper and lower displacements;
As shown in Fig. 2, Fig. 5, Fig. 6 and Fig. 7, described track seal device 14 is divided into symmetrical two with track 24 for axle Part, gathering sill25 is both sides common component, and left part includes telescoping cylinder22, track seals cotton23, gathering sill27 With track sealing plate28, described track sealing plate28 pass through gathering sill25 and gathering sill27 with sleeper sealing plate 17 even Connect;Track seals cotton23 are fixed on track sealing plateOn 28, its shape and size match on the left of track 24;Telescoping cylinder 22 back cylinder cover ends are connected with sleeper sealing plate 17, front end housing end and track sealing plate28 connect;Right part includes telescoping cylinder 26, track seals cotton29, gathering sill30 and track sealing plate31, the same left part of annexation of its same parts, Simply telescoping cylinderThe direction of motion of 26 and telescoping cylinder22 is contrary, and track seals cottonThe shape and size of 29 are right with track 24 Match in side;
As shown in Figure 8, described railway ballast sealing device 15 includes that railway ballast sealing plate support 32, balancing weight 33 and railway ballast seal Cotton 34, described railway ballast sealing plate support 32 is the ingredient of main framing, and it is evenly distributed in the upper surface balancing weight 33, and lower surface is fitted One layer of railway ballast seals cotton 34.
Preferably, oven heat 1 uses liquefied gas burning to provide heat, and is provided with temperature sensor realization to combustion switch Controlling, the use of temperature sensor can preferably ensure that the gas in oven heat 1 meets the requirement of preset temperature.
Further, sleeper sealing plate 17 seals cotton 16 edges having face to contact with tie 20 by sleeper and is equipped with sealing Bar, forms dual-seal together with sleeper sealing plate 17, further increases sealing effectiveness.
Further, between heating air pump 2 and hot air interface 4, it is provided with warm-air pipe 3, is connected by the transition of warm-air pipe 3, just In at hot blast pump 2 invariant position, heating dolly 5 can realize operation in relatively large-scale region, can reduce work Industry amount.
Further, between cooling air pump 6 and cold wind interface 8, it is provided with cool air hose 7, is connected by the transition of cool air hose 7, just In when cooling down air pump 6 invariant position, cooling dolly 9 can realize operation in relatively large-scale region, can reduce Workload.
Preferably, telescoping cylinder is cylinder, by cylinder control sealing device compared with oil cylinder control, and light and flexible, no Construction quality can be affected because railway roadbed is polluted by hydraulic fluid leak.
Further, the road wheel of heating dolly 5 and cooling dolly 9 is provided with brake positioning device, it is possible to more accurately Parking in seal point, brake control to use manually with the automatically controlled mode combined, convenient operate.
During work, heating dolly 5 is moved to region to be heated, skidding, presses PLC control knob, start heating System works, the now telescoping cylinder on vehicle frame 1312 move downward, and drive seal assembly system to pass through telescoping cylinder12 along guiding Post11 move downward, and when railway ballast sealing device 15 falls, railway ballast seals cotton 34 in the action of gravity Xia Yuzha road of balancing weight 33 Laminating, completes railway ballast and seals, it is achieved primary seal;
While railway ballast has sealed, sleeper sealing device 10 in the vertical direction has also reached its predeterminated position, i.e. Sleeper seals the horizontal plane at cotton 16 places and is less than plane on sleeper 20, now starts telescoping cylinder21 drive sleeper sealing plate 17 even Band sleeper seals cotton 16 at leadMove towards sleeper 20 in the horizontal direction on 18, when sleeper seals cotton 16 and sleeper 20 During laminating, telescoping cylinder21 stop motions, complete sleeper and seal;
While sleeper has sealed, track seal device 14 in the vertical direction has also reached its predeterminated position, i.e. Track seals cotton23 and track seal cottonThe horizontal plane at 29 places intersects with track 24;Now start the telescoping cylinder in left side 22 drive track sealing plate28 related tracks seal cotton23 along gathering sill25 and gathering sill27 in the horizontal direction towards track 24 motions;Also start the telescoping cylinder on right side simultaneously26 drive track sealing plate31 related tracks seal cotton29 along guiding Groove25 and gathering sill30 move towards track 24 in the horizontal direction, when track seals cotton23 and track seal cotton29 points When other and track 24 left and right sides are fitted, telescoping cylinder22 and telescoping cylinder26 stop motions, complete track and seal, real Existing secondary seal;
After above sealing system completes, oven heat 1 is added hot-air by liquefied gas burning infrared mode, heats air pump 2 thermal currents being up to preset temperature are delivered to heat dolly 5 by hot air interface 4, and the gas of heating is close heating dolly 5 In envelope system, railway roadbed is carried out heating and dehumidification, after reaching temperature and humidity and requiring, be again started up PLC control system, first Releasing track seals, and i.e. starts telescoping cylinder22 and telescoping cylinder26 bring up track sealing plate at horizontal reverse28 and track Sealing plate31 leave track;Secondly release sleeper to seal, i.e. start telescoping cylinder21 drive sleeper sealing plate in the horizontal direction 17 leave sleeper 20;Then telescoping cylinder is started12 lift-off seal assembly system main framings, drive railway ballast sealing plate support 32 and The railway ballast of lower surface seals cotton 34 and leaves Zha Dao, finally discharges brake, heating dolly 5 is moved to next station;
Finally cooling dolly 9 is moved to the heating region at former heating dolly 5 place, according to the control of above-mentioned heating dolly 5 After flow process completes the seal operation to railway roadbed, start cooling air pump 6, in cooling dolly 9, inject cold airflow by cool air hose 7, Stopping note wind after railway ballast temperature reaches design temperature, also according to the operating process depressurization to heating dolly 5, release is stopped Car, moves to next station by cooling dolly 9.
It is more than one and complete has tiny fragments of stone, coal, etc. railway roadbed dehumidification and temperature adjustment equipment workflow.

Claims (7)

1. have a tiny fragments of stone, coal, etc. railway roadbed dehumidification and temperature adjustment equipment, including heater, chiller and PLC control system, heater and Chiller is all connected with PLC control system;
Described heater includes oven heat (1), heating air pump (2) and heating dolly (5), described heating air pump (2) End connects oven heat (1), and the other end connects the hot air interface (4) that heating dolly (5) top is arranged;
Described chiller include cool down air pump (6) and cool down dolly (9), described cooling air pump (6) be arranged on cooling The cold wind interface (8) at dolly (9) top connects;
It is characterized in that, described heating dolly (5) is consistent with cooling dolly (9) on structure composition, all includes vehicle frame System and seal assembly system;
Described frame system and frame includes lead(11), telescoping cylinderAnd vehicle frame (13), lead (12)And telescoping cylinder (11) (12) it is installed on vehicle frame (13);
Described seal assembly system includes sleeper sealing device (10), track seal device (14) and railway ballast sealing device (15), this three part is connected by a main framing, by upper sealing plate (19) and telescoping cylinder(12) connect, telescoping cylinder(12) with lead Xiang Zhu(11) connect;
Described sleeper sealing device (10) includes that sleeper seals cotton (16), sleeper sealing plate (17), lead(18), upper envelope Plate (19) and telescoping cylinder(21), sleeper seals cotton (16) and is arranged on the lower end of sleeper sealing plate (17), and with tie (20) Fitting in side, sleeper sealing plate (17) upper end is provided with gathering sill(25), lower end is provided with gathering sill(27), gathering sill (30), described gathering sill(27), gathering sill(30) gap between is fitted in structure and size mutually with track (24) Should;Telescoping cylinder(21) one end connects seal assembly main framing, and the other end connects sleeper sealing plate (17), drives sleeper sealing plate (17) along being fixed on the lead on upper sealing plate (19)(18) move forward and backward, telescoping cylinder(12) sleeper sealing plate (17) is driven Along lead(11) upper and lower displacement;
Described track seal device (14) is that axle is divided into symmetrical two parts, gathering sill with track (24)(25) it is both sides Common component, left part includes telescoping cylinder(22), track seals cotton(23), gathering sillAnd track sealing plate (27) (28), described track sealing plate(28) gathering sill is passed throughAnd gathering sill (25)(27) it is connected with sleeper sealing plate (17); Track seals cotton(23) track sealing plate it is fixed on(28), on, its shape and size match with track (24) left side;Flexible Cylinder(22) back cylinder cover end is connected with sleeper sealing plate (17), front end housing end and track sealing plate(28) connect;Right part Including telescoping cylinder(26), track seals cotton(29), gathering sillAnd track sealing plate (30)(31), its same parts The same left part of annexation, simply telescoping cylinder(26) the direction of motion and telescoping cylinder(22) contrary, track seals cotton (29) shape and size match with track (24) right side;
Described railway ballast sealing device (15) includes that railway ballast sealing plate support (32), balancing weight (33) and railway ballast seal cotton (34), Described railway ballast sealing plate support (32) is the ingredient of main framing, and it is evenly distributed in the upper surface balancing weight (33), and lower surface is fitted Railway ballast seals cotton (34).
The most according to claim 1 have tiny fragments of stone, coal, etc. railway roadbed dehumidification and temperature adjustment equipment, it is characterised in that described oven heat (1) uses Liquefied gas burning provides heat, and is provided with the temperature sensor realization control to combustion switch.
The most according to claim 1 and 2 have tiny fragments of stone, coal, etc. railway roadbed dehumidification and temperature adjustment equipment, it is characterised in that described sleeper sealing plate (17) edge having face to contact with tie (20) by sleeper sealing cotton (16) is equipped with sealing strip.
The most according to claim 1 and 2 have tiny fragments of stone, coal, etc. railway roadbed dehumidification and temperature adjustment equipment, it is characterised in that described heating air pump (2) And between hot air interface (4), it is provided with warm-air pipe (3).
The most according to claim 1 and 2 have tiny fragments of stone, coal, etc. railway roadbed dehumidification and temperature adjustment equipment, it is characterised in that described cooling air pump (6) And between cold wind interface (8), it is provided with cool air hose (7).
The most according to claim 1 and 2 have tiny fragments of stone, coal, etc. railway roadbed dehumidification and temperature adjustment equipment, it is characterised in that described telescoping cylinder is Cylinder.
The most according to claim 1 and 2 have tiny fragments of stone, coal, etc. railway roadbed dehumidification and temperature adjustment equipment, it is characterised in that described heating dolly (5) It is provided with brake positioning device with the road wheel of cooling dolly (9).
CN201410506719.2A 2014-09-28 2014-09-28 One has tiny fragments of stone, coal, etc. railway roadbed dehumidification and temperature adjustment equipment Active CN104313955B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410506719.2A CN104313955B (en) 2014-09-28 2014-09-28 One has tiny fragments of stone, coal, etc. railway roadbed dehumidification and temperature adjustment equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410506719.2A CN104313955B (en) 2014-09-28 2014-09-28 One has tiny fragments of stone, coal, etc. railway roadbed dehumidification and temperature adjustment equipment

Publications (2)

Publication Number Publication Date
CN104313955A CN104313955A (en) 2015-01-28
CN104313955B true CN104313955B (en) 2016-08-31

Family

ID=52369255

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410506719.2A Active CN104313955B (en) 2014-09-28 2014-09-28 One has tiny fragments of stone, coal, etc. railway roadbed dehumidification and temperature adjustment equipment

Country Status (1)

Country Link
CN (1) CN104313955B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109680570B (en) * 2019-01-20 2024-04-16 江苏奥新科技有限公司 Integrated intelligent track dust removal dehumidification heating car

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2240572A (en) * 1990-02-06 1991-08-07 Plasser Bahnbaumasch Franz A continuously advancing track maintenance machine for consolidating ballast bed of a railway track
CN101370983A (en) * 2006-01-20 2009-02-18 拜尔材料科学股份公司 Ballast roadbed and method for manufacturing ballast roadbed
CN101878339A (en) * 2007-11-27 2010-11-03 亨内克股份有限公司 The method and the device that is used to carry out the method that are used for the compacting railway roadbed
CN202000225U (en) * 2011-03-30 2011-10-05 中铁一局集团有限公司 Sleeper electrical-heating steam curing system
CN202106502U (en) * 2011-05-31 2012-01-11 上海齐敬机械有限公司 Polyurethane foam auxiliary device
CN204112175U (en) * 2014-09-28 2015-01-21 徐州徐工铁路装备有限公司 There is tiny fragments of stone, coal, etc. railway roadbed dehumidification and temperature adjustment equipment

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2240572A (en) * 1990-02-06 1991-08-07 Plasser Bahnbaumasch Franz A continuously advancing track maintenance machine for consolidating ballast bed of a railway track
CN101370983A (en) * 2006-01-20 2009-02-18 拜尔材料科学股份公司 Ballast roadbed and method for manufacturing ballast roadbed
CN101878339A (en) * 2007-11-27 2010-11-03 亨内克股份有限公司 The method and the device that is used to carry out the method that are used for the compacting railway roadbed
CN202000225U (en) * 2011-03-30 2011-10-05 中铁一局集团有限公司 Sleeper electrical-heating steam curing system
CN202106502U (en) * 2011-05-31 2012-01-11 上海齐敬机械有限公司 Polyurethane foam auxiliary device
CN204112175U (en) * 2014-09-28 2015-01-21 徐州徐工铁路装备有限公司 There is tiny fragments of stone, coal, etc. railway roadbed dehumidification and temperature adjustment equipment

Also Published As

Publication number Publication date
CN104313955A (en) 2015-01-28

Similar Documents

Publication Publication Date Title
KR101227439B1 (en) Loading sprinkler system of electromotive car
CN103935285B (en) A kind of two way rail dual-purpose multifunctional emergency rescue fire vehicle
JP5819405B2 (en) Adjusting device and adjusting method for drying and temperature control of ballast roadbed
CN205343779U (en) Take bright trim installation device of car of buckle
JP2013527346A5 (en)
CN204112175U (en) There is tiny fragments of stone, coal, etc. railway roadbed dehumidification and temperature adjustment equipment
CN101851881B (en) Freeze and shock proof turnout
CN104313955B (en) One has tiny fragments of stone, coal, etc. railway roadbed dehumidification and temperature adjustment equipment
CN103434514A (en) Sand spraying system of 100% low floor light rail vehicle
CN104677102B (en) The curing of a kind of artificial quartz stone plate and device
CN205851296U (en) A kind of isolated infra-red radiation tunnel curing oven device
CN203247466U (en) Device for conducting drying and temperature control on railway ballast
US3566796A (en) Rail temperature regulating apparatus
CN112274330A (en) Traffic accident emergency safety equipment in tunnel
CN106626178A (en) Edge-sealing post-treatment device for arc-shaped workpiece, and sealing device and method for arc-shaped workpiece
CN212006615U (en) Railway ballast bed drying equipment
CN104238504B (en) Curing process device control system of polyurethane foam curing track bed
EP3382097B1 (en) Removable insulating device for grooved rails of urban railway tracks
CN214333370U (en) Electric heating trolley furnace with multilayer high-temperature-resistant protection
CN205701325U (en) A kind of panel daub device of rock wool heat-preservation composite plate
CN212073838U (en) Movable hot water source
CN208278055U (en) A kind of device substituting electric locomotive sander
CN202052750U (en) Smoke dust collecting device
CN208040259U (en) A kind of railway transportation safety door/screen door drive system automatic heating device
CN102865743B (en) Sealing device and method used between ignition furnace in sintering device and trolley

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant