CN104294845A - City comprehensive pipe gallery - Google Patents

City comprehensive pipe gallery Download PDF

Info

Publication number
CN104294845A
CN104294845A CN201410594046.0A CN201410594046A CN104294845A CN 104294845 A CN104294845 A CN 104294845A CN 201410594046 A CN201410594046 A CN 201410594046A CN 104294845 A CN104294845 A CN 104294845A
Authority
CN
China
Prior art keywords
gallery
central dividing
dividing plate
main body
trench portion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410594046.0A
Other languages
Chinese (zh)
Other versions
CN104294845B (en
Inventor
沈晓铃
王泽阳
朱沙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201410594046.0A priority Critical patent/CN104294845B/en
Publication of CN104294845A publication Critical patent/CN104294845A/en
Application granted granted Critical
Publication of CN104294845B publication Critical patent/CN104294845B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F3/00Sewer pipe-line systems
    • E03F3/04Pipes or fittings specially adapted to sewers
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • E02D2200/16Shapes
    • E02D2200/1607Shapes round, e.g. circle
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • E02D2200/16Shapes
    • E02D2200/1628Shapes rectangular

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Civil Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Health & Medical Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Sewage (AREA)

Abstract

The invention relates to a city comprehensive pipe gallery, and belongs to the technical field of public facilities. The city comprehensive pipe gallery comprises a gallery body. At least one middle separating plate is arranged inside the gallery body, the middle separating plate divides the gallery body into a pipe ditch portion and a drainage channel, the pipe ditch portion is used for containing municipal pipelines, a pipeline covering plate and a drainage covering plate are arranged at the upper portion of the pipe ditch portion and the upper portion of the drainage channel respectively, a plurality of drain holes are formed in the drainage covering plate, the lower portion of the middle separating plate is connected with the bottom surface of the gallery body through an overturning pin shaft, and a plurality of supports used for supporting the pipelines are arranged in the pipe ditch portion. The city comprehensive pipe gallery is simple in structure, is compact in design, can reduce the needed width of a road and needed space, and reduces the size and investment.

Description

A kind of city integrated piping lane
Technical field
The present invention relates in a kind of urban construction the city integrated piping lane used, belong to urban operating mechanism technical field.
Background technology
City integrated piping lane, also referred to as common trench, integrated pipe canal, namely under town road, a underground gallery is built, by included in the lump for the various municipal pipelines such as electric power, communication, heating power and plumbing, and the facilities such as special access hole, dog-house are set, unified implementation management, saves pipeline self independently structure and soil excavation, can the utilizing space resources of active set reduction.But, needing based on management maintenance and maintenance, generally needing to arrange the passage for overhauling wherein, according to code requirement, its channel width should not be less than 0.7 ~ 1.0 meter, and this just causes, and the pipe gallery civil engineering scale of construction is comparatively large, cost is high, which also limits applying of pipe gallery.And in order to collect rainwater on road surface, need to arrange the facilities that catchment such as rainwater gutter or double-edged fine-toothed comb, independently arranging outward at pipe gallery, like this with regard to requiring that town road needs enough width to lay these pipelines and facility, and hence, limit the use of pipe gallery in the region of width of roadway deficiency.
Summary of the invention
The object of the invention is to solve in prior art the city piping lane civil engineering scale of construction comparatively large, the shortcoming that cost is higher, providing that a kind of scale of construction is little, city integrated piping lane that reduced investment, little, the easy access of taking up room are safeguarded.
The present invention adopts following technical scheme: a kind of city integrated piping lane, comprise gallery main body, described gallery body interior is provided with central dividing plate, gallery main body is divided into pipe trench portion for placing municipal pipeline and drainage channel by described central dividing plate, the top of described pipe trench portion and drainage channel arranges and has been respectively arranged with pipeline cover plate and water drainage cover board, cover plate above described drainage channel is provided with some spilled water holes, and the below of described central dividing plate is connected with the bottom surface of gallery main body by upset bearing pin.
Further, described gallery main body is any one in rectangle, circle or u-shaped cross-section.
Further, described gallery main body is any one in reinforced concrete structure, high density polyethylene (HDPE) or resin concrete.
Further, the quantity of described central dividing plate is 1 or 2.
Further, some supports for supporting pipeline are provided with in described pipe trench portion.
Structure of the present invention is simple, compact to design, utilize the drainage channel of band spilled water hole to solve existing pipe gallery and cannot collect ground rainwater, need the problem that rainwater collection collector is independently set at pipe gallery outward, greatly reduce width of roadway and the space of pipe gallery needs; And by turnover central dividing plate, access path is utilized as drainage channel, reduces pipe gallery size and capital investment.
Accompanying drawing explanation
Fig. 1 crosses water state sectional schematic diagram containing during 1 central dividing plate in the present invention.
Fig. 2 is containing inspecting state sectional schematic diagram during 1 central dividing plate in the present invention.
Fig. 3 crosses water state sectional schematic diagram containing during 2 central dividing plates in the present invention.
Fig. 4 is containing inspecting state sectional schematic diagram during 2 central dividing plates in the present invention.
Reference numeral: gallery main body 1, central dividing plate 2, first central dividing plate 2-1, the second central dividing plate 2-2, pipeline cover plate 3, first pipeline cover plate 3-1, second pipe cover plate 3-2, water drainage cover board 4, pipe trench portion 5, first pipe trench portion 5-1, the second pipe trench portion 5-2, drainage channel 6, upset bearing pin 7, first overturn bearing pin 7-1, the second upset bearing pin 7-2, support 8, first support 8-1, the second support 8-2, spilled water hole 9.
 
Detailed description of the invention
Below in conjunction with accompanying drawing, the invention will be further described.
Design principle of the present invention is: adopt central dividing plate that gallery body portion is divided into pipe trench portion and drainage channel, requires can insert the various municipal pipelines such as electric power, communication, feedwater, regenerated water, the upper cover plate capping of pipe trench portion in pipe trench portion according to comb; Drainage channel upper cover plate arranges spilled water hole, and when raining, rainwater enters drainage channel through spilled water hole and gets rid of fast, and drainage channel isolate by central dividing plate and pipe trench portion, prevents the interference of rainwater accessible pipe duct portion or pollution pipe trench all the other municipal pipelines interior in drainage channel; When needs overhaul, open cover plate, upset central dividing plate, can utilize drainage channel as space for maintenance to municipal pipeline repair and maintenance in pipe trench portion, and maintenance terminates, and is resetted by central dividing plate, and isolation pipe trench portion and drainage channel recover using function.
As Figure 1-Figure 2, a kind of city integrated piping lane, is provided with 1 central dividing plate for two cabin structure, is made up of gallery main body 1, central dividing plate 2, pipeline cover plate 3 and water drainage cover board 4 in this gallery main body 1.Gallery main body 1 is divided into for pipe trench portion 5 and drainage channel 6 two parts by central dividing plate 2, the bottom of central dividing plate 2 is linked with the bottom surface of gallery main body 1 by upset bearing pin 7, the sidewall in pipe trench portion 5 is provided with some supports 8 for laying all kinds of municipal pipeline, pipeline cover plate 3 is provided with above pipe trench portion, the top of drainage channel 6 is provided with water drainage cover board 4, water drainage cover board 4 is provided with some spilled water holes 9.
When rainy, rainwater enters drainage channel 6 through spilled water hole 9 and gets rid of fast, and drainage channel 6 is isolated with pipe trench portion 5 by central dividing plate 2, prevents rainwater accessible pipe duct portion 5 in drainage channel 6, interference or pollute all the other municipal pipelines in pipe trench portion 5; When needing maintenance, opening conduits cover plate 3 and water drainage cover board 4, upset central dividing plate 2, can utilize drainage channel 6 as space for maintenance to the municipal pipeline repair and maintenance in pipe trench portion 5; Maintenance terminates, and reset central dividing plate 2 isolation pipe trench portion 5 and drainage channel 6, recovers using function.
As Figure 3-Figure 4, a kind of city integrated piping lane, this gallery main body 1 is three cabin structures containing 2 central dividing plates, comprises gallery main body 1, first central dividing plate 2-1, the second central dividing plate 2-2, the first pipeline cover plate 3-1, second pipe cover plate 3-2 and water drainage cover board 4 and forms.First central dividing plate 2-1 and the second central dividing plate 2-2 spaced set will be divided into the first pipe trench portion 5-1 and the second pipe trench portion 5-2 outside gallery main body 1, centre is drainage channel 6.First central dividing plate 2-1 and the second central dividing plate 2-2 is linked with the bottom surface of gallery main body 1 by the first upset bearing pin 7-1 and second upset bearing pin 7-2, the sidewall of the first pipe trench portion 5-1 and the second pipe trench portion 5-2 arranges the first support 8-1 be respectively arranged with for supporting pipeline and the second support 8-2, be provided with the first pipeline cover plate 3-1 above first pipe trench portion 5-1, the top of the second pipe trench portion 5-2 is provided with 3-2.Side is provided with water drainage cover board plate 4 to drainage channel 6, water drainage cover board 4 is arranged spilled water hole 9.
When raining, rainwater enters drainage channel 6 through spilled water hole 9 and gets rid of fast, drainage channel 6 is isolated by the first central dividing plate 2-1 and the second central dividing plate 2-2 and the first pipe trench portion 5-1 and the second pipe trench portion 5-2, prevent rainwater in drainage channel 6 from entering the first pipe trench portion 5-1 and the second pipe trench portion 5-2, disturb or pollute all the other municipal pipelines in pipe trench portion; When needing maintenance, open the first pipeline cover plate 3-1 or second pipe cover plate 3-2 and water drainage cover board 4, overturn the first central dividing plate 2-1 or the second central dividing plate 2-2, drainage channel 6 can be utilized as space for maintenance to municipal pipeline repair and maintenance in the first pipe trench portion 5-1 or the second pipe trench portion 5-2.Maintenance terminates, and the first central dividing plate 2-1 or the second central dividing plate 2-2 resets, and can isolate the first pipe trench portion 5-1 or the second pipe trench portion 5-2 and drainage channel 6, recovers using function.

Claims (5)

1. a city integrated piping lane, it is characterized in that: comprise gallery main body (1), described gallery main body (1) inside is provided with central dividing plate (2), gallery main body (1) is divided into pipe trench portion (5) for placing municipal pipeline and drainage channel (6) by described central dividing plate (2), the top of described pipe trench portion (5) and drainage channel (6) arranges and is respectively arranged with pipeline cover plate (3) and water drainage cover board (4), described water drainage cover board (4) is provided with some spilled water holes (9), the below of described central dividing plate (2) is connected with the bottom surface of gallery main body (1) by upset bearing pin (7).
2. city integrated piping lane as claimed in claim 1, is characterized in that: described gallery main body (1) is rectangle, any one in circle or u-shaped cross-section.
3. city integrated piping lane as claimed in claim 1, is characterized in that: described gallery main body (1) is reinforced concrete structure, any one in high density polyethylene (HDPE) or resin concrete.
4. city integrated piping lane as claimed in claim 1, is characterized in that: the quantity of described central dividing plate (2) is 1 or 2.
5. city integrated piping lane as claimed in claim 1, is characterized in that: be provided with some supports for supporting pipeline (8) in described pipe trench portion (5).
CN201410594046.0A 2014-10-29 2014-10-29 A kind of city integrated piping lane Active CN104294845B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410594046.0A CN104294845B (en) 2014-10-29 2014-10-29 A kind of city integrated piping lane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410594046.0A CN104294845B (en) 2014-10-29 2014-10-29 A kind of city integrated piping lane

Publications (2)

Publication Number Publication Date
CN104294845A true CN104294845A (en) 2015-01-21
CN104294845B CN104294845B (en) 2016-04-27

Family

ID=52314775

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410594046.0A Active CN104294845B (en) 2014-10-29 2014-10-29 A kind of city integrated piping lane

Country Status (1)

Country Link
CN (1) CN104294845B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105951876A (en) * 2016-05-04 2016-09-21 东北大学 Cover plate type precast concrete urban comprehensive pipe gallery and construction method thereof
CN105971018A (en) * 2016-07-19 2016-09-28 中冶京诚工程技术有限公司 Tubular cross section steel buckled plate city utility tunnel
CN106013235A (en) * 2016-07-19 2016-10-12 中冶京诚工程技术有限公司 City utility tunnel of arch cross section steel buckled plate
CN106128283A (en) * 2016-08-15 2016-11-16 江苏建筑职业技术学院 Underground piping vestibule tectonic model and manufacture method
CN108842818A (en) * 2018-07-27 2018-11-20 中铁第四勘察设计院集团有限公司 Integrated synthesis pipe trench and construction method based on energy storage type tramcar engineering
CN109339099A (en) * 2018-11-08 2019-02-15 北京场道市政工程集团有限公司 A kind of municipal works road pavement structure

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1982553A (en) * 2005-12-16 2007-06-20 周大林 Method for fastly collecting rain and leaking on ground
JP2010106596A (en) * 2008-10-31 2010-05-13 Kajima Corp Lifting pipe and method of constructing lifting pipe
CN202969415U (en) * 2012-09-29 2013-06-05 何江 Multifunctional assembled comprehensive pipe gallery
CN203393742U (en) * 2013-08-12 2014-01-15 上海市城市建设设计研究总院 Integrated pipe gallery structure
CN204238243U (en) * 2014-10-29 2015-04-01 沈晓铃 A kind of city integrated piping lane

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1982553A (en) * 2005-12-16 2007-06-20 周大林 Method for fastly collecting rain and leaking on ground
JP2010106596A (en) * 2008-10-31 2010-05-13 Kajima Corp Lifting pipe and method of constructing lifting pipe
CN202969415U (en) * 2012-09-29 2013-06-05 何江 Multifunctional assembled comprehensive pipe gallery
CN203393742U (en) * 2013-08-12 2014-01-15 上海市城市建设设计研究总院 Integrated pipe gallery structure
CN204238243U (en) * 2014-10-29 2015-04-01 沈晓铃 A kind of city integrated piping lane

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105951876A (en) * 2016-05-04 2016-09-21 东北大学 Cover plate type precast concrete urban comprehensive pipe gallery and construction method thereof
CN105971018A (en) * 2016-07-19 2016-09-28 中冶京诚工程技术有限公司 Tubular cross section steel buckled plate city utility tunnel
CN106013235A (en) * 2016-07-19 2016-10-12 中冶京诚工程技术有限公司 City utility tunnel of arch cross section steel buckled plate
CN106128283A (en) * 2016-08-15 2016-11-16 江苏建筑职业技术学院 Underground piping vestibule tectonic model and manufacture method
CN108842818A (en) * 2018-07-27 2018-11-20 中铁第四勘察设计院集团有限公司 Integrated synthesis pipe trench and construction method based on energy storage type tramcar engineering
CN109339099A (en) * 2018-11-08 2019-02-15 北京场道市政工程集团有限公司 A kind of municipal works road pavement structure
CN109339099B (en) * 2018-11-08 2023-09-22 北京场道市政工程集团有限公司 Municipal works road pavement structure

Also Published As

Publication number Publication date
CN104294845B (en) 2016-04-27

Similar Documents

Publication Publication Date Title
CN204238243U (en) A kind of city integrated piping lane
CN104294845B (en) A kind of city integrated piping lane
CN106638681B (en) A kind of pipe gallery
CN105089302A (en) Rainwater garden system for community rainwater flow diversion, peak clipping and ecological purification
CN204903531U (en) Open -air portable runoff district
CN203393742U (en) Integrated pipe gallery structure
CN102587486A (en) Hidden-buried sewage interception facility inside river bank
CN103397662A (en) Comprehensive pipe gallery structure
CN201459901U (en) Collinear bypass type double-layer drainage pipe duct
CN206135372U (en) Multifunctional cable ditch
CN204940015U (en) Draining of rail device and rail system
CN208472770U (en) A kind of underground pipe gallery structure suitable for mountain area riverfront landform
CN205242594U (en) Collect rain pretreatment of water and overflow in finished product inlet for stom water of an organic whole
CN109763552A (en) A kind of basis is dark to apply gravity type draining regeneration application system and its construction method
CN215055647U (en) Cover drainage system that covers on vehicle
CN104088491B (en) The vertical method for arranging of a kind of 220kV transformer station ramp type
CN205242593U (en) Collection oozes to stagnate and holds integral type finished product inlet for stom water of clean row of rainwater
CN202519780U (en) Embedded sewage intercepting facility inside river bank
CN202220345U (en) Drain pipe system below community driveway
CN204876039U (en) Ditch cover for town road
CN203066124U (en) Underground water level control system
CN113833016A (en) Comprehensive structure for preventing flood, draining waterlogging and laying underground pipeline
CN202139680U (en) Drainage ditch for ash storage yard of power plant
CN203049404U (en) Cooling pavement structure with water-accumulating box
CN207608914U (en) A kind of drainage system of household refuse landfill sites

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant